Attachment D Project Maps Contents *This information is provided by Southern California Edison. Figure 1 SCE Mapbook, Figure 1, Regional Vicinity Map, Chino Hills Underground, Tehachapi Transmission Project (TRTP) Figure 2 SCE Mapbook, Figure 3a - Legend, Impacts to Jurisdictional Waters Map - Segment 7, Chino Hills Underground, Tehachapi Transmission Project (TRTP) Figure 3 SCE Mapbook, Figure 3a –Sheet 2, Impacts to Jurisdictional Waters Map - Segment 7, Chino Hills Underground, Tehachapi Transmission Project (TRTP) Figure 4 SCE Mapbook, Figure 3a –Sheet 3, Impacts to Jurisdictional Waters Map - Segment 7, Chino Hills Underground, Tehachapi Transmission Project (TRTP) Figure 5 SCE Mapbook, Figure 3a –Sheet 4, Impacts to Jurisdictional Waters Map - Segment 7, Chino Hills Underground, Tehachapi Transmission Project (TRTP) Figure 6 SCE Mapbook, Figure 3a –Legend, Impacts to Jurisdictional Waters Map - Segment 8, Chino Hills Underground, Tehachapi Transmission Project (TRTP) Figure 7 SCE Mapbook, Figure 3a –Sheet 45, Impacts to Jurisdictional Waters Map - Segment 8, Chino Hills Underground, Tehachapi Transmission Project (TRTP) Figure 8 SCE Mapbook, Figure 3a –Sheet 56, Impacts to Jurisdictional Waters Map - Segment 8, Chino Hills Underground, Tehachapi Transmission Project (TRTP) Figure 9 SCE Mapbook, Figure 3b –Sheet 1, Impacts to Jurisdictional Features, Chino Hills Underground, Tehachapi Transmission Project (TRTP) Figure 10 SCE Mapbook, Figure 3b –Sheet 2, Impacts to Jurisdictional Features, Chino Hills Underground, Tehachapi Transmission Project (TRTP) Figure 11 SCE Mapbook, Figure 3b –Sheet 3, Impacts to Jurisdictional Features, Chino Hills Underground, Tehachapi Transmission Project (TRTP) Figure 12 SCE Mapbook, Figure 3b –Sheet 13, Impacts to Jurisdictional Features, Chino Hills Underground, Tehachapi Transmission Project (TRTP)

Attachment D Project Maps · New Structure New, Replace Existing Structure Remove Structure Replace K:\Projects_4\SCE_TRTP\00200_13\mapdoc\JD\Permit_Apps\Fig03a_JD_Waters_seg8_Legend.mxd

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Attachment D Project Maps · New Structure New, Replace Existing Structure Remove Structure Replace K:\Projects_4\SCE_TRTP\00200_13\mapdoc\JD\Permit_Apps\Fig03a_JD_Waters_seg8_Legend.mxd

Attachment D Project Maps

Contents

*This information is provided by Southern California Edison.

Figure 1 SCE Mapbook, Figure 1, Regional Vicinity Map, Chino Hills Underground,

Tehachapi Transmission Project (TRTP)

Figure 2 SCE Mapbook, Figure 3a - Legend, Impacts to Jurisdictional Waters Map - Segment 7, Chino Hills Underground, Tehachapi Transmission Project (TRTP)

Figure 3 SCE Mapbook, Figure 3a –Sheet 2, Impacts to Jurisdictional Waters Map - Segment 7, Chino Hills Underground, Tehachapi Transmission Project (TRTP)

Figure 4 SCE Mapbook, Figure 3a –Sheet 3, Impacts to Jurisdictional Waters Map - Segment 7, Chino Hills Underground, Tehachapi Transmission Project (TRTP)

Figure 5 SCE Mapbook, Figure 3a –Sheet 4, Impacts to Jurisdictional Waters Map - Segment 7, Chino Hills Underground, Tehachapi Transmission Project (TRTP)

Figure 6 SCE Mapbook, Figure 3a –Legend, Impacts to Jurisdictional Waters Map - Segment 8, Chino Hills Underground, Tehachapi Transmission Project (TRTP)

Figure 7 SCE Mapbook, Figure 3a –Sheet 45, Impacts to Jurisdictional Waters Map - Segment 8, Chino Hills Underground, Tehachapi Transmission Project (TRTP)

