19
PRESENTED BY: EBO REPORT 13 AUGUST 18, 2016

AUGUST 18 , 2016€¦ · Business Opportunity acvies and accomplishments that have occurred from contract incep&on through 31 July 2016, and to illustrate the progress made toward

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: AUGUST 18 , 2016€¦ · Business Opportunity acvies and accomplishments that have occurred from contract incep&on through 31 July 2016, and to illustrate the progress made toward

PRESENTEDBY:

EBOREPORT13

AUGUST18,2016

Page 2: AUGUST 18 , 2016€¦ · Business Opportunity acvies and accomplishments that have occurred from contract incep&on through 31 July 2016, and to illustrate the progress made toward

Confiden'al

8/18/2016 1

INTRODUCTION

This Execu+ve Summary has been prepared to provide highlights of the EqualBusiness Opportunity ac0vi0es and accomplishments that have occurred fromcontract incep&on through 31 July 2016, and to illustrate the progress madetowardtheM/FBEgoalof31%par6cipa6onontheconstruc6onof theAtlantaFalconsMercedes-BenzStadium(“MBStadium”).

As illustrated on the following pages, currently $336,828,750 of the totalMBStadium contract value has been commi$ed to M/FBE firms. This figurecomprisesthetotalcontractdollarsawardedtoM/FBEs for theen7rescopeoftheproject,whichincludesthedevelopment,design,andconstruc*onphasesofthestadium.Ofthetotaldollarscommi%edtoM/FBEs,$229,326,966hasbeenpaidthrough31July2016,tothefirmsawarded.Asofthecloseofthesecondquarter of 2016,M/FBE par+cipa%onon theMBStadiumwas at 36.4%of thetotalcontract.

Page 3: AUGUST 18 , 2016€¦ · Business Opportunity acvies and accomplishments that have occurred from contract incep&on through 31 July 2016, and to illustrate the progress made toward

Confiden'al

8/18/2016 2

PARTNERSHIPSFORSUCCESS

ThissegmenthighlightssuccessstoriesthathaveoccurredsincetheMercedes-Benz Stadium construc1on began. It illustrates what can happen whenopportunity, coupledwith diligence and a strong desire to learn, combine andlead to win-win collabora'ons for all par(es involved. This report featurespartner:

• DUNLOPNDT InspectionServices

Page 4: AUGUST 18 , 2016€¦ · Business Opportunity acvies and accomplishments that have occurred from contract incep&on through 31 July 2016, and to illustrate the progress made toward

Confiden'al

8/18/2016 3

“At Dunlop NDT we put our mission, vision and core values into everything we do and we believe we are only as good as the promises we make.”

Mercedes-BenzStadiumandDunlopNDT:RisingUpTogether

DunlopNDTLLC(“Dunlop”or“DNDT”)isates$ngandinspec$onfirmlocatedinBuford,Georgia,thatoffersawiderangeofdestruc'veandmetallurgicaltes'ngservices.DNDTisaCityofAtlantacer5fiedFBE.

Dunlop is a teaming partner to AMEC for the construc7on material tes7ngpor$onoftheMercedes-BenzStadium(“MBStadium”).Itisresponsibleforfieldtes$ng in the fabrica*on shops and for quality assurance tes*ng, with anemphasisonfinalchecksandinspec0onsofmaterials.

While the ideaofDNDTwas thebrain-childofCEOAmandaDunlop foroveradecade,DunlopNDTbeganprovidingitsservicesin2013.Ithasallthemakingsof a great start-up: three friends had the idea that they could provide great,quality service in thefieldofmaterial tes5ng. Thecompanystarted ina spareroomofAmanda’shome,andithasgrownexponen5allyinthethreeyearssinceithasbeeninexistence.

Mercedes–BenzStadiumProject

Page 5: AUGUST 18 , 2016€¦ · Business Opportunity acvies and accomplishments that have occurred from contract incep&on through 31 July 2016, and to illustrate the progress made toward

Confiden'al

8/18/2016 4

Dunlop’sCEOisarguablylivingtheentrepreneurialdreamrightnow–oratleastreaping the reward of all of the hardwork (and “blood, sweat, and tears”) oftakingtheleapintothebusiness-ownershippool.Amandastartedoutintheengineering world as an administra/ve assistant who worked her way up tobeing a director of nondestruc0ve tes0ng with an engineering firm beforestar%nghercompany(a1erthatfirmdecidedtogoinadifferentdirec%onthanshehadenvisionedhercareergoing).

