AUSTIN REGION ITS Master Implementation Plan October 2018

AUSTIN REGION ITS · 5 Purpose: • Provide high-level plan to guide ITS deployments for major roadway corridors in the Austin region • Introduces new traffic management strategies

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: AUSTIN REGION ITS · 5 Purpose: • Provide high-level plan to guide ITS deployments for major roadway corridors in the Austin region • Introduces new traffic management strategies

AUSTIN REGION ITS Master Implementation PlanOctober 2018

Page 2: AUSTIN REGION ITS · 5 Purpose: • Provide high-level plan to guide ITS deployments for major roadway corridors in the Austin region • Introduces new traffic management strategies

Timeline

2

2014

Assess State of the District System

Continue Legacy Projects Identify Quick Wins

Identify System GapsSupport Immediate NeedSurveillance & Communication

In the Beginning…

Page 3: AUSTIN REGION ITS · 5 Purpose: • Provide high-level plan to guide ITS deployments for major roadway corridors in the Austin region • Introduces new traffic management strategies

Timeline

3

2014 2015

Assess State of the District System

Continue Legacy Projects Identify Quick Wins

Identify System GapsSupport Immediate NeedSurveillance & Communication

Set Vision Layout Framework for ITS PlanningDevelop I-35 ITS Master Plan

Learn & Establish Framework…

Page 4: AUSTIN REGION ITS · 5 Purpose: • Provide high-level plan to guide ITS deployments for major roadway corridors in the Austin region • Introduces new traffic management strategies

Working Closely with Our Partners

COORDINATION

OTHERS

4

Page 5: AUSTIN REGION ITS · 5 Purpose: • Provide high-level plan to guide ITS deployments for major roadway corridors in the Austin region • Introduces new traffic management strategies

Establish Purpose

5

Purpose:

• Provide high-level plan to guide ITS deployments for major roadway corridors in the Austin region

• Introduces new traffic management strategies• Updated on a regular basis

• Provide guidance for developing ITS projects throughout the Austin region

• Stand-alone projects• Augment roadway construction projects

• Develop high-level layout of ITS technologies and a planning level cost for each corridor

• Utilize the existing Austin Regional ITS Architecture and Deployment Plan and the Mobility Investment Priorities as source documents

Page 6: AUSTIN REGION ITS · 5 Purpose: • Provide high-level plan to guide ITS deployments for major roadway corridors in the Austin region • Introduces new traffic management strategies

Underlying Goal

6

We aim for the Austin District Traffic Section to become a:

“Center of Excellence”

Image Source: APTIM

Page 7: AUSTIN REGION ITS · 5 Purpose: • Provide high-level plan to guide ITS deployments for major roadway corridors in the Austin region • Introduces new traffic management strategies

Austin Region ITS Master Implementation Plan

7

Austin Region ITS MIP.PDF Link

Page 8: AUSTIN REGION ITS · 5 Purpose: • Provide high-level plan to guide ITS deployments for major roadway corridors in the Austin region • Introduces new traffic management strategies

Austin Region ITS Master Implementation Plan - Map

8

Page 9: AUSTIN REGION ITS · 5 Purpose: • Provide high-level plan to guide ITS deployments for major roadway corridors in the Austin region • Introduces new traffic management strategies

Develop General ITS Planning & Guidance Document

9

Page 10: AUSTIN REGION ITS · 5 Purpose: • Provide high-level plan to guide ITS deployments for major roadway corridors in the Austin region • Introduces new traffic management strategies

Timeline

10

2014 2015 2016

Assess State of the District System

Continue Legacy Projects Identify Quick Wins

Identify System GapsSupport Immediate NeedSurveillance & Communication

Set Vision Layout Framework for ITS PlanningDevelop I-35 ITS Master Plan

Expand ITS Master Plan to Core Urban Major Corridors

Reach Out, Find Resources,Expand…

Page 11: AUSTIN REGION ITS · 5 Purpose: • Provide high-level plan to guide ITS deployments for major roadway corridors in the Austin region • Introduces new traffic management strategies

ITS Master Plan Project Development/Deployment Progression

11

Page 12: AUSTIN REGION ITS · 5 Purpose: • Provide high-level plan to guide ITS deployments for major roadway corridors in the Austin region • Introduces new traffic management strategies

Master Implementation Plan – ITS Corridors

12

Corridor Begin EndPlanned Length(Miles)

I-35 Bell County Line Comal County Line 80

SH 130 I-35 North SH 45 South 47

US 183 SH 45 North SH 71 22

SL 1 SH 45 North Slaughter Lane 24

SH 71 RM 620 Norwood Lane 26

SH 45 North US 183 SH 130 13

SH 45 South I-35 South SH 130 8

TX69 Spur/US 290 Koenig Lane SH 130 8

SL 360 US183 SH 71 14

RM 620 US183 SH 71 19

FM 734 SH 45 North US 290 14

ML King Blvd/FM 969 Lamar Boulevard SH 130 10

RM 2222 Loop 360 I-35 10

SL 111/Airport Boulevard I-35 US 183 4

Page 13: AUSTIN REGION ITS · 5 Purpose: • Provide high-level plan to guide ITS deployments for major roadway corridors in the Austin region • Introduces new traffic management strategies

