8/13/2019 B.2.2_Elec Design Guidelines http://slidepdf.com/reader/full/b22elec-design-guidelines 1/43  Sheet 1 of 43 HINDUSTAN PETROLEUM CORPORATION LIMITED MUMBAI DHT PROJECT ENGINEERING DESIGN GUIDELINES ELECTRICAL DOCUMENT NO: 44LK-5100-00/E.02/0002/A4 Rev No. Issue Date Pages Rev Description Prepared By Checked By Approved By A 16.02.2 008 43 Issued for Approval MSJ VDV RBD B 29-08-2008 43 Issued for Engineering MSJ VDV VDV C 12-09-2008 43 Revised after incorporating HPCL comments & Issued for FEED MSJ VDV VDV 0 08-10-2 008 43 Approved by HPCL & Issued for Implementation MSJ VDV VDV

B.2.2_Elec Design Guidelines

Embed Size (px)

Citation preview

Page 1: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 1/43

Sheet 1 of 43

HINDUSTAN PETROLEUM CORPORATION LIMITED

MUMBAI

DHT PROJECT

ENGINEERING DESIGN GUIDELINES

ELECTRICAL

DOCUMENT NO: 44LK-5100-00/E.02/0002/A4

Rev No. Issue Date Pages Rev Description Prepared

By

Checked

By

Approved

By

A 16.02.2008 43 Issued for Approval MSJ VDV RBD

B 29-08-2008 43 Issued for Engineering MSJ VDV VDV

C 12-09-2008 43 Revised after

incorporating HPCL

comments & Issued for

FEED

MSJ VDV VDV

0 08-10-2008 43 Approved by HPCL &

Issued for

Implementation

MSJ VDV VDV

Page 2: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 2/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 2 of 43

ELECTRICAL Revision 0

TABLE OF CONTENTS

1.0 SCOPE 3 2.0 STATUTORY REQUIREMENTS, CODES & STANDARDS 3 3.0 ELECTRICAL SYSTEM DESCRIPTION 4 4.0 AREA CLASSIFICATION 5 5.0 SYSTEM DESIGN PHILOSOPHY 6 6.0 EQUIPMENT DESIGN PHILOSOPHY 17 7.0 SYSTEM LAYOUTS 31 8.0 INSTALLATION 39 9.0 FIELD TESTING AND COMMISSIONING 39 10.0 MAKE OF COMPONENTS 40 ANNEXURE – I :LIST OF REFERENCE STANDARD SPECIFICATIONS : 42

Page 3: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 3/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 3 of 43

ELECTRICAL Revision 0

1.0 SCOPEThis Engineering Design Guidelines along with the Engineering Design BasisDocument No. 44LK-5100-00/E.02/0001/A4 shall form the basis for developingdetailed design and engineering for electrical facilities included in the bid Document.All data required in this regard shall be taken into consideration for acceptable,satisfactory and trouble free operation of the system as per good engineeringpractices.

Compliance with these specifications and / or review of any of the contractordocuments shall in no case relieve the contractor of his contractual obligations.

2.0 STATUTORY REQUIREMENTS, CODES & STANDARDS

The design and the installation shall be in accordance with established codes, goodengineering practices and shall conform to the statutory regulations applicable in thecountry. Contractor shall be responsible for obtaining necessary approvals from thestatutory authorities e.g. Electrical inspectorate, CCE as applicable beforecommissioning of electrical facilities.

2.1 The main codes, standards and statutory regulations considered as minimumrequirements are as given below: -

Latest version of these shall be followed:

- Indian Standards

- OISD standards

- Indian Electricity Act

- Indian Electricity rules

- International Electro technical commission

- The Factory act

- The Petroleum Rules

- API Standards / IEEE

Some of the bare minimum relevant Indian Standards / OISD Standards are as listedbelow. However, system / equipment design shall be in line with latest edition of allapplicable standards.

IS 5572 Classification of hazardous areas for electrical installations.

IS 5571 Guide for selection of electrical equipment. for hazardous

areas.IS 12360 Voltage bands for electrical installations including preferred

voltages and frequency.

IS 13234 Guide for short circuit calculations.

IS 3716 Application guide for insulation co ordination.

IS 9676 Reference ambient temperature for electrical equipment.

IS 3043 Code of practice for earthing.

Page 4: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 4/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 4 of 43

ELECTRICAL Revision 0

IS 732 Code of practice for electrical wiring installations system

voltages not exceeding 650V.

IS 6665 Code of practice for Industrial lighting.

IS 3646 Interior illumination: Part I & Part II.

IS 1944 Code of practice for lighting of Public through fares.

IS 13346 General requirements for electrical apparatus for explosive gasatmosphere.

IS 13408 Code of practice for the selection, installation and maintenanceof electrical apparatus for use in potentially explosiveatmospheres.

IS 7689 Guide for control of undesirable static electricity.

IS 2309 Code of practice for the protection of buildings and alliedstructures against lightning.

IS 1646 Code of practice for fire safety of buildings and electricalinstallations.

IS 3034 Code of practice for fire safety of industrial buildings - Electricalgenerating & distributing stations.

SP 30 National Electrical Code (NEC) - BIS Publication.

OISD 113 Classification of areas for electrical installation at hydrocarbonprocessing and handling facilities.

OISD RP 147 Inspection and safe practices during electrical installations.

OISD RP 149 Design aspects for safety in Electrical system.

OISD 173 Fire prevention and protection system for electrical installation.

OISD GDN 180 Lightning protection.

IS 12459 Code of practice for fire protection of cable runs.

2.2 Any other standard may be followed provided it is equivalent or more stringent thanthe standards specified above.

2.3 In case of any conflict / deviation amongst various Documents the order ofprecedence shall as be as follows:

- Statutory regulations.

- Job specification.

- Design basis / Engineering Design Guidelines.

- Standard specifications, installation standards, etc.

3.0 ELECTRICAL SYSTEM DESCRIPTION

3.1 Total power requirement of ISBL facilities (DHDT, HGU, SRU/ARU, and SWS/TGT)and OSBL facilities shall be catered by Tata Power Company (TPC) supply at 110kV.

3.2 Primary distribution to different substations for DHT project is at 6.6 kV. Secondarydistribution is at 6.6 kV and 0.415 kV for HT motors / distribution transformers and LTload respectively.

Page 5: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 5/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 5 of 43

ELECTRICAL Revision 0

3.3 6.6 kV system is designed for 450 MVA withstand for 3 seconds and 415 V system is

designed for 35 MVA withstand for 1 seconds.

3.5 CONSTRUCTION POWER

3.5.1 EPCC contractors shall make their own arrangement for construction power supplyand power supply for office lighting purpose.

3.5.2 EPCC contractor shall include adequately rated sub distribution boards, power supplycables, other associated material, trenches, overhead structures, road crossings etc.for feeding loads to carry out construction, fabrication activities, etc.

3.5.3 It shall be EPCC contractor’s responsibility to maintain power factor more than 0.95at all power distribution boards. Power factor improvement capacitors as required formaintaining a power factor more than 0.95 shall be supplied, installed andmaintained by the EPCC contractor. The power distribution boards shall be providedwith ELCB / CBCT with ELR for all its feeders.

3.5.4 EPCC contractor shall provide adequate area lighting at site of construction,fabrication yards, office, etc. by means of high flood light masts, flood lighting poles,etc. which are to be supplied and maintained by the EPCC contractor.

4.0 AREA CLASSIFICATION

4.1 Following factors shall be considered for proper selection of electrical equipment foruse in hazardous areas:

- Area classification (Zone 0 / Zone1 / Zone2)

- Gas Group classification (Gr. II A / IIB / IIC) – Characteristic of the gas /vapour involved

- Temperature classification (T1 to T6)

- Environmental conditions – selected electrical equipment shall be protectedagainst corrosive and solvent agencies, water ingress, dusty, chemicallypolluted atmosphere as determined by the environmental conditions.

4.2 All electrical equipment installed in classified areas shall be selected as per IS 5571,OISD-113 and other relevant standards. For Zone 2 areas as a minimum Ex (e) typeof equipment shall be used.

4.3 Selection of equipment for hazardous areas shall be as follows: -

Area Classified Type of protection Symbol

Zone 0 - No electrical equipment to be installed.

Zone 1 - Flameproof enclosure ‘ d ‘

- Intrinsic safety category ‘ i ‘ ‘ i ‘

- Pressurised ‘ p ‘

- Other electrical apparatus specifically

designed for Zone 1

‘ s ‘

Zone 2 - All Equipments suitable for Zone 1

- Increased safety

‘ e ‘

Page 6: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 6/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 6 of 43

ELECTRICAL Revision 0

4.4 For pressurised electrical equipment installed in hazardous area, on failure ofpressurisation system, electrical equipment shall be switched off with audio - visualalarm.

4.5 Increased safety apparatus located outdoor shall be provided with minimum IPW55protection as per IS 4691.

4.6 All electrical equipment for hazardous areas shall be certified by testing authoritieslike CIMFR, PTB, BASEEFA, UL / FM for the service and the area of installation andshall be approved by CCE. All indigenous flameproof equipment Ex (d) shall beunder BIS license.

4.7 As additional safety features, the following requirements for electrical equipment shallbe followed.

4.7.1 All electric motors for agitators, mixers, and metering pumps handling flammablematerial shall be flameproof type Ex’d’ irrespective of the area being classified asZone-2 or Zone-1.

4.7.2 All electric motors for vertical oil sump pumps shall be flameproof type Ex-d.

4.7.3 Irrespective of the area classification (whether Zone-1 or Zone-2) all motors andlighting fixtures within the storage areas, pump house associated with storage areasand within the loading / unloading gantries shall be flameproof type Ex’d’.

4.7.4 Even though fired heaters in process units are not considered for area classification,all electrical equipment associated with fired heaters in process units shall, as aminimum be suitable for installation in Zone-2 area.

4.7.5 Motors for hazardous area application, when fed from frequency controller VSD panelshall have enclosure protection flameproof Ex’d ’ irrespective of area classification.

4.7.6 All electrical equipment installed inside a compressor shed where hydrogen is beingprocessed / handled shall be flameproof type (Ex’d’) suitable for gas group-IIC forarea being classified as Zone-1 and shall be increased safety type (Ex’e’) suitable forgas group-IIC for area being classified as Zone-2. However in case CMRI testcertificate is not available for Ex’e’ type as per IS 6381-2004, then flameproof type(Ex’d’) suitable for gas group-IIC shall be supplied.

4.7.7 All electrical equipment installed for an analyser room shall be flameproof type Ex’d’ suitable for gas group-IIA, IIB, IIC irrespective of the area being classified as Zone-1or Zone-2.

4.7.8 All equipment inside the process units shall be suitable for Zone-2 and shall beincreased safety Ex (e) & temperature class T3 irrespective of area being safe.

4.7.9 Process units having different types of gas groups like IIA/IIB/IIC or different areaclassification like Zone-1 or Zone-2 or safe shall have electrical equipment to meet allgas groups / area classification to facilitate installation and minimum spare inventoryand uniformity.

4.7.10 6.6 kV motors in hazardous areas shall be either with EX ’d’ or EX ‘p’ enclosure only,irrespective of zone classification of zone 1 or zone 2.

4.7.11 Light fittings in hazardous areas shall be with EX ’d’ enclosure only, irrespective ofzone classification of zone 1 or zone 2.

