AT&T Mobility Cell Site Civil Quality Training Ralph Natale & Mike Scott
Part 22 – Standards and Audits
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
2
Mobility Cell Site Quality Introduction
Intentionally left blank
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
3
Mobility Cell Site Quality Introduction
Standards & Requirements
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
• Purpose - Consistent Site Quality
4
Mobility Cell Site Quality Working Together
National Standards Team
Third Party Audit (TPA)
Team
Cell Site Operations (CSO)
Team
One team working for a
common purpose
Interactions
• Audit • Extend • Feedback • Interpret • Measure & Report • Train
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
• Develop • Deliver • Extend • Interpret • Train
• Audit • Extend • Feedback • Interpret • Measure & Report • Train
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
• Role - Develop and Deliver Standards
5
National Standards Team
One team working for a
common purpose
Third Party Audit (TPA)
Team
Cell Site Operations (CSO)
Team
• Develop • Deliver • Extend • Interpret • Train
Mobility Cell Site Quality National Standards Team
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
6
Mobility Cell Site Quality National Standards Team
AT&T C&E Mobility Program Office (CEMPO)
Hardware Standards Team
1. Jeff Townend (21) Area Manager – C&E Mobility Program Office
2. Kurt Beecher (23) Vendor Management, Remote Site Management
3. Scott Whitney (17) RAN Hardware Standards
4. Tom Land (20) RAN Hardware Standards
5. Rick Badgero (20) Power and Thermal Standards
6. Matt Karcher (19) Shelter and HVAC Standards
7. James Martin (24) Generator and Site Control Standards
8. Glen Sparks (24) Installation, Grounding and Cable Standards
9. Bijo Abraham (12) Cabinet and Equipment Enclosure Standards
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
7
Mobility Cell Site Quality National Standards
Q: What are the AT&T Mobility site National Standards? Mandatory minimal standards designed for service, safety, and long term
strategic planning
Q: What do these standards apply to? All Mobility cell sites
All locations
Q: Where do the standards documents come from? From the equipment design and the team’s technical experience and
feedback from markets/vendors
Q: Where can copies of the standards be obtained? Posted in APEX (AT&T internal) Posted on the Vendor Management Tool (VMT) for TVs & TPA auditors
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
Q: Can an OEM or supplier standards be used?
Yes, if accepted by the National Standards Team Some requirements in an OEM or supplier standard may not meet
AT&T minimum standards – review required
Q: Can Markets use their own local requirements?
Yes, if they do not contradict the National Standards Yes, if a National Standard does not exit Yes, if local regulatory requirements demand something different NO, if they do not meet he minimum National Standards
Q: Who decides if a local requirement contradicts the
National Standard?
National Standards Team SME
8
Mobility Cell Site Quality National Standards
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
Q: Who signs off on a local requirement where a National
Standard does not exist?
National Standards Team SME
Q: How does a Market get approval for a local requirement or exception?
