Environmental and Social Monitoring Report Project Number: 46907-014 December 2018
THA: Ayudhaya Natural Gas Power Project
Prepared by Gulf JP UT Company Limited
The environmental and social monitoring report is a document of the borrower. The views
expressed herein do not necessarily represent those of ADB's Board of Directors, Management,
or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website.
In preparing any country program or strategy, financing any project, or by making any designation
of or reference to a particular territory or geographic area in this document, the Asian
Development Bank does not intend to make any judgments as to the legal or other status of any
territory or area.
0081594-0000024 TY:2847989.13 1
ENVIRONMENTAL AND SOCIAL ISSUES COMPLIANCE
REPORT
AYUDHAYA NATURAL GAS POWER PROJECT
PROPOSE
ASIAN DEVELOPMENT BANK
GULF JP UT COMPANY LIMITED
JULY - DECEMBER 2018
0081594-0000024 TY:2847989.13 2
ENVIRONMENTAL AND SOCIAL ISSUES COMPLIANCE REPORT
Ayudhaya Natural Gas Power Project of Gulf JP UT Company Limited is 1,700 MW. Its location is
in the area of 300 rai approximately in the Rojana Industrial Park (RIP) Phase VI at Ban Chang Sub-district,
Uthai District, Phra Nakhon Si Ayutthaya Province. The project aims to generate and distribute the
electricity through transmission line system of Electricity Generating Authority of Thailand (EGAT) in order
to strengthen the power security of the country. The project detail on below.
(1) Project Title : Ayudhaya Natural Gas Power Project (Uthai Power Plant)
(2) Project capacity : 1,700 MW.
(3) Project Owner : Gulf JP UT Co., Ltd.
(4) EIA Approved : January 17th, 2012
(5) Start of construction : January 7th, 2013
(6) Accomplishment : 100.0% completion
(7) Target completion period : December 1st, 2015
Summary of the potential environmental impacts as follows:
Air quality Emission from combustion is the main source which might cause impact on air quality. In order to minimize its impact to be at the lowest level, the project has installed the Continuous Emission
Monitoring System; CEMs to fully monitor and control the emission rate to comply with the prevention and
mitigation measures and national standard.
Noise Machinery for electricity generating might cause noise affected to both working staff. In order
to minimize its impact to be at the lowest level, the Project has provided the proper Personal Protection
Equipment such as ear muff to all staff and provided the warning sign at the noisy area. Noise contour map is
developed in the year of production and every 5 years. From noise contour map information, it was indicated
that all area have sound level below 85 dB(A). Periodically maintenance programs are also applied to reduce
the noisy source.
Surface water quality Cooling water blow down discharge, wastewater discharge and oil –contaminated rain water are 3 main sources of water pollution which might cause impact the surface water
quality. The power plant already constructed retention containment adequate for retaining both cooling water
blowdown water and wastewater and also installed the automatic online monitoring system so the water
quality will be monitored and control to comply with the regulation before discharge. Oil-contaminated rain
water will be collected in the oil separation pond before draining the unpolluted water to the Rojana Storm
Water Drainage System.
Transportation Project regularly trained the driver for transportation rules and regulation. Chemical
and waste transporting truck is inspected for the proper condition, safety sign comply with UN
recommendation and HAZCHEM.
Management of solid waste Wastes generated from staffs’ consumption and operation activities may cause an impact. In order to minimize its impact to be at the lowest level, the project has fully complied with the prevention and mitigation measures; e.g., provision of sufficient garbage bins with lids at various places in the project area, assigned staff has gathered and put in the designated area, at least once a day. Wastes was classified for re-use or sold. General waste is transported and disposed by Ban Charng Subdistrict Administrative Organization and sludge from water pre-treatment by Ayothaya Recycle 2002 Co., Ltd that is the authorized company from Department of Industrial Works.
Drainage and flood control The project area has designed and constructed drainage system for storm
water and collected to Storm water Holding Pond before discharge to drainage system of Rojana Industrial
Park. Checked-up conditions of drainage system and removal waste from drainage channels are scheduled on a weekly basis.
0081594-0000024 TY:2847989.13 3
Public participation and public relations The project has established the Community Participation
Committee on July 13, 2017 and the Community Participation Committee established the Environmental Inspector and assigned them to organize and monitor the project implementation. There were 2 Environmental Inspector meetings on September 10, 2018 and November 5, 2018. The project informed and disseminated information about the project mitigation measures through meeting media and listened to the
concerns of communities. The project has joined activities with communities and government agencies continuously, such as support GULF FOOTBALL CLINIC with Buriram United Club, support budget for Environment Exhibition at Tourism Promotion Center Conserver Natural Resuorces and Environment (Hed Tub Tao) and support budget to Loi Krathong Festival in the community around the power plant, etc.