5.0 SYSTEM DESIGN PHILOSOPHY

5.1 The design of electrical installation shall ensure provision of a safe and reliablesupply of electricity at all times. Safe conditions shall be ensured under all operating

Page 7: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 7/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 7 of 43

ELECTRICAL Revision 0

conditions including those associated with start up and shut down of plant as well as

those arising out of failure of electrical equipment. The isolation of part of system ofelectrical equipment due to either maintenance or shut down shall not compromisesafety. Power distribution system shall constitute substations located near loadcentres as far as practical.

5.2 System shall be designed considering following aspects in general: -

- To facilitate inspection, cleaning and maintenance with the care to safety inoperation and personnel protection

- To provide reliability and flexibility of service

- Adequate provision for future extension and modification

- Maximum interchangeability of equipment

- Desired level of operator interface to achieve co-ordinated efficient and fail-

safe operation, data logging and maintenance of the equipment.

- To decide redundancy, stand by, spares and overload capacities to achievedesired reliability and flexibility requirement.

All the electrical consumers within the battery limit shall be correctly identified andlisted to have complete details of rating, efficiency, power factor, operating duty cycle(continuous, intermittent, standby), category of supply required (emergency, normal,critical) etc.

Required redundancy (based on specific process / operating needs) shall be built insubstation which feeds power supply to process unit / important facilities so that incase of tr ipping of one feeder, the unit may not be adversely affected and continuity inoperation is achieved.

While sizing the system necessary consideration shall be given to restrict the system

voltage drop within permissible limits during starting of large rated motor or group ofmotors. At the same time, the short circuit current shall be kept within limits keeping inview of the market availability of switchgears. Reduced voltage starting (soft starterfeature) for motors may be considered as per system requirements.

5.3 Load Grouping

Electrical consumers shall be classified as 'normal / non-essential, emergency /essential or vital / critical loads as per the concepts defined below:

5.3.1 'Emergency' or 'essential' loads shall be identified on the criteria that, when failing inoperation or when failing if called upon, will affect the continuity of operation, the qualityor the quantity of product. For such load reliable source shall be ensured. Suchfeeders shall be grouped on a separate bus-section in the respective MCCs.

Some of the loads which can be identified as emergency / essential load but not

essentially limited to following:

- Electrical loads required for continuous operation of process plants / utility etc.

- Electrical loads required for safe shut down of facilities

- Emergency lighting

- All communication facilities

- Fire Alarm System / Fire fighting equipment

- Level gauge / vessel lamp illumination

Page 8: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 8/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 8 of 43

ELECTRICAL Revision 0

- UPS / Battery charging equipment

- Control room AC equipment

- Essential ventilation system for offices / manned areas of other buildings

5.3.2 'Critical' or 'vital' loads shall be identified on the criteria that, when failing in operation orwhen called upon, can cause an unsafe condition of the installation, jeopardize life orcause a major damage to the installation. For critical loads if any, UPS supply shall beprovided to facilitate uninterrupted supply. The loads on UPS are PLC / DCS etc.Critical drives if any, shall be provided with DC motors.

Some of the load which can be identified as critical / vital load but not essentiallylimited to following:

- Loads providing control and protection to plant equipment

- Loads serving critical equipment for safety of plant, equipment and / or

personnel

5.3.3. Non-essential service is a service, which is neither 'essential' nor 'vital'. Hence thenon-essential load does not require any special measure such as standby feeder orstandby source to safeguard the continuity of service.

5.4 SYSTEM VOLTAGES

Following factors shall be taken into account while selecting the voltage levels: -

- Short circuit level

- Availability of the switchgear with suitable current rating and short circuit rating.

- Existing available voltage levels in the refinery.

- Utilisation voltages of various equipment

- Provision of future extension.

- Size and location of loads

- Choice of voltage may also be affected by local regulations, standards as wellas the voltage of existing installations

- Overall economy for optimum voltage selection.

5.5 All the components of electrical system shall be designed to take into accountfollowing: -

- Maximum demand under most severe operating conditions

- Intermittent service loads, if any.

- 20 % spare for future addition.

Switchgears (MV, LV) to be supplied by contractor shall have 2 incomers and 1 no.Buscoupler. In case of 6.6 kV Switchgear, 415V PCC/PMCC, Normal operation shallbe with both the incomer in ‘ON’ position and bus coupler in ‘OFF’ position. Uponfailure of any of the incomer in ‘ON’ due to loss of power supply, the bus coupler shallbe closed through automatic bus transfer, thereby restoring power supply to theaffected section. Once the power supply is resumed / fault is cleared on affectedincomer, closing of the incomer and tripping of bus coupler shall be done manually,with momentary paralleling of two incomers through synchro check relay.

MCC shall be provided with 2 incomers and one no. bus-coupler. Working & standbyload shall be distributed on different bus sections.

Page 9: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 9/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 9 of 43

ELECTRICAL Revision 0

5.6 PLANT UTILITY LEVELS:

Motors rated above 160 KW : 6.6 kV TP, 50Hz

Motors rated 0.37KW - upto andincluding 160KW

: 415V AC, TP, 50Hz

Motors rated below 0.37KW : 240V AC, SPN, 50Hz

UPS system : 110 V SPN for Instrumentation loads

AC lighting / Auxiliary boards : 415 V AC, TPN, 50Hz

Normal lighting : 240 V AC, SPN, 50 Hz

Telephone system : 240 V AC, SPN, 50 Hz

Critical lighting : 220V DC

Control supply 240V SPN AC for MCC to be derived fromcontrol bus in each vertical section of MCC.

110V DC for MV Switchgears andPMCC/MCC

110V, AC for DCS / PLC control supply to bederived from UPS.

110V, AC for any other control supply to bederived from UPS.

Control supply from UPS for excitation panel,AVR, Fire Alarm system and Paging system.

5.7 VOLTAGE DROPS:

The maximum voltage drops in various sections of the electrical system shall be withinthe limits stated in the following table:

Sr.No.

System Element Maximum Permissible

Voltage Drop

1 Bus duct / Cable between transformersecondary and switchgear (HV / MV / LV)

0.5 %

2 Cables between PMCC and MCC/PCC orauxiliary switchboard

Location of switchboard: Near PMCC

Remote0.5 %

Max. 2.5 %

3 Cables between HV Switchgear and HV motor 3 %

4 Maximum Voltage drop upto LT motor terminal

during running condition

during starting condition

5 %

20 %

5. Cables from ASB/PDB to Power Points 4.5 %

6 Circuit between LDB and lighting points 5 %

Page 10: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 10/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 10 of 43

ELECTRICAL Revision 0

7 DC supply circuits (Electrical controls) 5 %

8 UPS circuits As per instrumentationrequirement.

The voltage available at the motor terminals during start - up must be sufficient toensure positive starting or re acceleration of the motor (even with the motor fullyloaded, if required) without causing any damage to the motor.

For HT motors, the voltage available at the motor terminals must not be less than 85% of the rated value during start-up or re acceleration. For LT motors, the voltageavailable at the motor terminals must not be less than 80 % of the rated value duringstart-up or re-acceleration.

5.8 DESIGN CRITERIA FOR CABLES:

Sr. no. Design Criteria 6.6 kV 415 V

5.8.1 Recommended limiting size ofmulti core cable (mm

2)

300 – 3 core

1000 – 1 core

300 – 3, 3½, & 4 cores

630 – 1 core

5.8.2 Short circuit withstand time 1 Sec. – Powerfdr & transf.Fdr

0.25 Sec. –Motor fdr

- Transf. To PMCC – 1 Sec.

- ACB controlled incomers toMCC/PCC/ASB etc. – 1 sec

5.8.3 Insulation voltage grade 6.6 kVUnearthed

Earthed

5.8.4 Type of cable insulation XLPE XLPE

5.9 SHORT CIRCUIT CAPACITIESAll the switchgears shall be designed for following fault level withstand capacity.

6.6 kV switchgear - 457 MVA for 3 secs.

415 V switchgear - 35 MVA for 1 sec. (In case the upper limit of 6.6/0.433kVtransformer is increased to more than 2000kVA, then if necessary, the fault level of the415V switchgear shall be appropriately increased taking into account the impedance ofthe 6.6/0.433kV transformer and the fault contribution from motors)

Sizing of high voltage cables shall be based on short circuit withstand capacity in additionto the current capacity.

5.10 INSULATION SYSTEM

Following factors shall be considered while designing the Insulation of Electrical system

- System voltage

- System grounding

- Switching over voltages

- Lightning surges

- For MV motors (VCB controlled) surge arresters shall be provided.

5.11 For resistance grounded systems, the resistance value shall be chosen to limit the earthfault current to a value recommended by motor manufacturer for insulation protectionand sufficient for selective and reliable operation of earth fault protection system. The

Page 11: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 11/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 11 of 43

ELECTRICAL Revision 0

value of limited earth fault current shall not exceed 100 % of transformer full load current.

5.12 PROTECTION AND METERING SCHEMES

Selection and co ordination of Protection and metering system shall be such as toensure:

- Selective, sensitive and reliable protection of equipment against damage due tointernal or external faults or atmosphere discharge.

- Uninterrupted operation of healthy system

- Personnel & plant safety

5.12.1 Important plant feeders such as source feeders shall be provided with differentialprotection. The CT arrangement / locations provided for differential protection shall besuch that overlapping zones are formed for differential protections provided for MVfeeders, incomers, bus couplers, tie feeders etc so that the protection zone gets

extended upto the last breaker / zone for which differential protection is provided.Restricted earth fault protection shall be provided for transformer secondary.

5.12.1.1 Protective relays / releases shall be numerical and communicable type with openprotocol (such as modbus) of latest version suitable to communicate with MMI and ECS.100% redundancy shall be provided for communication. Relays shall support featureslike remote relay parameterisation, disturbance recorder etc.

5.12.1.2 In general, fast acting relays (with time delays if required) shall be used and all faulttripping shall be done through high speed tripping relays.

5.12.1.3 Bare minimum Protection devices for power distribution system shall be as indicatedbelow, however EPCC shall provide any other necessary protection relays required forcomplete protection of system: -

Page 12: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 12/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 12 of 43

ELECTRICAL Revision 0

Type of Relay Transformer

Feeder (HV side)

Motor

Feeder

Outgoing

Feeder

Incomer

(L.V.winding

≥ 6.6 kV)

(L.V.winding

≤ 0.433kV)

MV MV LVPCC/PMCC

MV LV PCC/PMCC

51 IDMTL

over-current relay

Yes Yes - Yes Yes Yes Yes

51N IDMTL

earth-fault relay

Yes No - Yes Yes Yes Yes

51 G backup E/F

relay (secondaryneutral)

Yes No - NA No No No

Motor protectionrelay with lockedrotor feature 50,50N, 46, 49, 50L/Retc.

No No Yes NA Yes

(7)

No No

64 R instant-aneous restrictedearth-fault relay(secondary side)

Yes Yes - NA No Yes

(21)

Yes

(21)

50 instantaneousover-current relay

Yes Yes - NA No No No

50N instantaneousearth-fault relay

Yes Yes - NA No No No

87 differentialprotection relay

Yes

(1)

No Yes

(2)

NA No Yes

(13)

No

86 tripping relay Yes Yes Yes

(14)

NA Yes

(14)

Yes Yes

95 trip circuitsupervision relay Yes Yes Yes NA No Yes No

63 Auxiliary

relay

(transformer)

Yes

(20)

Yes

(20)

- NA No No No

27, 2 under-voltagerelay with timer

- - Yes

(11)

NA - Yes

(4)

Yes

(4)

All relays shall be with non-volatile memory, comprehensive unit providing protection,

Page 13: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 13/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 13 of 43

ELECTRICAL Revision 0

metering, control and communication with MMI. It shall be possible to set / operate the

relay from the front facia. Lock out relay shall be conventional type with hand resetfacility.