Figure 8 SCE Mapbook, Figure 3a –Sheet 56, Impacts to Jurisdictional Waters Map - Segment 8, Chino Hills Underground, Tehachapi Transmission Project (TRTP)

Figure 9 SCE Mapbook, Figure 3b –Sheet 1, Impacts to Jurisdictional Features, Chino Hills Underground, Tehachapi Transmission Project (TRTP)

Figure 10 SCE Mapbook, Figure 3b –Sheet 2, Impacts to Jurisdictional Features, Chino Hills Underground, Tehachapi Transmission Project (TRTP)

Figure 11 SCE Mapbook, Figure 3b –Sheet 3, Impacts to Jurisdictional Features, Chino Hills Underground, Tehachapi Transmission Project (TRTP)

Figure 12 SCE Mapbook, Figure 3b –Sheet 13, Impacts to Jurisdictional Features, Chino Hills Underground, Tehachapi Transmission Project (TRTP)

Page 2: Attachment D Project Maps · New Structure New, Replace Existing Structure Remove Structure Replace K:\Projects_4\SCE_TRTP\00200_13\mapdoc\JD\Permit_Apps\Fig03a_JD_Waters_seg8_Legend.mxd

Figure 13 SCE Mapbook, Figure 3b –Sheet 14, Impacts to Jurisdictional Features, Chino Hills Underground, Tehachapi Transmission Project (TRTP)

Page 3: Attachment D Project Maps · New Structure New, Replace Existing Structure Remove Structure Replace K:\Projects_4\SCE_TRTP\00200_13\mapdoc\JD\Permit_Apps\Fig03a_JD_Waters_seg8_Legend.mxd

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(

!(

!(

!(

!(

Kern County

Los Angeles County

San

Bern

ardi

no C

ount

yLo

s A

ngel

es C

ount

y

UV2

Castaic LakeCastaic LakeState Rec AreaState Rec Area

AngelesAngelesNationalNationalForestForest San BernardinoSan Bernardino

National ForestNational Forest

Edwards Air Force Base

National Guard Armory

Pomona

Corona

Ontario

Norwalk

Van NuysGlendale

Pasadena

Palmdale

ElMonte

Lancaster

Hollywood

Inglewood

Fullerton

West CovinaLos Angeles

Santa Clarita

Rancho Cucamonga

East Los Angeles

Burbank

Downey

Compton

§̈¦15

§̈¦405

§̈¦10

§̈¦210

§̈¦5

§̈¦710

§̈¦10

§̈¦15

£¤395

UV14

UV138

UV210

UV134

UV91

UV71

UV1

UV142

UV57

UV90

UV170

UV118

UV107

UV66

UV213

UV2

UV90

UV2

UV1

UV14

UV134

UV90

UV107

UV30

§̈¦10

UV83

UV2

UV107UV107

UV72UV90UV90

UV57UV1

UV1

UV91

UV60

UV58

UV27

UV138

UV39

£¤101

£¤395

§̈¦110

§̈¦105

§̈¦710

§̈¦5

§̈¦5

§̈¦10§̈¦10

§̈¦405

§̈¦605

§̈¦15

Chino

Mesa

Gould

PeytonWalnut

Ganesha

Nogales

Vincent

Windhub

Goodrich

Rosamond

Antelope

Mira Loma

Rio Hondo

Whirlwind

Path

: K:\P

roje

cts_

4\S

CE_

TRTP

\002

00_1

3\m

apdo

c\JD

\Per

mit_

App

s\Fi

g01_

Reg

iona

l_Vi

cini

ty.m

xd

!!!

!!!

!!!

!!!!!!!!!

!!!

!!!

!!!!!!!!!!!!

!!!

