Upload
gonka-klima-as
View
315
Download
5
Tags:
Embed Size (px)
DESCRIPTION
GONKA, established as a limited company in 1986 in Ostim, Ankara, has become one of the leading firms in Heating - Cooling - Air Conditioning - Ventilating Installation, with the high performance and disciplined working mentality of Halil GONCU (Mechanical engineer, BS MS ITU, 1975) and Salih KADAYIFCIOGLU (Mechanical Engineer, BS GU, 1982) within more than 23 years for both manufacturing and contracting.GONKA Company, has been continuing its activities, in its factory located in Sincan Organized Industrial Area, since 1996. GONKA manufactures its products related to Heating - Cooling - Air Conditioning - Ventilating Installation in its factory in an area of 10.000 m2 and equipped with the latest technology.GONKA, which is continuing its activities through its technical and managerial staff in its modern Directorate General Building in Cetin Emec Boulevard, Ankara which it has moved in 2002, has been replaced "GONKA Air Conditioning Installation Construction and Trade Joint-Stock Company" by transforming into "joint-stock company" in 2003.GONKA enforces its activity in Turkey By serving through its network consisted of Istanbul and Ankara Region Offices and maintenance-repair services firms. In regions other than these, GONKA offers contact and service through local offices and central maintenance-repair crews.GONKA; has KnowHow, especially about the field of "Clean Room" technology, which requires sterility in operating theatres and air conditioning-ventilating systems of environments such as operas, theatres, auditorium buildings, television studios which require silence.GONKA has created "model company" profile in air conditioning sector through both manufacturing or supply of devices and its disciplined approach in mechanical operations by succeeding a lot of projects within last 23 years. GONKA, which has focused on internto 32 countries and succeeded many projects in Middle-East, Asia and Africa countries by its powerful foreign trade departmentational projects in last 15 years, gave representations
Citation preview
GÖNKA Inc. Azerbaijan References
GÖNKA
BÝle
suva
r O
lym
pic
Tra
inin
g C
om
ple
x
20
08
2/3
BÝle
suva
r O
lym
pic
Tra
inin
g C
om
ple
x
Bilesuvar Olympic Training Complex
The Whole Mechanical Contracting ; piping, duct work, heating system, boiler room, cooling system, were made by GONKA. All HVAC equipment is supplied by GONKA.
Swimming pool & olympic training facilities are completed in the complex the, finshed in 2008
Air Cooled Water Chillers
Fan Coils Ceiling & Wall Type
Air Handling Units
Are used in complex
20
08
Ba
ku T
urk
ish A
na
tolia
n H
igh S
cho
ol
4/5
Baku Turkish Anatolian High School
Baku Turkish Anatolian High School
20
09
Gö
yça
y O
lym
pic
Tra
inin
g C
om
ple
x
Göyçay Olympic Training Complex
The Mechanical Contracting ; piping, duct work, heating system, boiler room, cooling system, were made by GONKA Inc. All HVAC equipment is manufactured and supplied by GÖNKA
Swimming pool, & olympic training facilities and remaining works are completed in 2009
6/7
Air cooled water chillers
Fan Coils Ceiling & Wall Type
Air Handling Units
Are used in complex
Boiler room, pump station and piping. Ductwork
20
09
Hö
vsa
n O
lym
pic
Tra
inin
g C
om
ple
x
Hövsan Olympic Training Complex
8/9
GONKA Screw compressor air cooled water cooling groups,
with its models in the range of high efficiency and high
capacity, are ideal for cooling operations related to comfort
and industrial purposes. R22 , R134a or R407c options.
Compressors; Half hermetic screw compressors.
Compressors changing between 1 and 4 according to
cooling capacity.
Condenser; Highly efficient, original condenser situated in V
type and condensation provided through 900 cyclical and
low sound level axial fans situated in the open edge of the
condenser.
Evaporator; Shell- tube evaporator whose cooling liquid side
and water side have one-circuit, multiple transitional, two
mirrored construction.
Refrigerating Circuit;Cooling Circuit; Cooling circuit and
circuit elements entirely independent for every compressor.
