40
Standards Certification Education & Training Publishing Conferences & Exhibits Automation Opportunities in LDAR (and the P&ID Data Conundrum)

Automation Opportunities in LDAR

  • Upload
    khalil

  • View
    57

  • Download
    1

Embed Size (px)

DESCRIPTION

Automation Opportunities in LDAR. (and the P&ID Data Conundrum). Presenter. - PowerPoint PPT Presentation

Citation preview

Page 1: Automation Opportunities in LDAR

Standards

Certification

Education & Training

Publishing

Conferences & Exhibits

Automation Opportunities in

LDAR(and the P&ID Data Conundrum)

Page 2: Automation Opportunities in LDAR

2

Presenter

• Shane Kling is CEO and Co-Founder of Environmental intellect (Ei) and has approximately 9 years of LDAR compliance experience. During his career, he has supported more than 100 facilities spanning petroleum refining, chemicals, upstream oil and gas, and other manufacturing industries. He recently transitioned from Sage Environmental Consulting to support Ei’s mission on a full-time basis, which is to improve industry standards by introducing industry best available technology and integrating existing data systems to achieve the highest level of compliance.

Page 3: Automation Opportunities in LDAR

3

Audience Poll

What type of phone do you use?

or

Page 4: Automation Opportunities in LDAR

Topics to be Covered

– LDAR Compliance Processes and Management Systems

– Description of Various LDAR Compliance Processes

– P&IDs: The Compliance Foundation

– Automating Manual Compliance Processes

– Reducing Costs Associated With Manual Processes

– Question and Answer

4

Page 5: Automation Opportunities in LDAR

Topics *Not* Covered

– Automating LDAR Monitoring Data Collection–Bluetooth transmitters in combination with LDAR

databases is already industry best practice

– Automating LDAR Calibration Process–LDAR Tools as already addressed this area with its

Cal3.0™ software and SpanBox3™

– LDAR Monitoring Robots, Puppies or Rainbows

5

Page 6: Automation Opportunities in LDAR

LDAR Automation Opportunities

6

Page 7: Automation Opportunities in LDAR

Why Automate Manual Processes?

1. Reduce opportunities for error

2. Eliminate inefficiencies and maximize labor force

3. Save costs by automating repetitive processes

4. Improve QA/QC between data systems

5. Create sustainable compliance processes

7

Page 8: Automation Opportunities in LDAR

Various LDAR Compliance Processes

8

•LDAR Applicability Determinations: (review and highlighting of P&IDs to indicate LDAR / non-LDAR)

•LDAR Inventory/Retag (transcribing P&IDs markups through flagging, then tagging and documentation)

•Management of Change (managing impacts to LDAR program from engineering changes)

•Fugitive Emissions Estimating (heavy liquid equipment counts)

•LDAR QA/QC (cross-referencing P&IDs vs. LDAR database to verify accuracy)

Page 9: Automation Opportunities in LDAR

Common Link Within Compliance Processes

9

•What do all of these things have in common?• LDAR Applicability Determinations • LDAR Inventory/Retag• Management of Change• Fugitive Emissions Estimating• LDAR QA/QC

1.They are all manually-intensive processes2.They all involve Piping and Instrumentation Diagrams (P&IDs)

Page 10: Automation Opportunities in LDAR

The Compliance Foundation

What in the world do P&IDs and foundations for houses have in common?

10

Page 11: Automation Opportunities in LDAR

Data Within P&IDs

11

•The following data can be present in P&IDs:• Equipment counts/inventory• Equipment types• Stream speciation• Equipment design specifications• Directional flow• From/to information• PI tag references• Line lists, including piping IDs• MOCs, redlines, and revision numbers• Process unit, drawing number, and facility name

Page 12: Automation Opportunities in LDAR

Anatomy Of P&ID:Data, Data, Data

12

Page 13: Automation Opportunities in LDAR

The P&ID Data Conundrum

13

• Industry standard CAD programs were not designed to meet the needs of compliance programs– Purpose was to provide an "electronic drawing board" to

draftspersons

• In fact, the first commercial version of AutoCAD was released in 1982:– Shortly after the promulgation of NSPS VV (1981) but before

NSPS GGG (1983)– 10 YEARS prior to the promulgation of the Process Safety

Management standards in 1992, which requires P&ID updates every 5 years as part of PHA revalidation

– 32 YEARS prior to promulgation of NSPS GGGa and VVa (2008)

Page 14: Automation Opportunities in LDAR

Best Opportunity to Automate?