Amandapartneredwith two long-!mecolleagues,withwhomshehadworkedover the years, to form the company that exists today, and they began toleverage their past working rela1onships to secure the contracts that are thebasisforaveryimpressivepor.olioofwork.DNDThasworkedonprojectsattheExxon Mobile and Baxter Pharmaceu5cals campuses, and Hartsfield-JacksonAtlantaInterna*onalAirport.

Dunlop’s work on theMB Stadium is especiallymeaningful for the company’sownerbecause,shepointsout,thatduetobeingawardedthecontract,herfirmhasgrownfive-foldinama&erofmonths!Dunlophasgrownfromatotalof12employeestobeingabletoemployee25-30peoplewhoworkprimarilyontheMBStadiumprojectalone.Also,asaresult,therehasbeen“phenomenalgrowthinternally” and because Amanda knows the value of coming up through theranks, she proudly spoke of how the MB Stadium contract has resulted in anumber of employees being promoted upward within the organiza,on andinspiringotherstostudytogetdegreesinengineeringfields.

AccordingtoAmanda,theawardoftheMBStadiumcontracthastakenDunlop’sbusinessto“anotherlevel;”inaddi3ontohiringmoreemployees,ithasrecentlyopenedafullservicedestruc.vetes.nglab.

Page 6: AUGUST 18 , 2016€¦ · Business Opportunity acvies and accomplishments that have occurred from contract incep&on through 31 July 2016, and to illustrate the progress made toward

Confiden'al

8/18/2016 5

WhenaskedwhatitmeanstoworkontheMBStadium,Dunlop’sCEOstatedthatDunlopwas“incrediblygrateful”tobegiventheopportunity;ithasallowedfortremendousgrowthofDunlopNDTinashortamountof%me.Dunloprecognizeshowexcep)onalitistobeworkingontheMBStadium,especiallysoearlyinitsexistence.ForDunlopithasalwaysbeenaboutseizingtheopportunitywhenitpresentsitselfanddoingwhatittakestoproducegreatresults.

ForthiswinningpartnershipbetweenMercedes-BenzStadiumandDunlopNDTthe%mecertainlyisnow.

DUNLOPNDT 4465 Commerce Drive

Suite 107 Buford, GA 30518

www.dunlopndt.com

“We are not just an inspection firm and will serve as your team member and a project liaison from the inception of your project to its completion. Working closely with you, we will provide services within your projects procedures and specifications keeping you abreast of its status throughout the process. We can handle projects and quantities large or small.”

Page 7: AUGUST 18 , 2016€¦ · Business Opportunity acvies and accomplishments that have occurred from contract incep&on through 31 July 2016, and to illustrate the progress made toward

Confiden'al

8/18/2016 6

PAYMENTSTATUSSUMMARY

PAYMENTSUMMARYSTATUSAABE FBE REMAININGEBO’S

TOTAL

TotalContractValue $925,639,760

M/FBECommitteddollars146,503,920 151,556,972 38,767,858 $336,828,750

M/FBEPaidtoDate $229,326,966

%committedtoMFBE’s 36.4%

TotalProject%GOAL 31%

Page 8: AUGUST 18 , 2016€¦ · Business Opportunity acvies and accomplishments that have occurred from contract incep&on through 31 July 2016, and to illustrate the progress made toward