Electrical Screen and Control Board; board including switch
and micro-processor controlled module and control cards
as well as elements such as systemic control elements and
f u s e , t h e r m i c m a g n e t i c s w i t c h a n d r e l a y.
Micro-processor based Control System; Full control over all
the cooling circuits. Connections on board through simplified
device failure follow-up and easily recognized electrical
diagram.
Low noise level.
Multiple compressor, multiple cyclical, high efficiency.
%25-%100 continuous modulating capacity control in every
compressor.
Hardconstruction and long life. Easy handling, installation
and service.
Effortless service.
C o m p a t i b l e w i t h a v a i l a b l e B M S s y s t e m s .
Meeting consumer requirements in the most suitable way
through broad accessory and option alternatives.
Newly improved use of screw compressor with high COP
value. Trouble-proof operations under high temperatures.
Rational control.
Air cooled liquid chiller
Serin
Ho
tel B
aku
20
06
10/11
Serin Hotel Baku
Air cooled liquid chiller
Ba
lake
n O
lym
pic
Tra
inin
g C
om
ple
x2
00
9
Balaken Olympic Training Complex
12/13
The Mechanical Contracting ; piping, duct work, heating system, boiler room, cooling system, were made by GONKA Inc. All HVAC equipment is manufactured and supplied by GÖNKA
Swimming pool, & olympic training facilities and remaining works are completed in 2009
Chiller Air Cooled
Fan Coils Ceiling & Wall Type
Air Handling Units
Are used in complex
Ba
ku A
dm
inis
tra
tion O
f Th
e N
atio
na
l Arc
hiv
e B
uild
ing
20
08
14/15
Baku Administration Of The NationalArchive Building
Air handling unit
Optional Accessories;
! GONKA vapor humidifier, standard vapor cylinder, immersion electrodes, stainless vapor distributor and microprocessor control unit.
! Mufflers which are made up of coulisses to provide required sound holding capacity.
! Plate heat exchanger or Heat recovery wheel for recovery of the heat emitted with exhaust air.
! Electrical board.
! Frequency Converter
Standard Series
Application Area: business centers, schools,
hospitals, factories, hotels and restaurants.
! 8 different models which provide required humidity
and temperature by conditioning air volume in the
range of 3000m³/h and 100.000 m³/h.
! The framework which is formed by combination of
aluminum frames, which are connected specially, with
plastic and aluminum comers.
! Boards which are made up of double skilled
galvanized iron in a standard way.
! Polyurethane insulated panels, which are 30 mm in
thickness, for thermal and acoustic insulation in a
standard way.
Standard Accessories;
! Filter Chambers; Chamber design which provides easy mounting and de-mounting in filters and filters with different productivity levels on demand.
! Heating and Cooling Coils; Seamless cooper tubes. In heating coils, 4 options: warm water, vapor, hot water, electrically heated; in cooling coils, 2 options: chilled water and DX (direct expansion).
! Dampers; Rigid aluminum frame in multi airfoil structure which is the least resistant against airflow. Rubber gaskets which reduce air leakage through blades to the minimum level.
! Fans; Statically and dynamically balanced aspirators and ventilators in double inlet belt driven centrifugal type. Forward curved fans in systems with low, medium and high duct pressures,.
Hb
Clin
ique
Ba
ku2
00
7
16/17
Hb Clinique Baku
Laminar flow air system
! HEPA filters which clean filtrated air before going into
operating room.
! Mounting situated in ceiling of the operating theatre in
such a way that it should locate over operating table.
! Stainless steel air distribution box, Hepa filters, transparent
air distributor (laminarizator) and pendant operating
table lighting connection.
! Easy maintenance and disinfection because of
transparent air distributor's being pulled down. Operating
theatre lighting system made up of airproof
construction.
! A laminar, vertical air flow from transparent air distributor
through operating table prevents turbulent air flow in
conventional air systems and offers a high level
cleanliness class around the operating table during the
operati
! The system which remove particulates and microbes
from operation part due to laminar flow.
! Special design for operation theatres which require
especially high level sterilization in accordance with DIN
1946.
! Differential pressure sensors. Easy connection differential
pressure sensors and leakage testing.
! Easy installation to all kinds of ceilings.