14

Sure, “automation” sounds like a nice concept,

but…

…how do we justify the costs?

•The answer for most plants: capital projects, turnarounds, or LDAR inventory/retag projects

Page 15: Automation Opportunities in LDAR

LDAR Inventory/Retag Projects

15

• Let’s now examine the various steps in a retag project and explore opportunities for automation:– Applicability determinations and P&ID markup– Flagging– Tagging– Documentation

Page 16: Automation Opportunities in LDAR

Manual: LDAR Applicability Determinations

16

Page 17: Automation Opportunities in LDAR

Automated: LDAR Applicability Determinations

17

• Use “smart” P&IDs to automate process

Page 18: Automation Opportunities in LDAR

MANUAL: LDAR FLAGGING

18

Page 19: Automation Opportunities in LDAR

AUTOMATED: LDAR FLAGGING

• Engineering data is incorporated into smart P&ID™• Single-click functionality to “push” inventory data into

GuideWare™ (directly) or LeakDAS™ database (indirectly)• Saves on inventory/retag technician labor-hours• More efficient data management/reduces potential for errors

19

Page 20: Automation Opportunities in LDAR

MANUAL: LDAR TAGGING

20

Page 21: Automation Opportunities in LDAR

(SEMI)AUTOMATED: LDAR TAGGING

• Physical hanging of tags is unchanged; however you can:• Track that all tags hung for valves, pumps, and other tagged

equipment match LDAR applicability in smart P&ID• Audit LDAR database and smart P&ID to identify tagging gaps• Incorporate LDAR tag numbers into P&IDs for future MOC tracking

21

Page 22: Automation Opportunities in LDAR

MANUAL: LDAR DOCUMENTATION

22

Page 23: Automation Opportunities in LDAR

AUTOMATED: LDAR DOCUMENTATION

• Equipment, Stream, Service, Drawing No. etc. is stored in sP&ID™

• Data is exported from sP&IDs™ into GuideWare™ or LeakDAS™

• Data is pre-populated into handhelds for technicians to field-verify

Increased Efficiency!

23

Page 24: Automation Opportunities in LDAR

DocumentationWorkflow

24

Page 25: Automation Opportunities in LDAR

Example LDAR MOC Workflow

Page 26: Automation Opportunities in LDAR

Automated LDAR MOC Workflow

26

MOC Data Shared Amongst Plant

Disciplines

HA-135Technician with “smart P&ID” loaded on tablet

Smart P&ID indicating MOC changes (pink cloud)

Component identified and updated in tablet

Page 27: Automation Opportunities in LDAR

Automated LDAR MOC Tools

27

HA-135

NAPHTHA FEED PUMP 1A4FWA-1A

LUBE OIL PUMP DISCHARGE 269-1

Page 28: Automation Opportunities in LDAR

Novel Approach to IdentifyWhen MOCs are Put into Service

28

PI tag near newly-added component may indicate if equipment is in

hydrocarbon service

Page 29: Automation Opportunities in LDAR

Manual: Leak Repair Scheduling

• Question: When a leak is identified, how is the repair scheduled, tracked, and ultimately logged into database for compliance records?– Answer: The LDAR Coordinator or Database Admin

generates Leak Repair Work Order, and this is distributed to Maintenance

• Maintenance then logs the repair into its maintenance management system (e.g., SAP)

• Closure of leak relies on a lot of communication, manual processes, and data “silos”

29

Page 30: Automation Opportunities in LDAR

Automated: Repair Scheduling and Data Exchange

30 30

Maintenance work orders within smart

P&ID

Page 31: Automation Opportunities in LDAR

Automated: Repair Scheduling and Data Exchange (cont.)

