8/12/2019 ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report http://slidepdf.com/reader/full/attachment-a-brima-construction-photos-task-force-cmrcf-report 1/12 Page 1 of 12 Task Force CMRCF Report  ATTACHMENT “A”  A. BRIMA CONSTRUCTION Photos The contract has 12 components, however, the provision for the construction of: (a) Toilet & Bath; and (b) Training Center, were deleted. Other components are the following: Figure 1. Construction of Material Recovery Facility Bldg. 1 in the amount of P4,277,053.22.

ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report

Embed Size (px)

Citation preview

Page 1: ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report

8/12/2019 ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/attachment-a-brima-construction-photos-task-force-cmrcf-report 1/12

Page 1 of 12 

Task Force CMRCF Report

 ATTACHMENT “A” 

 A. BRIMA CONSTRUCTION Photos

The contract has 12 components, however, the provision for the construction

of: (a) Toilet & Bath; and (b) Training Center, were deleted. Other components are

the following:

Figure 1. Construction of Material Recovery Facility Bldg. 1 in the amount of

P4,277,053.22.

Page 2: ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report

8/12/2019 ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/attachment-a-brima-construction-photos-task-force-cmrcf-report 2/12

Page 2 of 12 

Figure 2. Construction of Material Recovery Facility Bldg. 2 in the amount of

P4,948,650.86.

Page 3: ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report

8/12/2019 ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/attachment-a-brima-construction-photos-task-force-cmrcf-report 3/12

Page 3 of 12 

Figure 3. Construction of Motorpool Bldg. (MRF) in the amount of P3,596,756.91.

Page 4: ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report

8/12/2019 ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/attachment-a-brima-construction-photos-task-force-cmrcf-report 4/12

Page 4 of 12 

Figure 4. Construction of Warehouse Bldg. 1 & 2 in the amount of P10,483,635.32.

Page 5: ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report

8/12/2019 ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/attachment-a-brima-construction-photos-task-force-cmrcf-report 5/12

Page 5 of 12 

Figure 5. Construction of Administrative Bldg. (MRF) in the amount ofP2,839,611.93.

Page 6: ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report

8/12/2019 ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/attachment-a-brima-construction-photos-task-force-cmrcf-report 6/12

Page 6 of 12 

Figure 6. Construction of Guard House (MRF) in the amount of P126,624.35 with

Electrical Works of P24,795.97.

Page 7: ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report

8/12/2019 ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/attachment-a-brima-construction-photos-task-force-cmrcf-report 7/12

Page 7 of 12 

Figures 7 & 8. Construction of 5-Hectares Perimeter Fence at MRF in the amount of

P1,243,375.34.

Page 8: ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report

8/12/2019 ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/attachment-a-brima-construction-photos-task-force-cmrcf-report 8/12

Page 8 of 12 

Figure 9. Water Supply for MRF P320,841.23, (a) Supply of labor, materials, tools

and equipment to do the installation of pipes and accessories for the water supply sys-

tem of the MRF facilities); and

Page 9: ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report

8/12/2019 ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/attachment-a-brima-construction-photos-task-force-cmrcf-report 9/12

Page 9 of 12 

Figure 10. Site Development for Admin. Bldg. in the amount of P3,638,308.07.

Page 10: ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report

8/12/2019 ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/attachment-a-brima-construction-photos-task-force-cmrcf-report 10/12

Page 10 of 12 

Variation Order No.1 as Extra Work No 1. for the following:

Figures 11 & 12. Riprapping Works (Slope Protection and Existing Open Canal) in

the amount of P628,065.22;

Page 11: ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report

8/12/2019 ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/attachment-a-brima-construction-photos-task-force-cmrcf-report 11/12

Page 12: ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report

8/12/2019 ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/attachment-a-brima-construction-photos-task-force-cmrcf-report 12/12

Page 12 of 12 

(4) Ceiling Works at Admin Bldg. in the amount of P196,847.28; (5) Perimeter Fence

in the amount of P870,745.65.

In Variation Order No. 2 (Extra Work), the total amount of the change order

is P2,188,001.19 and was added for the construction of the following:

Figure 14. I. Steel Works (Warehouse) 1 & 2), Motorpool in the amount of

P721,155.81;

II. Concrete Works (Warehouse 1 & 2), Motorpool;

III. Steel Reinforcement (Warehouse 1 & 2)/Motorpool in the amount of

P871,050.80.