Timeline

13

2014 2015 2016 2017

Assess State of the District System

Continue Legacy Projects Identify Quick Wins

Identify System GapsSupport Immediate NeedSurveillance & Communication

Set Vision Layout Framework for ITS PlanningDevelop I-35 ITS Master Plan

Expand ITS Master Plan to Core Urban Major Corridors

Realize Planning Effort withTangible Results

• TMC Staff Augmentation

• Innovative Deployments

• Expanded Roadside Service

Improve Overall Customer Service SafetyOperationsMaintenance

Page 14: AUSTIN REGION ITS · 5 Purpose: • Provide high-level plan to guide ITS deployments for major roadway corridors in the Austin region • Introduces new traffic management strategies

Timeline

14

2014 2015 2016 2017 2018

Assess State of the District System

Continue Legacy Projects Identify Quick Wins

Identify System GapsSupport Immediate NeedSurveillance & Communication

Set Vision Layout Framework for ITS PlanningDevelop I-35 ITS Master Plan

Expand ITS Master Plan to Core Urban Major Corridors

Realize Planning Effort withTangible Results

• TMC Staff Augmentation

• Innovative Deployments

• Expanded Roadside Service

Improve Overall Customer Service SafetyOperationsMaintenance

Adopt Holistic Approach to Planning, Design, Operations,and Maintenance

Page 15: AUSTIN REGION ITS · 5 Purpose: • Provide high-level plan to guide ITS deployments for major roadway corridors in the Austin region • Introduces new traffic management strategies

Austin District TMS Expenditures

15

Category FY 16 FY 17 FY 18 FY 19 Category Total

PEPS ITS Consultant Design/Planning $2,000,000 $2,000,000 $3,000,000 $6,000,000 $13,000,000

Stand Alone TMS Let FY $500,000 $0 $2,000,000 $10,000,000 $12,500,000

TMS Roadway Construction Lettings in FY $1,000,000 $2,000,000 $4,100,000 $5,200,000 $12,300,000

TMS Maintenance Budget $2,500,000 $2,250,000 $3,000,000 $4,000,000 $11,750,000

Contracted TMC Operations $0 $0 $1,750,000 $1,750,000 $3,500,000

TMS Capital Improvements (Video Wall, UPS, Generator, etc.) $200,000 $0 $85,000 $1,500,000 $1,785,000

Service Patrol/HERO/MAP (TxDOT Contribution only including federal funds)

$0 $0 $3,600,000 $3,600,000 $7,200,000

Federal Grant Projects (ATCMTD or other) $0 $200,000 $200,000 $200,000 $600,000

FY Total $6,200,000 $6,450,000 $17,735,000 $32,250,000

Total Current and Prior Biennium $62,635,000

Source: September 2018 Traffic Management System Status Report | Austin District

Page 16: AUSTIN REGION ITS · 5 Purpose: • Provide high-level plan to guide ITS deployments for major roadway corridors in the Austin region • Introduces new traffic management strategies

TxDOT - CAMPO Funded ITS/Operations Projects (FY 2019 – 2022)

Project Name Limits (To) Limits (From) Description CAT 2 Funding Award

HERO Program ExpansionContinue & Expand the HERO Program $24,461,363

FM 734 SH 45-N US 290-E ITS Deployment $6,192,225

RM 620/SH 71 US 183 US 290 ITS Deployment $10,544,227

SH 71 SH 130 Norwood Lane ITS Deployment $826,450

RM 2222 LP 360 I-35 ITS Deployment $3,934,903

LP 360 LP 1 (MOPAC) SH 71 ITS Deployment $5,599,304

$51,558,472

16

Page 17: AUSTIN REGION ITS · 5 Purpose: • Provide high-level plan to guide ITS deployments for major roadway corridors in the Austin region • Introduces new traffic management strategies

Common Denominator

17

Our success to-date can be attributed to the development of the ITS Master Implementation Plan, which provides:

• Alignment with the Vision• Planning Framework • Enhanced Collaboration• Strategy Driven Deployment• Visible and Measurable Results

Page 18: AUSTIN REGION ITS · 5 Purpose: • Provide high-level plan to guide ITS deployments for major roadway corridors in the Austin region • Introduces new traffic management strategies

What’s Next?

18

• Create a Rural Austin District ITS Plan• This will be incorporated into the Austin Region MIP

• Collect data and update Austin Region MIP annually• Continue to build support and foster stakeholder

engagement for an I-35 Integrated Corridor Management System (ICMS)

• Develop an ITS Asset Inventory Process• Implement the Austin Region MIP by identifying, funding,

developing, and deploying ITS projects and strategies that improve safety, mobility, infrastructure security, air quality, and economic vitality to maximize the investments in Austin’s multimodal transportation system.

Page 19: AUSTIN REGION ITS · 5 Purpose: • Provide high-level plan to guide ITS deployments for major roadway corridors in the Austin region • Introduces new traffic management strategies

Final Thoughts……

19

If you fail to plan,you plan to fail.

Page 20: AUSTIN REGION ITS · 5 Purpose: • Provide high-level plan to guide ITS deployments for major roadway corridors in the Austin region • Introduces new traffic management strategies

20

Page 21: AUSTIN REGION ITS · 5 Purpose: • Provide high-level plan to guide ITS deployments for major roadway corridors in the Austin region • Introduces new traffic management strategies

21