1

EBO Summary #13Committed EBO Contracts and Amounts Paid To-Date

PAYMENTSTATUSSUMMARYAABE FBE RemainingEBOs TOTAL

TotalContractValue $925,639,760

M/FBECommittedDollars $146,503,920 $151,556,972 $38,767,858 $336,828,750

M/FBEPaidTo-Date $229,326,966

%CommittedtoMFBE's 36.4%

TotalProject%Goal 31%

ScopeofWork ContractorName ContractValue TotalEBOContractAmountTo-Date

AABE FBE RemainingEBOs

DrilledPiers ABE 9,066,904$

Anasteel&Supply $1,528,512

CapitalCityMachineShop $262,866 *

RamToolandSupply $22,514

S.A.WhiteOilCompany $133,418

Specialties AccessoriesUnlmited,Inc. 5,459,291$

PinnacleServiceGrp.,Inc. $2,650,000

OverheadDoors/LoadingDockEqp.AcoustiDoorsandSpecialists,LLC 862,671$

DrywallandAcoustalWorkBelow1061' AcoustiEngineering 19,190,554$

AlphaInsulation&Waterproof $3,500,740

APDrywall $900,000

IwesConstructionSrvs. $1,340,030

J.S.82ConstructionGroup $1,000,000

LevelConstructionSrvs. $637,937

SiteWaterproofing AlphaInsulationandWaterproofing,Inc.4,971,287$ $4,971,287

ResteelMaterial AnasteelandSupplyCompany 1,033,017$ $1,033,017 *

Page 9: AUGUST 18 , 2016€¦ · Business Opportunity acvies and accomplishments that have occurred from contract incep&on through 31 July 2016, and to illustrate the progress made toward

2

PAYMENTSTATUSSUMMARYScopeofWork ContractorName ContractValue TotalEBOContractAmountTo-Date

AABE FBE RemainingEBOs

ResteelInstallation Anatek,Inc. 615,762$ $615,762 *

ConcreteMaterial/PurchaseOrder ArgosUSAReadyMix 914,693$

AsphaltPaving Atl.PavingandConcreteConstructionCo.306,117$ $306,117

Mechanical&PlumbingAtlantaStadiumPartners,AJointVenture 125,602,490$

AlphaInsulation/Wtrprfg. $131,434

AminSheetMetal $1,151,065

ARS(JVPartner) $6,042,091

ARS(Self-PerformedWork) $13,040,464

AtlantaCommunications $15,565

BoyetteBrothersCompany $150,000

ContractBusinessInteriors $20,405EasternPower

Technologies,Inc. $910,000

F&SMechanical $20,045,668

GoldenInsulation $8,042

H&RCommericalFlooring $8,495

PeachtreeMechanical $3,261,463

PrecisionLayoutandDesign $250,000

SouthsideStreetMetal $4,745,413

VulcanIndustrial $3,953,204

AugerCastPiles Berkel 7,987,314$

Trucking AmerconConstructionGroup $39,882

Anasteel $2,448

Steel Anatek $982,132

MicscellaneousMaterialRamToolandSupplyCompany $3,935

Trucking SAWATransportation $159,497

Fuel S.A.WhiteOilCompany $33,703

SheetingandShoring Berkel 748,266$

Steel Anasteel $223,348

RamToolandSupplyCo. $668

GeneralRequirements BrandEnergySolutions,LLC 700,778$

Page 10: AUGUST 18 , 2016€¦ · Business Opportunity acvies and accomplishments that have occurred from contract incep&on through 31 July 2016, and to illustrate the progress made toward

3

PAYMENTSTATUSSUMMARYScopeofWork ContractorName ContractValue TotalEBOContractAmountTo-Date

AABE FBE RemainingEBOs

Hardscape/Landscape/Irrigation Brightview(formerlyValleycrestLandscape)6,045,661$

GreenHillsLandscaping $916,987

LimitlessConcrete&Works,Inc. $1,081,128

C.M.Steel,Inc. 54,625$

StructuralSteelRoof-DesignAssist CanamSteelCorporation 27,365,000$

ADGEnterprises,Inc. $76,950 *

Amer.CustomManufacturing $3,147,055

BennettLogistics $4,441,592

ChampionPainting $2,876,712

RyjohnSteel $67,842

Waterproofing/Caulking/ExpansionJoints ChamblissConst.Specialist,Inc. 2,848,565$

LevelConstruction $1,265,000

TCMWaterproofing $175,000

InteriorMasonry CornerstoneMasonryGroup,Inc. 10,710,896$

AnasteelSupply $1,200,000

TCMLLC $2,190,954

AdminOffices-DemountableParticionsCorporateEnviornments 345,945$ $345,945

ExteriorEnclosure CrownCorr 50,585,731$

BennettInternationalLogistics $7,663

C&KUnitedSheetMetal $7,899,944 *

EGM $6,874,592 *

ExteriorMetalServices $1,160,000

TCMWaterproofing $175,000

ResinousFlooring CSSCoatings 1,397,100$

REURenoviations,LLC $433,101 *

SwitchBackRampDemolition D.H.GriffinWreckingCompany 521,711$

KellyConstructionCompany $32,824

KnightSteel,Inc. $3,778

Page 11: AUGUST 18 , 2016€¦ · Business Opportunity acvies and accomplishments that have occurred from contract incep&on through 31 July 2016, and to illustrate the progress made toward

