22
AVOID THE IRRESISTIBLE Daniel Baltar London February, 2015

AVOID THE IRRESISTIBLEe2ab2795878289afcc94-5f07cf287e13b4eba5efff33cfd882b2.r30.cf… · portfolio Probability of success (PoS) Exploration portfolio after 3D CSEM Economic threshold

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: AVOID THE IRRESISTIBLEe2ab2795878289afcc94-5f07cf287e13b4eba5efff33cfd882b2.r30.cf… · portfolio Probability of success (PoS) Exploration portfolio after 3D CSEM Economic threshold

AVOID THE IRRESISTIBLE Daniel Baltar

London

February, 2015

Page 2: AVOID THE IRRESISTIBLEe2ab2795878289afcc94-5f07cf287e13b4eba5efff33cfd882b2.r30.cf… · portfolio Probability of success (PoS) Exploration portfolio after 3D CSEM Economic threshold

Outline

• Challenges to exploration performance and value creation

• Impact of CSEM in exploration uncertainty

• Performance of CSEM in prospect evaluation

• Challenges to the application of CSEM and value realization

Page 3: AVOID THE IRRESISTIBLEe2ab2795878289afcc94-5f07cf287e13b4eba5efff33cfd882b2.r30.cf… · portfolio Probability of success (PoS) Exploration portfolio after 3D CSEM Economic threshold

Value of exploration

𝐕𝐞𝐱𝐩 = 𝐍𝐏𝐕𝐞 𝐏𝐞 − 𝟏 − 𝐏𝐞 𝐂𝐞𝐱𝐩

Vexp is Value of Exploration NPVe is the average Net Present Value of an economic success Pe is the probability of an economic success Cexp is the Cost of Exploration

• Pe is the main Value of Exploration driver

Gains term Losses term

Page 4: AVOID THE IRRESISTIBLEe2ab2795878289afcc94-5f07cf287e13b4eba5efff33cfd882b2.r30.cf… · portfolio Probability of success (PoS) Exploration portfolio after 3D CSEM Economic threshold

PoS

Trap Reservoir

Charge Seal

Pe

Volume estimation

Area Net thickness

Porosity Saturation

Rf FVF

Evaluation workflow

UNCERTAINTY Pe

Page 5: AVOID THE IRRESISTIBLEe2ab2795878289afcc94-5f07cf287e13b4eba5efff33cfd882b2.r30.cf… · portfolio Probability of success (PoS) Exploration portfolio after 3D CSEM Economic threshold

A better exploration outcome

Trap 10%

Reservoir 15%

Charge 30%

Seal 45%

Typical exploration failures: most failures are due to the fluid component

Page 6: AVOID THE IRRESISTIBLEe2ab2795878289afcc94-5f07cf287e13b4eba5efff33cfd882b2.r30.cf… · portfolio Probability of success (PoS) Exploration portfolio after 3D CSEM Economic threshold

PORTFOLIO VS PROSPECT

Do we need exploration to optimize EP portfolios? IQPC Portfolio Optimization in Oil

and Gas, Houston, TX, February 2004. Copyright 2013, Daniel Zweidler & Associates, Inc.

Page 7: AVOID THE IRRESISTIBLEe2ab2795878289afcc94-5f07cf287e13b4eba5efff33cfd882b2.r30.cf… · portfolio Probability of success (PoS) Exploration portfolio after 3D CSEM Economic threshold

Net rock volume [e+6 m3]

Recovera

ble

volu

me [

MM

boe]

VOLUME ESTIMATION UNCERTAINTY

RV = NRV Φ Shc Rf / FVF

The net rock volume is the main source of recoverable

volume uncertainty

Page 8: AVOID THE IRRESISTIBLEe2ab2795878289afcc94-5f07cf287e13b4eba5efff33cfd882b2.r30.cf… · portfolio Probability of success (PoS) Exploration portfolio after 3D CSEM Economic threshold

Area Net thickness

Porosity Saturation

Rf FVF

Decision making under uncertainty

Pe

Volume estimation

PoS

Trap Reservoir

Charge Seal

Pe

Area Net thickness

Porosity Saturation

Rf FVF

Volume estimation

PoS

Trap Reservoir

Charge Seal

Pe ~ 5-50%

Can EM do something to improve this?

Page 9: AVOID THE IRRESISTIBLEe2ab2795878289afcc94-5f07cf287e13b4eba5efff33cfd882b2.r30.cf… · portfolio Probability of success (PoS) Exploration portfolio after 3D CSEM Economic threshold

3D EM TECHNOLOGY

What EM does:

Image subsurface resistivity

Acquisition

Water depth

20 – 3500m

CSEM

Measurement

Sensitivity

0 – 3500m

Page 10: AVOID THE IRRESISTIBLEe2ab2795878289afcc94-5f07cf287e13b4eba5efff33cfd882b2.r30.cf… · portfolio Probability of success (PoS) Exploration portfolio after 3D CSEM Economic threshold

CSEM SENSITIVITY FOR A SPECIFIC TARGET

The larger the resistive

body, the larger the

EM signal

Area [km2]

Net th

ickness [m

] x R

esis

tivity [Ω

m]

EM

sig

nal

Page 11: AVOID THE IRRESISTIBLEe2ab2795878289afcc94-5f07cf287e13b4eba5efff33cfd882b2.r30.cf… · portfolio Probability of success (PoS) Exploration portfolio after 3D CSEM Economic threshold