Special protection for any feeder such as differential, restricted earth fault, directionaldistance power relays etc. shall also be through numerical relay having serial port formonitoring.

Notes

1. For transformers rated 5 MVA and above and shall include primary & secondarybusduct / cables also.

2. For motors rated 1000 kW and above

3. NA

4. For switchgears where auto transfer feature is provided.

5. Instantaneous overcurrent 50 and earth fault 50 N shall be provided only fortransformer with delta primary.

6. NA

7. For motor feeders rated 75 kW and above.

8. NA

9. The bus tie feeder in switchboards shall be provided with 51, 51N, 86 and 95relays.

10. The feeders shall be provided with timers for delayed tripping on bus undervoltage while the under voltage relay shall be common for the bus.

11. MV breaker controlled motor feeders or contactor feeders with DC control

supply. U/V tripping of motors in 6.6 kV system shall be based on critical / non-critical selection (0.5 / 5 sec).

12. One no. DC supply supervision relay (80) shall be provided for each incomingDC supply to the switchboard

13. One set of bus differential relays (87B) and bus wire supervision relay (95 B) foreach bus section shall be provided for MV switchboards. Bus differentialprotection IN / OUT selector switch shall be provided on panel with indication.Bus differential protection shall have overlapping zones.

14. Two sets of 86 relays shall be considered for each HT motor feeder. One forelectrical tripping and other for process tripping and each relay shall be handreset type only. 86 relay shall be part of the Numerical relay and shall haveprovision for hand reset. Separate Electromechanical relay shall not be provided.

15. NA16. PT fuse failure relays in MV / LV panels and Busbar differential supervision relay

(VTX-31) to be installed

17. Value of stabilising resistor for Differential relay (CAG 14) to be selected suitablybased on fault level

18. The breaker contacts for critical logic (upstream / downstream tripping,changeover etc.) shall be provided directly from breaker auxiliary contacts andnot from auxiliary contactors.

Page 14: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 14/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 14 of 43

ELECTRICAL Revision 0

19. Memory / History of the Numerical relay shall not get erased due to loss of

auxiliary supply of the relay. Preferably similar make of relays to be installed inone particular substation.

20. Transformer auxiliary protection: Buchholz, OT, WT, MOG, OLTC alarm / tripsto be provided.

21. For transformer secondary side.

5.12.1.4 Capacitor Banks shall be provided with following protection:

- IDMTL overcurrent with high set element for protection against short circuits

- Instantaneous earth fault

- Neutral phase displacement

- Undervoltage

- Overvoltage

- Built in fuse for each basic capacitor unit.

5.12.2 Metering instruments shall be provided to keep record of power consumption andsupervision of all concerned parameters like current, voltage, power, frequency, powerfactor etc. All the instruments shall be flush mounted. Except voltmeter and ammeter, allthe metering shall be a part of comprehensive metering and protection relay unit.

FeederType

A V Hz MW MWH

Hour

Run

MVAR MVAH MVA PF

110/6.9kV

Transf.Feeder

X - - X X - X - - -

6.6kV SwgrIncomer

X X X X X - X X X X

6.6kV SwgrBus Tie

X - - - - - - - - -

6.6/0.433kV

Transformer

X - - X X - - - - X

6.6kV BusP.T.

- X - - - - - - - -

6.6KV PlantFeeder

X - - - X - - - - -

6.6kV MotorFeeder

X - - - X

(kWh)

X - - - -

6.6kVCapacitor

X X - - - - X - - -

PMCC/MCC

Incomer

X X - X X

(kW

- - - - -

Page 15: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 15/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 15 of 43

ELECTRICAL Revision 0

h)

FeederType

A V Hz MW MWH

Hour

Run

MVAR MVAH MVA -

PCC/MCC

Bus Tie

X - - - - - - - - -

PMCC Bus

P.T

- X - - - - - - - -

ACB

Outgoing

X - - - X

(kWh)

- - - - -

LV Motor X

(see

note-

3)

- - - - - - - - -

PCC/ASB

Incomer

X X - - - - - - - -

MCCB/SFU

Outgoing

(≥ 250 A)

X - - - X

(kWh)

- - - - -

LDB

Incomer

X X - - X

(kWh)

- - - - -

DG Set X X X X

(kW)

X

(kWh)

X - - - -

Notes: -

1. All metering shall be a part of comprehensive relay. However, analogue typevoltmeter and ammeter shall be separately provided.

2. Field ammeters are to be provided for all 3 phase motors

3 Ammeter shall be provided on all motor feeders. Up to 11 kW ammeter shall bedirectly connected to Y phase. Above 11 kW Ammeter shall be connectedthrough CT connected on Y phase. For motors rated 37 kW & above, 3 numberCTs shall be connected on three phases with Ammeter Selector Switch for 1number Ammeter.

Page 16: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 16/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 16 of 43

ELECTRICAL Revision 0

5.13 DATA CONCENTRATOR / MMI / INTERFACE TO DCS SYSTEM

5.13.1 0ne number laptop shall be provided as engineering workstation. System configurationshall be latest proven model and upgradable. MMI system should be either of Siemens orABB make and shall be integrated with the existing GFEC MMI system. Existing GFECMMI system is of ABB make. EPCC / LEPCC contractor shall visit site if required forcollecting the details of the existing MMI system for the purpose of integration of the NewMMI system with the existing GFEC MMI system.

5.13.2 MMI shall allow minimum of the following functions

- Feeder status monitoring

- Data Logging

- Relay parameterisation

- Event recording

- Annunciation

- View of historical data and generating trends

- Preparation of maintenance schedule.

5.13.3 Data concentrator for MV switchboard (6.6. kV) and LV system (if relay make is different)shall be separate for faster and effective communication for control, monitoring andsupervising the electrical system. Suitable switching hardware shall be provided forselection of required data concentrator with click of a mouse from MMI.

5.13.4 User-friendly windows based software shall be provided for interactive display ofsubstation data in multi-window feature. Softwares shall have the capability to display

substation single line diagrams, display for electrical system parameters, reports, alarmannunciation, daily and monthly data logging, continuously polling, relay programming,relay monitoring, data logging, relay supervision, tripping features, fault disturbancerecord of each relay, graphic representation and trending of data etc. The display shallhave electrical system overview and detailed information about its sub system. Allsoftwares shall be written for operating on a common operating system platform plantwide and shall be able to communicate with other/existing system. A change of operatingplatform for MMI, CPU during detail engineering shall not have any commercialimplications. Audio / Visual Alarm annunciation shall be provided alongwith hooter.

5.13.5 MMI system shall have two distinctive passwords one for viewing of data metering etc.and second for authorisation for change in relay setting etc.

5.13.6 All numerical relays shall communicate to its data concentrator / bay module / RTUserially on dual redundant RS 485, mod bus / proprietary protocol. Data concentrator

shall have dual redundant architecture including internal bus and processor for thereliability of data communication. Scan time of Relay LAN shall be less than one second.Data not available on relay LAN shall be acquired through hardwired connections to MMIRTU.

5.13.7 Data concentrator/ Bay module shall be interfaced with RTU of integrator’s system ondual redundant RS485, mod bus protocol. In case relays are communicating serially todata concentrator/ Bay module on proprietary protocol, suitable protocol converter shallbe supplied as a part of supply of data concentrator/ Bay module. Signals, data asrequired for MMI/ ECS system serially and through hard wiring as designed elsewhereshall be wired upto RTU panel.

Page 17: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 17/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 17 of 43

ELECTRICAL Revision 0

5.13.8 The system shall be complied with standard IEC 60073 - Basic and safety principles for

man-machine interface, marking and identification.

5.13.9 All hardware and software shall be suitable for substation operation and integration withECS-RTU and to achieve minimum but not limited to the requirement as definedelsewhere.

5.13.10 Each MMI shall also have provision of interface with remote DCS located at centralisedplace and necessary port RS485 etc. as required shall be included.

5.13.11 Each relay / MMI system shall be time synchronised with GPS.

5.14 DC POWER SUPPLY

Unless otherwise specified, independent DC power supply systems shall be provided forfollowing

a. Electrical switchgear control

b. Critical lighting

c. Critical DC drives

d. MMI

5.15 EMERGENCY POWER SUPPLY

The emergency power supply system shall be designed to feed the following types ofloads as required:

- Electrical loads essential for safe shut down

- Emergency lighting

- Loads critical for process, plant and personnel safety.

6.0 EQUIPMENT DESIGN PHILOSOPHY

6.1 TRANSFORMERS

6.1.1 The transformers except lighting transformers shall be ONAN, 3-phase, oil immersed /Dry type, double wound type suitable for outdoor installation. Lighting transformers shallbe dry type.

6.1.2 Transformer sizing shall be such as to take care of continuous maximum demand,starting of highest rated induction motor with other load in running condition andminimum 20 % spare capacity for future requirement.

While sizing the transformer following guidelines shall be followed for various types ofloads i.e. continuous, intermittent and stand-by: -

Type of load Diversity Factor to be ConsideredContinuous 1.0

Intermittent 0.31)

Stand-by 0.12) & 3)

Page 18: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 18/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 18 of 43

ELECTRICAL Revision 0

1)

The loads which are required to be operated only during start-up of the plant andwhich are not required to be operated during normal operation of the plant neednot be considered for transformer sizing (Diversity Factor = 0.0).

2) The standby loads to intermittent loads which will come into operation only when

the working intermittent load fails/trips need not be considered for transformersizing (Diversity Factor = 0.0)

3) The diversity factor of 0.1 for stand by loads need to be considered for only those

loads/drives which are required to be started before switching off of the normalworking loads/drives when there is a planned change over to standby system(other standby loads need not be considered for transformer sizing)

6.1.3 In general, rating and % impedance of each transformer shall be selected to limit the

short circuit current to values within the current rating and rupturing capacity ofswitchgear available and also to ensure the voltage drop within permissible limit. Thetransformer impedances shall be as per Indian standards unless otherwise required.

6.1.4 100 % standby transformer shall be provided in substation, lighting system unlessotherwise specified.

6.1.5 Power transformers shall be of low losses type. Usually no load & load losses shall beoptimised for operation around 40 - 50 % of their ONAN rating.

6.1.6 Maximum rating of distribution transformers (6.6/ 0.433 kV) shall be normally limited to2.5 MVA, whereas for power transformers (110 /6.9 kV) rating shall be limited to 30MVA. However, for 6.6/0.433kV transformer, relaxation to maximum rating up to3.15MVA may be considered as a special case by Owner/PMC, if space availability andlayout restriction dictates so and is subject to the condition that the overall size of all the

related equipments is such that it can be accommodated in the available space and theequipments are rated for corresponding increased fault level and have valid type testcertificates corresponding to the increased fault level.