Public health, occupational health and safety The operation activities may cause impacts on the
health of workers and peoples who are living nearby the project area. So the project has complied with the prevention and mitigation measures, including provided first aid equipment, medical supplies and vehicles
for use in case it is necessary to transport any power plant employee(s) to the nearest clinic or hospital
immediately. PPE wearing is also mandated, including safety helmet, safety gloves, safety shoes, noise
protective devices, etc., while working all the time. Conducted routine inspections of quality of equipment,
tools and machines as specified in the manufacturer's manual (by also including pre-use inspections).
Providing training in knowledge, safety and environment as well as safety and environmental instructions for
employees according to job characteristics and every related person. Project prepared adequate firefighting
and first aid equipment, place them at proper places. Recorded accidents and investigated the causes, and
also recorded the causes of illnesses and used the information obtained from these activities to find a way to
prevent and correct the problems. Material safety data sheet (MSDS) is posted for every type of chemicals
had separately kept reactive chemicals from each other.
Major Hazards Project inspected the natural gas and diesel oil pipeline systems and other equipment
to ensure that they were ready for use and also conducted a surveillance of these systems and equipment for
Safety all the time. The power plant designated the plant area and the gas pressure regulating & metering
station as specific areas where no work generating heat or sparks is allowed to take place, by also posting
warning signs at the gas pressure regulating & metering station and the diesel oil tank In case it was
necessary to enter any of such areas, strict checking and control as well as work permit system were required
The power plant had provided training for its staff and related persons so as to advise them of accurate work
instructions, work precautions, work methods and how to react when encountering a gas or oil leak or other
hazardous event, or to provide them with other necessary training courses. Disaster Response Plan is
established, which focused on gas or oil leaks and listed of emergency phone numbers for use when
requiring control of the aforementioned emergencies are posted.
0081594-0000024 TY:2847989.13 4
1. Mitigation Measures and Monitoring Programme
AIR QUALITY (EMISSION GAS)
Monitoring station: Emission stacks (Please indicate the location of the monitoring stations as indicated in
the EMP such as the [●])
HRSG 11 Item
Unit
Measured
Value
(Mean)
Measured
Value
(Max.)
Country’s Standards
Referred
International
Standards
Remarks
(Frequency, Method, etc.)
SO2 ppm 0.46 0.47 10 2000 Frequency;
- Twice a year.
Method of Analysis;
SO2 : US EPA Method 6C
NO2: US EPA Method 7E
CO: US EPA Method 10
TSP: US EPA Method 5
Gas Flow: US EPA Method 2
NO21 ppm 30.86 31.13 70 -
CO ppm 59.33 64.38 - -
O2 % 14.10 14.13 - -
TSP mg/Ncu.m 0.55 0.55 20 50
Gas Flow rate
Ncu.m/min 24,059 24,059 - -
Remark : 1. The monitoring of air quality (emission gas) on August 1, 2018. 2.1For NO2 the Thai standards will be applied.
HRSG 12 Item
Unit
Measured
Value
(Mean)
Measured
Value
(Max.)
Country’s Standards
Referred
International
Standards
Remarks
(Frequency, Method, etc.)
SO2 ppm 1.46 1.71 10 2000 Frequency;
- Twice a year.
Method of Analysis;
SO2 : US EPA Method 6C
NO2: US EPA Method 7E
CO: US EPA Method 10
TSP: US EPA Method 5
Gas Flow: US EPA Method 2
NO21 ppm 21.88 22.92 70 -
CO ppm 95.81 103.14 - -
O2 % 14.09 14.12 - -
TSP mg/Ncu.m 0.82 0.82 20 50
Gas Flow rate
Ncu.m/min 23,306 23,306 - -
Remark : 1. The monitoring of air quality (emission gas) on August 1, 2018. 2.
1For NO2 the Thai standards will be applied.
0081594-0000024 TY:2847989.13 5
HRSG 21 Item
Unit
Measured
Value
(Mean)
Measured
Value
(Max.)
Country’s Standards
Referred
International
Standards
Remarks
(Frequency, Method, etc.)
SO2 ppm 0.08 0.08 10 2000 Frequency;
- Twice a year.