Packaged hygienic air conditioner
! Highly efficient filtration of supply and extract air.
! Maximum function control: room temperature and relative humidity control throughout the year.
! Meeting fresh air that surgical operations require
! Quiet and non-vibrating operation that operating theatres require.
! An independent system which is under direct control of authorized health staff.
! Pressure control in aseptic and septic surgical operations.
! Continuous control of room temperature and humidity.
! Quiet and non-vibrating operation.
! Replacing the old installation in available places and generally, because their sizes are small, occupying less room than any time before, however available air canal and water installation could be, easy erection in any type of health institutions.
! In fan part, one or two directly actuated highly static pressurized fans to provide required air volumetric flow rate even when filters are choked.
! Fans with inverter; St316 stainless steel fans which are used as a higher standard in respect to epoxy dyed standard fans in terms of hygiene and endurance. With a view to achieving continuous speed control, inverter equipment in supply and extract fans.
! Air Filters; F5 class filter in fresh air input and F9 class filters on the extract side.
! Dx battery;
! Vapor humidifiers; Standard steam cylinder, dipping electrodes, stainless steam distributor and micro-process control.
! Compressor; 1 or 2 Scroll Compressors according to the capacity.
! Electrical Board; All of the elements required for the trouble-proof operation of master switch and device.
! Micro-processor; AC micro-processor control of temperature and relative humidity over all of the operation and safety functions integrally (I) or rational- integrally (PI).
! PCO2 micro-processor of device control and adjustment system which provides remote control terminal with erection inside the clean room.
Ba
ku M
inis
try
Of H
ea
lth T
op
çub
aþo
v H
osp
ital
20
08
Laminar flow system
! HEPA filters which clean filtrated air before going into
operating room.
! Mounting situated in ceiling of the operating theatre in
such a way that it should locate over operating table.
! Stainless steel air distribution box, Hepa filters, transparent
air distributor (laminarizator) and pendant operating
table lighting connection.
! Easy maintenance and disinfection because of transparent air distributor's being pulled down. Operating theatre lighting system made up of airproof construction.
! A laminar, vertical air flow from transparent air distributor through operating table prevents turbulent air flow in conventional air systems and offers a high level cleanliness class around the operating table during the operatic
! The system which remove particulates and microbes
from operation part due to laminar flow.
! Special design for operation theatres which require
especially high level sterilization in accordance with DIN
1946.
! Differential pressure sensors. Easy connection differential
pressure sensors and leakage testing.
! Easy installation to all kinds of ceilings.
18/19
Baku Ministry Of Health Topçubaþov Hospital
Laminar flow system
Serin
Ho
spita
l Aze
rba
ijan
20
08
20/21
Serin Hospital Azerbaijan
Serin
Ho
spita
l Aze
rba
ijan
20
08
Packaged hygienic air conditioner
! Highly efficient filtration of supply and extract air.
! Maximum function control: room temperature and relative humidity control throughout the year.
! Meeting fresh air that surgical operations require
! Quiet and non-vibrating operation that operating theatres require.
! An independent system which is under direct control of authorized health staff.
! Pressure control in aseptic and septic surgical operations.
! Continuous control of room temperature and humidity.
! Quiet and non-vibrating operation.
! Replacing the old installation in available places and generally, because their sizes are small, occupying less room than any time before, however available air canal and water installation could be, easy erection in any type of health institutions.
! In fan part, one or two directly actuated highly static pressurized fans to provide required air volumetric flow rate even when filters are choked.
! Fans with inverter; St316 stainless steel fans which are used as a higher standard in respect to epoxy dyed standard fans in terms of hygiene and endurance. With a view to achieving continuous speed control, inverter equipment in supply and extract fans.
! Air Filters; F5 class filter in fresh air input and F9 class filters on the extract side.
! Dx battery;
! Vapor humidifiers; Standard steam cylinder, dipping electrodes, stainless steam distributor and micro-process control.
! Compressor; 1 or 2 Scroll Compressors according to the capacity.
! Electrical Board; All of the elements required for the trouble-proof operation of master switch and device.
! Micro-processor; AC micro-processor control of temperature and relative humidity over all of the operation and safety functions integrally (I) or rational- integrally (PI).