!\!\Carson City

Oakland

CA

NV

San Diego

Los Angeles

FresnoSan Jose

LasVegas

Bakersfield

Sacramento

Legend

Chino Hills Underground

!( Proposed Substation!( Existing Substation

TRTP RouteSegment 4Segment 5Segment 6Segment 7Segment 8 EastSegment 8 Chino HillsSegment 8 WestSegment 10Segment 11

66kV

Telecom 7

Telecom 8

Telecom 10

Source: ESRI StreetmapNorth America, 2008

0 84

Miles ±

Figure 1SCE Mapbook, Figure 1

Regional Vicinity MapChino Hills Underground, Tehachapi Transmission Project (TRTP)

Page 4: Attachment D Project Maps · New Structure New, Replace Existing Structure Remove Structure Replace K:\Projects_4\SCE_TRTP\00200_13\mapdoc\JD\Permit_Apps\Fig03a_JD_Waters_seg8_Legend.mxd

Figure 3a - LegendImpacts to Jurisdictional Waters Map - Segment 7

Chino Hills UndergroundTehachapi Renewable Transmission Project (TRTP)

Jurisdictional WatersWetlandOHWMCDFWJurisdictional Stream

66 kVGeneral Disturbance AreaConstruction Disturbance AreaMaterial Storage AreaPole Work AreasPulling SitesRiser Setup AreaVault Setup AreaVehicle Parking/Staging Area12, Exsiting, OH; 12, n/a, OH66, Proposed, UG66, New-R-EX, OH; 66, Re-Route, OH; 66, Proposed, OH; 66, Modify, OH66, Existing, OH; 66, Idle, UG66, Approved, UG66, Remove, OH; 12, Approved, UG; 12, n/a, UG66, Proposed, n/a66, New, OH12, Proposed, OH; 12, Proposed, UGExisting RoutesAccess RoadsNew-R-EXModify, Re-RouteNewRemoveModify RiserNew VaultExistingNew TSPNew Riser12 Existing Pole

Segments 7 & 8 EngineeringMac Drain Single, PermanentGrading Limits, TemporaryGrading Limits, PermanentCrane Pad Boundary, PermanentCrane Pad Boundary, TemporaryCrane Pad DisturbanceStructure Work AreaParking/Staging AreaWire Tag Site/Wire Setup SiteTemporary Contractor Work LimitGuard PoleLanding ZoneMaterial Stockpiling AreaGeneral Disturbance AreaRoad Pullout/TurnoutUG DisturbanceOPGW Tower SpliceTelcom Pull SiteDist_AreaRd Existing Disturbance Area

Alignment (SCE)Energized ConductorNew ConductorModify ConductorRe-Route ConductorRemove ConductorExisting ConductorRD Existing Perm., no improveRD Existing Perm., min. improve *RD Existing Perm., med. improve *RD Existing Perm., heavy improve *RD Existing Temp., no improveRD Existing Temp., min. improve *RD Existing Temp., med. improve *New Overhead OPGWPole LineFiber Optic, UG, NewFiber Optic, OH, ExistingNew ADSS

Structures (SCE)Constructed StructureNew StructureNew, Replace Existing StructureExisting StructureRemove StructureExisting Pole

K:\P

roje

cts_

4\SC

E_TR

TP\0

0200

_13\

map

doc\

JD\P

erm

it_A

pps\

Fig0

3a_J

D_W

ater

s_se

g7_L

egen

d.m

xd D

ate:

10/

3/20

13 1

9316

Date Prepared: 10/3/2013

Figure 2SCE Mapbook, Figure 3a - Legend

Impacts to Jurisdictional Waters Map - Segment 7, Chino Hills UndergroundTehachapi Transmission Project (TRTP)

Gra

phic

s//0

0097

.12

007

Teha

chap

i (04

-14)

SS

Page 5: Attachment D Project Maps · New Structure New, Replace Existing Structure Remove Structure Replace K:\Projects_4\SCE_TRTP\00200_13\mapdoc\JD\Permit_Apps\Fig03a_JD_Waters_seg8_Legend.mxd

Rio H

ondo - Vincent #2

Mira Lom

a - Vincent

Mira Lom

a

- Vincent

Rio H

ondo - Vincent #2

M54-T1A

138

137

189

136

139

Const113

P/T 113S

135Pole(tcom)

7-1-S-11

7-1-S-12

7-1-S-13

7-1-S-14

7-1-S-15

7-1-S-16

7-1-S-17

7-1-S-18

7-1-S-19

7-1-S-2

7-1-S-20

7-1-S-3

7-1-S-4

7-2-S-1

7-2-S-2

7-2-S-3

7-2-S-4

7-2-S-5

7-2-S-6

7-2-S-7

7-2-S-1

7-1-S-1

34.159 dd,-117.948 dd

34.163 dd,-117.939 dd

Figure 3a - Sheet 2Impacts to Jurisdictional Waters Map - Segment 7

Chino Hills UndergroundTehachapi Renewable Transmission Project (TRTP)