Method of Analysis;
SO2 : US EPA Method 6C
NO2: US EPA Method 7E
CO: US EPA Method 10
TSP: US EPA Method 5
Gas Flow: US EPA Method 2
NO21 ppm 23.14 23.30 70 -
CO ppm 38.20 39.14 - -
O2 % 13.94 13.95 - -
TSP Mg/Ncu.m 0.75 0.75 20 50
Gas Flow rate
Ncu.m/min 26,340 26,340 - -
Remark : 1. The monitoring of air quality (emission gas) on September 13, 2018.
2.1For NO2 the Thai standards will be applied.
HRSG 22 Item
Unit
Measured
Value
(Mean)
Measured
Value
(Max.)
Country’s Standards
Referred
International
Standards
Remarks
(Frequency, Method, etc.)
SO2 ppm 0.37 0.37 10 2000 Frequency;
- Twice a year.
Method of Analysis;
SO2 : US EPA Method 6C
NO2: US EPA Method 7E
CO: US EPA Method 10
TSP: US EPA Method 5
Gas Flow: US EPA Method 2
NO21 ppm 13.68 13.86 70 -
CO ppm 106.48 108.82 - -
O2 % 14.12 14.16 - -
TSP Mg/Ncu.m 0.54 0.54 20 50
Gas Flow rate
Ncu.m/min 27,825 27,825 - -
Remark : 1. The monitoring of air quality (emission gas) on September 13, 2018. 2.1For NO2 the Thai standards will be applied.
0081594-0000024 TY:2847989.13 6
AIR QUALITY (AMBIENT AIR QUALITY)
Monitoring Station No. 1: Wat Nong Nam Som
Item Unit Measured
Value
( Mean)
Measured
Value
( Max.)
Country’s Standards
Referred
International
Standards
Remarks
(Frequency, Method, etc.)
SO2 (average 1- hour)
ppb 1.52 4.50 3001/
- Frequency;
- Twice a year for 7-day
continuous monitoring covering
working day and holiday period.
Method of Analysis;
- TSP : Hi-Volume, Gravimetric
Method
- PM-10 : Size Selective, Hi-
Volume, Gravimetric Method
- NO2 : Chemiluminescence
Method
- SO2 : UV-Fluorescence Method
- WS-WD : Cup Anemometer
/Anodized Aluminum Vane
/Ultrasonic
- Ambient Temperature :
Temperature Sensor
SO2 (average 24-hour)
ppb 1.52 1.78 1202/
47.754/
NO2 (average 1-hour)
ppb 8.92 14.90 1703/
-
TSP
(average 24-hour) mg/m
3 0.039 0.051 0.330
2/ -
PM-10
(average 24-hour) mg/m
3 0.026 0.034 0.1202/ 0.150
Wind speed m/s 0.7 3.3 - -
Wind direction - - ESE - -
Ambient
Temperature ºC 31.1 38.3 - -
Remark : 1. The monitoring of ambient air quality during September 24th - October 1
st, 2018.
2. Country’s Standard According to :
1/ Notification of the National Environment Board No.21 (B.E.2544).
2/ Notification of the National Environment Board No.24 (B.E.2547).
3/ Notification of the National Environment Board No.33 (B.E.2552).
3. 4/ International Standard according to World Health Organization(WHO). Air quality Guidelines Global Update, 2005, equivalent to 125 µg/m3
0081594-0000024 TY:2847989.13 7
AIR QUALITY (AMBIENT AIR QUALITY)
Monitoring Station No. 2: Wat Nang Chi School
Item Unit Measured
Value
( Mean)
Measured
Value
( Max.)
Country’s Standards
Referred
International
Standards
Remarks
(Frequency, Method, etc.)
SO2 (average 1- hour)
ppb 1.41 4.20 3001/
- Frequency;
- Twice a year for 7-day
continuous monitoring covering
working day and holiday period.
Method of Analysis;
- TSP : Hi-Volume, Gravimetric
Method
- PM-10 : Size Selective, Hi-
Volume, Gravimetric Method
- NO2 : Chemiluminescence
Method
- SO2 : UV-Fluorescence Method
- WS-WD : Cup Anemometer
/Anodized Aluminum Vane
/Ultrasonic
- Ambient Temperature :
Temperature Sensor
SO2 (average 24-hour)
ppb 1.41 1.76 1202/
47.754/
NO2 (average 1-hour)
ppb 5.56 11.50 1703/
-
TSP
(average 24-hour) mg/m
3 0.046 0.069 0.330
2/ -
PM10
(average 24-hour) mg/m
3 0.037 0.060 0.1202/ 0.150
Wind speed m/s 0.3 3.0 - -
Wind direction - - SE - -
Ambient
Temperature ºC 30.8 39.0 - -
Remark : 1. The monitoring of ambient air quality during September 24th - October 1
st, 2018.