4

PAYMENTSTATUSSUMMARYScopeofWork ContractorName ContractValue TotalEBOContractAmountTo-Date

AABE FBE RemainingEBOs

GADomeUtilities,ErosionControl,NSPSiteDemo(Incl.MtVernon) DennisTaylor 1,722,441$

C&CFence $2,783

CornerstoneDemolition $551,670

Demolition SouthernSiteDevelopment $195,000

OrnamentalHandrails DillionForge 233,000$

WebCameras Earthcam 75,951$

ArchitecturalPrecast GatePrecastErectionCompany 3,573,955$

ArchitecturalPrecastSolutions $95,932

TCMWaterproofing $237,730

InteriorGlassandGlazing GlassStream,Inc. 2,374,458$

AlphaInssulation $80,000

Paint/Wallcovering GoodmanDecoratingCo. 3,728,359$

CommericlalPainter's360 $1,155,791

Superstructure HHRMSelfPerform 125,562,749$

Anasteel $20,965,351

Anatek $10,547,274

BrysonConstructors $2,785,992

C.D.MoodyConstruction $12,587,520

C.D.MoodyConstruction(COW) $574,209

ContractBusinessInteriors $1,865

EagleSafetySupply $3,940

EasternData $22,247

FreemanFormsdbaMySupplies $6,649

Gunby $1,221,533

H.J.Russell $12,587,520

H.J.Russell(COW) $53,403

LongEngineering $276,208

RamTool $1,047,856

S.A.White $76,419

ThePrintingPeople $105

Page 12: AUGUST 18 , 2016€¦ · Business Opportunity acvies and accomplishments that have occurred from contract incep&on through 31 July 2016, and to illustrate the progress made toward

5

PAYMENTSTATUSSUMMARYScopeofWork ContractorName ContractValue TotalEBOContractAmountTo-Date

AABE FBE RemainingEBOs

SteelStairsandLids Immec,Inc. 3,235,466$

SpecialSystems InternationalBusinessMachines,Inc.53,941,187$

CoLiantSolutions $21,632,151

J&AEngineering $535,594

Electrical-FOT Inglett,Cleveland,Uptime(ICU)JV 306,384$

ElectricalInglett,Cleveland,Uptime(ICU)JVElectric 73,467,015$

B&SSupply $400,000

BoyetteBrothersCompany $924,606

ContractBusinessSolutions $4,000

JJDalSupply $100,000 *

Mayer $20,651,883

Uptime(JVPartner) $9,081,037 *Uptime(Self-performed

work) $8,050,086 *

FOTElectrical InglettandStubbs,LLC 198,085$

FriendshipBaptistChurchDemolitionandAbatement KissbergConstruction 194,220$ $194,220 *

LittleEnvironmental $10,000

Elevators Kone,Inc. 11,300,522$

MillsSpecialityMetals $979,687

StructuralPeer/ConsultantAgreementKSIStructuralEngineers 13,065$

GraphicsandWayfinding L&HSignsInc. 2,408,000$

C&KUnitedSheetMetal&Mechanical,Inc. $325,000

JKB,LLC $239,350

SoutheastExhibitsandEvents,LLC $182,358 *

DrywallandAcoustical MarekInteriorSystems,Inc. 20,612,494$

AlphaInsulation&Waterproof $7,626,623

SwitchbackStairRailing McPhersonEnterprises,Inc. 149,752$

Page 13: AUGUST 18 , 2016€¦ · Business Opportunity acvies and accomplishments that have occurred from contract incep&on through 31 July 2016, and to illustrate the progress made toward

6

PAYMENTSTATUSSUMMARYScopeofWork ContractorName ContractValue TotalEBOContractAmountTo-Date