! PCO2 micro-processor of device control and adjustment system which provides remote control terminal with erection inside the clean room.
22/23
Serin
Ho
spita
l Aze
rba
ijan
20
08
24/25
Serin Hospital Azerbaijan
Aze
rba
ijan M
ilita
ry H
osp
ital 3
00
Be
d2
00
7
Laminar flow system
! HEPA filters which clean filtrated air before going into
operating room.
! Mounting situated in ceiling of the operating theatre in
such a way that it should locate over operating table.
! Stainless steel air distribution box, Hepa filters, transparent
air distributor (laminarizator) and pendant operating
table lighting connection.
! Easy maintenance and disinfection because of transparent air distributor's being pulled down. Operating theatre lighting system made up of airproof construction.
! A laminar, vertical air flow from transparent air distributor through operating table prevents turbulent air flow in conventional air systems and offers a high level cleanliness class around the operating table during the operati
! The system which remove particulates and microbes
from operation part due to laminar flow.
! Special design for operation theatres which require
especially high level sterilization in accordance with DIN
1946.
! Differential pressure sensors. Easy connection differential
pressure sensors and leakage testing.
! Easy installation to all kinds of ceilings.
26/27
Azerbaijan Military Hospital 300 Bed
HVAC equipment related to operating theatres are supplied
by GONKA Inc.
Ce
ntra
l Ba
nk
of A
zerb
aija
n R
ep
ub
lic2
00
9
28/29
Central Bank of Azerbaijan RepublicHVAC equipment periodic maintenance are being provided
by GONKA Inc.
HVAC equipment periodic maintenance is being provided
by GONKA Inc.
Aze
rba
ijan M
c D
ona
ld’s
20
02
Azerbaijan Mc Donald’s
Centrifugal roof extracts
Technical specification The manufactured centrifugal roof
extract unit has been designed for the effective exhaust. it is
possible to montage in the desired angle with the small
sound Ievel it may be used in for the industrial applications
and kitchens. It has been designed for Iong service Iife
without maintenance. The manufacturing range 500-
12.000 m³/h air and 0-50 mmSS pressure.
Body It is designed according to the bat environment
conditions Galvanized stell frame, aluminium upper cover
are used. Moto-fan group Cenrifugal ventilatör is statically
and dynamically balanced.Motor serves 380V/50 Hz 900-
1400d/d as astandard and directly coupled with d-phase
electirical motor.By this way, it works quitely and without
vibration.
Fan has dense f imed, low sound level and
highperformance.It is easy to open the fan and clean the
fin at shot notice. By the help aof special protection cover,
itwork many years without any problem. Centrifugal roof
extract units designed as direct extraction or combined
with a duct type.
30/31
Ba
ku S
tate
Univ
ers
ity
20
08
32/33
Baku State University
Air handling unit
Optional Accessories;
! GONKA vapor humidifier, standard vapor cylinder, immersion electrodes, stainless vapor distributor and microprocessor control unit.
! Mufflers which are made up of coulisses to provide required sound holding capacity.
! Plate heat exchanger or Heat recovery wheel for recovery of the heat emitted with exhaust air.
! Electrical board.
! Frequency Converter
Standard Series
Application Area: business centers, schools,
hospitals, factories, hotels and restaurants.
! 8 different models which provide required humidity and
temperature by conditioning air volume in the range of
3000m³/h and 100.000 m³/h.
! The framework which is formed by combination of
aluminum frames, which are connected specially, with
plastic and aluminum comers.
! Boards which are made up of double skilled galvanized
iron in a standard way.
! Polyurethane insulated panels, which are 30 mm in
thickness, for thermal and acoustic insulation in a
standard way.
Standard Accessories;
! Filter Chambers; Chamber design which provides easy mounting and de-mounting in filters and filters with different productivity levels on demand.
! Heating and Cooling Coils; Seamless cooper tubes. In heating coils, 4 options: warm water, vapor, hot water, electrically heated; in cooling coils, 2 options: chilled water and DX (direct expansion).
! Dampers; Rigid aluminum frame in multi airfoil structure which is the least resistant against airflow. Rubber gaskets which reduce air leakage through blades to the minimum level.