0 200100

Feet

Jurisdictional WatersWetland

OHWM

CDFG

Jurisdictional Stream

K:\P

roje

cts_

4\SC

E_TR

TP\0

0200

_13\

map

doc\

JD\P

erm

it_A

pps\

Fig0

3a_J

D_W

ater

s_se

g7.m

xd D

ate:

10/

3/20

13 1

9316

Date Prepared: 10/3/20131 inch = 200 feet

Figure 3SCE Mapbook, Figure 3a –Sheet 2

Impacts to Jurisdictional Waters Map - Segment 7, Chino Hills UndergroundTehachapi Transmission Project (TRTP)

Gra

phic

s//0

0097

.12

007

Teha

chap

i (04

-14)

SS

Page 6: Attachment D Project Maps · New Structure New, Replace Existing Structure Remove Structure Replace K:\Projects_4\SCE_TRTP\00200_13\mapdoc\JD\Permit_Apps\Fig03a_JD_Waters_seg8_Legend.mxd

Mira Lom

a

- Vincent

188

135

7-3-S-1

7-2-S-10 7-2-S-11

7-2-S-12

7-2-S-13

7-2-S-14

7-2-S-15

7-2-S-6

7-2-S-7

7-2-S-8

7-2-S-9

7-3-S-2 7-3-S-7

7-3-S-8

7-3-S-9

7-92-S-1

7-92-S-1

7-2-S-13

7-3-S-1 7-3A-S-5

34.158 dd,-117.948 dd

34.155 dd,-117.939 dd

Figure 3a - Sheet 3Impacts to Jurisdictional Waters Map - Segment 7

Chino Hills UndergroundTehachapi Renewable Transmission Project (TRTP)

0 200100

Feet

Jurisdictional WatersWetland

OHWM

CDFG

Jurisdictional Stream

K:\P

roje

cts_

4\SC

E_TR

TP\0

0200

_13\

map

doc\

JD\P

erm

it_A

pps\

Fig0

3a_J

D_W

ater

s_se

g7.m

xd D

ate:

10/

3/20

13 1

9316

Date Prepared: 10/3/20131 inch = 200 feet

Figure 4SCE Mapbook, Figure 3a –Sheet 3

Impacts to Jurisdictional Waters Map - Segment 7, Chino Hills UndergroundTehachapi Transmission Project (TRTP)

Gra

phic

s//0

0097

.12

007

Teha

chap

i (04

-14)

SS

Page 7: Attachment D Project Maps · New Structure New, Replace Existing Structure Remove Structure Replace K:\Projects_4\SCE_TRTP\00200_13\mapdoc\JD\Permit_Apps\Fig03a_JD_Waters_seg8_Legend.mxd

Pole(tcom)

Pole(tcom)

Pole(tcom)

Pole(tcom)

7-3A-S-3

7-3A-S-5

7-3-S-6

7-3-S-8

7-3-S-9

7-3-S-4

7-3-S-1

7-3A-S-5

WoodbluffS

t

Briar Smt

Brookdale Ln

Markwood St

Bet

tyhi

ll Av

e

Crestview Ct

Starcrest Dr

GreenbankA

ve

Sunnydale Dr

Brookridge Rd

Willowglen Dr

Mel Canyon

Rd

Las

Lom

asRd

Opal Canyon

Rd

Cedarwood Ave

34.154 dd,-117.948 dd

34.150 dd,-117.939 dd

Figure 3a - Sheet 4Impacts to Jurisdictional Waters Map - Segment 7

Chino Hills UndergroundTehachapi Renewable Transmission Project (TRTP)

0 200100

Feet

Jurisdictional WatersWetland

OHWM

CDFG

Jurisdictional Stream

K:\P

roje

cts_

4\SC

E_TR

TP\0

0200

_13\

map

doc\

JD\P

erm

it_A

pps\

Fig0

3a_J

D_W

ater

s_se

g7.m

xd D

ate:

10/

3/20

13 1

9316

Date Prepared: 10/3/20131 inch = 200 feet

Figure 5SCE Mapbook, Figure 3a –Sheet 4

Impacts to Jurisdictional Waters Map - Segment 7, Chino Hills UndergroundTehachapi Transmission Project (TRTP)

Gra

phic

s//0

0097

.12

007

Teha

chap

i (04

-14)

SS

Page 8: Attachment D Project Maps · New Structure New, Replace Existing Structure Remove Structure Replace K:\Projects_4\SCE_TRTP\00200_13\mapdoc\JD\Permit_Apps\Fig03a_JD_Waters_seg8_Legend.mxd

Figure 3a - LegendImpacts to Jurisdictional Waters Map - Segment 8

Chino Hills UndergroundTehachapi Renewable Transmission Project (TRTP)

Jurisdictional WatersWetlandOHWMCDFWJurisdictional Stream

Impacts to Waters*Permanent ImpactsTemporary Impacts

Chino Hills Underground EngineeringComm Vault, PermanentRestraint Vault, PermanentTransmission Vault , PermanentCircuit 1 UG Trench, PermanentDrainage Feature, Under Sidewalk Drain, PermanentDrainage Feature, V-Ditch, PermanentGrading Limits, PermanentGrading Limits,TemporaryRip Rap, PermanentTransition StationsDrivewayNew Engineering Spur Road, PermanentHDD Duct, PermanentBoring Site Disturbance, TemporaryContractor Work Limit, TemporaryDuct Disturbance Area, TemporaryStructure Work Area, TemporaryO& M Permanent BufferCircuit 1, 1UGHDDAccess Road GateEngineering Access Road, PermanentExisting Construction Access, TemporaryNew Structure PointsHDD Bore Pits

Segments 7 & 8 EngineeringDriveway, PermanentSpur-Edge, TemporarySpur-Edge, PermanentGrading Limits, TemporaryGrading Limits, PermanentCrane Pad Boundary, PermanentCrane Pad Boundary, TemporaryCrane Pad DisturbanceStructure Work AreaTemporary Contractor Work LimitWire Tag Site/Wire Setup SiteRoad Pullout/TurnoutGeneral Disturbance AreaWater Bar DisturbanceGuard PoleLanding ZoneStaging AreaOPGW UG DisturbanceOPGW Tower Splice

Alignment (SCE)ModifyRemoveIdleRe-RouteExistingNew ConductorRd New AccessRD Existing Perm., heavy improve *RD Existing Perm., med. improve *RD Existing Perm., min. improve *RD Existing Perm., no improveRD Existing Temp., no improveRD Existing Temp., min. improve *RD Existing Temp., med. improve *Temporary Overland Travel

Structures (SCE)Constructed StructureExistingModifyNew StructureNew, Replace Existing StructureRemove StructureReplaceTemporary Structure (Shoo-Fly)

K:\P

roje

cts_

4\SC

E_TR

TP\0

0200

_13\

map

doc\

JD\P

erm

it_A

pps\

Fig0

3a_J

D_W

ater

s_se

g8_L

egen

d.m

xd D

ate:

10/

3/20

13 1

9316

Date Prepared: 10/3/2013

*Impacts only shown for Chino Hills Underground. Impacts for Segments 7 and 8 shown in previous submittals.

Figure 6SCE Mapbook, Figure 3a –Legend

Impacts to Jurisdictional Waters Map - Segment 8, Chino Hills UndergroundTehachapi Transmission Project (TRTP)

Gra

phic

s//0

0097

.12

007

Teha

chap

i (04

-14)

SS

Page 9: Attachment D Project Maps · New Structure New, Replace Existing Structure Remove Structure Replace K:\Projects_4\SCE_TRTP\00200_13\mapdoc\JD\Permit_Apps\Fig03a_JD_Waters_seg8_Legend.mxd

8-20-S-1

8-20-S-2

8-20-S-4

8-19-S-1

8-20-S-400

8-20-S-4

8-20-W-1

Elza Dr

39

Bud

leig

h D

r

High Tor Dr

Skyline Dr

Glencove Dr

33.972 dd,-117.968 dd

33.977 dd,-117.959 dd

Figure 3a - Sheet 45Impacts to Jurisdictional Waters Map - Segment 8

Chino Hills UndergroundTehachapi Renewable Transmission Project (TRTP)

0 200100

Feet

Jurisdictional WatersWetland

OHWM

CDFW

Jurisdictional Stream

K:\P

roje

cts_

4\SC

E_TR

TP\0

0200

_13\

map

doc\

JD\P

erm

it_A

pps\

Fig0

3a_J

D_W

ater

s_se

g8.m

xd D

ate:

10/

3/20

13 1

9316

Date Prepared: 10/3/20131 inch = 200 feet

Impacts to Waters*Permanent Impacts

Temporary Impacts

*Impacts only shown for Chino Hills Underground. Impacts for Segments 7 and 8 shown in previous submittals.