Trap Reservoir

Charge Seal

PoS Pe

Decision making under uncertainty

Volume estimation

Area Net thickness

Porosity Saturation

Rf FVF

CSEM result

Integration with seismic & well log data

CSEM sensitivity Rock property uncertainties

CSEM uncertainties

Page 12: AVOID THE IRRESISTIBLEe2ab2795878289afcc94-5f07cf287e13b4eba5efff33cfd882b2.r30.cf… · portfolio Probability of success (PoS) Exploration portfolio after 3D CSEM Economic threshold

Barents Sea example Courtesy: Det Norske

Page 13: AVOID THE IRRESISTIBLEe2ab2795878289afcc94-5f07cf287e13b4eba5efff33cfd882b2.r30.cf… · portfolio Probability of success (PoS) Exploration portfolio after 3D CSEM Economic threshold

Volume prediction with CSEM

Actual volumes

P50 C

SE

M p

redic

ted N

RV

Do we need exploration to optimize EP portfolios? IQPC Portfolio

Optimization in Oil and Gas, Houston, TX, February 2004.

Copyright 2013, Daniel Zweidler & Associates, Inc.

Page 14: AVOID THE IRRESISTIBLEe2ab2795878289afcc94-5f07cf287e13b4eba5efff33cfd882b2.r30.cf… · portfolio Probability of success (PoS) Exploration portfolio after 3D CSEM Economic threshold

Exploration Portfolio before 3D CSEM

Probability of success (PoS)

Rec

ove

rab

le v

olu

me

[MM

bo

e]

Economic threshold

Note: only CSEM feasible prospects included in this portfolio

Page 15: AVOID THE IRRESISTIBLEe2ab2795878289afcc94-5f07cf287e13b4eba5efff33cfd882b2.r30.cf… · portfolio Probability of success (PoS) Exploration portfolio after 3D CSEM Economic threshold

Exploration portfolio after 3D CSEM

Rec

ove

rab

le v

olu

me

[MM

bo

e]

Economic threshold

Note: only CSEM feasible prospects included in this portfolio

Probability of success (PoS)

Page 16: AVOID THE IRRESISTIBLEe2ab2795878289afcc94-5f07cf287e13b4eba5efff33cfd882b2.r30.cf… · portfolio Probability of success (PoS) Exploration portfolio after 3D CSEM Economic threshold

Exploration portfolio after 3D CSEM

Economic threshold

Note: only CSEM feasible prospects included in this portfolio

Rec

ove

rab

le v

olu

me

[MM

bo

e]

Probability of success (PoS)

Page 17: AVOID THE IRRESISTIBLEe2ab2795878289afcc94-5f07cf287e13b4eba5efff33cfd882b2.r30.cf… · portfolio Probability of success (PoS) Exploration portfolio after 3D CSEM Economic threshold

Exploration portfolio after 3D CSEM

Economic threshold

Note: only CSEM feasible prospects included in this portfolio

Rec

ove

rab

le v

olu

me

[MM

bo

e]

Probability of success (PoS)

Page 18: AVOID THE IRRESISTIBLEe2ab2795878289afcc94-5f07cf287e13b4eba5efff33cfd882b2.r30.cf… · portfolio Probability of success (PoS) Exploration portfolio after 3D CSEM Economic threshold

Portfolio before and after 3D EM

14 wells drilled 1 economic success 3 mid-sized discoveries 10 dry wells / technical success Pe no EM = 7% Pe with EM = 33 %

Page 19: AVOID THE IRRESISTIBLEe2ab2795878289afcc94-5f07cf287e13b4eba5efff33cfd882b2.r30.cf… · portfolio Probability of success (PoS) Exploration portfolio after 3D CSEM Economic threshold

Decision making under uncertainty

Pe

Area Net thickness

Porosity Saturation

Rf FVF

Volume estimation

PoS

Trap Reservoir

Charge Seal

Pe

Area Net thickness

Porosity Saturation

Rf FVF

Volume estimation

PoS

Trap Reservoir

Charge Seal

Pe ~ 5-50%

Can EM do something to improve this?

Yes, evidence from Brazil, Mexico, and the Barents Sea prove this is the case.

Page 20: AVOID THE IRRESISTIBLEe2ab2795878289afcc94-5f07cf287e13b4eba5efff33cfd882b2.r30.cf… · portfolio Probability of success (PoS) Exploration portfolio after 3D CSEM Economic threshold

Challenges to CSEM adoption and application

Workflows Interpreters

Data

Information

Evaluation

Decision

2002

2012

2008

Page 21: AVOID THE IRRESISTIBLEe2ab2795878289afcc94-5f07cf287e13b4eba5efff33cfd882b2.r30.cf… · portfolio Probability of success (PoS) Exploration portfolio after 3D CSEM Economic threshold

Conclusion • Pe is the main Value of Exploration driver

• Fluid presence and net rock volume evaluation uncertainties prevent Pe improvement

• Resistivity derived from CSEM allows for a significant reduction of the main uncertainties and increase of Pe

• Needs to be adopted systematically

• Workflows must be adapted

• Interpreters have to be trained

• The exploration workflow will need to change to adapt to the new tool

• EMGS offers an integral CSEM solution for hydrocarbon exploration

Page 22: AVOID THE IRRESISTIBLEe2ab2795878289afcc94-5f07cf287e13b4eba5efff33cfd882b2.r30.cf… · portfolio Probability of success (PoS) Exploration portfolio after 3D CSEM Economic threshold

Thank you