AABE FBE RemainingEBOsStructuralPrecastMaterial Metromont 26,815,647$

Anasteel&SupplyCompany $26,015

ArchitecturalPrecastSolns. $154,272

BrysonConstructorsInc. $3,658,525

Millwork MortensenWoodwork,Inc. 14,203,147$

M.GarciaandSons $3,542,214

InteriorProgressions Multivista 273,478$

AdminOffices-Drywall/ACTNESDrywallandAcoustic 805,000$

AlphaInsulationandWaterproofing $148,925

PlazaPileCaps&FirstLiftofColumns,WestSide NewGenConstruction,LLC 703,525$ $703,525

FireProtection NorthstarFireProtectionofTX 8,441,283$

AlzanServices,LLC $71,469 *

ARSMechanical $2,545,422

PrecisionLayoutandDesign $6,165

AccordionFireDoors OverheadDoorCo.ofAtlanta 342,583$

CivilEngineer-RoadwaysProjectsParsonsBrinckerhoff 2,634,798$

Surveyor&UtilityDesign LongEngineering $520,073

SiteLightingWilliams,Russell,Johnson(WRJ) $193,788

Roofing PorterRoofingConrractors,Inc. 8,617,447$

RamTool $573,817

ShallowFoundation/FirstLift PrecisionConcreteConstruction,Inc.26,720,805$

Anatek $4,030,591

GrierBrothers $168,018

RamTool $188,064

TechniqueConcrete $8,280,148

AASHTOGirderInstallation PrecisionStoneSettingCo. 61,666$

AdminOffices-ElectricalSystemsPutzelElectricalContractors 1,021,980$

Page 14: AUGUST 18 , 2016€¦ · Business Opportunity acvies and accomplishments that have occurred from contract incep&on through 31 July 2016, and to illustrate the progress made toward

7

PAYMENTSTATUSSUMMARYScopeofWork ContractorName ContractValue TotalEBOContractAmountTo-Date

AABE FBE RemainingEBOs

GCElectricalSolutions $454,625

ExteriorMasonry PyramidMasonry 856,738$

MeadowsConstruction $250,720

Railings RaydeoEnterprises,Inc. 9,607,920$

Eddies'sWelding $155,000

MorganConstructors $686,600

RemediationGroup,Inc. $3,001,625

Contractor(MangumStreetRelocation)ReevesYoung,LLC 3,208,311$

Asphalt AtlantaPaving $270,000

Fencing C&CFence $30,935

ErosionControl CleanWaterConsultants $2,084

Trucking GrierBrothers $101,000

Trucking HarrellHaulingInc. $190,193 *

Markings&Signage HighwayServices $32,984

Trucking MARTrucking $5,000

Trucking MCTrucking $26,158

Electrical MEContractors $28,646

Trucking NavigatorsConstruction $5,874

TrafficControl TheCorbettGroup $280,000

MassExcavationandSiteGrading ReevesContractingCo. 18,596,936$

Shoring AmericanShoring 319,952

Paving AtlantaPaving $138,880

Trucking GrierBrothers $134,135

Trucking HarrellHaulingInc. $2,425,000 *

Engineering LongEngineering $19,368

Trucking MARTrucking $15,640

Trucking MCTrucking $46,020

Constructionofthevault NewGen $1,460,000

Trucking R.S.Senter $381,295

Blasting SymmetryRockDrilling $35,000

TrafficControl TheCorbettGroup $955,106

RoadwaysPhaseII ReevesContracting,Inc. 16,244,215$

Anatek $2,596,882

AtlantaPaving $400,000

Page 15: AUGUST 18 , 2016€¦ · Business Opportunity acvies and accomplishments that have occurred from contract incep&on through 31 July 2016, and to illustrate the progress made toward

8

PAYMENTSTATUSSUMMARYScopeofWork ContractorName ContractValue TotalEBOContractAmountTo-Date