Figure 7SCE Mapbook, Figure 3a –Sheet 45

Impacts to Jurisdictional Waters Map - Segment 8, Chino Hills UndergroundTehachapi Transmission Project (TRTP)

Gra

phic

s//0

0097

.12

007

Teha

chap

i (04

-14)

SS

Page 10: Attachment D Project Maps · New Structure New, Replace Existing Structure Remove Structure Replace K:\Projects_4\SCE_TRTP\00200_13\mapdoc\JD\Permit_Apps\Fig03a_JD_Waters_seg8_Legend.mxd

8-25A-S-1

8-54-S-300

8-56-S-300

8-24-W-1

Dublin Way

4wd Rd

YorkshireW

ay

Fullerton Rd

Harbor Blvd

Pathfinder Rd

33.964 dd,-117.920 dd

33.968 dd,-117.911 dd

Figure 3a - Sheet 56Impacts to Jurisdictional Waters Map - Segment 8

Chino Hills UndergroundTehachapi Renewable Transmission Project (TRTP)

0 200100

Feet

Jurisdictional WatersWetland

OHWM

CDFW

Jurisdictional Stream

K:\P

roje

cts_

4\SC

E_TR

TP\0

0200

_13\

map

doc\

JD\P

erm

it_A

pps\

Fig0

3a_J

D_W

ater

s_se

g8.m

xd D

ate:

10/

3/20

13 1

9316

Date Prepared: 10/3/20131 inch = 200 feet

Impacts to Waters*Permanent Impacts

Temporary Impacts

*Impacts only shown for Chino Hills Underground. Impacts for Segments 7 and 8 shown in previous submittals.

Figure 8SCE Mapbook, Figure 3a –Sheet 56

Impacts to Jurisdictional Waters Map - Segment 8, Chino Hills UndergroundTehachapi Transmission Project (TRTP)

Gra

phic

s//0

0097

.12

007

Teha

chap

i (04

-14)

SS

Page 11: Attachment D Project Maps · New Structure New, Replace Existing Structure Remove Structure Replace K:\Projects_4\SCE_TRTP\00200_13\mapdoc\JD\Permit_Apps\Fig03a_JD_Waters_seg8_Legend.mxd

WesternTransition

StationSite Preparation, Temporary Construction Access and Permanent Grading (Western Transition Station Construction), Stormwater Management Facilities

Site Preparation, Temporary Construction Access and Permanent Grading (Western Transition Station Construction), Stormwater Management Facilities

Site Preparation and Permanent Grading(Western Transition Station), Stormwater Management Facilities Site Preparation and

Permanent Grading (Western Transition Station), Stormwater Management Facilities

M60-T1X

CommVaultWTS

-117.778 dd,33.971 dd

-117.773 dd,33.969 dd

8-39a-S-1

8-39a-W-1

8-39a-W-1

8-39a-W-3

8-39a-W-2

Figure 3b - Sheet 1Impacts on Jurisdictional Features

Chino Hills UndergroundTehachapi Renewable Transmission Project (TRTP)

0 10050

Feet± Î Registration Point

Jurisdictional Delineation

USACE/SWRCB

CDFW

Wetland

Jurisdictional Feature Underground

Engineering

!( Structures

#T-#M Mile Tower

Alignment

Construction Access Roads

Circuit 1 Vaults

RV Restraint Vault

VC Transmission Vault

CV Comm Vault

Impact Areas

Permanent

Temporary

No Impact

Path

: K:\P

roje

cts_

4\SC

E_TR

TP\0

0200

_13\

map

doc\

JD\P

erm

it_A

pps\

Fig0

3b_J

D_W

ater

s_C

HU

G_u

pdat

ed.m

xd; A

utho

r: 2

2912

; Dat

e: 2

/13/

2014

Date Prepared: 2/13/20141 inch = 100 feet

9

3

87

54

1 2

6

11 12 141310 Figure 9SCE Mapbook, Figure 3b –Sheet 1Impacts to Jurisdictional Features