2. Country’s Standard According to :
1/ Notification of the National Environment Board No.21 (B.E.2544).
2/ Notification of the National Environment Board No.24 (B.E.2547).
3/ Notification of the National Environment Board No.33 (B.E.2552).
3. 4/ International Standard according to World Health Organization(WHO). Air quality Guidelines Global Update, 2005, equivalent to 125 µg/m3
0081594-0000024 TY:2847989.13 8
AIR QUALITY (AMBIENT AIR QUALITY)
Monitoring Station No. 3: Wat Don Pudsa School
Item Unit Measured
Value
( Mean)
Measured
Value
( Max.)
Country’s Standards
Referred
International
Standards
Remarks
(Frequency, Method, etc.)
SO2 (average 1- hour)
ppb 1.79 3.10 3001/
- Frequency;
- Twice a year for 7-day
continuous monitoring covering
working day and holiday period.
Method of Analysis;
- TSP : Hi-Volume, Gravimetric
Method
- PM-10 : Size Selective, Hi-
Volume, Gravimetric Method
- NO2 : Chemiluminescence
Method
- SO2 : UV-Fluorescence Method
- WS-WD : Cup Anemometer
/Anodized Aluminum Vane
/Ultrasonic
- Ambient Temperature :
Temperature Sensor
SO2 (average 24-hour)
ppb 1.79 2.06 1202/
47.754/
NO2 (average 1-hour)
ppb 5.80 15.31 1703/
-
TSP
(average 24-hour) mg/m
3 0.035 0.057 0.3302/ -
PM10
(average 24-hour) mg/m
3 0.026 0.047 0.1202/ 0.150
Wind speed m/s 0.4 2.6 - -
Wind direction - - ESE - -
Ambient
Temperature ºC 30.4 37.8 - -
Remark : 1. The monitoring of ambient air quality during September 24th - October 1
st, 2018.
2. Country’s Standard According to :
1/ Notification of the National Environment Board No.21 (B.E.2544).
2/ Notification of the National Environment Board No.24 (B.E.2547).
3/ Notification of the National Environment Board No.33 (B.E.2552).
3. 4/ International Standard according to World Health Organization(WHO). Air quality Guidelines Global Update, 2005, equivalent to 125 µg/m3
0081594-0000024 TY:2847989.13 9
AIR QUALITY (AMBIENT AIR QUALITY)
Monitoring Station No. 4: Rojana Industrial Park phase 1 – IV
Item Unit Measured
Value
( Mean)
Measured
Value
( Max.)
Country’s Standards
Referred
International
Standards
Remarks
(Frequency, Method, etc.)
SO2 (average 1- hour)
ppb 1.67 3.20 3001/
- Frequency;
- Twice a year for 5-day
continuous monitoring covering
working day and holiday period.
Method of Analysis;
- TSP : Hi-Volume, Gravimetric
Method
- PM-10 : Size Selective, Hi-
Volume, Gravimetric Method
- NO2 : Chemiluminescence
Method
- SO2 : UV-Fluorescence Method
- WS-WD : Cup Anemometer
/Anodized Aluminum Vane
/Ultrasonic
- Ambient Temperature :
Temperature Sensor
SO2 (average 24-hour)
ppb 1.67 1.72 1202/
47.754/
NO2 (average 1-hour)
ppb3 7.86 19.86 170
3/ -
TSP
(average 24-hour) mg/m
3 0.061 0.074 0.330
2/ -
PM10
(average 24-hour) mg/m
3 0.039 0.063 0.1202/ 0.150
Wind speed m/s 0.8 2.6 - -
Wind direction - - E - -
Ambient
Temperature ºC 31.0 37.4 - -
Remark : 1. The monitoring of ambient air quality during September 24th - October 1
st, 2018.
2. Country’s Standard According to :
1/ Notification of the National Environment Board No.21 (B.E.2544).
2/ Notification of the National Environment Board No.24 (B.E.2547).
3/ Notification of the National Environment Board No.33 (B.E.2552).
3. 4/ International Standard according to World Health Organization(WHO). Air quality Guidelines Global Update, 2005, equivalent to 125 µg/m3
0081594-0000024 TY:2847989.13 10
SURFACE WATER QUALITY (EFFLUENT QUALITY)
During Operation Phase
Monitoring Station: Cooling Water Holding Pond Item Measured Value
( Mean) Measured Value
( Max.) Country’s Standards
Referred
International
Standards
Remarks
(Frequency, Method, etc.)
Temperature (˚C ) 29.6 33.4 ≤ 40˚C ≤ +3˚C Frequency; - Once a month.
