BA 452 Lesson B.3 Integer Programming 11
Readings
Readings
Chapter 7Integer Linear Programming
BA 452 Lesson B.3 Integer Programming 22
Overview
Overview
BA 452 Lesson B.3 Integer Programming 33
Overview
Rounding Off solutions in continuous variables to the nearest integer (like 2.67 rounded off to 3) is an unreliable way to solve a linear programming problem when decision variables should be integers.
Sensitivity Analysis with Integer Variables is more important than with continuous variables because a small change in a constraint coefficient can cause a relatively large change in the optimal solution.
Assignment Problems with Valuable Time minimize the total time of assigning workers to jobs. Minimizing total time is appropriate when each worker has the same value of time.
Assignment Problems with Supply and Demand are Transportation Problems of suppliers to demanders except that each demand is assigned to exactly one supplier.
BA 452 Lesson B.3 Integer Programming 44
Tool Summary Do not make integer restrictions, and maybe the variables at an
optimum will be integers.• First Example: Pi = (integer) number of producers in month i.
Use compound variables:• First Example: Pi = number of producers in month i
Use dynamic or recursive constraints:• First Example: Define the constraint that the number of
apprentices in a month must not exceed the number of recruits in the previous month: A2 - R1 < 0; A3 - R2 < 0
Constrain one variable to be a proportional to another variable:• First Example: Define the constraint that each trainer can train
two recruits: 2T1 - R1 > 0; 2T2 - R2 > 0 Use inventory variables:
• Second Example: P2 + I1–I2 = 150 (production-net inventory = demand)
Overview
BA 452 Lesson B.3 Integer Programming 55
Tool Summary Use binary variables to model fixed cost constraints.
• For example, consider a linear programming problem with a constraint• M1 < 15
• Introduce binary variable U1 and constraints:• M1 > 5 U1 • 15U1 > M1
• Then, U1 = 1 if M1 > 0, and either M1 = 0 or M1 > 5. Do not try to solve an integer linear program by rounding off (up or
down) a solution to the problem without integer constraints. Rather, graph all feasible integer solutions and use iso-value linear, or use the Management Scientist module.
Tool Summary
BA 452 Lesson B.3 Integer Programming 66
Rounding Off
Rounding Off
BA 452 Lesson B.3 Integer Programming 77
Overview
Rounding Off solutions in continuous variables to the nearest integer (like 2.67 rounded off to 3) is an unreliable way to solve a linear programming problem when decision variables should be integers.
Rounding Off
BA 452 Lesson B.3 Integer Programming 88
A LP in which all the variables are restricted to be integers is called an all-integer linear program (ILP).
The LP that results from dropping the integer requirements is called the LP Relaxation of the ILP.
If only a subset of the variables are restricted to be integers, the problem is called a mixed-integer linear program (MILP).
Binary variables are variables whose values are restricted to be 0 or 1. If all variables are restricted to be 0 or 1, the problem is called a 0-1 or binary integer linear program.
Rounding Off
BA 452 Lesson B.3 Integer Programming 99
Solve the following all-integer linear program, and compare that solution to the problem where the decision variables do not have to be integers:
Max 3x1 + 2x2
s.t. 3x1 + x2 < 9
x1 + 3x2 < 7
-x1 + x2 < 1
x1, x2 > 0 and integer
Rounding Off
BA 452 Lesson B.3 Integer Programming 1010
LP Relaxation. If we drop the integer constraints, we can graph the optimal solution to the linear program. And the optimal solution has fractional values: x1 = 2.5, x2 = 1.5, Max 3x1 + 2x2 = 10.5
Max 3x1 + 2x2
s.t. 3x1 + x2 < 9
x1 + 3x2 < 7
-x1 + x2 < 1
x1, x2 > 0 and integer
LP Optimal (2.5, 1.5)
Max 3x1 + 2x2
- x1 + x2 < 1
x2
x1
3x1 + x2 < 9
x1 + 3x2 < 7
1 2 3 4 5 6 7
1
3
2
5
4
Rounding Off
BA 452 Lesson B.3 Integer Programming 1111
Rounding Up. If we round up the fractional solution (x1 = 2.5, x2 = 1.5) to the previous relaxed LP problem, we get x1 = 3 and x2 = 2. But the graph shows those values are infeasible.
Max 3x1 + 2x2
s.t. 3x1 + x2 < 9
x1 + 3x2 < 7
-x1 + x2 < 1
x1, x2 > 0 and integer
ILP Infeasible (3, 2)
LP Optimal (2.5, 1.5)
Max 3x1 + 2x2
- x1 + x2 < 1
x2
x1
3x1 + x2 < 9
x1 + 3x2 < 7
1 2 3 4 5 6 7
1
3
2
5
4
Rounding Off
BA 452 Lesson B.3 Integer Programming 1212
Rounding Down. By rounding the non-integer solution down to x1 = 2, x2 = 1, we have a feasible solution, with objective function 3x1 + 2x2 = 8. But that solution is not optimal for the integer program.