Chino Hills UndergroundTehachapi Transmission Project (TRTP)

Gra

phic

s//0

0097

.12

007

Teha

chap

i (04

-14)

SS

Page 12: Attachment D Project Maps · New Structure New, Replace Existing Structure Remove Structure Replace K:\Projects_4\SCE_TRTP\00200_13\mapdoc\JD\Permit_Apps\Fig03a_JD_Waters_seg8_Legend.mxd

Site Preparation and Temporary Construction Access (Access Road),Stormwater Management Facilities,Duct Bank Installatio

Site Preparation and Temporary Construction Access (Access Road), Duct Bank Installation

Site Preparation and Temporary Construction Access

Site Preparation and Temporary Construction Access

RV1

VC1 CV1

-117.774 dd,33.972 dd

-117.770 dd,33.971 dd

Compadres

Eucalyptus Ave

8-39-S-2

8-39-S-1

8-39-S-3

8-39-W-3

8-39-S-1

8-39-W-2

Figure 3b - Sheet 2Impacts on Jurisdictional Features

Chino Hills UndergroundTehachapi Renewable Transmission Project (TRTP)

0 10050

Feet± Î Registration Point

Jurisdictional Delineation

USACE/SWRCB

CDFW

Wetland

Jurisdictional Feature Underground

Engineering

!( Structures

#T-#M Mile Tower

Alignment

Construction Access Roads

Circuit 1 Vaults

RV Restraint Vault

VC Transmission Vault

CV Comm Vault

Impact Areas

Permanent

Temporary

No Impact

Path

: K:\P

roje

cts_

4\SC

E_TR

TP\0

0200

_13\

map

doc\

JD\P

erm

it_A

pps\

Fig0

3b_J

D_W

ater

s_C

HU

G_u

pdat

ed.m

xd; A

utho

r: 2

2912

; Dat

e: 2

/13/

2014

Date Prepared: 2/13/20141 inch = 100 feet

9

3

87

54

1 2

6

11 12 141310 Figure 10SCE Mapbook, Figure 3b –Sheet 2Impacts to Jurisdictional Features

Chino Hills UndergroundTehachapi Transmission Project (TRTP)

Gra

phic

s//0

0097

.12

007

Teha

chap

i (04

-14)

SS

Page 13: Attachment D Project Maps · New Structure New, Replace Existing Structure Remove Structure Replace K:\Projects_4\SCE_TRTP\00200_13\mapdoc\JD\Permit_Apps\Fig03a_JD_Waters_seg8_Legend.mxd

Site Preparation and Temporary Construction Access (Access Road),Stormwater Management Facilities,Duct Bank Installatio

Site Preparation and Temporary Construction Access (Access Road), Duct Bank Installation

Site Preparation and Temporary Construction Access (Duct BankVault Construction), Stormwater Management Facilities, Duct BankInstallation, O&M Vegetation Management

Site Preparation and Temporary Construction Access

Site Preparation and Temporary Construction Access

CV2VC2

RV1

-117.770 dd,33.974 dd

-117.766 dd,33.972 dd

Rancho Hills Dr

Eucalyptus Ave

8-39-S-2

8-39-S-3

8-39-S-104

8-39a-W-4

8-39-W-3

8-39-W-2

8-39a-W-4

Figure 3b - Sheet 3Impacts on Jurisdictional Features

Chino Hills UndergroundTehachapi Renewable Transmission Project (TRTP)

0 10050

Feet± Î Registration Point

Jurisdictional Delineation

USACE/SWRCB

CDFW

Wetland

Jurisdictional Feature Underground

Engineering

!( Structures

#T-#M Mile Tower

Alignment

Construction Access Roads

Circuit 1 Vaults

RV Restraint Vault

VC Transmission Vault

CV Comm Vault

Impact Areas

Permanent

Temporary

No Impact

Path

: K:\P

roje

cts_

4\SC

E_TR

TP\0

0200

_13\

map

doc\

JD\P

erm

it_A

pps\

Fig0

3b_J

D_W

ater

s_C

HU

G_u

pdat

ed.m

xd; A

utho

r: 2

2912

; Dat

e: 2

/13/

2014

Date Prepared: 2/13/20141 inch = 100 feet

9

3

87

54

1 2

6

11 12 141310 Figure 11SCE Mapbook, Figure 3b –Sheet 3Impacts to Jurisdictional Features