Method of Analysis;
- Temperature : 2550
- pH 4500-H B
- TDS: 2540C
- Oil and grease : 5520B
- Residual chlorine : 4500 –Cl G
- Zinc : 3111 B
- Copper : 3111 B
TDS (mg/l) 1,028 1,134 ≤ 3,000 - Oil and Grease
(mg/l)
ND(
0081594-0000024 TY:2847989.13 11
NOISE
During Construction Phase
Monitoring Station 1: At fence area of the Project Site, on the South direction
Item Leq (24hr) Ldn L90 Country’s Standards
Referred
International
Standards
Remarks
(Frequency, Method,
etc.)
Noise level
(Daytime) - - - 70 55
Frequency;
- Twice a year for 5-day
continuous monitoring
covering working day
and holiday period.
Method of Analysis; - Integration Sound Level
Meter following
Noise level
(Night time) - - - 70 45
Monitoring Station 2: Wat Nong Namsom
Item Leq (24hr) Ldn L90 Country’s Standards
Referred
International
Standards
Remarks
(Frequency, Method,
etc.)
Noise level
(Daytime) - - - 70 55
Frequency;
- Twice a year for 5-day
continuous monitoring
covering working day
and holiday period.
Method of Analysis; - Integration Sound Level
Meter following
Noise level
(Night time) - - - 70 45
Monitoring Station 3: Wat Nang Chi School
Item Leq (24hr) Ldn L90 Country’s Standards
Referred
International
Standards
Remarks
(Frequency, Method,
etc.)
Noise level
(Daytime) - - - 70 55
Frequency;
- Twice a year for 5-day
continuous monitoring
covering working day
and holiday period.
Method of Analysis; - Integration Sound Level
Meter following
Noise level
(Night time) - - - 70 45
Remark : 1/ Currently, project is during operation phase
2/ The sound pressure level standard of 70 dB(A) notified by the Notification of the National
Environment Board, No. 15, B.E.2540 (1997)
Standard of Ldn and L90 are not specified yet.
3/ No nearby communities will be affected by the high noise level during construction.
0081594-0000024 TY:2847989.13 12
NOISE
During Operation Phase
Monitoring Station 1: At fence area of the Project Site, on the South direction
Item Leq (24hr) Ld, Ln L90 Country’s Standards
Referred
International
Standards
Remarks
(Frequency, Method,
etc.)
Noise level
(Daytime) 54.3-57.9 55.6 56.6 70 55
Frequency;
- Twice a year for 5-day
continuous monitoring
covering working day
and holiday period.
Method of Analysis;
- Integration Sound Level
Meter following
Noise level
(Night time) 54.3-57.9 59.2 56.6 70 45
Monitoring Station 2: Wat Nong Namsom
Item Leq (24hr) Ld, Ln L90 Country’s Standards
Referred
International
Standards
Remarks
(Frequency, Method,
etc.)
Noise level
(Daytime) 54.0-55.3 55.1 48.5 70 55
Frequency;
- Twice a year for 5-day
continuous monitoring
covering working day
and holiday period.
Method of Analysis; - Integration Sound Level
Meter following
Noise level
(Night time) 54.0-55.3 54.5 48.5 70 45
Monitoring Station 3: Wat Nang Chi School
Item Leq (24hr) Ld, Ln L90 Country’s Standards
Referred
International
Standards
Remarks
(Frequency, Method,
etc.)
Noise level
(Daytime) 56.8-59.9 57.5 52.9 70 55
Frequency;
- Twice a year for 5-day
continuous monitoring
covering working day
and holiday period.
Method of Analysis; - Integration Sound Level
Meter following
Noise level
(Night time) 56.8-59.9 59.4 52.9 70 45
Remark : 1/ The measurement of sound pressure levels during March 8-13, 2018
2/ The sound pressure level standard of 70 dB(A) notified by the Notification of the National
Environment Board, No. 15, B.E.2540 (1997)
Standard of Ldn and L90 are not specified yet.
3/ No nearby communities will be affected by the high noise level during construction.
0081594-0000024 TY:2847989.13 13
SOLID WASTE
During Construction Phase
Parameter: Types and volume of general garbage and scraps from construction activities/ Type and
disposal methods for hazardous wastes from construction activities.
Location: Project area.
Duration: Once a month during the operation period.
- The project is currently during operation phase.
During Operation Phase
Parameter: Types and volume of general garbage and wastes from production process.
Location: Project area.
Duration: Once a month during the operation period.
-Waste from operation generated within project could be classified into 3 categories; 1)
general garbage 2) sludge from water pre-treatment and 3) waste/unused material from maintenance activity.
