August 2, 2017 South Bridge Environmental Assessment Public Meeting

August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

August 2, 2017

South Bridge Environmental AssessmentPublic Meeting

Page 2: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

Why Are We Here Tonight?

• In 2013, South Bridge Environmental Assessment (EA) was reviewed and signed by CDOT and FHWA.

• Public hearing and 45-day public EA review between October/December 2013.

• As part of EA review, the Roaring Fork Transportation Authority (RFTA) noted concerns about potential project effects to future rail service.

Page 3: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

Why Are We Here Tonight (cont.)?

• Coordination and detailed alternatives review culminated in:

– Revisions to Preferred Alternative 10B

– 2016 Alternatives Workshop

• Tonight’s public meeting:

– Receive feedback/comments on Revised Preferred Alternative

– Discuss next steps

Page 4: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

Regional Map/Project Vicinity

Page 5: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

Purpose and Need• The purpose of the South Bridge project is to

provide a critical second route between SH 82 and the western side of the Roaring Fork River in the southern Glenwood Springs area.

• This new route would improve emergency evacuation, emergency service access, and local land use access.

• This second route would respond to the previous 2005 Congressional earmark for the Glenwood Springs South Bridge (new, off system bridge), Public Law 109-59, 109th Congress.

Page 6: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

Project Needs• Emergency evacuation needs include:

– Increased local capacity to support both emergency vehicle ingress and evacuation egress.

– Improved redundancy to reduce emergency service provider travel times and reduce the likelihood of a catastrophic occurrence where residents and visitors could be stranded if the existing primary access route is cut off.

• General transportation access needs include:

– Reasonable access options to limit temporary closures due to natural hazards and accidents.

Page 7: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

Project Goals• Minimize environmental impacts to scenic, aesthetic,

historic, and natural resources

• Provide a project that is in harmony with the community

• Provide a practical and financially realistic alternative

• Minimize private property impacts• Safely accommodate traffic on area roadways

• Provide an alternative that is consistent with local plans, regional plans, and current studies

• Provide a design that encourages multi-modal traveland does not preclude future multi-modal alternatives in the study area

Page 8: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

A transportation-related EA is a specific level of documentation required under the National Environmental Policy Act (NEPA) that includes:• Scoping & Data Collection• Development of Purpose & Need• Alternatives Development & Screening• Impacts Assessment & Mitigation Documented in

EA• EA Review• Preparation of Decision Document

Environmental Assessment

Page 9: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

Alternatives Analysis & Screening• 35 alternatives were

analyzed for the EA, including a No Action Alternative.

• Alternatives were screened at four levels, at an increasing level of detail.

• Number of alternatives decreased at each level.

Page 10: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

Input to Alternatives AnalysisInput was received from general public; elected officials; and local, state, and federal agencies through:• Open Houses (3) and Public Hearing • Elected Officials Meetings (23)• Citizens Advisory Group Meetings (14)

– Two dozen residents and community members

– Provided valuable input to the Project Working Group

Page 11: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

Level 1 (Fatal Flaw)

= Screened out during Level 1, but elements could be used to enhance the Preferred Alternative.

35 alternatives screened to 25

Page 12: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

Level 2 (Comparative)

= Screened out during Level 2

25 alternatives screened to 8

Page 13: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

Level 3 (Detailed Analysis)

= Screened out during Level 3

8 alternatives screened to 2

Page 14: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

Level 4 (Detailed Analysis)

Detailed evaluation of Alternatives 8b and 10b

= Screened out during Level 4

Page 15: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

Preferred Alternative – 10b

Page 16: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

Preferred Alternative – 10b

Page 17: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

EA Preferred Alternative – 10b

Page 18: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

EA Preferred Alternative – 10b

Page 19: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

EA Preferred Alternative – 10b

Page 20: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

EA Preferred Alternative – 10b

Page 21: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

EA Preferred Alternative – 10b

Page 22: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

EA Preferred Alternative – 10b

Page 23: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

EA Preferred Alternative – 10b

Page 24: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm
Page 25: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

RFTA Corridor / Rail-Banked Status

Page 26: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

Alternative Crossings of RFTA Corridor29 of the 37 Alternatives cross the RFTA Corridor:• 8 Alternatives with no

impact: screened in Level 1

• 14 Alternatives cross RFTA Corridor where trail is lower than SH 82

• 15 Alternatives cross RFTA Corridor at-grade

Alternatives as part of 2016 Alternatives Workshop

Page 27: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

Revised Preferred Alternative 10B

Page 28: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

Revised Preferred Alternative 10B

Page 29: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

Vertical Scale: 1 Square = 10 ftHorizontal Scale: 1 Square = 50 ft

Revised Preferred Alternative 10B

Page 30: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

Vertical Scale: 1 Square = 10 ftHorizontal Scale: 1 Square = 50 ft

Revised Preferred Alternative 10B

SH 82 Profile at Proposed Interchange

Page 31: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

Revised Preferred Alternative 10B

Page 32: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

Revised Preferred Alternative 10B

Page 33: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

Revised Preferred Alternative 10B

Page 34: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

Revised Preferred Alternative 10B

Page 35: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

Revised Preferred Alternative 10B

Page 36: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

No Action Alternative

• Includes only committed projects planned by local or state agencies.

Preferred Alternative (Alternative 10b)

• The Preferred Alternative would:

– Provide enhanced emergency and local access.

– Improve the safety and efficiency of existing intersections.

– Provide additional opportunities for bicycle and pedestrian use.

Alternatives Evaluated in EA

Page 37: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

• Right-of-way: Similar impacts but some additional right-of-way would be needed near SH 82.

• Noise: Potential for increased noise levels near new SH 82 interchange because of free flowing traffic.

• Wildlife connectivity: Some long-term effects to wildlife movement and migration.

New/Different Impacts

Page 38: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

• Visual: Changed views to/from SH 82, from proposed retaining walls and higher elevation of SH 82.

• Historic: Permanent South Bridge crossing of Denver and Rio Grande Western Railroad.

• Parks and Recreation: Minor realignment of Rio Grande Trail.

New/Different Impacts (cont.)

Page 39: August 2, 2017 - Glenwood South Bridge 4 - Presentation 0802… · 17/2/2008  · Microsoft PowerPoint - Public Meeting Presentation 07-31-2017.ppt [Compatibility Mode] Author: swanm

• Finalize revised impacts from revised Preferred Alternative.

• Respond to comments on EA.• CDOT/ FHWA issue a ‘Decision Document’—

completes EA process.• Conduct preliminary design of the Preferred

Alternative.

• Begin initial right-of-way identification/acquisition.

• Develop project funding plan and construction phasing.

• Conduct final design/right-of-way acquisition.

• Construct the project.

Next Steps