Chino Hills UndergroundTehachapi Transmission Project (TRTP)

Gra

phic

s//0

0097

.12

007

Teha

chap

i (04

-14)

SS

Page 14: Attachment D Project Maps · New Structure New, Replace Existing Structure Remove Structure Replace K:\Projects_4\SCE_TRTP\00200_13\mapdoc\JD\Permit_Apps\Fig03a_JD_Waters_seg8_Legend.mxd

VC12CV2

-117.732 dd,33.988 dd

-117.727 dd,33.986 dd

Brie

rwoo

d D

r

Acor

n St

Velvet St

Garden Ct

Alder Pl

Alder PlAlder Pl

Peyt

on D

r

Peyt

on D

r

Figure 3b - Sheet 11Impacts on Jurisdictional Features

Chino Hills UndergroundTehachapi Renewable Transmission Project (TRTP)

0 10050

Feet± Î Registration Point

Jurisdictional Delineation

USACE/SWRCB

CDFW

Wetland

Jurisdictional Feature Underground

Engineering

!( Structures

#T-#M Mile Tower

Alignment

Construction Access Roads

Circuit 1 Vaults

RV Restraint Vault

VC Transmission Vault

CV Comm Vault

Impact Areas

Permanent

Temporary

No Impact

Path

: K:\P

roje

cts_

4\SC

E_TR

TP\0

0200

_13\

map

doc\

JD\P

erm

it_A

pps\

Fig0

3b_J

D_W

ater

s_C

HU

G_u

pdat

ed.m

xd; A

utho

r: 2

2912

; Dat

e: 2

/13/

2014

Date Prepared: 2/13/20141 inch = 100 feet

9

3

87

54

1 2

6

11 12 141310 Figure 12SCE Mapbook, Figure 3b –Sheet 11Impacts to Jurisdictional Features

Chino Hills UndergroundTehachapi Transmission Project (TRTP)

Gra

phic

s//0

0097

.12

007

Teha

chap

i (04

-14)

SS

Page 15: Attachment D Project Maps · New Structure New, Replace Existing Structure Remove Structure Replace K:\Projects_4\SCE_TRTP\00200_13\mapdoc\JD\Permit_Apps\Fig03a_JD_Waters_seg8_Legend.mxd

VC14

CV14VC13

-117.721dd,

33.987 dd

-117.717 dd,33.986 dd

Cherry C

ir

Ash

Cir

Blue

bell

Dr

Rol

ling

Rid

ge D

r

Cascades Ct

Car

lsba

d Pl

May

woo

d D

r

Yosemite Ct

Yellowstone Cir

Alder Pl

8-44-W-1

Figure 3b - Sheet 13Impacts on Jurisdictional Features

Chino Hills UndergroundTehachapi Renewable Transmission Project (TRTP)

0 10050

Feet± Î Registration Point

Jurisdictional Delineation

USACE/SWRCB

CDFW

Wetland

Jurisdictional Feature Underground

Engineering

!( Structures

#T-#M Mile Tower

Alignment

Construction Access Roads

Circuit 1 Vaults

RV Restraint Vault

VC Transmission Vault

CV Comm Vault

Impact Areas

Permanent

Temporary

No Impact

Path

: K:\P

roje

cts_

4\SC

E_TR

TP\0

0200

_13\

map

doc\

JD\P

erm

it_A

pps\

Fig0

3b_J

D_W

ater

s_C

HU

G_u

pdat

ed.m

xd; A

utho

r: 2

2912

; Dat

e: 2

/13/

2014

Date Prepared: 2/13/20141 inch = 100 feet

9

3

87

54

1 2

6

11 12 141310 Figure 13SCE Mapbook, Figure 3b –Sheet 13Impacts to Jurisdictional Features

Chino Hills UndergroundTehachapi Transmission Project (TRTP)

Gra

phic

s//0

0097

.12

007

Teha

chap

i (04

-14)

SS