Max 3x1 + 2x2
s.t. 3x1 + x2 < 9
x1 + 3x2 < 7
-x1 + x2 < 1
x1, x2 > 0 and integer
ILP Optimal (3, 0)
Max 3x1 + 2x2
- x1 + x2 < 1
x2
x1
3x1 + x2 < 9
x1 + 3x2 < 7
1 2 3 4 5 6 7
1
3
2
5
4
Optimal ILP solution. The optimal ILP solution (3,0) is not the closest feasible point to the non-integer solution (2.5,1.5).
Rounding Off
BA 452 Lesson B.3 Integer Programming 1313
x1 x2 3x1 + 2x2
1. 0 0 0 2. 1 0 3 3. 2 0 6 4. 3 0 9 optimal
solution 5. 0 1 2 6. 1 1 5 7. 2 1 8
8. 1 2 7
Max 3x1 + 2x2
s.t. 3x1 + x2 < 9
x1 + 3x2 < 7
-x1 + x2 < 1
x1, x2 > 0 and integer
Exhaustive Search. One way to solve the integer linear program is to evaluate the objective function at each feasible solution. There are 8 alternative feasible solutions in Example 1.
Rounding Off
BA 452 Lesson B.3 Integer Programming 1414
Max 3x1 + 2x2
s.t. 3x1 + x2 < 9
x1 + 3x2 < 7
-x1 + x2 < 1
x1, x2 > 0 and integer
Rounding Off
BA 452 Lesson B.3 Integer Programming 1515
Max 3x1 + 2x2
s.t. 3x1 + x2 < 9
x1 + 3x2 < 7
-x1 + x2 < 1
x1, x2 > 0 and integer
ILP Optimal (3, 0)
Rounding Off
BA 452 Lesson B.3 Integer Programming 1616
Sensitivity Analysis with Integer Variables
Sensitivity Analysis with Integer Variables
BA 452 Lesson B.3 Integer Programming 1717
Overview
Sensitivity Analysis with Integer Variables is more important than Sensitivity Analysis with Continuous Variables because a small change in a constraint coefficient can cause a relatively large change in the optimal solution, and in the objective-function value of the optimal solution.
Sensitivity Analysis with Integer Variables
BA 452 Lesson B.3 Integer Programming 1818
Sensitivity analysis often is more crucial for ILP problems than for LP problems.
A small change in a constraint coefficient can cause a relatively large change in the optimal solution, and the objective-function value of the optimal solution.
Recommendation: Resolve the ILP problem several times with slight variations in the coefficients before choosing the “best” solution for implementation.
Sensitivity Analysis with Integer Variables
BA 452 Lesson B.3 Integer Programming 1919
Sensitivity Analysis
Max 3x1 + 2x2 = 9 at old optimum (3,0)
x2
x11 2 3 4 5 6 7
1
3
2
5
4
Max 3x1 + 2x2 = 10 at new optimum (2,2)
A small change in the constraints (adding the red feasible area) can cause a jump in the objective function at the optimum, from 9 to 10.
BA 452 Lesson B.3 Integer Programming 2020
Assignment with Valuable Time
Assignment with Valuable Time
BA 452 Lesson B.3 Integer Programming 2121
Overview
Assignment Problems with Valuable Time minimize the total time of assigning workers to jobs. Minimizing total time is appropriate when each worker has the same value of time.
Assignment with Valuable Time
BA 452 Lesson B.3 Integer Programming 2222
Question: The NPD Group is a market research firm with three clients that each request the firm conduct a sample survey. Four statisticians can be assigned to these three projects; however, all four are busy, and therefore can handle only one client. The following are the number of hours required for each statistician to complete each job. The differences in time are based on experience and ability of the statisticians.
Assignment with Valuable Time
Client A Client B Client C
Statistician 1 150 210 270
Statistician 2 170 230 220
Statistician 3 180 230 225
Statistician 4 160 240 230
BA 452 Lesson B.3 Integer Programming 2323
What is the most natural objective function for the firm to optimize?
Formulate the firm’s optimization problem.
Are there any implicit assumptions in your formulation?
