17
Coastal Protection and Restoration Authority 150 Terrace Avenue, Baton Rouge, LA 70802 | [email protected] | www.coastal.la.gov 2017 Coastal Master Plan Attachment C4-11.1: Metric Values by Project Report: Final Date: April 2017 Prepared By: Denise Reed, Ann Hijuelos, Scott Hemmerling, and Eric White (The Water Institute of the Gulf); Jordan Fischbach (RAND Corporation); Mandy Green and Melanie Saucier (Coastal Protection and Restoration Authority)

Attachment C4-11.1: Metric Values by Project

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Coastal Protection and Restoration Authority 150 Terrace Avenue, Baton Rouge, LA 70802 | [email protected] | www.coastal.la.gov

2017 Coastal Master Plan

Attachment C4-11.1:

Metric Values by Project

Report: Final

Date: April 2017

Prepared By: Denise Reed, Ann Hijuelos, Scott Hemmerling, and Eric White (The Water Institute of

the Gulf); Jordan Fischbach (RAND Corporation); Mandy Green and Melanie Saucier (Coastal

Protection and Restoration Authority)

2017 Coastal Master Plan: Metric Values by Project

Page | ii

Coastal Protection and Restoration Authority

This document was prepared in support of the 2017 Coastal Master Plan being prepared by the

Coastal Protection and Restoration Authority (CPRA). CPRA was established by the Louisiana

Legislature in response to Hurricanes Katrina and Rita through Act 8 of the First Extraordinary

Session of 2005. Act 8 of the First Extraordinary Session of 2005 expanded the membership, duties

and responsibilities of CPRA and charged the new authority to develop and implement a

comprehensive coastal protection plan, consisting of a master plan (revised every five years)

and annual plans. CPRA’s mandate is to develop, implement and enforce a comprehensive

coastal protection and restoration master plan.

Suggested Citation:

Reed, D. J., Hijuelos, A. C., Hemmerling, S. A., White, E., Fischbach, J., Green, M., and Saucier, M.

(2017). 2017 Coastal Master Plan: Attachment C4-11.1: Metric Values by Project. Version Final.

(pp. 1-17). Baton Rouge, Louisiana: Coastal Protection and Restoration Authority.

2017 Coastal Master Plan: Metric Values by Project

Page | iii

Acknowledgements

This document was developed as part of a broader Model Improvement Plan in support of the

2017 Coastal Master Plan under the guidance of the Master Plan Delivery Team (MPDT).

The Louisiana State University Agricultural Center provided literature used in developing some of

the metrics. Input was provided from members of the MPDT, other advisors and focus groups

convened as part of the 2017 Coastal Master Plan planning process.

This effort was funded by the CPRA of Louisiana under Cooperative Endeavor Agreement

Number 2503-12-58, Task Order No. 03.

2017 Coastal Master Plan: Metric Values by Project

Page | iv

List of Tables

Table 1: Metric Values by Project for the Low, Medium, and High Scenarios. ..................................... 1

Table 2: Total Number of Historic Properties Flooded in FWOA and the Percent Protected.. ......... 12

Table 3: Total Number of Strategic Assets (All Asset Categories Summed) Flooded in FWOA and

the Percent Protected.. ................................................................................................................................. 13

2017 Coastal Master Plan: Metric Values by Project

Page | 1

Table 1: Metric Values by Project for the Low, Medium, and High Scenarios.