-The general garbage from operation phase is mostly the food waste and office waste from
project’s staff. The quantity of general garbage from operation phase was monthly recorded and disposed by Ban Chang Sub-district Administrative Organization as the data shown above.
Month Quantity of Solid Wastes / Kilograms
July 1,908
August 1,860
September 1,710
October 1,893
November
December
Total
4,553
1,938
13,861
-The quantity of sludge from water pre-treatment during July-December 2018 is 50,750
Kilograms. The example of waste manifest is shown in Appendix 1.
-Unused material from maintenance activity during July-December 2018 such as insulation,
oil/chemical contaminated container, used oil were collected in the waste storage area to the suitable quantity
for transportation and disposal as the data shown below and Appendix 1.
0081594-0000024 TY:2847989.13 14
Quantity of Solid Wastes Generated
Type of Wastes Unit Waste Quantity
Jul 18 Oct 18 Sep 18 Oct 18 Nov 18 Dec 18 Total
Non-Hazardous
- Sludge Ton - - - - 25.85 24.90 50.75 - Air Filter Ton - - - 1.50 - 1.50 - Water Filter Ton - - - 0.29 0.30 - 0.59
- Paper Used Ton - - - - 0.00
- Insulation Ton - - - 0.15 1.835 - 1.99
Hazardous
- Oil Contaminated Material Ton - - - 0.05 1.08 - 1.13
- Chemical Contaminated Bag Ton - - - 0.02 0.40 - 0.42
- Aerosol Canister Ton - - - 0.01 0.065 - 0.08
- Battery Ton - - - - 0.04 - 0.04
- Oil Used Ton - - - - - - 0.00
Total 0.00 0.00 0.00 0.52 31.07 24.90 56.49
0081594-0000024 TY:2847989.13 15
COMMUNITY HEALTH AND SAFETY
Operation Phase
Parameter Location/Person Duration Remarks
Noise Dose Employees working in the
process of the power plant
4 times a year Please refer to the
measurement method as
indicated in the EMP Noise Contour The electricity generating area
having high noise level
Prepare a complete
noise contour map
within the first year
of operation period.
Heat-Wet Bulb Globe Temperature
(WBGT)
heat sources , such as: (i)
condenser exhaust unit, (ii)
steam pipeline area, (iii)
generator area, and (iv)
combustion turbine area.
4 times a year.
Light Electrical and Control Building
Administration Building
Workshop
4 times a year.
Health examination for New
Employees of U-Thai Power Plant:
(i) General Physical Examination,
(ii) Lung X-rays and (iii) Basic
blood test.
Before working within the
specified period by the law.
Health examination for Employees
of U-Thai Power Plant: (i) lung x-
rays, (ii) vision test, (iii) general
physical examination and blood
test. : complete blood cell, blood
group and Hepatitis B immunity.
Once per year
Special examination –hearing test for mechanical workers, lung
function test for maintenance
workers and vision test for every
employee.
Once per year
Fire Prevention and Fire Fighting
System The safety, occupational
health and working
environment section will
have a meeting in order to
summarize the problems,
recommendations and to
revise the safety manual and
emergency plan by
recording the details,
statistics and comments
from the employees and
local firefighting authority
on the safety and
occupational health of the
project.
Inspection of fire protection equipment, at least once a
week.
Evaluation of the emergency response drill in
order to revise the
emergency plan and
practice skills.
0081594-0000024 TY:2847989.13 16
The project has monitored on community health and safety including; noise dose, noise contour,
Heat-Wet Bulb Globe Temperature (WBGT), Light intensity twice during July - December 2018. All
parameters are within standard value as the detail in Appendix 2. Moreover, the physical/health check was
applied to every new staff before start work and annual health check for existing staff as the sample of health
check in Appendix 3.
COMMUNITY HEALTH AND SAFETY
Construction Phase
Number of health safety and environment training and other training/orientation conducted for the
workers/labourers, and general description of awareness.
-The project is currently during operation phase.
Course Attendees Trainer
Male Female Total
- - - - -
Total - - -
Various accidents/incidents involving workers/labourer (including clinic/hospital reports, nature of
accidents/incidents), action undertaken to ensure accidents/incidents will be avoided.
- The project is currently during operation phase
Various project related accidents/incidents affecting local communities (these may arise from traffic, dust,
noise, vibration, or interaction with labourers), action undertaken to ensure accidents/incidents will be
avoided.