! Fans; Statically and dynamically balanced aspirators and ventilators in double inlet belt driven centrifugal type. Forward curved fans in systems with low, medium and high duct pressures,.
Aze
rba
ijan G
ön
ka O
ffic
e a
nd
Sh
ow
roo
m2
00
9
34/35
Azerbaijan Gönka Office and Showroom
! The most important feature of decorative type Fan-Coil
units is their use both with casing and without casing
(concealed) in every position. While ceiling cabinet and
cabinet floor types are mounted inside the room,
concealed types are mounted within ceilings or walls.
Unit models which operate both heating and cooling or
only heating are available.
! Low sound level; quality is high level for providing quiet
study environment.
! Ideal acoustic and thermal insulation.
! Functional remote control.
! 2 or 3-way On/ Off or rational control.
! Outer casing; It is made from DKP sheet steel, outside
and inside of the unit are painted with electrostatic
powder paint against rust and external effects.
! Internal frame; Mounting upon originally designed
framework made from galvanized steel together with
battery, fan, motor group, dried pan and dropper.
! Battery; Copper pipe, aluminum fins.
! Fan and engine group; 1 or 2 fans to provide required
capacity in devices in accordance with capacity table.
Fan coil units
Ata
Oku
l Aze
rba
ijan
20
08
36/37
Ata Okul Azerbaijan
Ha
sano
glu
Furn
iture
Fa
cto
ry2
00
9-2
01
0
38/39
Hasanoglu Furniture Factory
Air Cooled Water Chillers, Chambered Exhaust Fans, Air Handling Units, Roof Extract Fans are manufactured, supplied and installed by GONKA Inc.
Unit heaters with radial fan
GÖNKA GDA series unit heaters are designed to meet the
heating requirements of workshops, warehouses, factories,
stores, garages, sporting halls etc. They are manufactured so
as to be connected either to hot water, superheated water or
steam lines. There are 13 models in order to handle heating
capacities between 4.000-60.000Kcal/h and they are
available in two types; wall mounted and ceiling.
Technical specification Casing Manufactured from
phosphatized steel sheets finished with oven baked
electrostatic paint. Centrifugal fan-motor group As a
standard the centrifugal fans are directly coupled to three-
phase electric motor, which has high starting torque. The fans
are statically and dynamically balanced to ensure vibration
and noise free operation. Air mixing box
In case fresh air intake is necessary, a mixing box is mounted
on the air inlet to provide the required air mixture.Air
discharge louvers In order to direct the airflow to desired
direction adjustable discharge louvers, consisting of parallel
moving flaps and frames, are used. Coil connections
Connection of the coils to the hot water or steam lines is done
easily via coil union stems, manufactured to fit standard
pipes
Organize Sanayi Bölgesi
Göktürk Cad. No:6
Sincan / ANKARA / TURKEY
Tel :0 312 267 09 90 (pbx)
Fax:0 312 267 09 93
FACTORY and MAIN OFFICE
Nerimanov rayonu,
Y. V. Çemenzeminli Sok.
1996-cý mahalle AFEN Plaza
Baku - AZERBAIJAN
Tel / Fax: (00 994) 12 564 07 04
117 Tsereteli avenue
Tbilisi - GEORGIA
Tel: (00 995) 32 921 821
Fax:(00 995) 32 941 120
AZERBAIJAN BRANCH OFFICE
GEORGIA BRANCH OFFICE
GÖNKA Azerbaijan References
- Hövsan Olympic Training Complex
- Baku Turkish Anatolian High School
- Göyçay Olympic Training Complex
- Serin Hotel Baku
- Balaken Olympic Structure
- BÝlesuvar Olympic Structure
- Baku Administration Of The National
Archive Building
- Hb Clinique Baku
- Azerbaijan Baku Endos. Hospital
- Azerbaijan Military Hospital 300 Bed
- Karwan Mtk Azerbaijan
- Ata Okul Azerbaijan
- Serin Hospital Azerbaijan
- Baku Ministry Of Health Topçubaþov
Hospital
- Baku State University Kitchen And
Restaurant