Project Number Metric Low Scenario Medium Scenario High Scenario

001.DI.02 NAV -0.147 -0.147 -0.179

001.DI.100 NAV 0.025 0.024 0.004

001.DI.101 NAV -0.266 -0.265 -0.262

001.DI.102 NAV 0.003 0.002 0.005

001.DI.103 NAV -0.493 -0.496 -0.490

001.DI.17 NAV -0.492 -0.497 -0.489

001.DI.18 NAV -0.083 -0.090 -0.090

001.DI.21 NAV 0.001 0.001 0.001

001.DI.23 NAV -0.120 -0.123 -0.119

001.DI.29 NAV 0.003 0.001 0.001

001.HP.04 NAV 0.000 0.000 0.000

001.HP.05 NAV -0.200 -0.200 -0.200

001.HP.08 NAV -0.200 -0.200 -0.200

001.HP.13 NAV 0.000 0.000 0.000

001.HR.100 NAV -0.023 -0.037 -0.039

001.MC.02 NAV -0.025 -0.041 -0.042

001.MC.05 NAV 0.025 -0.029 -0.041

001.MC.06a NAV -0.026 -0.042 -0.043

001.MC.07a NAV -0.013 0.015 -0.041

001.MC.08a NAV -0.019 -0.042 -0.044

001.MC.09 NAV -0.024 -0.039 -0.041

001.MC.100 NAV -0.024 0.015 -0.043

001.MC.101 NAV 0.046 0.015 0.000

001.MC.102 NAV -0.025 -0.041 -0.042

001.MC.103 NAV -0.015 -0.040 -0.042

001.MC.104 NAV -0.013 -0.027 -0.042

001.MC.105 NAV -0.011 -0.033 -0.042

001.MC.106 NAV -0.023 -0.038 -0.042

001.MC.107 NAV 0.046 0.015 0.000

001.MC.108 NAV 0.047 0.016 0.002

001.MC.13 NAV -0.009 -0.036 -0.037

001.MC.17 NAV -0.024 0.018 -0.041

001.OR.01a NAV -0.024 -0.040 -0.039

001.OR.100 NAV 0.049 0.028 0.007

001.RC.01 NAV 0.051 0.021 0.002

001.RC.100 NAV 0.081 0.036 -0.001

001.RC.102 NAV -0.025 -0.040 -0.042

001.RC.103 NAV -0.025 -0.031 -0.037

001.SP.01 NAV -0.025 -0.040 -0.041

001.SP.03 NAV -0.024 -0.040 -0.041

001.SP.04 NAV -0.022 -0.037 -0.038

2017 Coastal Master Plan: Metric Values by Project

Page | 2

Project Number Metric Low Scenario Medium Scenario High Scenario

001.SP.05 NAV -0.022 -0.038 -0.039

001.SP.100 NAV -0.025 -0.041 -0.042

001.SP.101 NAV -0.008 -0.031 -0.037

001.SP.102 NAV -0.019 -0.036 -0.037

001.SP.103 NAV -0.023 -0.038 -0.040

001.SP.104 NAV -0.023 -0.039 -0.040

002.BH.04 NAV -0.022 -0.038 -0.040

002.BH.05 NAV -0.022 -0.037 -0.040

002.DI.03 NAV -0.499 -0.498 -0.494

002.DI.03a NAV -0.495 -0.497 -0.500

002.DI.100 NAV -0.499 -0.498 -0.496

002.DI.101 NAV -0.499 -0.498 -0.496

002.DI.15 NAV -0.216 -0.215 -0.212

002.HP.06 NAV -0.200 -0.200 -0.200

002.HP.07 NAV -0.200 -0.200 -0.200

002.HP.100 NAV 0.000 0.000 0.000

002.HP.101 NAV 0.000 0.000 0.000

002.HP.102 NAV 0.000 0.000 0.000

002.MC.04a NAV -0.006 -0.027 -0.037

002.MC.05e NAV -0.007 -0.034 -0.035

002.MC.07 NAV 0.003 -0.003 -0.019

002.MC.08 NAV -0.015 -0.027 -0.036

002.MC.100 NAV -0.008 0.039 -0.019

002.RC.01 NAV -0.021 -0.036 -0.040

002.RC.02 NAV -0.006 -0.029 -0.037

002.RC.100 NAV 0.050 0.021 0.003

002.RC.101 NAV -0.021 -0.036 -0.039

002.RC.102 NAV -0.022 -0.037 -0.039

002.RC.103 NAV -0.021 -0.036 -0.039

002.SP.100 NAV -0.019 -0.035 -0.039

002.SP.101 NAV 0.027 -0.028 -0.041

002.SP.102 NAV -0.021 -0.037 -0.039

002.SP.103 NAV -0.021 -0.036 -0.039

002.SP.104 NAV -0.012 -0.037 -0.040

002.SP.105 NAV 0.049 0.019 0.003