6.1.7 One no. power transformer and one no. distribution transformer from each lot to beselected for type test in addition to routine test

6.1.8 For all other requirement refer ESS: 44LK-5100/E.02/004.

6.2 MV SWITCHGEAR (6.6 kV)

6.2.1 All switchgears and associated equipment shall be rated for the rating of transformer /motor being fed from it under any circuit configuration. However, breaker and busbarrating of incomers, buscoupler and outgoing feeders of MV switchgear shall be same.

6.2.2 Rating of Bus coupler shall be suitable for following conditions:

- Maximum running load on either side of bus section.

- Bus coupler rating equal to largest incoming circuit breaker rating.

- Should not be less than bus bar current rating.

6.2.3 Minimum 25 % spare feeders or one no. of each rating and type, whichever is more,shall be provided in each panel.

6.2.4 In case of MV vacuum circuit breaker, adequate provision shall be made for motorswitching to limit the over voltage to 2.2 per unit of rated peak line to earth voltage.Required surge arrestors may be provided for this purpose.

Page 19: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 19/43

Page 20: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 20/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 20 of 43

ELECTRICAL Revision 0

6.3.14 For all other requirement refer ESS: 44LK-5100/E.02/002 & ESS: 44LK-5100/E.02/003.

6.4 MOTORS

6.4.1 In general, three phase squirrel cage induction motors designed for direct on line startingshall be used. Motors shall be totally enclosed fan cooled suitable for outdoor application.

6.4.2 The type of enclosure for motors (i.e. indoor/outdoor, industrial / increased safety/flameproof) shall be adequate for the application and area in which it is to be used.

6.4.3 The mechanical parameters such as duty, mounting type, shaft extension, direction ofrotation, starting torque requirements etc. shall be adequate for the application. Sleeve oranti friction type bearings shall be used. Vertical motors shall have thrust bearingssuitable for the load imposed by the driven machinery. Motors with sleeve bearings mayrequire proximity probes to measure shaft vibration adjacent and relative to the bearings.

Generally, all motors, except for application such as crane, hoist, turbine / enginestarting, shall be designed for continuous duty with rated load.

6.4.4 When the motors and pumps are mounted on the common base frame jackscrews withplate of suitable size shall be provided on all four sides of base frame. These jackscrewsalong with the plate are required for moving the motor during alignment.

6.4.5 All 6.6kV motors shall be provided with 6 nos. duplex RTDs for winding temperaturedetection and 2 nos. duplex RTDs for bearing temperature detection. Dual dial typetemperature indicator without contacts for bearing also shall be provided for all 6.6kVmotors. All LV motor including & above 75 KW shall be provided with PTC thermistors.

6.4.6 The terminal box of MV motor shall be designed to withstand the specified short circuitcurrent for 0.25 second without damage. A separate neutral terminal box shall beprovided for making star connection and it shall be adequately sized to accommodate the

current transformers for differential protection.

6.4.7 All the motors shall have class ‘ F ’ insulation with temperature rise limited to class ‘B’.

6.4.8 Motors shall be capable for 20 % overspeed without danger of mechanical failure.

6.4.9 Type of motors that require variable speed drive system shall be suitable forvariable speed range with temperature rise within limit and also shall be suitable for areaclassification. For hazardous area application motors with variable speed drive systemshall be Ex ‘ d ’ type. All motors operating on VSDs shall have embedded temperaturedetectors / thermistors for winding with thermistor relay which will trip the motor in casethe temperature of winding exceeds the permissible limits. Flameproof motors operatingon variable speed drive system shall have CMRI or equivalent authority certifying thesuitability of drive motor with VSDs.

6.4.10 Limiting Conditions for Motor start up (e.g. starting current limitation or method of

starting):-

- Starting current of MV motors rated upto 2.5 MW shall be limited to 500 %(inclusive of + tolerance). Generally, motors rated between 2.5 MW & 7.5 MWshall be started through Soft starter and motor rated above 7.5 MW unlessotherwise required by process, shall be started through variable speed drivesystem having soft start feature

- Starting current of motors rated upto 75 kW shall be limited to 600% (including +vetolerance) of normal current.

- Starting current of motor rated more than 75 KW and upto 160 kW shall be as perIS-12615-2004.

Page 21: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 21/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 21 of 43

ELECTRICAL Revision 0

6.4.11 Any assisted type of starting method (e.g. soft starter, Auto transformer etc.) for MV / LV

motors may be considered for regulation / motor drop within limits, ensuring properacceleration of the driven equipment.

6.4.12 Re-acceleration for identified critical motors shall be provided to cover brief interruptionup to 5 seconds in normal power supply. Insulation for these motors shall be designedfor 140 % of rated insulation level to take care of any over voltages that might resultduring changeover.

6.4.13 Outdoor motors shall be provided with canopy.

6.4.14 Motors of rating above 55 kW shall be provided with space heater. Ammeter shall beprovided on the panel for the space heater circuit.

6.4.15 Motors shall be rated for starting at 80 % voltage at motor terminals.

6.4.16 Winding temperature and bearing temperature alarm and trip shall be provided for all MV

motors. Minimum 10% additional RTD points shall be provided.

6.4.17 One no. motor from each lot for motors more than 1.5 MW rating, shall be subjected totype test.

6.4.18 All motors rated up to 55 kW shall be controlled from MCC. All motors above 55 kW upto 160 kW and any critical drive shall be controlled from PMCC using ACB.

6.4.19 For all other requirement refer ESS: 44LK-5100/E.02/001.

6.5 BUS-DUCT (if Required)

6.5.1 MV busduct shall be phase segregated and LV bus duct shall be non-phase segregatedtype.

6.5.2 6.6 kV & LV Bus bars shall be of Copper.6.5.3 It shall be suitably supported at regular intervals and both busbars and supports shall be

adequately sized and clamped to withstand rated short circuit current without permanentdeformation.

6.5.4 The bus insulators shall be of non-hygroscopic and non-inflammable material. Earth busshall run along the full length of bus duct without any break.

6.5.5 Outdoor bus-duct shall be weatherproof to IP-55 and shall be provided with canopy.

6.5.6 Bus-duct shall be supplied with bus-bar flexible links for connection at both the ends andexpansion joints for every 3m of bus-duct and bus-duct support materials.

6.5.7 Openings with cover at suitable locations shall be provided on bus-duct for accessing thebus-bars for maintenance.

6.5.8 For all other requirement refer ESS: 44LK-5100/E.02/007.

6.6 NEUTRAL GROUNDING RESISTOR (NGR)

6.6.1 Neutral grounding resistor shall be housed in a sheet metal enclosure and shall benaturally ventilated.

6.6.2 The value of the NGR shall be such as to limit the earth fault current to a value, whichdoes not harm the equipment (Generators, Motors and Transformers), and also ensuresthe protective relay operation.

Page 22: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 22/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 22 of 43

ELECTRICAL Revision 0

6.6.3 NGR shall be able to carry at least 10 % of its rated current continuously, unless

otherwise specified, and full rated current (100%) for a minimum duration of 10 seconds.

6.6.4 For all other requirement refer ESS: 44LK-5100/E.02/017.

6.7 BATTERIES

6.7.1 While sizing the batteries temperature correction, back-up time, design margin, ageingfactor and maintenance factor shall be considered.

6.7.2 Batteries shall be complete with batteries and battery racks.

6.7.2 Batteries shall be adequate to meet the requirements as per duty cycle, type of load andmin. 20 % spare capacity for future requirement.

6.7.3 Isolator shall be provided for battery bank isolation near battery.

6.7.4 All batteries shall be Ni-Cd type.

6.7.5 Battery back-up time shall be considered as 2 hours for switchgear control supply batteryand 1 hour for DC critical lighting battery.

6.7.6 For all other requirement refer ESS: 44LK-5100/E.02/005.

6.8 BATTERY CHARGER

6.8.1 For batteries meant for switchgear control, the charger shall have dual parallel redundantmodules of float cum boost charging unit. For batteries meant for DC critical lighting, thecharger shall have single module of float cum boost charging unit.

6.8.2 The rating of the charger shall be adequate to trickle / boost charging of batteries and to

feed the DC load requirement with minimum 10 % spare capacity.

6.8.3 25% spare outgoing feeders for future use shall be provided in each DCDB for eachrating and type of feeder.

6.8.4 One summary fault contact shall be provided for remote alarm.

6.8.5 For all other requirement refer ESS: 44LK-5100/E.02/005.

6.9 UNINTERRUPTED POWER SUPPLY (UPS)

6.9.1 The UPS shall have duty and ratings of feeders adequate for the application and shall besuitable for indoor use. UPS system shall be sized to take care of the crest factor of theload current.

6.9.2 Each UPS unit shall have dual parallel redundant modules. Each module shall consistsof rectifier transformer, rectifier-cum charger, inverter, filter circuit, static switches,bypass transformer, facility for manual transfer between inverter supply and bypass line,facility for bypassing inverter, static switch for maintenance and ACDB. set of batteries(for each UPS module), adequate to supply required rated output for half hour.

Page 23: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 23/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 23 of 43

ELECTRICAL Revision 0

6.9.3 Under normal operating conditions, the rectifier cum charger shall feed the inverter and

charge the battery set. In case of mains failure, the battery shall supply the necessarypower to the inverter. Inverter in turn shall feed the load through the static switch. If theinverter malfunction or get overloaded, the load shall be instantaneously transferred tothe bypass line through the static switch. Normally, the inverter shall be operated insynchronised mode with the bypass line and manual transfer forward/ reverse shall beeffected without any break. The overload capacity & current limiting shall be adequate forthe application. Harmonic filters if required shall be considered at input side.

6.9.4 Fused disconnect switch shall be provided for each outgoing feeder of the UPS and thefuse shall be of fast clearing type. The fuse rating shall be selected to achieve co-ordination to protect the UPS during short circuit. The rating of the largest branch circuitshall not exceed 25% of the system rating.

6.9.5 The UPS rating shall be adequately sized considering 25% spare capacity for future load.

6.9.6 25% spare outgoing feeders for future use shall be provided in each ACDB for eachrating and type of feeder. Isolation transformer shall be provided wherever necessary inoutgoing feeders of ACDB.

6.9.7 Redundant outgoing feeders shall be provided in ACDB.

6.9.8 Three separate source supply shall be provided to UPS Incomers.

6.9.9 For all other requirement refer ESS: 44LK-5100/E.02/025

6.10 LIGHTING, POWER & DC DISTRIBUTION BOARDS

6.10.1 No. of LPs, PPs & DCDB shall be provided for complete lighting & power distributionadequate for the respective areas of each EPCC/LEPCC contractor.

6.10.2 Lighting distribution boards fed through 415 / 415 V lighting transformers with off circuittaps +2.5 % shall be planned for feeding the lighting system of the package units.

6.10.3 Each lighting transformers shall be sized to feed the entire plant normal lighting load with20 % as a minimum spare capacity.

6.10.4 Lighting distribution board shall have three incomers and two bus-couplers. Twoincomers shall be fed from two bus-sections of PMCC and the third incomer shall be fedfrom Emergency PCC.

6.10.5 Deleted

6.10.6 No. of LPs shall be considered based on location / area served and total loading.

6.10.7 Plant lighting circuits shall be fed from dedicated lighting distribution boards installed in asafe area. For LPs, incomer shall be provided with MCB and outgoings shall be with

MCBs + ELCBs for control and protection of lighting circuits.

6.10.8 Plant lighting circuits shall be single phase (P & N) rated 240 V AC. Each circuit shall berated to 16A but not loaded more than 8 A. A minimum of 25% of MCBs of each boardshall be left as spares. Normally about 8-10 fittings shall be wired in each circuit.