AABE FBE RemainingEBOs

BonnJ $556,898

CadenConstructionCo. $400,000

C&CFence $9,000

HarrellHauling $450,000 *

LagniappeDevelopmentCo. $795,000

NewGen $600,000

PlazaFormwork SkylineFormingofGA,Inc. 2,752,882$

DoorsandFramesMaterial SouthernDoorandPlywood,Inc. 3,343,589$ $3,343,589

MarquisSignDemo SouthernSiteDevelopment 45,500$ $45,550

Carpet;ResilientandRubber/WoodFlooring&TileSpectraContractFlooring 7,315,145$

S.L.GreshamCompany $2,564,065

AASHTOGirders-Plaza StandardConcrete 1,123,602$

ElevatorSteel SteinSteelandSupplyCompany 1,994,775$

AmericanCustomManufacturing $1,394,946

ChurchDemolitionSuperiorRigging&ErectingCompany 328,150$

ConsultantServices ThorntonThomasetti 45,000$

SiteSecurity/Fencing Tusco,Inc. 3,440,962$ $3,440,962

MiscellaneousSteel VariableSteelUnlimited 3,289,975$ $3,289,975

CIPAisleSteps WorldDynamics 1,586,528$

Anasteel $55,000 *

SouthernDoorandPlywood $65,500

CONSTRUCTIONREQUIREMENTSConstructionRequirements 24,645,469$

BilledDirect AllstateWaste(CR) $396,592ContractedthruWaste

Management AllstateWaste(GC) $387,500

BrysonConstructors(CR) $1,993,499

Page 16: AUGUST 18 , 2016€¦ · Business Opportunity acvies and accomplishments that have occurred from contract incep&on through 31 July 2016, and to illustrate the progress made toward

9

PAYMENTSTATUSSUMMARYScopeofWork ContractorName ContractValue TotalEBOContractAmountTo-Date

AABE FBE RemainingEBOs

Fencing C&CFence(CR) $473,689

JVPartnerC.D.MoodyConstruction(CR) $1,929,474

ConstructionClean-UpSpecialists(CR) $5,549

EagleSafetySupply,Inc.(CR) $135,063

EagleSecurity(CR) $568,011

EasternData(CR) $3,985

JVPartner H.J.Russell $740,013

JVPartner H.J.Russell $110,613

LongEngineering(CR) $750,000

MySupplies(CR) $156

ConsultantAgreementOasisConsultingServices,

LLC(GC) $26,066

RamTools(CR) $403,073

Oil/GasolineSupplier S.A.White $22,694

ThePrintingPeople(CR) $3,890

INSURANCE,PERMITS,&FEES

Insurance,Permits 10,981,370$

JVPartner H.J.Russell(Bonds) $598,975

JVPartnerC.D.MoodyConstruction(Bonds) $873,984

Fees 23,220,176$

JVPartner H.J.Russell(Bonds) $2,284,850

JVPartnerC.D.MoodyConstruction(Bonds) $2,284,850

GENERALCONDITIONS

49,504,364$

AActionVending(GC) $12,140

AActionJanitorial(GC) $143,908

PhotosAerialInnovationsofGA(GC) $4,330

MovingServices B&BMovers(GC) $8,091

WorkOrder BrysonConstructors(GC) $1,449,568

Fencing C&CFence(GC) $53,178

JVPartnerC.D.MoodyConstr.(GCStaff) $2,232,753

OfficeFurnitureContractBusinessInteriors(GC) $137,680

EagleSafetySupply,Inc.(GC) $827

Electronics EasternData(GC) $155,734

JVPartner H.J.Russell(GCStaff) $1,326,717

OfficeSupplies MySupplies(GC) $128,343

RamTools(GC) $79,539

JVPartner ShumateMechanical(GC) $86

Labor Staffzone $3,525

Page 17: AUGUST 18 , 2016€¦ · Business Opportunity acvies and accomplishments that have occurred from contract incep&on through 31 July 2016, and to illustrate the progress made toward

10

PAYMENTSTATUSSUMMARYScopeofWork ContractorName ContractValue TotalEBOContractAmountTo-Date