002.SP.106 NAV -0.021 -0.036 -0.039

002.SP.107 NAV -0.018 -0.035 -0.038

002.SP.108 NAV -0.025 -0.040 -0.042

002.SP.109 NAV -0.018 -0.041 -0.042

004.BS.01 NAV -0.007 -0.032 -0.032

004.BS.02 NAV -0.016 -0.029 -0.031

004.BS.05 NAV -0.022 0.022 -0.035

2017 Coastal Master Plan: Metric Values by Project

Page | 3

Project Number Metric Low Scenario Medium Scenario High Scenario

004.HP.15 NAV -0.200 -0.200 -0.200

004.HR.06 NAV -0.002 -0.019 -0.024

004.MC.01 NAV -0.020 -0.032 -0.034

004.MC.04 NAV 0.049 0.021 0.008

004.MC.07 NAV -0.002 -0.020 -0.019

004.MC.10 NAV -0.022 -0.033 -0.034

004.MC.100 NAV -0.001 0.032 -0.020

004.MC.101 NAV -0.014 0.029 -0.026

004.MC.102 NAV -0.016 -0.028 -0.034

004.MC.103 NAV -0.019 -0.032 -0.035

004.MC.104 NAV -0.020 -0.035 -0.036

004.MC.105 NAV -0.012 0.019 -0.035

004.MC.106 NAV -0.022 -0.034 -0.034

004.MC.107 NAV -0.021 -0.034 -0.035

004.MC.13 NAV -0.023 -0.035 -0.035

004.MC.16 NAV 0.028 -0.024 -0.035

004.MC.19 NAV -0.006 -0.013 -0.026

004.MC.23 NAV -0.008 -0.027 -0.035

004.MC.25 NAV -0.017 -0.037 -0.037

004.RC.01 NAV -0.024 -0.029 -0.036

004.RC.02 NAV -0.015 -0.028 -0.025

004.RC.03 NAV -0.020 -0.033 -0.034

004.RC.05 NAV -0.023 -0.039 -0.041

004.SP.02 NAV -0.022 -0.036 -0.037

004.SP.03 NAV 0.062 0.047 0.029

004.SP.05a NAV 0.051 0.021 0.002

004.SP.07 NAV -0.022 -0.036 -0.036

004.SP.08 NAV 0.046 0.016 0.000

004.SP.100 NAV 0.050 0.023 0.008

004.SP.102 NAV 0.047 0.017 0.000

03a.BH.03 NAV -0.024 -0.037 -0.041

03a.BH.04 NAV -0.024 -0.038 -0.040

03a.BS.100 NAV -0.020 -0.031 -0.036

03a.DI.01 NAV 0.001 0.001 0.001

03a.DI.05 NAV 0.000 0.000 0.000

03a.HP.02b NAV -0.200 -0.200 -0.200

03a.HP.20 NAV 0.000 0.000 0.000

03a.HR.02 NAV -0.014 -0.013 -0.019

03a.HR.100 NAV -0.018 -0.031 -0.032

03a.MC.07 NAV 0.086 0.045 0.005

03a.MC.09b NAV 0.047 0.019 0.003

03a.MC.100 NAV 0.052 0.023 0.004

2017 Coastal Master Plan: Metric Values by Project

Page | 4

Project Number Metric Low Scenario Medium Scenario High Scenario

03a.MC.101 NAV 0.059 0.044 0.024

03a.RC.01 NAV -0.014 -0.024 -0.025

03a.RC.02 NAV 0.047 0.019 0.003

03a.RC.03 NAV -0.013 -0.023 -0.024

03a.RC.04 NAV -0.016 -0.028 -0.027

03a.RC.05 NAV 0.047 0.019 0.003

03a.RC.06 NAV -0.022 0.019 -0.040

03a.SP.100 NAV 0.047 0.019 0.003

03b.DI.04 NAV 0.000 0.000 0.000

03b.HP.08 NAV -0.200 -0.200 -0.200

03b.HP.10 NAV 0.000 0.000 0.000

03b.HP.12 NAV -0.200 -0.200 -0.200

03b.HP.13 NAV -0.200 -0.200 -0.200

03b.HP.14 NAV -0.200 -0.200 -0.200

03b.MC.03 NAV -0.016 -0.028 -0.028

03b.MC.07 NAV 0.054 0.027 0.014

03b.MC.09 NAV 0.056 0.030 0.015

03b.MC.100 NAV 0.090 0.049 0.014

03b.MC.101 NAV 0.054 0.028 0.014

03b.SP.01 NAV 0.061 0.038 0.026

03b.SP.05 NAV -0.022 -0.036 -0.036

03b.SP.06a NAV -0.014 -0.027 -0.026

03b.SP.08 NAV -0.016 -0.027 -0.027

03b.SP.100 NAV -0.017 -0.028 -0.027

03b.SP.101 NAV -0.011 -0.025 -0.024

001.DI.02 PRG 0.008357 0.007424 0.003345