6.10.9 Plant lighting distribution board shall include 25% spare outgoing circuits.

6.10.10 Adjacent lighting fittings shall not be fed from the same circuit.

Page 24: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 24/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 24 of 43

ELECTRICAL Revision 0

6.10.11 Plant lighting circuits (excluding level gauge lighting) for open to sky areas shall be

designed for auto/manual switching. In Auto mode switching shall be controlled throughphotocell. In addition it shall be possible to switch ON/ OFF entire lighting from ECS andlocal switchboard.

6.10.12 Lighting control scheme shall also be designed to trip the entire lighting system in case ofair raid warning.

6.10.13 Auxiliary relays as required for remote switching ON / OFF of lighting system shall beincluded in lighting distribution board.

6.10.14 For all other requirement refer ESS: 44LK-5100/E.02/010 and ESS: 44LK-5100/E.02/001.

6.11 LOCAL CONTROL STATIONS (LCS)

6.11.1 The local control stations shall be of Die cast Aluminium.

6.11.2 The type and number of switchgear components such as push buttons, selectorswitches, ammeters, lamps etc. shall be based on the functional requirements of thecontrol scheme and the type of equipment.

6.11.3 Control stations shall be provided for each motor in the field.

6.11.4 Enclosure of the control station shall be suitable for site conditions such as weatherproof, dust proof, flame proof, corrosion resistant etc. All outdoor control stations shall beprovided with FRP canopy.

6.11.5 Stop push button shall be of stay put type, however it can be of momentary type in caseof drives such as lube oil pump etc, which are critical.

6.11.6 Two numbers of stop push buttons shall be provided for the motors, which are installed

at elevated platforms, such as cooling tower fan etc. One of the push buttons shall beinstalled at ground level and the other near the motor.

6.11.7 Local control station shall be provided with ammeter for motors rated 15 kW & above.Local control station for aux. Lube oil pumps, heater etc. shall be provided with ammeterirrespective of motor rating. LCS for all emergency / critical drives shall be provided withammeters.

6.11.8 Weatherproof, push button type emergency push button station shall be provided neartransformers to trip the transformer feeder in case of emergency. Push button shall beshrouded type.

6.11.9 For all other requirement refer ESS: 44LK-5100/E.02/012 and 44LK-5100/E.02/013

6.12 VARIABLE SPEED DRIVES (VSD)6.12.1 Microprocessor based variable speed drive shall be communicable type and shall be

able to communicate with MMI / ECS / DCS. If the application calls for a continuousspeed variation over a certain range and requires automatic control/change/adjustmentof speed through a feedback control system (or open loop control system).

6.12.2 System shall be highly reliable, efficient and shall provide high power factor, lowharmonic distortion, low noise level etc.

6.12.3 System shall be provided with complete by pass circuit to ensure the power supplyreliability in case of VSD failure.

Page 25: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 25/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 25 of 43

ELECTRICAL Revision 0

6.12.4 The system shall be suitable for load characteristics, continuous speed control and shall

be with soft start feature. Drive shall be able to accelerate the load over the full speedrange (0 – 100 %) with incoming line voltage regulation of 10 %.

6.12.5 The system shall be designed for 150 % over current withstand for 1 minute. Thesystem shall be equipped with an automatic restart facility with preset time within 0 – 15seconds which will restart the system in case of voltage dip over 20 % or powerinterruptions less than 4 seconds and recovery of voltage to 95 % with a facility to blockthe automatic restart.

6.12.6 The system shall be suitably designed with due care for long length of cables, outputfilters, chokes, motor insulation, cable voltage grades etc. In case the cable lengths fromVSD to motors are very much on higher side, then suitable number of output reactorsshall be provided as well as higher rating of VSD shall be selected.

6.12.7 The VSD panel shall be selected for location in the clean air conditioned room preferably

in the sub-station / MCC room. Required local control equipment shall have start, stopspeed raise and lower push buttons, ammeter, speed indicator, ON/OFF/READY statusselector switches as required and shall be installed near the motor.

6.12.8 The VSD panels to be supplied shall be of proven model. VSDs shall be of ABB orSiemens make only.

6.12.9 For all other requirement refer ESS: 44LK-5100/E.02/031

6.13 SOFT STARTERS

6.13.1 The soft starters shall be solid state microprocessor control type with self torqueadjustment (during controlled start) feature with bypass contactor.

6.13.2 Soft starter shall be designed with starting current limited to 350 % to 400 % (However

EPCC contractor shall ensure that this reduced starting voltage is suitable to developnecessary starting torque requirement of the respective motor) . The soft starters shallbe so designed that the minimum possible supply voltage drop shall occur keeping inmind the accelerating torque requirement of the drive motor & the load.

6.13.3 For MV motor drives soft starter can be connected to neutral side of motor. For thesame, phase segregated terminal box shall be provided for the neutral side of the motor.

6.13.4 For LV motor dives, soft starter shall be connected to line side of the motor.

6.13.5 Soft starter shall be as per standards IEC 34/ BS 4999 / IS 325 / BS 5000. Soft starters shall be of ABB or Siemens make only.

6.13.6 The EPCC contractor shall super impose the motor torque Vs speed curve at reducedvoltage (to motor terminals at starting) on torque Vs speed characteristics of the drivenequipment to confirm correct operation i.e. acceleration to rated speed. The EPCC

contractor shall also calculate acceleration time at reduced voltage (based on theseTorque Vs speed curves) required for accelerating the drive, to full rated speed. Thisacceleration time shall be sufficiently less than the hot withstand time of the motor.

6.13.7 For all other requirements refer ESS : 44LK-5100/E.02/065.

6.14 CABLES (MV / LV)

6.14.1 Cables shall be sized considering the following factors.

Page 26: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 26/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 26 of 43

ELECTRICAL Revision 0

- Maximum continuous load current

- Voltage drop

- System voltage

- Laying conditions

- (Derating due to ambient air temperature, ground temperature, grouping andproximity of cables with each other, thermal resistivity of soil etc. shall be takeninto account)

- Short circuit withstand criteria as per Cl. 5.8 – design criteria for cables

- Transformer cables shall be sized to continuously carry transformer full load

current.

6.14.2 All power, control, data, signal cables shall be FRLS PVC outer sheath. Cable outersheath should have the cable size embossed.

6.14.3 All LV power cables shall be with stranded aluminium / copper conductor with XLPE insulation, PVC sheathed armoured and construction as per IS 1554/IS 7098. Powercables with conductor size upto and including 16 sq mm shall be with copper conductor,conductor size above 16 sq.mm. shall be aluminium or copper conductor as indicated inDesign basis 44LK5100-00/E.02/0001/A4.

6.14.4 All control cables shall be with 2.5 sq. mm, stranded copper conductor with XLPE insulation, PVC sheath, armour and construction as per IS 1554. Control cables shall betwisted pair or shielded wherever electro-magnetic / electrostatic interference isanticipated.

6.14.5 All control cables shall have 20 % spare cores. All cores shall be identified withnumerical core numbers printed on core instead of colours.

6.14.6 All MV power cables shall be made of stranded aluminium or copper conductor with drycured XLPE insulation, PVC sheathed armoured, conductor screen, insulation screenand construction as per IS 7098.

6.14.7 All cables shall be armoured and shall have extruded inner and outer sheath

6.14.8 Cables connected in parallel shall be of the same type, cross section and terminations.

6.14.9 All power and control cables shall be in continuous lengths (except for very long feeders)without any joints. The cables used for lighting and wires in conduits shall haveappropriate junction boxes with adequately sized terminals. Cable joints in hazardousareas shall not be permitted.

6.14.10 In case of difficulty in connecting the cables to instrument or relay terminals, minimumcross section may be reduced to 1.5 sq.mm Cu. For lighting inside the building, minimum1.5 sq.mm Cu conductor, PVC insulated wire shall be used in conduit system (for circuitand point wiring), with proper colour coding.

6.14.11 All LV power cables shall be 3 core / 3 1/2 core / 4 core with stranded aluminium / copperconductor with XLPE insulation and construction as per IS 1554. For all LPs / PPsincoming power supply cable shall be 4 core of required cross section.

6.14.12 6.6 kV cables shall be unearthed grade.

6.14.13 Cables for Fire alarm system and DC lighting shall be FRLS cables.

6.14.14 For all other requirement refer ESS: 44LK-5100/E.02/008

Page 27: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 27/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 27 of 43

ELECTRICAL Revision 0

6.15 CABLE TRAYS

6.15.1 Cable trays shall be run in either cable trenches / on overhead cable rack or along thepipe rack to suit the site conditions.

6.15.2 Separate cable trays shall be selected for:-

- MV cables

- LV power cable

- LV control cable

- Instrumentation cables/communication cable

- Cable trays shall be sized considering single layer of cables.

6.15.3 The trays shall not show deflection / bend / deformation after laying of cables.

6.15.4 All cable trays and accessories shall be FRP/GI. For tray system design, in addition toself load and wind forces, following guidelines for design shall be considered.

- Support span : 2000 mm

- Cable load for

- • 150 mm wide cable tray : 30 kg/m

- • 300 mm wide cable tray : 60 kg/m

- • 600 mm wide cable tray : 90 kg/m

- • 750 mm wide cable tray : 120 kg/m

6.15.5 In addition to this, 70 kg concentrated load at centre span shall be considered. Allstructural steel design shall be as per Indian Standards.

6.15.6 Bends, tees, reducers, crosses, droppers etc. shall have the required bending radii asrecommended by the manufacturer with 10% allowance for various cable sizes with aminimum of 300 mm.

6.16 LIGHTING EQUIPMENT

6.16.1 Lighting fittings shall be of energy efficient type.

6.16.2 All ballasts shall be with copper winding and capacitor for power factor improvement (to0.95) shall be provided with fixtures as applicable.

6.16.3 Generally following types of fittings shall be used for the application mentioned.However, alternative / different type may also be used depending upon application wherethe fittings are to be installed.

Indoor areasControl room, administrative building,security office canteen

2 x 36 W fluorescent mirror optic,decorative.

Sub-station, MCC room, store,workshop

2 x 36 W fluorescent industrial.

D.G.room, compressor room etc. withmounting height more than 6 meters

: 1 x 250W / 400W HPMV mediumbay or high bay

Page 28: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 28/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 28 of 43

ELECTRICAL Revision 0

Outdoor areas

Platforms, pump bays, skids, etc. wheremounting height upto 3 m to 3.5m ispossible

: 1 x 125 W HPMV well glass forsafe areas and HPMV lightingfittings for hazardous areas.

Transformer bay pump bays, tank farm,switchyard, etc.

: HPMV lighting fittings / Fluorescentlighting fittings

6.16.4 HPMV & MLL lamps shall generally be used for outdoor plant lighting. Keeping inview the re strike time lag and to avoid complete darkness in case of a voltagedip/black out condition necessary incandescent lamps may be judiciously distributedthroughout the plant area. Safe area street and area lighting may employ sodiumvapour lamps. Low pressure / High pressure sodium vapour lamps shall not beinstalled in hazardous areas.

6.16.5 Aviation warning lights shall be installed in accordance with the recommendation by

the International Airport Authority of India. The lamp fittings shall consist of a doublelamp unit with automatic switchover to the stand-by lamp upon failure of theoperating one. LED type, heavy duty, weatherproof aviation warning light shall beused for chimneys.