31

• Integrating LDAR databases, such as GuideWare™ or LeakDAS™ with SAP or Maximo offers: compliance improvements, reduced labor, and seamless communication

• Some companies have integrated their LDAR database with SAP, but there are others with limited I.T. resources that have this need

Page 32: Automation Opportunities in LDAR

Costs Associated with P&IDs

• Many operating facilities spend millions of dollars each year in activities that directly/indirectly involve P&IDs:– Engineering/CAD

– MOC Updates and Redlines, Troubleshooting

– CAD Updates

– Safety– PHA Revalidation– Process Safety Information (PSI) Updates

32

Page 33: Automation Opportunities in LDAR

Costs Associated with P&IDs (cont.)

– Operations and Maintenance– Identification of equipment

– Environmental– Applicability determinations

– P&ID-based compliance reviews (e.g., LDAR, BWON, NSPS Ja)

– MOC updates

33

Page 34: Automation Opportunities in LDAR

LDAR Compliance Costs

34

•There are several LDAR-related costs that can be reduced with automation, including but not limited to: •LDAR Applicability Determinations•LDAR Inventory/Retag •Management of Change •LDAR QA/QC•Fugitive Emissions Estimating

Page 35: Automation Opportunities in LDAR

Return on Investment: LDAR Applicability Determinations / P&ID Markups

35

No. of P&IDs 1000

Frequency Every 5 Years

Labor Category Bill Rate Time w/o (hrs) Cost w/o

Engineer $100/hr 1 $100

- 1 P&ID per hour to markup by Efficiency Gain Time w/ Cost w/

hand, speciate, and scan into PDF 90% 0.1 $10

Net Savings $90

Total Savings $90,000

Page 36: Automation Opportunities in LDAR

Return on Investment: LDAR Inventory/Retag

36

Task LDAR Inventory/RetagNo. of P&IDs 1,000

No. of Components 50,000Labor Category Bill Rate Time w/o (hrs) Cost w/o

Flagging Technician $50/hr 2500 $125,000 - Flag 4 P&IDs per Day Efficiency Gain Time w/ Cost w/o

  50% 1250 $62,500   Bill Rate Time w/o (hrs) Cost w/o

Tagging Technician $30/hr 2000 $60,000 - Hang 250 Tags per Day Efficiency Gain Time w/ Cost w/

  0% 2000 $60,000   Bill Rate Time w/o (hrs) Cost w/o

Documenting Technician $40/hr 2000 $80,000 - Document 250 Comps per Day Efficiency Gain Time w/ Cost w/

  50% 1000 $40,000 Total Savings $102,500

Page 37: Automation Opportunities in LDAR

Return on Investment: LDAR MOC

37

Task MOC LDAR Updates

No. of MOCs/Year 500

Frequency Daily

Labor Category Bill Rate Time w/o (hrs) Cost w/o

MOC Technician $45/hr 4 $180

- 4 hours per P&ID Efficiency Gain Time w/ Cost w/

to inventory and monitor 33% 3 $135

Net Savings $45

Total Annual Savings $30,000

5-Year Return $150,000

Page 38: Automation Opportunities in LDAR

Concluding Thoughts

1. Shift from Analog to Digital: The need exists to begin process of converting your facility P&IDs into "smart P&IDs" that can fulfill the company's needs.

2. Technology Integration Reduces Operational Costs: Automating repetitive processes allows professionals to focus on solving problems computers cannot

3. Management Buy-in: There are several opportunities to gain Management buy-in, such as capital projects, P&ID revalidation, LDAR inventory/retag, etc.

38

Page 39: Automation Opportunities in LDAR

Concluding Thoughts (cont.)

4. Leading the Effort: As professionals, your knowledge is more valuable to the company than repetitive job tasks

5. Ask Questions, Learn More: The information presented today should provide a good introductory conversation with CAD, engineering and your Management on opportunities for automation.

39

Page 40: Automation Opportunities in LDAR

Don’t Let These Compliance Processes Continue to Chase You

40

LDAR Applicability

Management of Change

Fugitive Emissions Estimating

LDAR Inventory/

Retag

LDAR QA/QC

DataCompliance