001.DI.100 PRG -0.000015 0.000046 0.003680

001.DI.101 PRG 0.005820 -0.011116 -0.020052

001.DI.102 PRG -0.018155 -0.015870 0.011799

001.DI.103 PRG 0.001269 0.006371 0.005112

001.DI.17 PRG -0.017718 -0.001517 0.018291

001.DI.18 PRG 0.005604 0.002936 0.006449

001.DI.21 PRG 0.012026 -0.003125 -0.000718

001.DI.23 PRG 0.011993 0.010092 0.004326

001.DI.29 PRG 0.004683 -0.016042 -0.004014

001.HP.04 PRG 0.000000 0.000000 0.000000

001.HP.05 PRG 0.000000 0.000000 0.000000

001.HP.08 PRG 0.000000 0.000000 0.000000

001.HP.13 PRG 0.000000 0.000000 0.000000

001.HR.100 PRG 0.002244 -0.001082 0.001330

001.MC.02 PRG 0.001152 -0.000011 -0.000021

001.MC.05 PRG 0.011030 0.010332 0.010067

2017 Coastal Master Plan: Metric Values by Project

Page | 5

Project Number Metric Low Scenario Medium Scenario High Scenario

001.MC.06a PRG 0.007122 -0.001170 -0.000086

001.MC.07a PRG 0.002669 -0.000050 -0.000139

001.MC.08a PRG 0.001813 0.000017 0.000008

001.MC.09 PRG 0.010071 0.001188 -0.000005

001.MC.100 PRG 0.000440 -0.000086 0.000025

001.MC.101 PRG 0.000400 0.000257 -0.000067

001.MC.102 PRG 0.011361 0.006638 0.004002

001.MC.103 PRG 0.002640 0.001973 -0.000086

001.MC.104 PRG 0.001070 0.000044 0.000003

001.MC.105 PRG 0.000626 0.000623 0.000364

001.MC.106 PRG 0.002809 0.001880 -0.000034

001.MC.107 PRG 0.001872 -0.000167 0.000008

001.MC.108 PRG 0.000595 0.000310 0.000704

001.MC.13 PRG 0.002228 0.000143 -0.000255

001.MC.17 PRG 0.003932 -0.000070 -0.000002

001.OR.01a PRG -0.000001 -0.000001 0.000000

001.OR.100 PRG -0.000041 -0.000017 -0.000003

001.RC.01 PRG 0.000348 -0.000031 0.000026

001.RC.100 PRG -0.000271 0.000502 0.000230

001.RC.102 PRG 0.000244 0.002371 -0.000620

001.RC.103 PRG 0.000220 0.001378 0.000156

001.SP.01 PRG -0.000002 0.000020 0.000129

001.SP.03 PRG 0.000002 0.000000 0.000000

001.SP.04 PRG 0.000027 0.000025 0.000037

001.SP.05 PRG 0.000002 0.000000 0.000000

001.SP.100 PRG 0.000012 0.000024 0.000032

001.SP.101 PRG 0.000002 0.000000 0.000000

001.SP.102 PRG 0.000151 0.000011 0.000042

001.SP.103 PRG 0.000194 0.000011 0.000023

001.SP.104 PRG 0.000002 0.000007 0.000708

002.BH.04 PRG 0.003038 0.002121 0.000771

002.BH.05 PRG 0.001542 0.000812 0.000343

002.DI.03 PRG 0.023123 0.009735 -0.016085

002.DI.03a PRG 0.028367 0.009589 -0.021819

002.DI.100 PRG 0.019040 0.008520 -0.019453

002.DI.101 PRG 0.032596 0.014823 -0.026860

002.DI.15 PRG 0.016932 -0.000840 -0.002897

002.HP.06 PRG 0.000000 0.000000 0.000000

002.HP.07 PRG 0.000000 0.000000 0.000000

002.HP.100 PRG 0.000000 0.000000 0.000000

002.HP.101 PRG 0.000000 0.000000 0.000000

002.HP.102 PRG 0.000000 0.000000 0.000000

2017 Coastal Master Plan: Metric Values by Project

Page | 6

Project Number Metric Low Scenario Medium Scenario High Scenario

002.MC.04a PRG 0.016311 0.011311 0.003329

002.MC.05e PRG 0.006904 0.005113 0.000236

002.MC.07 PRG 0.001604 -0.000025 -0.000557