- The project is currently during operation phase
Number of contractor’s random alcohol and urine testing and description of general results
- The project is currently during operation phase
Number of health education programs conducted for workers/labourers (covering sanitation, family planning,
and prevention of communicable diseases such as HIV/AIDS).
- The project is currently during operation phase
Operations Phase
Various project related accidents/incidents or health problems affecting local communities (these may arise
from operations phase activities affecting environmental media such as air and water which may have
affected the community), action undertaken to address the issue.
-During July-December 2018 has no accident/incidents or health problems affecting local
communities (Appendix 4).
0081594-0000024 TY:2847989.13 17
SOCIO-ECONOMICS
1. Socio-economic survey and opinion
Implementation
Phase
Parameter Location Duration/Frequency Methodology
Pre-construction,
Construction and
Operation
Socio-economic survey
and opinion of people,
community leaders and
representatives of
concerned agencies on the
timeliness and
effectiveness of the
environmental and social
mitigating measures and
the social programs being
implemented by the
Company.
Communities in the
vicinity area of the
U-Thai Power Plant
Representative of
concerned agencies
Once 3 months before
construction / once a
year during the
construction period /
once a year during
operation period
Visiting, talking,
interviewing with
community leaders
and representatives
of concerned
agencies
Survey by
questionnaires
The project recently monitored on socio-economic impacts by interviewing the peoples who are
living within 5 km radius of the project site. These comprise 65 communities, 58 villages of 9 sub-districts, 3
districts in Phra Nakhon Si Ayudhaya Province which has been reported in the Environment and Social
Issues Compliance Report (July- December 2018).
2. Grievance Registry
Relevant
party
expressing
grievance
Implementation
Phase/Date
received
Parties
likely to
facilitate
grievance
resolution
Nature of
Grievance
Responses/Actions from
the Company
Further actions
needed to settle
grievance and
relevant timeline
- - - - - -
- - - - - - Note: Grievance Registry report to be included in the project report submitted to ADB – biannually during construction and annually during operation stage. Remark: No Grievance Registry report during July-December 2018. However, Project provided procedure
of grievance registry (Appendix 5). Additionally, the project has set up a community coordination centre
which located at Administration Building of Uthai Power Plant 999 moo 1 ,Uthai district, Pra Nakorn Sri
Ayudhaya as a channel of grievance registry. The information of grievance registry channels is distributed
via CPC meeting and Project billboards.
0081594-0000024 TY:2847989.13 18
3. Corporate Social responsibility Programs (CSR Programs)
Reporting of CSR monthly activities and beneficiaries
Month Activity Target Area Target Groups
Number of
Beneficiaries
(segregated by
gender)
Approximate cost
(Indicate if the
communities/
beneficiaries have
in-kind or cash
counterpart
Remarks
July
2018
Organize Gulf Football Clinic
project by Buriram United
Football Club
Students
around the
power plant
area
People,
Government,
STUDENT
200
(m180 f20) 15,000
Supporting budget for
organizing long-boat
competitions to Ban Chang Subdistrict Administration
Organization
Ban Chang
Subdistrict
Administration
Organization
People,
Government
300
(m200f100) 30,000
August
2018
Supporting budget for
organizing "Yor Yos Ying
Fah, Ayutthaya World
Heritage", year 2018
Phra Nakhon Si
Ayutthaya
Province
Government 500
(m300 f200)
100,000
Supporting budget for
organizing "Industry and
Environmental Governance"
for the year 2018
Phra Nakhon Si
Ayutthaya
Provincial
Industry Office
Government 200
(m100 f100) 50,000
Organizing the Environmental
Audit Committee meeting
No.3/2018
People around
5 kilometers radius of GUT
People 15
(m10f5) 10,000
September
2018
Supporting budget for
organizing the Canal and River Conservation Day
Phra Nakhon Si
Ayutthaya
Province
People,
Government
500 (m300 f200) 30,000
Supporting budget for the 3rd
Football League of Local
Government Organization
Local
government
organization
People,
Government
400
(m200f200) 20,000
October
2018
Supporting budget for the Loi
Krathong Festival to Ban
Chang Sub-district
Ban Chang
Sub-district
People,
Government
400
(m 200 f 200 ) 20,000
Supporting budget for the Loi
Krathong Festival to Nong
Nam Som Sub-district
Nong Nam
Som Sub-
district
People,
Government
300
(m200 f100)
15,000
November
2018
Supporting budget for the Red
Cross of Phra Nakhon Si
Ayutthaya Province, year 2018
Phra Nakhon Si
Ayutthaya
Province
Government
1,000 (m500 f500)
100,000
Supporting budget for making
annual Kathin ceremony 2018
People and
Temple around
5 kilometers radius of GUT
Temple,
People
500
(m250f250) 10,000
Supporting budget for making
the royal Kathin ceremony
2018
Phra Nakhon Si
Ayutthaya
Provincial
Energy Office
Government 600
(m300f300) 10,000
Supporting budget for
organizing the New Year
event for communities around
Uthai Power Plant
People around
5 kilometers radius of GUT
People 700
(m350f350) 35,000
Note: CSR report to be included in the project report submitted to ADB-biannually during construction and annually during
operation phase.
