Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
ATTACHMENT 6
Baker River Dams Storage Evaluation Scope of Work
Prepared by Corps, revised June 11, 2003, as a delivery order to participate in and provide hydraulic engineering expertise for an evaluation for the optimal flood storage that can be utilized for Lower and Upper Baker Dams to reduce flood damages for the Skagit River floodplain.