002.MC.08 PRG 0.015389 0.002899 0.002577

002.MC.100 PRG 0.007431 0.000684 0.001955

002.RC.01 PRG 0.000098 -0.000682 -0.000702

002.RC.02 PRG -0.000030 0.000551 0.000048

002.RC.100 PRG -0.000544 0.000780 -0.000070

002.RC.101 PRG 0.000153 0.000159 0.000128

002.RC.102 PRG 0.000168 0.000243 0.000165

002.RC.103 PRG 0.000300 0.000152 0.000090

002.SP.100 PRG 0.000045 0.000019 0.000034

002.SP.101 PRG 0.000009 -0.000052 0.000027

002.SP.102 PRG 0.000064 0.000079 0.000037

002.SP.103 PRG 0.000044 0.000020 0.000032

002.SP.104 PRG 0.000015 -0.000052 -0.000010

002.SP.105 PRG -0.000090 -0.000156 -0.000069

002.SP.106 PRG 0.000045 0.000055 0.000034

002.SP.107 PRG 0.000020 0.000174 0.000057

002.SP.108 PRG 0.000000 0.000006 0.000001

002.SP.109 PRG -0.000025 0.000012 -0.000100

004.BS.01 PRG 0.000022 -0.000004 -0.000084

004.BS.02 PRG -0.000002 -0.000005 0.000000

004.BS.05 PRG 0.000002 -0.000137 -0.000003

004.HP.15 PRG 0.000000 0.000000 0.000000

004.HR.06 PRG 0.011127 0.007245 -0.000275

004.MC.01 PRG 0.005482 0.003422 0.000545

004.MC.04 PRG 0.002664 0.000037 0.000007

004.MC.07 PRG 0.004264 0.001410 0.003536

004.MC.10 PRG 0.005271 -0.000061 0.000115

004.MC.100 PRG 0.002630 -0.000689 0.003363

004.MC.101 PRG 0.000970 -0.000234 0.003644

004.MC.102 PRG 0.002453 0.006833 -0.000040

004.MC.103 PRG 0.000401 -0.001396 0.000027

004.MC.104 PRG 0.003498 -0.000270 -0.000002

004.MC.105 PRG 0.006697 0.005230 0.000064

004.MC.106 PRG 0.015772 0.011694 0.000097

004.MC.107 PRG 0.005482 -0.000181 -0.000038

004.MC.13 PRG 0.002690 0.002256 0.000207

004.MC.16 PRG 0.006934 0.000530 -0.000196

004.MC.19 PRG 0.011562 -0.000400 -0.000174

004.MC.23 PRG 0.001764 -0.000064 -0.000015

2017 Coastal Master Plan: Metric Values by Project

Page | 7

Project Number Metric Low Scenario Medium Scenario High Scenario

004.MC.25 PRG 0.000239 0.000021 -0.000015

004.RC.01 PRG 0.000014 0.000022 -0.000015

004.RC.02 PRG -0.002264 0.000140 -0.000459

004.RC.03 PRG 0.000031 0.000113 -0.000022

004.RC.05 PRG -0.000034 -0.000001 0.000017

004.SP.02 PRG 0.000001 0.000007 0.000003

004.SP.03 PRG -0.001017 -0.000831 0.005506

004.SP.05a PRG 0.000023 -0.000118 -0.000120

004.SP.07 PRG -0.000001 0.000075 -0.000048

004.SP.08 PRG -0.000005 -0.000011 -0.000001

004.SP.100 PRG -0.000048 -0.002570 -0.000239

004.SP.102 PRG 0.000002 -0.000006 -0.000004

03a.BH.03 PRG 0.001723 0.000265 0.000488

03a.BH.04 PRG -0.000255 -0.000333 -0.000016

03a.BS.100 PRG -0.000254 0.000310 0.000046

03a.DI.01 PRG 0.002466 -0.006394 0.002389

03a.DI.05 PRG 0.002690 -0.005596 0.003957

03a.HP.02b PRG 0.000000 0.000000 0.000000

03a.HP.20 PRG 0.000000 0.000000 0.000000

03a.HR.02 PRG 0.003944 0.000417 0.001459

03a.HR.100 PRG 0.000071 -0.000648 0.000675

03a.MC.07 PRG 0.016380 0.010067 -0.000415

03a.MC.09b PRG 0.003520 0.000709 0.000027

03a.MC.100 PRG 0.013751 0.010477 0.000551

03a.MC.101 PRG 0.008004 0.004099 0.005715

03a.RC.01 PRG -0.000159 -0.001264 -0.000186