The power plant has joined government agencies, the public and local community leaders in
arranging and supporting activities to build a good relationship between the power plant and communities.
0081594-0000024 TY:2847989.13 19
SOCIAL PROTECTION
1. General discussion on compliance with applicable Thai labour regulations and ADB’s Social Protection Strategy which requires compliance with core labour standards. The Company, its
contractors and subcontractors are covered by and will comply with Thai labour regulations which
have provisions that are consistent with core labour standards. The core labour standards are the
elimination of all forms of forced or compulsory labour; the abolition of child labour; elimination of
discrimination in respect of employment and occupation; and freedom of association and the effective
recognition of the right to collective bargaining, as per the relevant conventions of the International
Labour Organization.
- The company’s performance/operation is based on Thai laws.
- The project has provided adequate personal protective equipment (PPE)
- Employment of labour force; the Company has for job applications from 18-years-old
(absolutely) persons, by respecting human rights and not employing illegal labour according to
the law.
2. Statistics of workers/labourers, including Company (GUT), contractors and subcontractors office
workers During the Reporting Period Company Total Number of
Staff/Workers
Type of Staff/Worker Information on Daily/Weekly Wage for
each type of Staff/Worker
Male Female Male Female
GUT Staff 4 1 Management
Agreement Contract (Monthly)
- - Technician
52 6 Staff
Contractors - - Management
- - Technician
- - Staff
45 19 Worker
Subcontractors - - Management
- - Technician
(Man-day) 5,625 2,375 Worker Note: Manpower, December 31, 2018
3. Information on whether any of the staff, workers or labourers have expressed interest to form a
workers association, trade union or any form of organized groups to discuss workers’ rights, compensation and benefits or any issue related to their well-being.
- Provisions are made according to the laws, including social security, compensation fund and
labour protection welfares. GUT established the Labour Welfare Committee in October 2018.
4. Report on Power Development Fund (PDF)
GUT to ensure copy of Annual PDF Report is shared with ADB. ADB recognizes that the Company
has no direct hand in the implementation, use, and selection of projects to be funded under the fund.
Annual report is expected to be shared with ADB throughout the project operation stage.
-Gulf JP UT Co.,Ltd. transferred 9,155,998.00 Baht (July-December 2018) to the fund -ERC (Energy Regulatory Commission) approved Fiscal Year 2018 annual work plan. The progresses
on the community project implementation are as follows:
o ERC approved 202 community projects (70,916,841 Baht)
0081594-0000024 TY:2847989.13 20
o Next step: CDC (Community Development Committee) notify, in writing, the outcome of
community project consideration to those who presented the projects and sign contract or
agreement
Report on Compliance with ADB’s Social Protection Requirements Does the Investee company/s carry out its activities consistent with
the intent of ensuring legally permissible equal opportunity, fair
treatment and non-discrimination in relation to recruitment and
hiring, compensation, working conditions and term of employment
for its workers (including prohibiting any form of discrimination
against women during hiring and providing equal work for equal
pay for men and women?
Yes.
Does the investee company allow its workers from developing a
legally permissible means of expressing their grievances and
protecting their rights regarding working conditions and terms of
employment?
Yes.
Does the investee company engage contractors and other providers
of goods and services:
(i) Who do not employ child labour1 or forced labour
2;
(ii) Who have appropriate management systems that
will allow them to operate in a manner which is
consistent with the intent of (A) ensuring legally
permissible equal opportunity and fair treatment
and non-discrimination for their workers, and (B)
not restricting their workers from developing a
legally permissible means of expressing their
grievances and protecting their rights regarding
working conditions and terms of employment; and
(iii) Whose subcontracts contain provisions which are
consistent with paragraph (i) and (ii) above.
Yes.
Remarks 1Child labour means the employment of children whose age is below the statutory minimum age
of employment in the relevant country, or employment of children in contravention of
International Labour Organization Convention No. 138 ‘Minimum Age Convention’ (www.ioo.org).
2Forced labour means all work or services not voluntarily performed, that is, extracted from
individuals under threat of force or penalty.
http://www.ioo.org/