Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
BYD
Bat
tery
-Box
Res
2.5
-10.
0
Inst
alla
tion
Sho
rt In
stru
ctio
n
V2.
1
A
BC
CD
B1B2
B3B4
+-+-+-+-
A.c
ut t
he p
acki
ng b
elt,r
emov
e th
e ca
rton
, Rem
ove
the
pape
r an
gle
bead
and
spo
nge,
Rem
ove
the
door
and
put
out
the
acc
esso
ry in
the
cab
inet
.
B.D
isas
sem
ble
scre
ws
and
inst
all c
able
s
Brea
ker
To b
usba
r
To B
-Plu
s2.5
C.P
ut t
he c
able
s in
to t
he t
runk
ing.
PEPE
D. D
rill
4 ho
les
on t
he w
all,
diam
eter
10m
m. i
nsta
ll Fa
sten
er. S
ecur
e th
e ca
bine
t to
the
fast
ener
.
Ins
tall
the
Gro
und
(PE)
.
Skill
ed p
erso
nnel
rec
ogni
zed
This
man
ual a
nd t
he t
asks
and
pro
cedu
res
desc
ribe
d he
rein
are
inte
nded
for
use
by s
kille
d w
orke
rs o
nly.
A
ski
lled
wor
ker
is d
efin
ed a
s a
trai
ned
and
qual
ified
ele
ctri
cian
or
inst
alle
r w
ho h
as a
ll of
the
follo
win
g sk
ills
and
expe
nenc
e:•
Know
ledg
e of
the
func
tiona
l pri
ncip
les
and
oper
atio
n of
on-
grid
sys
tem
s.•
Know
ledg
e of
the
dan
gers
and
ris
ks a
ssoc
iate
d w
ith in
stal
ling
and
usin
g el
ectr
ical
dev
ices
and
acc
epta
ble
miti
gatio
n m
etho
ds.
• Kn
owle
dge
of t
he in
stal
latio
n of
ele
ctri
cal d
evic
es•
Know
ledg
e of
and
adh
eren
ce t
o th
is m
anua
l and
all
safe
ty p
reca
utio
ns a
nd b
est
orac
tices
.
Tool
s
E GHF
E. In
stal
l the
B-P
lus
2.5
into
the
cab
inet
.
Con
nect
the
B-P
lus
2.5
and
air
switc
h.Ba
tt +
Batt
-
PE CA
N
PE
to
the
door
AD
RR
DIP
AD
RR
DIP
AD
RR
DIP
1111
0100
2201
1010
110
0000
1200
1100
2311
1010
201
0000
1310
1100
2400
0110
311
0000
1401
1100
2510
0110
400
1000
1511
1100
2601
0110
510
1000
1600
0010
2711
0110
601
1000
1710
0010
2800
1110
711
1000
1801
0010
2910
1110
800
0100
1911
0010
3001
1110
910
0100
2000
1010
3111
1110
1001
0100
2110
1010
3200
0001
G. S
et t
he a
ddre
ss. A
ll th
e ad
dres
s m
ust
star
t N
o.1,
And
the
add
ress
mus
t be
con
tinuo
us.
T
he la
st a
ddre
ss b
arre
ry is
con
nect
ed t
o BM
U.
H1.
Cab
inet
in p
aral
lel.
(
All
the
addr
ess
mus
t st
art
No.
1, A
nd t
he a
ddre
ss m
ust
be c
ontin
uous
. The
last
add
ress
bar
rery
is c
onne
cted
to
BMU
. )
H2.
Che
ck t
he c
omm
unic
atio
n af
ter
Inst
alle
d us
e th
e so
ftw
are.
The
corr
ect
boot
ord
er:
1. P
ress
eac
h ba
tter
y sw
itch
to a
ctiv
ate
all
batt
erie
s.2.
Tur
n on
the
air
sw
itch
for
each
bat
tery
.3.
Tur
n on
the
mai
n sw
itch
of t
he c
abin
et.
4. S
tart
the
inve
rter
.