03a.RC.02 PRG -0.000279 0.000129 -0.000112

03a.RC.03 PRG 0.000942 -0.000544 -0.000191

03a.RC.04 PRG 0.000554 0.000334 0.000767

03a.RC.05 PRG -0.000220 0.000006 -0.000021

03a.RC.06 PRG -0.000001 -0.000086 0.000264

03a.SP.100 PRG -0.000347 -0.001085 -0.000010

03b.DI.04 PRG 0.014088 0.000642 0.004829

03b.HP.08 PRG 0.000000 0.000000 0.000000

03b.HP.10 PRG 0.000000 0.000000 0.000000

03b.HP.12 PRG 0.000000 0.000000 0.000000

03b.HP.13 PRG 0.000000 0.000000 0.000000

03b.HP.14 PRG 0.000000 0.000000 0.000000

03b.MC.03 PRG 0.005663 0.004382 -0.000358

03b.MC.07 PRG 0.002510 -0.000058 0.003852

03b.MC.09 PRG 0.008019 0.001982 0.003444

03b.MC.100 PRG 0.003820 -0.000246 0.003337

2017 Coastal Master Plan: Metric Values by Project

Page | 8

Project Number Metric Low Scenario Medium Scenario High Scenario

03b.MC.101 PRG -0.000279 -0.000030 0.004069

03b.SP.01 PRG -0.000182 -0.002820 0.000957

03b.SP.05 PRG 0.000006 0.000110 0.000003

03b.SP.06a PRG 0.000552 0.000349 -0.000442

03b.SP.08 PRG 0.000606 0.000199 -0.000200

03b.SP.100 PRG 0.000062 -0.000051 -0.000030

03b.SP.101 PRG -0.000231 -0.000735 -0.000101

001.DI.02 UNP 0.514 0.514 0.514

001.DI.100 UNP 0.000 0.000 0.000

001.DI.101 UNP 0.514 0.514 0.514

001.DI.102 UNP 0.419 0.419 0.419

001.DI.103 UNP 0.574 0.574 0.574

001.DI.17 UNP 1.000 1.000 1.000

001.DI.18 UNP 0.412 0.412 0.412

001.DI.21 UNP 0.400 0.400 0.400

001.DI.23 UNP 0.477 0.477 0.477

001.DI.29 UNP 0.404 0.404 0.404

001.HP.04 UNP 0.000 0.000 0.000

001.HP.05 UNP -0.800 -0.800 -0.800

001.HP.08 UNP -0.600 -0.600 -0.600

001.HP.13 UNP 0.000 0.000 0.000

001.HR.100 UNP 0.000 0.000 0.000

001.MC.02 UNP 0.100 0.100 0.100

001.MC.05 UNP 0.100 0.100 0.100

001.MC.06a UNP 0.100 0.100 0.100

001.MC.07a UNP 0.100 0.100 0.100

001.MC.08a UNP 0.100 0.100 0.100

001.MC.09 UNP 0.237 0.237 0.234

001.MC.100 UNP 0.108 0.108 0.108

001.MC.101 UNP 0.106 0.106 0.106

001.MC.102 UNP 0.279 0.280 0.286

001.MC.103 UNP 0.100 0.100 0.100

001.MC.104 UNP 0.118 0.118 0.118

001.MC.105 UNP 0.108 0.108 0.108

001.MC.106 UNP 0.100 0.100 0.100

001.MC.107 UNP 0.129 0.129 0.129

001.MC.108 UNP 0.100 0.100 0.100

001.MC.13 UNP 0.100 0.100 0.100

001.MC.17 UNP 0.100 0.100 0.100

001.OR.01a UNP 0.000 0.000 0.000

001.OR.100 UNP 0.000 0.000 0.000

001.RC.01 UNP 1.000 1.000 1.000

2017 Coastal Master Plan: Metric Values by Project

Page | 9

Project Number Metric Low Scenario Medium Scenario High Scenario

001.RC.100 UNP 0.337 0.337 0.337

001.RC.102 UNP 0.207 0.207 0.207

001.RC.103 UNP 0.169 0.169 0.169

001.SP.01 UNP 0.000 0.000 0.000

001.SP.03 UNP 0.000 0.000 0.000

001.SP.04 UNP 0.000 0.000 0.000

001.SP.05 UNP 0.000 0.000 0.000

001.SP.100 UNP 0.000 0.000 0.000

001.SP.101 UNP 0.000 0.000 0.000

001.SP.102 UNP 0.000 0.000 0.000

001.SP.103 UNP 0.000 0.000 0.000

001.SP.104 UNP 0.000 0.000 0.000

002.BH.04 UNP 0.400 0.400 0.400

002.BH.05 UNP 0.226 0.226 0.227