AABE FBE RemainingEBOs

PrintingServices ThePrintingPeople(GC) $14,470

Twelve&Associates(GC) $61,697

FOTLandscaping WidespreadLandscaping $7,500

TOTAL $853,204,447 $139,933,493 $142,492,680 $38,123,456

DESIGNTEAM

Architecture-DesignerandArchitectofRecordHOK,Inc. $23,772,776

Architecture-Local TVSDesign

Architecture-Local CNNA

Architecture-Local StanleyBeamanSears $1,232,065

Architecture-Local GoodeVanSlyke $2,380,926

CivilEngineering-PrimeConsultantKimleyHorn $2,853,552

CivilEngineering-LocalTeamMemberLongEngineering $381,235

CivilEngineering-LocalTeamMemberSkylineEngineering $65,675

LandscapeArchitecture-PrimeConsultantHGOR $478,745

LandscapeArchitecture-LocalTeamMemberTheCreativeEye,LLC(TCE) $33,250

LandscapeArchitecture-LocalTeamMemberCentricity,LLC $49,875

StructuralEngineering-PrimeConsultantBuroHappold $11,761,133

StructuralEngineering-LocalTeamMemberSykesConsulting $1,348,344

StructuralEngineering-RoofMechanizationUnisystems

Mech,Plumb,ElecandFPEngineer-PrimeConsultantWSPFlack&Kurtz $4,355,997

Mech,Plumb,ElecandFPEngineer-LocalTeamMemberSLKing $600,000

Mech,Plumb,ElecandFPEngineer-LocalTeamMemberKhafra $600,000

LEEDAdministration Ecoworks $222,000 $222,000

A/V WJHW $1,145,098

A/V-LocalTeamMember J&AEngineering $432,446

FieldDrainageandTurfDesignFTE $108,000 $108,000

Page 18: AUGUST 18 , 2016€¦ · Business Opportunity acvies and accomplishments that have occurred from contract incep&on through 31 July 2016, and to illustrate the progress made toward

11

PAYMENTSTATUSSUMMARYScopeofWork ContractorName ContractValue TotalEBOContractAmountTo-Date

AABE FBE RemainingEBOs

FoodService RiccaNewmarkDesign(RND) $213,540

FoodService-LocalTeamMemberComachoAssociates $54,300

ExperientialGraphics TBD

BuildingCodesandLifeSafetyFSC $317,200

BuildingCodesandLifeSafety-LocalTeamMemberRLBrown $59,000

Accessibility/ADA UnitedSpinal $89,500

Accessibility/ADA-LocalTeamMemberMcAfee3Architects $22,500 *

VerticalCirculation LerchBates $95,585

DoorHardware StudioEight $23,100

BuildingEnvelope Heitmann&Associates $290,776

BuildingEnvelope EpstenGroup $38,000

WindEngineering BMTFM $170,000

WindEngineering RWDI $49,000

TOTAL $45,946,002 $5,109,695 $1,923,175 $594,746

DEVELOPER

Darden&Company

Surveyor LongEngineering $848,872 $848,872

DiversityCoordinator Griffin&Strong,P.C. $340,000 $340,000

MaterialTester NOVA $104,878

MaterialsMngrs&Eng.,Inc. $26,220

FundamentalCommissioningWorkingBuildings $667,120

SmartBuildingSystems $75,200

ConstructionMaterialsTestingAMEC $19,000,000

TriTech/Aldridge $595,000

WillmerEngineeringInc $730,000

Page 19: AUGUST 18 , 2016€¦ · Business Opportunity acvies and accomplishments that have occurred from contract incep&on through 31 July 2016, and to illustrate the progress made toward

12

PAYMENTSTATUSSUMMARYScopeofWork ContractorName ContractValue TotalEBOContractAmountTo-Date

AABE FBE RemainingEBOs

DunlopNDT,LLC $4,425,000

Geotechnical/EnvironmentalEngineerLangan $3,346,079

AdvancedAnalyticalServ. $116,120

ExcaliburDrilling $166,812

ContourEngineering $23,436

OasisConstructionServices $28,475

WillmerEngineering $634,257

EnclosurePeerReview MorrisonHershfield $259,835

ME^3 $67,500

NSPSalesCenter HHRM $1,922,527

Uptime $383,032 *

AtlantaContractGlazing $24,569

F&SMechanical&Plumbing $133,912

AllianceFireProtection $15,625

MBAWaste $1,980

SouthernDoorandPlywood $13,491

ConstructionClean-up $2,004

TOTAL $26,489,311 $1,460,732 $7,141,117 $49,656

TOTALS $925,639,760 $146,503,920 $151,556,972 $38,767,858