6.16.6 Fluorescent lamps shall be used for indoor lighting for non process building andcontrol room. All chemical handling facilities shall be provided with chemicalresistant fixtures.

6.16.7 Floodlight fittings on lattice type structure/high masts shall be provided forillumination of tank farm / general area.

6.16.8 Fittings to be installed in the hazardous area shall be suitable for the zone and CMRIcertified with CCE approval.

6.16.9 All fittings to be installed outdoors shall have ingress protection of IP 55 minimum

and shall be weatherproof and have a guard.

6.16.10 The material of construction shall be as follows :-

- Body – FRP in safe areas & Die cast Aluminium in Hazardous areas.

- Gasket - EPDM or neoprene with u/v resistant and corrosion resistantproperties.

- Reflector - Aluminium stainless steel/chromium plated steel - mirrorfinished.

- Hardware - Stainless steel (316)

- Guard - Stainless steel (316)

- Painting - Epoxy painting.

6.16.11 Fittings for indoor installation where clean, non-corrosive atmosphere orpressurisation is maintained, manufacturer’s standard material of construction isacceptable; otherwise the material mentioned above shall be applicable.

6.16.12 Control gear for well glass and medium bay / high bay fittings shall be separatelyfitted in the control gearbox where it is not possible to have integral control gear.The material of construction shall be same as mentioned in clause 6.16.10 .

Page 29: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 29/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 29 of 43

ELECTRICAL Revision 0

6.17 JUNCTION BOXES

6.17.1 The Junction boxes/Telephone Tag boxes shall be FRP construction with IP 55degree of protection suitable for installation in classified areas, hazardous areas. Itshall be suitable for terminating or looping armoured signal/power cables. JBs shallbe provided with earthing stud. It shall be suitable for wall/column/structure/ceilingmounting.

6.17.2 Junction boxes installed in classified hazardous area shall be explosion proof Ex’d’only irrespective of area classification.

6.18 CONVENIENCE / WELDING RECEPTACLES

6.18.1 Enclosure of the convenience receptacle shall be suitable for site conditions such asweather proof, dust proof, flame proof, corrosion resistant etc. Necessary interlocksand earthing facilities shall be provided as per safety requirements. Thesereceptacles shall be provided at selected locations in the plant.

6.18.2 Welding receptacles shall be provided at suitable locations to make sure thereceptacle is accessible from any point of the process area with a trailing cable of 30meters length. The welding receptacle shall be rated for 63A, 415V, 3 phase andshall have a scraping earth.

6.18.3 63A, 415V, 3 phase receptacle (with scraping earth) shall be provided at suitablelocation near major equipment like compressors, blowers etc to provide power forportable equipment.

6.18.4 20A, 240V, single phase, three pin sockets shall be provided at suitable locations tomake sure that the receptacle is accessible from any manholes of the equipment,near static/rotary equipment with a trailing cable of 15 meters length. However forhazardous areas 240/24V transformer shall be provided within socket to supply 24Vto the portable equipment.

6.18.5 Outdoor receptacles shall be provided with FRP canopies.

6.19 ACTUATORS FOR MOTOR OPERATED VALVE

6.19.1 MOVs shall be provided with an integral control box consisting of starter,local/remote selector switch, start/stop switches or push buttons, torque switches,limit switches etc. The mechanical design shall be such that in case of torque or limitswitch failure, the motor shall be protected. Anti-condensation heater shall beprovided for the actuator. The power supply for the control circuit shall be AC .

6.19.2 The MOV shall be designed to start with 75% of the motor terminal voltage. Themotor insulation class shall be class F, but the temperature rise shall be limited to atemperature equivalent to class B. MOV actuators shall be of Rotork make only.

6.19.3 For all other requirement refer ESS : 44LK-5100/E.02/058

6.20 PUBLIC ADDRESS (PA) SYSTEM6.20.1 PA system shall meet the requirements of plant operations.

It shall consist of:

6.20.2 Microprocessor based central exchange, master station with external loudspeaker,microphone etc. & Desk type call stations alongwith external loudspeaker forinstallation in buildings, wall mounted call stations suitable for area classification withhorn type loudspeaker.

Page 30: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 30/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 30 of 43

ELECTRICAL Revision 0

6.22.1 Stand alone systems shall be provided for different process units, substations etc.

which shall be suitable for interfacing with Fire alarm system, EPABX system, RadioPaging system etc. System shall also be designed such that it can be integrated tocentralised control.

6.22.2 Paging speakers provided in areas having ambient noise levels shall produce apaging sound level at least 10 db above the anticipated ambient noise level. Whereit is not possible to achieve the sound level of above 10 dB above the ambient,rotating beacons shall be installed such a way that that the operator is alerted in thearea. The typical area where the provision of rotating beacons are envisaged arecompressor house. Acoustic hoods shall be provided for call stations located in highnoise areas.

6.22.3 Separate UPS with batteries shall be provided for each exchange

6.22.4 The design of the system shall be such as to provide two channel communication

i.e. Page & Party in each zone. Page & Party system shall comprise of one channelfor paging & one channel for party talk.

6.22.5 In the Party mode, conversation shall not be heard over the loud speaker but it shallbe carried out on the handsets. This mode shall be used for actual conversation,exchange of information etc.

6.22.6 It shall be possible to make a paging call by lifting the handset, off the hook switch &pressing the “press to page” switch. The paging message shall get transmitted overall the loud speakers when the paging person speaks in the microphone of thehandset. While paging, it shall automatically mute the loud speaker near the paginghandset to eliminate the acoustic feedback.

6.22.7 It shall be possible to communicate between two field stations without theinterference of the MCS / operator. Also it shall be possible to have directcommunication with the MCS.

6.22.8 A facility to monitor the health of the system including field stations / speaker shallbe provided in the system.

6.22.9 The equipment shall be sturdy, impact resistant, dust & damp proof generallyconforming to minimum IP 55 degree of protection. For classified hazardous areasflameproof equipment shall be provided duly certified by recognised certifyingauthority for the area of installation. The equipment for outdoor shall beweatherproof type conforming to IP 55 degree of protection & shall be provided withcanopy. All equipment & accessories shall be given tropical protection againstfungus, insects & corrosion. Equipment shall be made tamper proof by use of nonstandard screws, which can be opened only by means of special keys supplied bythe manufacturer. Solid state components shall be used throughout & assembled inplug-in type modules.

6.22.10 Paging system shall have battery backup for 8 hours in case of power failure.

6.22.11 For all other requirement refer ESS: 44LK-5100/E.02/062

6.23 TELEPHONE SYSTEM

6.23.1 The process plant, substations, control rooms, administration building & other non-process/plant buildings etc. shall be provided with sophisticated microprocessorbased intercom telephone system to facilitate intercommunication.

6.23.2 Telephones installed in classified hazardous area shall be flameproof type suitablefor the area classification, gas group & temperature class.

6.23.3 For all other requirement refer ESS : 44LK-5100/E.02/024

Page 31: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 31/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 31 of 43

ELECTRICAL Revision 0

6.24 FIRE ALARM SYSTEM

6.24.1 Fire Alarm system shall be microprocessor based, intelligent, digital addressabletype.

6.24.2 System shall be stand alone for entire plant area consisting of process unit,substation, control room etc. System shall be designed to provide necessary audiovisual signals at the main control panel with mimic panel and repeater control panel.The system shall be hooked up with main fire control panel located at fire stationcontrol room.

6.24.3 However system shall be suitable for integration with CCTV, PA, EPABX, GasDetection system and HVAC system.

6.24.4 System shall comprise of individual break glass type manual call points, smoke/heatdetectors, main panel, repeater panel, hooter, siren, battery, battery charger andother hardware.

6.24.5 Battery and charger shall be provided for each panel separately, rated for completefire alarm system operation for failure of power supply for at least 48 hours. FRLSarmoured cables shall be used for the system.

6.24.6 Detectors and Manual call points shall be connected in separate loop.

6.24.7 For all other requirement refer ESS : 44LK-5100/E.02/063

7.0 SYSTEM LAYOUTS

7.1 SUB-STATIONS

7.1.1 Layout of substation shall comply with OISD regulations, IE rules, TAC regulationsand any other applicable statutory rules and regulations.

7.1.2 The Substation shall be preferably a separate building with RCC roofing and brickwalls.

7.1.3 Substation shall have minimum two entries, one entry for equipment / normal entryand the second for emergency exit.

7.1.4 Substation shall be sized to take care of present and future needs and to maintainadequate clearances between equipment for ease of maintenance. Space for twoadjacent panels for future extension on each side of switchboard shall bemaintained.

7.1.5 The Ground floor of the s/s floor shall be suitably raised from adjacent grade level toavoid water ingress. The roof shall be given adequate water proofing treatment toensure that rain water does not seep into the s/s.

7.1.6 All S/S shall be pressurised. It is to be ensured that the inlet air of the pressurisedsystem shall be free from moisture and hazardous mixtures. Positive pressure of 2

mm shall be maintained inside the s/s.

7.1.7 Room housing critical power supply equipment and operators room of large sub-stations located close to process units shall be of blast proof design in case of maincontrol room being of blast proof construction.

7.1.8 Substation building shall be without any columns within the switchgear room toensure optimum space utilisation.

Page 32: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 32/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 32 of 43

ELECTRICAL Revision 0

7.1.9 Substation shall be equipped with MMI having 1 laptop as per purchaser’s

requirements and shall be installed in an air conditioned room in the substation forco-ordination, relay parameterisation (setting), load shedding and local monitoring /alarm purposes. MMI shall be kept in VSD room.

7.1.10 Normally transformers shall be installed outdoor. Electronic equipment like UPS /VSDs / excitation panel of synchronous motor shall be installed in a separate Air-conditioned room. Battery banks shall be located in a separate freely ventilatedroom in the s/s building along with the necessary exhaust system and waterconnection. Floor of battery room and the walls upto height of 1 m. shall be properlyacid/ alkaline resistant / painted with / alkali resistive paint. Light fittings in this roomshall be chemical resistant and FLP type.

7.1.11 Adequate access and lifting / loading / unloading facility shall be provided to bring inor take out switchgear panels. The layout of MV & LV switchgear, UPS batterychargers, LPs. PDBs, variable speed drives, soft starters etc. shall be complying

with the requirements of I.E.Rules and TAC recommendations and shall bedeveloped to have neat, systematic and uncluttered cabling in the cable alley.

7.1.12 Switchgear room shall be provided with following minimum (but not limited to)equipment :

- Suitably rated rubber mats in front of panels for their entire length. Rubber

mats shall meet the latest IS specifications.

- Electrically tested rubber gloves kept in dust free MS box with chalk powder.

- Framed shock treatment instruction card in English and local language. Name

and address together with telephone no. of nearest doctor should be entered

in it.

- First aid box easily accessible containing full compliments of ointments and

medicines for treatment of electrical burns.

- Adequate no. and size of CO2 fire extinguisher and dry chemical powder

suitable for dealing with fire.

- Round bottom fire buckets filled with clean dry sand.

- Framed single line diagram

- One No. earthing rod shall be provided for each Switchgear room floor of

substation (except cable cellar).

- One No. breaker lifting trolley each of MV and LV

- Earthing truck

- Battery impedance tester

- Two Almirahs for each floor of substation (except cable cellar).

- Adequate furniture (table/chair) shall be provided on each floor of substation

(except cable cellar).