002.DI.03 UNP 0.574 0.574 0.574

002.DI.03a UNP 1.000 1.000 1.000

002.DI.100 UNP 0.547 0.547 0.547

002.DI.101 UNP 0.531 0.531 0.531

002.DI.15 UNP 0.514 0.514 0.514

002.HP.06 UNP -0.600 -0.600 -0.600

002.HP.07 UNP -0.200 -0.200 -0.200

002.HP.100 UNP 0.000 0.000 0.000

002.HP.101 UNP 0.000 0.000 0.000

002.HP.102 UNP 0.000 0.000 0.000

002.MC.04a UNP 0.313 0.313 0.320

002.MC.05e UNP 0.227 0.227 0.226

002.MC.07 UNP 0.118 0.118 0.117

002.MC.08 UNP 0.345 0.345 0.341

002.MC.100 UNP 0.210 0.210 0.212

002.RC.01 UNP 0.016 0.016 0.016

002.RC.02 UNP 0.070 0.070 0.070

002.RC.100 UNP 0.016 0.016 0.016

002.RC.101 UNP 0.035 0.035 0.035

002.RC.102 UNP 0.056 0.056 0.056

002.RC.103 UNP 0.004 0.004 0.004

002.SP.100 UNP 0.000 0.000 0.000

002.SP.101 UNP 0.000 0.000 0.000

002.SP.102 UNP 0.000 0.000 0.000

002.SP.103 UNP 0.000 0.000 0.000

002.SP.104 UNP 0.000 0.000 0.000

002.SP.105 UNP 0.000 0.000 0.000

002.SP.106 UNP 0.000 0.000 0.000

2017 Coastal Master Plan: Metric Values by Project

Page | 10

Project Number Metric Low Scenario Medium Scenario High Scenario

002.SP.107 UNP 0.000 0.000 0.000

002.SP.108 UNP 0.000 0.000 0.000

002.SP.109 UNP 0.000 0.000 0.000

004.BS.01 UNP 0.000 0.000 0.000

004.BS.02 UNP 0.000 0.000 0.000

004.BS.05 UNP 0.000 0.000 0.000

004.HP.15 UNP -0.200 -0.200 -0.200

004.HR.06 UNP 0.590 0.590 0.590

004.MC.01 UNP 0.157 0.157 0.158

004.MC.04 UNP 0.132 0.132 0.134

004.MC.07 UNP 0.137 0.137 0.139

004.MC.10 UNP 0.147 0.147 0.150

004.MC.100 UNP 0.120 0.120 0.122

004.MC.101 UNP 0.109 0.109 0.110

004.MC.102 UNP 0.134 0.134 0.138

004.MC.103 UNP 0.107 0.107 0.107

004.MC.104 UNP 0.131 0.131 0.134

004.MC.105 UNP 0.174 0.174 0.177

004.MC.106 UNP 0.267 0.268 0.290

004.MC.107 UNP 0.161 0.161 0.165

004.MC.13 UNP 0.121 0.121 0.121

004.MC.16 UNP 0.175 0.175 0.178

004.MC.19 UNP 0.237 0.237 0.242

004.MC.23 UNP 0.119 0.119 0.119

004.MC.25 UNP 0.102 0.102 0.102

004.RC.01 UNP 0.000 0.000 0.000

004.RC.02 UNP 0.000 0.000 0.000

004.RC.03 UNP 0.000 0.000 0.000

004.RC.05 UNP 0.000 0.000 0.000

004.SP.02 UNP 0.000 0.000 0.000

004.SP.03 UNP 0.000 0.000 0.000

004.SP.05a UNP 0.000 0.000 0.000

004.SP.07 UNP 0.000 0.000 0.000

004.SP.08 UNP 0.000 0.000 0.000

004.SP.100 UNP 0.000 0.000 0.000

004.SP.102 UNP 0.000 0.000 0.000

03a.BH.03 UNP 0.301 0.301 0.300

03a.BH.04 UNP 0.204 0.204 0.204

03a.BS.100 UNP 0.000 0.000 0.000

03a.DI.01 UNP 0.000 0.000 0.000

03a.DI.05 UNP 0.000 0.000 0.000

03a.HP.02b UNP -1.000 -1.000 -1.000

2017 Coastal Master Plan: Metric Values by Project

Page | 11

Project Number Metric Low Scenario Medium Scenario High Scenario

03a.HP.20 UNP 0.000 0.000 0.000

03a.HR.02 UNP 0.039 0.039 0.039

03a.HR.100 UNP 0.006 0.006 0.006

03a.MC.07 UNP 0.100 0.100 0.100

03a.MC.09b UNP 0.100 0.100 0.100

03a.MC.100 UNP 0.100 0.100 0.100

03a.MC.101 UNP 0.260 0.260 0.257

03a.RC.01 UNP 0.004 0.004 0.004

03a.RC.02 UNP 0.000 0.000 0.000

