Follow-Up of Last TB Risk analysis ongoing ! – Plasma cell: oil and rubidium – Electron source: oil handling RF specifications for laser system to Menlo: – Done, waiting for comments from Menlo Compressor has been ordered. Plasma cell: – Tests in EHN1 done! – Plasma cell end flange design ongoing Electron spectrometer system: – Test of optical system – Test of screens 3  see Patric’s talks today  See Stefano/Lawrence’ talks today

Citation preview

Page 1: AWAKE Technical Board, 19 August 2015 1 E. Gschwendtner, CERN

AWAKE Technical Board, 19 August 2015

1

E. Gschwendtner, CERN

Page 2: AWAKE Technical Board, 19 August 2015 1 E. Gschwendtner, CERN

2

News

Welcome• Florence Friebel fellow in laser beam line Coordination Package• Gennady Plyushchev Project Associate at CERN, plasma simulations

First discussion with Frederic Bordry on setting up the Steering Board

Page 3: AWAKE Technical Board, 19 August 2015 1 E. Gschwendtner, CERN

3

Follow-Up of Last TB

• Risk analysis ongoing ! – Plasma cell: oil and rubidium– Electron source: oil handling

• RF specifications for laser system to Menlo:– Done, waiting for comments from Menlo

• Compressor has been ordered.• Plasma cell:

– Tests in EHN1 done!– Plasma cell end flange design ongoing

• Electron spectrometer system:– Test of optical system – Test of screens

see Patric’s talks today

See Stefano/Lawrence’ talks today

Page 4: AWAKE Technical Board, 19 August 2015 1 E. Gschwendtner, CERN

4

Follow-Up of Last TB

• Interlock– General: interlock team work on this

– Laser: Valentine, Josh to find a solution how it can be clearly defined in which power mode the laser system is.

– BTV screens: the proton beam line to be confirmed!

Page 5: AWAKE Technical Board, 19 August 2015 1 E. Gschwendtner, CERN

5

AWAKE EDMS, WPs

Page 6: AWAKE Technical Board, 19 August 2015 1 E. Gschwendtner, CERN

6

WP/Engineering SpecificationsWorkpackage Work-Package Documents EDMS link to document

1 SPS Beams2 RF Synchr3 e- source https://edms.cern.ch/document/1504591/14 p line https://edms.cern.ch/document/1504433/15 e-line https://edms.cern.ch/document/1503845/16 Shielding https://edms.cern.ch/document/1505517/0.1

7 Laser BeamLine and Clean room8 SMI Measurement https://edms.cern.ch/document/1504590/19 Secondary Beamline https://edms.cern.ch/document/1506691/1

10 Plasmas Simulations https://edms.cern.ch/document/1504590/111 Magnets12 Power Converters13 Vacuum https://edms.cern.ch/document/1407357/1

14.1 BI.BPM

14.2 BI.BTV https://edms.cern.ch/document/1503645/0.0; https://edms.cern.ch/document/1503646/0.0; https://edms.cern.ch/document/1501342/114.3 BI.BCT14.4 BI.BLM15.1 Beam Interlock https://edms.cern.ch/document/1531912/1.015.2 Magnet Interlock https://edms.cern.ch/document/1523701/116 Mechanical Design https://edms.cern.ch/document/1531991/117 Civil engineering https://edms.cern.ch/document/1505016/118 Cooling and Vent https://edms.cern.ch/document/1503785/0.1

19.1 Electrical Services https://edms.cern.ch/document/1500403/119.2 Cabling https://edms.cern.ch/document/1502788/120 Transp+Handling21 Access https://edms.cern.ch/document/1453638/122 Fire+Gas https://edms.cern.ch/document/1502570/123 Survey https://edms.cern.ch/document/1503228/124 Ethernet25 Control

26.1 RP Monitoring https://edms.cern.ch/document/1505690/126.2 RP Simulations https://edms.cern.ch/document/1505689/1

Institute's WPs

I1 Plasma Cell https://edms.cern.ch/document/1506635/1I2 SMI Diagnostics https://edms.cern.ch/document/1529772/1; https://edms.cern.ch/document/1506854/1I3 Laser https://edms.cern.ch/document/1506630/1I4 Electron Spectrometer https://edms.cern.ch/document/1503551/0.5I5 DAQ (Who writes?)I6 Accelerating Structure https://edms.cern.ch/document/1506739/1

I7 Electron Line Diagnostics TRIUMF https://edms.cern.ch/document/1508566/1I8 Laser Dump https://edms.cern.ch/document/1506855/2

Page 7: AWAKE Technical Board, 19 August 2015 1 E. Gschwendtner, CERN

7

Document Release Procedure

Page 8: AWAKE Technical Board, 19 August 2015 1 E. Gschwendtner, CERN

8

WP/Engineering Specifications

• Owner/main author of the WP send the document for engineering check to check list! (Deadline: now!) • Include all comments. (Deadline: end of August)• Then ready to send out for approval. (Beginning of September)

For questions, please ask Marlene!

Page 9: AWAKE Technical Board, 19 August 2015 1 E. Gschwendtner, CERN

9

Next Meetings

• Next TB/PEB: 28/30 September 2015 (Collaboration Meeting at CERN)• 4/5 November 2015• 9/10 December 2015