7.1.13 Transformer yard / bay shall be provided with fencing and gate and shall have fireisolation walls (fire rating commensurate with the extent of fire which could beencountered). In general 230 mm thick RCC wall or 355 mm brick wall shall beconsidered to provide adequate fire protection. Wall shall be carried upto a height ofat least 600 mm above the top of the equipment (e.g. transformer conservator) level.Fire wall shall extend at least 600 mm beyond the width of transformer and coolingradiators. Minimum 1000 mm clearances shall be provided all around thetransformer.

Page 33: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 33/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 33 of 43

ELECTRICAL Revision 0

7.1.14 Oil immersed transformers with oil capacity exceeding 2000 litres shall be provided

with a soak pit of sufficient capacity to take the whole of the oil of the equipment.Where oil capacity of transformers exceeds 9000 litres, provision shall be made todrain away the oil to OWS system located away through suitable drain pipes of 150mm or 200 mm in diameter. Nitrogen injection fire prevention system shall beprovided for all oil – filled transformers having oil content more than 2000 litres orrated above 10MVA.

7.1.15 All substation / MCC rooms shall be located outside the hazardous area.

7.1.16 Staircases in substation building shall be sufficiently wide so that 2 persons canclimb simultaneously.

7.1.17 Cable cellar shall be provided with all required fire & safety provisions as per latestOISD guidelines.

7.2 CABLE LAYOUTS / ROUTING.

7.2.1 Cabling system for various areas shall be generally as under. However, as far aspossible existing cabling system shall be followed in OSBL areas.

- For process units RCC lined trenches shall be waterproofed & filled with sand

- For offsites & utilities areas. RCC trenches and directly buried for paved and

unpaved areas respectively.

- Lighting, fire alarm, communication cables shall be laid directly buried in road

berms. The communication and fire alarm cables shall be laid in road berm

opposite to the berm where street lighting cables are laid.

- All cables from main receiving substation to FW pump house shall be directly

buried separated from all other cables as per TAC guidelines.

7.2.2 Cable trenches shall be sized depending upon the number and voltage grade ofcables used for different applications. Trenches in hazardous areas shall be filledup with sand. In unpaved areas cables may be directly buried in ground. At roadcrossing, cables shall be laid through culverts / hume pipes / pre-cast RCC ductbanks etc. Concrete lined trenches shall have suitable drainage arrangement toavoid water collection or these trenches shall be connected to nearest storm waterdrain. Concrete lined cable trenches shall be sealed against ingress of liquid andgases.

7.2.3 The top of cable trenches before entering the substation shall be maximum 1mabove the ground level and also all cutouts shall be properly sealed by a fireproof (4hr) sealing compound. Pipes laid for mechanical protection shall be sealed at boththe ends.

7.2.4 All entry and exit openings for cables crossing in substation, control room etc. shall

be provided with fire barrier and it shall have minimum three hours rating.

7.2.5 Fire proofing/painting for all power cables on 3 meter length of cable at motor endand load end in the field and panel end in the substation shall be provided. Firebarriers shall also be provided below the opening of all MV and LV switchboard in allsubstations.

Page 34: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 34/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 34 of 43

ELECTRICAL Revision 0

7.2.6 The offered painting and fire barriers shall be tested at site and comply to the

requirement defined in the BS: 476 (part – 20) Method of determination of fireresistance of element of construction and IS: 12458 Fire resistance test of firebarriers and UL: 1479 Fire test of through penetration fire barriers. Fire protection forcables shall be provided as per IS 12459: code of practice for fire protection ofcables.

7.2.7 For directly buried under ground cables, route markers shall be provided at every15m interval all along the cable routes, at cable joints and where direction of cabletrench changes. Cable joint pits shall be sand filled.

7.2.8 Whenever cables will be required to run above ground, these shall be run in a singlelayer form in FRP/GI cable trays. Necessary tees and bends shall be provided tohave neat and easily accessible routing. Separate cable trays shall be provided forMV power, LV power, control and communication cables. Separate trays shall beprovided for AC and DC signal / control circuits.

7.2.9 Above ground cables shall be well supported on cable trays and shall be suitablyprotected against mechanical damage. Routing shall be decided to avoidinterference with hot surfaces or places subject to undue fire risk. Cable trays shallbe covered whenever they are running below pipes.

7.2.10 Cable trays, racks and trenches shall be sized to allow for 25% future cables. Cableinstallations shall provide minimum cable bending radii as recommended by cablemanufacturer.

7.2.11 Wherever pipe rack / pipe sleepers are not available for laying of above groundcable trays, cable tray support shall be sized to ensure lowest tray level to be min.2.7m above grade.

7.2.12 Cables running between cable tray and the equipment shall either run throughflexible or rigid PVC conduits. Necessary supports shall be provided for the same.

7.2.13 Plant cables shall run in either of the two directions formed by main axis, avoiding asmuch as possible crossings with instrument cable trenches and pipelines andpreferably away from restricted areas.

7.2.14 Underground cable routes shall be designed to avoid close pipe crossings andadjacent runs with underground pipelines. A distance of at least 30 cm betweencable and pipe shall be maintained. Cables shall preferably cross underneathburied pipelines

7.2.15 Parallel / Duplicate feeder cables shall be laid separately as far as possible

7.3 EARTHING LAYOUTS

7.3.1 Entire earthing system shall be designed as per IEEE 80 / IS 3043 code of practice

for earthing. Further the requirements of I.E Rules, OISD standards for earthingshall be strictly adhered to.

7.3.2 The main earthing loop (MEL) shall be G.I. strip of adequate size (75 x 8 mm min.)This MEL shall also be connected to existing MEL at different locations whereverpossible.

7.3.3 Earthing leads connecting equipment enclosures, supports etc. to MEL shall be ofG.I. strip / wire /unarmoured aluminium cables of adequate size.

7.3.4 Earthing lead connections from MEL shall be taken by providing earth plates ofadequate size to serve a particular group of devices.

Page 35: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 35/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 35 of 43

ELECTRICAL Revision 0

7.3.5 Number of earth electrodes shall be decided based on the requirements of IE. Rules

and to stabilise the potential gradient of the MEL & earth to a safe limit.

7.3.6 DCS, PLC and other electronic instruments shall be provided with clean earth asrecommended by the manufacturer for safe and nuisance-free operation. This shallbe kept galvanically isolated from the system and safety earthing.

7.3.7 Value of resistance of an earthing system to the general mass of earth shall be asfollows

- For electrical system and equipment a value that ensures operation of the

protective device in the electrical circuit but not in excess of 1 Ω.

- For lighting protection value of resistance of 5 Ω shall be desirable but in no

case it shall be more than 10 Ω.

- Overall grid resistance shall be less than 1 Ω.

7.3.8 Earthing shall be provided for following (but not limited to) as a minimum:-

- Metallic non current carrying parts of all electrical apparatus such as

switchgears, motors, lighting / power panels, control panels, cable trays,

terminal boxes, control stations, lighting fixtures, receptacles junction boxes

etc.

- Transformers / Generator neutrals.

- Steel structures / pipe racks etc.

- Storage tanks, vessels, columns and all other process equipment. Floating

roof tank shall have separate earthing at least six places.

- Cable armour

- Cable shields and armour- Any other equipment required to be earthed / bonded

- Fence / gate for transformer

- Lighting poles & masts

- Electronic equipments / DCS / PLC etc

7.3.9 All utility / process pipelines shall be earthed on entering or leaving the hazardousarea, except where conflicting with the requirements of cathodic protection. Inaddition, steel

Pipe racks shall be earthed at every 25 meters. Earth continuity shall be ensuredacross all the flanges in process units & other hazardous areas. Equipment locatedremote from main earth network, may be earthed by means of individual earthconductors and earth electrodes.

7.3.10 Independent earthing loop for each S/S shall be connected with MEL

7.3.11 Earth pit engraved markers shall be provided for each earth pit.

7.3.12 Underground earthing strips to be provided with 50 % corrosion allowance.

7.3.13 For L.V. equipment earth loop impedance shall be such as to effect circuitdisconnection in a time less than 1 second under solid earth fault conditions takingin to account the manufacturer’s nominal time / current characteristics of protectivedevice.

Page 36: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 36/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 36 of 43

ELECTRICAL Revision 0

7.3.14 The LSTK Contractor shall carry out earth resistivity measurements at different

locations as required.

7.4 STATIC EARTHING AND BONDING

7.4.1 Vessels and pipelines, by the process of movement of flow of liquids, can lead tostatic charge generation due to friction, and these shall be properly bonded andearthed to system/safety earth to avoid accumulation of charge. Necessary earthingpads, earth strips, jumpers shall be provided.

7.4.2 Plant steel work shall be connected to the earth network at a minimum of two points.

7.4.3 Where equipment is mounted on steel structures and is in direct contact with plantsteel work, no further bonding is necessary.

7.4.4 Where equipment is insulated from plant steel work two earthing connections shallbe taken to the earthing network or to adjacent earthed steelwork.

7.4.5 Equipment shall normally be bonded to earthing system by bolted, connection suchthat removal of one connection shall not isolate any other item of equipment.

7.4.6 All pipelines shall be bonded together and connected to the earth network at the plotboundary and also the boundary between a hazardous and non-hazardous area.

7.4.7 Where the resistance across a flange connection exceeds 10Ω, GI bonding strapshall be fitted across the f lange under one of the flange bolts.

7.5 LIGHTNING PROTECTION

7.5.1 All structures, columns, towers, vessels stacks and premises shall be checked forrisk assessment as per IS 2309. Where lightning protection is found to benecessary, the recommendations of the standard shall be strictly followed. Self-

conducting structures may not be provided with aerial rod and down conductors.They shall however be connected to the earthing system at minimum two points atthe base. An independent earthing network shall be provided for lighting protectionand this shall be bonded with the main earthing network only at the point of buriedearth electrode.

7.5.2 Air terminations, ring, Faraday cage and down conductors shall be of G.I.strips/wires of adequate size and shape.

7.5.3 A dedicated system of an adequate number of electrodes shall be provided. Theseelectrodes shall be pipe electrodes.

7.5.4 In hazardous areas, storage tanks upto 30m in diameter and the tallest structuresand columns shall be directly connected as close to the base as possible to aminimum of two earth electrodes by 32 x 6 GI strip. Combined resistance shall not

exceed 10Ω.

7.5.5 Storage tanks above 30m dia. shall be earthed with a minimum of three earthelectrodes equally spaced round the tank

7.5.6 Any other tall structures, columns etc. which are considered to be likely recipients oflightning strokes by virtue of their height, relative to surrounding structures shall alsobe earthed as described above.

7.5.7 Separate lighting protection system shall be provided for tank farm areasconsidering high mast meeting the requirement of OISD standards and IS.

Page 37: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 37/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 37 of 43

ELECTRICAL Revision 0

7.5.8 Where structure of equipment are not electrically continuous or made of poorly

conducting material, down conductors and air termination shall be provided.Additions bonding shall be applied to structures as necessary in order that

resistance from the highest point to earth does not exceed 10Ω.

7.6 LIGHTING LAYOUTS

7.6.1 The lighting layouts shall be designed to meet the illumination levels recommencedin IS 3046.

7.6.2 Minimum illuminations levels as specified below shall be achieved while designingthe lighting system.

Area Lux (minimum)

Roads and tank farm 10

Pump house, sheds 100

Main operating platforms & access stairs 60

Ordinary platforms 20

Process areas, heat exchangers, heater,separators, pump bays etc.