03a.RC.03 UNP 0.014 0.014 0.014

03a.RC.04 UNP 0.000 0.000 0.000

03a.RC.05 UNP 0.000 0.000 0.000

03a.RC.06 UNP 0.190 0.190 0.190

03a.SP.100 UNP 0.000 0.000 0.000

03b.DI.04 UNP 0.000 0.000 0.000

03b.HP.08 UNP -0.200 -0.200 -0.200

03b.HP.10 UNP -0.200 -0.200 -0.200

03b.HP.12 UNP 0.000 0.000 0.000

03b.HP.13 UNP -0.200 -0.200 -0.200

03b.HP.14 UNP -0.200 -0.200 -0.200

03b.MC.03 UNP 0.160 0.160 0.164

03b.MC.07 UNP 0.138 0.138 0.143

03b.MC.09 UNP 0.207 0.207 0.210

03b.MC.100 UNP 0.146 0.146 0.148

03b.MC.101 UNP 0.104 0.104 0.104

03b.SP.01 UNP 0.000 0.000 0.000

03b.SP.05 UNP 0.000 0.000 0.000

03b.SP.06a UNP 0.000 0.000 0.000

03b.SP.08 UNP 0.000 0.000 0.000

03b.SP.100 UNP 0.000 0.000 0.000

03b.SP.101 UNP 0.000 0.000 0.000

2017 Coastal Master Plan: Metric Values by Project

Page | 12

Table 2: Total Number of Historic Properties Flooded in FWOA and the Percent Protected. Negative

Values Indicate Induced Flooding with the Project Compared to FWOA. (A – Medium Scenario; B –

High Scenario).

A - Medium Scenario

Archaeological Historic Sites Historic Districts

Project

Number

FWOA

Number

Flooded

%

Protected

FWOA

Number

Flooded

%

Protected

FWOA

Number

Flooded

%

Protected

001.HP.04 1 -200%

001.HP.05 14 64% 1 100%

001.HP.08 247 9%

001.HP.13 6 83% 1 100%

002.HP.06 265 6% 12 -8%

002.HP.07 55 56%

002.HP.102 61 2%

004.HP.15 12 67%

03a.HP.02b 547 8% 11 64%

03a.HP.102 547 8% 11 64%

03a.HP.103 547 8% 11 64%

03a.HP.20 6 67%

03b.HP.08 94 -1%

03b.HP.12 17 12%

03b.HP.13 26 -4%

03b.HP.14 57 7% 1 100% 1 100%

B - High Scenario

Archaeological Historic Sites Historic Districts

Project

Number

FWOA

Number

Flooded

%

Protected

FWOA

Number

Flooded

%

Protected

FWOA

Number

Flooded

%

Protected

001.HP.04 10 70%

001.HP.05 37 27% 1 100%

001.HP.08 244 5% 4 25%

001.HP.13 6 83%

002.HP.06 409 2% 9 44%

002.HP.07 244 13% 0 -1%

002.HP.102

004.HP.15 14 50 2 50%

03a.HP.02b 379 16% 20 65% 1 100%

03a.HP.102 379 16% 20 65% 1 100%

03a.HP.103 379 16% 20 65% 1 100%

03a.HP.20 6 67%

03b.HP.08 142 8% 2 100%

03b.HP.10 2 -50%

03b.HP.12 19 11% 6 67%

03b.HP.13

03b.HP.14 43 5% 7 29% 1 100%

2017 Coastal Master Plan: Metric Values by Project

Page | 13

Table 3: Total Number of Strategic Assets (All Asset Categories Summed) Flooded in FWOA and the

Percent Protected. Negative Values Indicate Induced Flooding with the Project Compared to

FWOA.

Medium Scenario High Scenario

Project

Number

Number of

Assets Flooded

FWOA % Protected

Number of

Assets Flooded

FWOA % Protected

001.HP.04 5 80%

001.HP.05 5 100% 7 100%

001.HP.08 18 61% 12 50%

001.HP.13 1 100% 1 100%

002.HP.06 20 65% 23 70%

002.HP.07 1 100% 1 100%

004.HP.15 9 44% 4 75%

03a.HP.02b 27 56% 33 21%

03a.HP.101 3 -33%

03a.HP.102 27 56% 33 21%

03a.HP.103 27 56% 33 21%

03a.HP.20 6 100% 6 100%

03b.HP.08 14 50% 15 40%

03b.HP.12 13 77% 15 60%

03b.HP.14 11 64% 10 60%