Assignment with Valuable Time
BA 452 Lesson B.3 Integer Programming 2424
Answer: Linear programming formulation (supply inequality, demand equality). Variables: Xij = 1 if Statistician i is assigned to Client j, else 0 Objective (minimize time, assuming all time values equal):
Min 150X11 + 210X12 + 270X13 + 170X21 + 230X22 + 220X23
+ 180X31 + 230X32 + 225X33 + 160X41 + 240X42 + 230X43 Supply Constraints (Statisticians to at most 1 Client):
X11 + X12 + X13 < 1, X21 + X22 + X23 < 1,
X31 + X32 + X33 < 1, X41 + X42 + X43 < 1 Demand Constraints (each Client served):
X11 + X21 + X31 + X41 = 1
X12 + X22 + X32 + X42 = 1
X13 + X23 + X33 + X43 = 1
Assignment with Valuable Time
BA 452 Lesson B.3 Integer Programming 2525
Assignment with Supply and Demand
Assignment with Supply and Demand
BA 452 Lesson B.3 Integer Programming 2626
Overview
Assignment Problems with Supply and Demand are Transportation Problems of suppliers to demanders except that each demand is assigned to exactly one supplier.
Assignment with Supply and Demand
BA 452 Lesson B.3 Integer Programming 2727
Question: Dow Chemical uses the chemical Rbase in production operations at five divisions. Only six suppliers of Rbase meet Dow’s quality standards. The quantity of Rbase needed by each Dow division and the price per gallon charged by each supplier are as follows:
Assignment with Supply and Demand
Price per Gallon ($)
Sup 1 12.60
Sup 2 14.00
Sup 3 10.20
Sup 4 14.20
Sup 5 12.00
Sup 6 13.00
Demand (1000s of gallons)
Div 1 40
Div 2 45
Div 3 50
Div 4 35
Div 5 45
BA 452 Lesson B.3 Integer Programming 2828
The cost per gallon ($) for shipping from each supplier to each division are as follows:
Assignment with Supply and Demand
Cij Div 1 Div 2 Div 3 Div 4 Div 5
Sup 1 2.75 0.80 4.70 2.60 3.40
Sup 2 2.50 0.20 2.60 1.80 0.40
Sup 3 3.15 5.40 5.30 4.40 5.00
Sup 4 2.80 1.20 2.80 2.40 1.20
Sup 5 2.75 3.40 6.00 5.00 2.60
Sup 6 2.75 1.00 5.60 2.80 3.60
BA 452 Lesson B.3 Integer Programming 2929
Dow wants to diversify by spreading its business so that each division’s demand is assigned to exactly one supplier.
Formulate the optimal assignment of suppliers to divisions as a linear-programming problem.
Assignment with Supply and Demand
BA 452 Lesson B.3 Integer Programming 3030
Answer: Linear programming formulation (supply inequality, demand equality). Variables: Xij = 1 if Supplier i is assigned to Division j,
else 0 Assignment Costs
The total cost is the sum of the purchase cost and the transportation cost.
Supplier 1 assigned to Division 1 (cost in $1000s): Purchase cost: (40 x $12.60) = $504 Transportation Cost: (40 x $2.75) = $110 Total Cost: $614
Assignment with Supply and Demand
BA 452 Lesson B.3 Integer Programming 3131
Assignment Costs: Cij = Cost of assigning Supplier i to Division j
Cij Div 1 Div 2 Div 3 Div 4 Div 5
Sup 1 614 603 865 532 720
Sup 2 660 639 830 553 648
Sup 3 534 702 775 511 684
Sup 4 680 693 850 581 693
Sup 5 590 693 900 595 657
Sup 6 630 630 930 553 747
Assignment with Supply and Demand
BA 452 Lesson B.3 Integer Programming 3232
Linear programming formulation (supply inequality, demand equality). Objective (minimize cost): Min S Cij Xij Demand Constraints (since each division’s demand is
assigned to exactly one supplier):X11 + X21 + X31 + X41 + X51 + X61 = 1
X12 + X22 + X32 + X42 + X52 + X62 = 1
X13 + X23 + X33 + X43 + X53 + X63 = 1
X14 + X24 + X34 + X44 + X54 + X64 = 1
X15 + X25 + X35 + X45 + X55 + X65 = 1
Assignment with Supply and Demand
BA 452 Lesson B.3 Integer Programming 3333
Optional: There is no mention of supply constraints, which are common in assignment problems. Here is what those common constraints would be in this problem. Supply Constraints (Each supplier can supply at most 1
Division): X11 + X12 + X13 + X14 + X15 < 1
X21 + X22 + X23 + X24 + X25 < 1
X31 + X32 + X33 + X34 + X35 < 1
X41 + X42 + X43 + X44 + X45 < 1
X51 + X52 + X53 + X54 + X55 < 1
X61 + X62 + X63 + X64 + X65 < 1
Assignment with Supply and Demand
BA 452 Lesson B.3 Integer Programming 3434
BA 452 Quantitative Analysis
End of Lesson B.3