60

cooling tower, pipe racks, 60

Switchgear room 200

Cable cellar 70

Battery room 150

Control room, laboratory 500

SRR Rack Room area 500

Console area 500

Ware house 100

Compressor area 200

Office 300

7.6.3 Lighting design shall conform to relevant International Codes &Standards, IES HandBook and shall take into consideration the requirements from point of view of safetyand ease in operation and maintenance. A maintenance factor of 0.8 shall be

assumed for lighting illumination level calculation for normal areas. However, fordusty areas, maintenance factor as per relevant codes and standards shall beconsidered.

Page 38: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 38/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 38 of 43

ELECTRICAL Revision 0

7.6.4 Generally plant lighting shall be classified as under:

Normal lighting

Emergency lighting

Critical lighting

7.6.5 Normal & emergency lighting system shall be on 415 / 240 V system, where criticallighting shall be on 220 V DC.

7.6.6 Sufficient lighting shall be provided so as to enable plant operators to move safelywithin the accessible areas of plant and to perform routine operations.

7.6.7 Lighting requirements provided during the failure of power supply for normal lighting

shall be broadly,

- To facilitate carrying out of specified operations, for safe shutdown of the

plant.

- To gain access and permit ready identification of fire fighting facilities.

- Escape route for safe evacuation of operating personnel.

Recommended areas for critical lighting :

- Control rooms

- Main substations

- D.G./ T.G / G.T room

- Central fire station

- Fire water pump house

- First aid centre- Emergency escape route.

- Any other specific areas requiring critical lighting .

Recommended areas for AC emergency lighting :

- Control rooms

- Fire stations

- Staircases

- Platforms with ladder changing directions

- Strategic locations in process, where specific safety operations are to be

carried out, such as Areas near heat exchangers, condensers, Barring

gears of turbine.

- Areas around drives fed by emergency supply.

Any other specific areas requiring emergency lighting.

7.6.8 Generally 15 % of normal lighting load shall be considered for AC emergency load.

7.6.9 Wiring for lighting and convenience outlets in outdoor areas shall be carried out with

copper conductor, PVC insulated, armoured cables run along the column/platforms

and structures. The armoured cable shall enter lighting fixture / JB through double

compression gland for safe area and through flameproof glands for Ex(d) and Ex(e)

equipment. Where required, suitable mechanical protection shall be provided for

lighting fixtures (e.g. wire guard)

Page 39: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 39/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 39 of 43

ELECTRICAL Revision 0

7.6.10 The lighting installations shall be designed to obviate stroboscopic effect.

7.6.11 Lamp fittings in structures shall be so located that maintenance and lamp changing

can be effected without use of ladder or scaffolding.

7.6.12 The lighting fittings shall be situated in such a way that reflection on instruments /

VDU etc. in control rooms and sub-stations is avoided.

7.6.13 All lighting fittings shall be wired using armoured PVC cable of suitable no. of cores

and size. Necessary type and no. of junction boxes shall be provided for branch

connections.

7.6.14 DC critical lighting shall employ incandescent lamps.

7.6.15 Adequate no. of ceiling fan points shall be provided in offices, rooms allocated for

operating and maintenance personnel etc.

7.6.16 2 pole isolation devices shall be used for controlling fixtures in hazardous areas to

isolate phase as well neutral.7.6.17 For buildings with false ceiling, concealed conduit wiring below the false ceiling and

surface conduit wiring above false ceiling shall be considered.

7.6.18 Adequate no. of pull boxes shall be used. No joints shall be allowed inside these

pull boxes.

7.6.19 Battery room shall have fitting mounted on wall in order to facilitate easy

replacement of fused lamps. Switches controlling the fittings and exhaust fan shall

be installed outside the battery room.

7.6.20 Substation / cable gallery lighting shall be centrally controlled from push button near

main entrance

7.7 Soot Blower panel, if any, and BMS panel, if any, for Furnace shall be located on

ground level and shall be of FLP type and with canopy. Soot Blower panel shall be

Timer controlled and not PLC controlled.

8.0 INSTALLATION

Installation of all electrical equipment shall be carried out with high standard of

workmanship, neat routing/layouts, and clearances/access as per recommendations

by the manufacturer.

After installation the system equipment shall be tested for pre-commissioning test as

recommended by the manufacturers & established practises. Further, commissioning

tests shall be conducted to prove agreed performance within specified tolerance,

temperature rise, noise and vibration.

For all other requirement refer standard specification doc. no. 44LK-5100/E.02/026.

9.0 FIELD TESTING AND COMMISSIONINGField tests as per the procedures approved by the Owner shall be performed on the

electrical equipment before being put into service. Acceptance of the complete

electrical installation shall be contingent upon inspection and test results. Field tests

shall include but not be limited to the following:

9.1 A visual inspection at both ends of a cable/conduit run, and all intermediate joints to

ensure that terminal chambers and other enclosures are clean, joints tight and sound,

wiring correctly dressed and labelled and no obvious faults are present.

Page 40: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 40/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 40 of 43

ELECTRICAL Revision 0

9.2 After visual inspection, all the covers shall be replaced and cover screw (and gaskets,

if any) checked to be present and tight.

9.3 ELECTRICAL TESTS SHALL INCLUDE :

9.3.1 An insulation test for each winding and circuit with a separate test for each core of

power circuit.

9.3.2 Continuity test for all power circuits and windings.

9.3.3 Earth continuity test for all circuits.

9.3.4 An earth resistance measurement for each group of electrodes, and the earthing

system as a whole

9.3.5 Lighting installation shall be tested for correct illumination levels with the fittings

installed. Fittings shall be operated only with their designed size of a lamp or tube.

9.3.6 All protective relays and meters shall be tested and calibrated. All relays must bechecked for settings.

9.3.7 After the above tests and inspection are completed. Control circuit shall be tested for

correct operation under all operating combinations and proved correct before applying

power to main circuits.

9.3.8 Main circuits shall be checked for correct phasing and rotation.

9.3.9 All motors except those having sealed prefabricated ball bearings shall be checked for

proper lubrication prior to energisation and shall be tested for correct rotation. ECP (

polymer cage) type bearings shall not be provided in motors. Only ECJ / ECM (steel /

brass cage) type shall be accepted. Grease tube shall be of MS.

9.3.10 A close visual inspection of all electrical equipment in hazardous area shall be made to

ensure that the equipment is both suitable and correctly installed.

9.3.11 Capacity test shall be carried out on UPS / batteries / battery charger after installationat site.

9.3.12 After completion of tests EPCC contractor shall prepare a joint test report for each test

carried out on each equipment and shall get signed by PMC/Owner representative. A

copy of such test reports shall form a part of completion report.

9.3.13 For all other requirement refer standard specification doc. no. 44LK-5100/E.02/026.

10.0 MAKE OF COMPONENTS

Sr. No Component Make

1) Circuit Breaker (6.6 kV) : Siemens/ ABB / Jyoti

2) Circuit Breaker (LT) : Siemens (3WL) / L&T (UPower) / Schneider

(Merlin Gerin Master Pact Imported make)

3) Switch (Incomer) : Siemens / L&T / Schneider

4) Switches for Motor feeder /

Power feeders

: Siemens / L&T / Schneider

5) Fuses : 1) Power : HRC link type Siemens / L&T / Schneider

2) Control : HRC link type Siemens / L&T / Schneider

6) Contactor : Siemens / L&T / Schneider

Page 41: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 41/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 41 of 43

ELECTRICAL Revision 0

7) Overload relays : Siemens / L&T / Schneider

8) Current transformer : Silkans / Precision / Pragati / Kappa / Prayog /Jyoti

9) Potential transformers : Silkans / Precision / Pragati/ Kappa / Prayog /Jyoti.

10) Push buttons : Siemens / Teknic / L&T.

11) Meters : A & V Meters - AE Make.

KWH/KVARH Meter - GEC / Simco .

Pf Meter – GEC/Simco.

12) Terminals : a) Power : Elmex .

b) Control : Elmex make .

13) Relays : ABB /Siemens

14) Auxiliary Contactors : Siemens / L&T / Jyoti (PLUGGING TYPE)

15) Selector switch : Kaycee

16) Timer : Siemens / L&T

17) Interposing relays : ABB/Allen Bradley /OEN

18) Transducers : ABB/Southern Transducers / Rochester (USA)

19) WTI : Perfect Controls / Precimeasure

20) OTI : Perfect Controls / Precimeasure

21) Tap Changer Assembly : BHEL / CGL / Easun Reyrolle

Page 42: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 42/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 42 of 43

ELECTRICAL Revision 0

ANNEXURE – I :List of reference standard specifications:

Ref. No. Title

44LK-5100/E.02/001 Induction Motors

44LK-5100/E.02/002 L.V. Switchgear

44LK-5100/E.02/003 Motor Control Centres (MCC)

44LK-5100/E.02/004 Power Transformers

44LK-5100/E.02/005 Battery & Charger

44LK-5100/E.02/006 HV Switchboards - Indoor Type (Up to 33kV)

44LK-5100/E.02/007 Bus Duct (HV/LV)

44LK-5100/E.02/008 Medium and High Voltage Heavy Duty Cables

44LK-5100/E.02/009 Main Lighting & Power Distribution Boards

44LK-5100/E.02/010 Lighting Panels.

44LK-5100/E.02/011 Lighting and DC Distribution panels with MCBs

44LK-5100/E.02/012 Industrial Local Control Stations

44LK-5100/E.02/013 Flameproof Local Control Stations

44LK-5100/E.02/017 Neutral Grounding Resistors

44LK-5100/E.02/024 Telephone System

44LK-5100/E.02/025 Static Uninterruptible Power Supply Unit (U.P.S)

44LK-5100/E.02/026 Electrical Installation

44LK-5100/E.02/027 Electrical Content of Package Unit

44LK-5100/E.02/029 HV Capacitor Bank

44LK-5100/E.02/031 AC Variable Speed Drive System.

44LK-5100/E.02/032 Lighting Transformers

44LK-5100/E.02/035 Conduit Installation for Conduits and Fittings Embedded in R.C.C. Work

44LK-5100/E.02/058 Motorized Valve Actuators

44LK-5100/E.02/059 3-Phase Alternating Current Generators Upto 1.5MVA For Standby Duty

44LK-5100/E.02/062 Public Address System

44LK-5100/E.02/063 Fire Alarm System

Page 43: B.2.2_Elec Design Guidelines

8/13/2019 B.2.2_Elec Design Guidelines

http://slidepdf.com/reader/full/b22elec-design-guidelines 43/43

ENGINEERING DESIGN 44LK-5100-00/E.02/0002/A4

GUIDELINES Sheet 43 of 43

ELECTRICAL Revision 0

ANNEXURE – I :List of reference standard specifications (Contd.)

44LK-5100/E.02/064 ECS

44LK-5100/E.02/065 Soft Starter

44LK-5100/E.02/067Flameproof distribution panel, plugs, sockets, lamps and Light fittings for

Hazardous locations.

44LK-5100/E.02/069 Electrical system for E. O. T. Crane

44LK-5100/E.02/070 High Voltage Synchronous Motors

44LK-5100/E.02/071 Thyristor Control Panel for Electric Heaters

44LK-5100/E.02/072 Electrical Heaters