Work though the exception process Submit to National Standards Team for review Submit directly or through TPA Team Market is responsible for any added cost
9
Mobility Cell Site Quality National Standards
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
10
Mobility Cell Site Quality National Standards
CEMPO Team and TURF Vendor Monthly Forum
Scheduled each month to work through the submitted questions and concerns from the Turf Vendors
Focused to improve quality and reduce ambiguity
Used as a feedback loop to determine if modifications or clarifications are needed in the standards documents
Relationship to TPA and Ops audits
TPA enforces National Standards at Construction Complete (MS125/126) Ops Audit enforces National Standards at Integration Complete (MS143)
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
Third Party Audits & AuditMaster
11
Mobility Cell Site Quality Third Party Audit Overview
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
• Role - Turf Vendor Construction Quality
12
Mobility Cell Site Quality Third Party Audit Team
National Standards Team
Interactions
One team working for
common purpose
Cell Site Operations (CSO)
Team
Third Party Audit (TPA)
Team
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
• Audit • Extend • Feedback • Interpret • Measure & Report • Train
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
• Purpose for the TPA – Verify Turf Vendor’s civil construction quality
• Justification for the TPA – Defined in the AT&T/Turf Vendor contract
• Site project types audited – NSB – LTE 1C – UMTS 1C – Future programs
• Timing – CASPR Construction Complete Milestone – MS125/126
• Audit volume – 30% minimum per market, per Turf Vendor, and per project
• Audit Scope:
– Ground (indoor & outdoor) and tower work
13
Mobility Cell Site Quality Third Party Audit Overview
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
• Audit Checklist:
TPA - Civil Construction Acceptance Checklist: ATT-002-290-502
• Independent (third party) auditors are utilized to perform the audits
• The auditors are contracted through AT&T Supply Chain Management
• Auditors reference the National Standards as inspection criteria
• Audits are funded by the AT&T Markets
• Each step of the audit process has a defined duration assigned
• One of three site audits…
• Third Party Audit (TPA) • Cell Site Operations Audit (CSO) • Site Condition, Access, Security, & Safety Bi-Annual Inspection (CASS)
14
Mobility Cell Site Quality Third Party Audit Overview
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
• There are six primary steps in the TPA process…and reporting
• Each step has an owner
1. Site / Auditor Selection – AT&T 2. Perform Site Audit – Auditor 3. Submit Site Audit Report – Auditor 4. Initial Review – AT&T and Turf Vendor 5. Corrective Action – Turf Vendor 6. Post Repair Review – AT&T
• Performance Measurement and Reporting
15
Mobility Cell Site Quality Third Party Audit Overview
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
Site & Auditor Selection – completed within 60 days of
Construction Complete milestone (MS125/126)
1. Selects the sites to audit 2. Selects the auditor 3. Initiates the Purchase Order procurement
What happens if…
– Missed 60-day site selection window: Missed opportunity to audit a
site
– P.O. procurement delay: Delay of audits, impacts auditor’s window of opportunity (schedule compression)
16
Mobility Cell Site Quality Step 1 - AT&T Roles & Responsibilities
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
Site Audit – completed within 120 days of Construction Complete milestone (MS125/126)
1. Communicate with AT&T market and mobilize to conduct site audit 2. Conduct site audit IAW the TPA checklist (ATT-002-290-502)
Audit Report Submission – within 3 days of audit completion
1. Submit completed audit report/photos to AuditMaster 2. Audit result are distributed to:
• Market audit originator • Turf Vendor • National TPA management
What happens if…
– Auditing process delays: Delay of downstream processes (schedule compression)
17
Mobility Cell Site Quality Step 2 & 3 - Auditor Roles & Responsibilities
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
Initial Review (IR) – completed within 14 days receipt of the audit report
– To review each audit finding with the turf vendor to verify accountability and ownership
– The OOM is available on the AuditMaster Initial Review page as a reference during the review
– Key Reminder: If a finding has been repaired prior to the Initial Review meeting, the repair does not remove the finding from the audit
What happens if… – IR process conducted without TV: The site will be placed back in the IR
module and the process will be repeated with the Turf Vendor present
– 14-day window is missed: Creates a delay in performance report publication and causes a downstream schedule compression
– Failing to “Save/Send” IR changes: The site will continue to appear on the Initial Review Aging report
18
Mobility Cell Site Quality Step 4 - AT&T plus Turf Vendor Roles & Responsibilities
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
Corrective Action – resolution submitted within 10 days post Initial
Review
– Address/repair each finding assigned
– Document resolution action
– Submit camera-dated photos of resolutions
What happens if…
– Corrective Action is not completed: Risk of site operational failure due to defects plus potential findings in subsequent audits (CSO, CASS)
– Failing to “Save and Submit” inputs: AuditMaster will not be updated and the site will continue to appear on the Corrective Action Aging report
19
Mobility Cell Site Quality Step 5 - Turf Vendor Roles & Responsibilities
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
Post Repair Review – completed within 10 days after the Corrective
Action is submitted
– AT&T Market Manger reviews and approves the Turf Vendor’s repairs
– Turf Vendor is notified that audit is closed
What happens if…
– Repairs are rejected: – unapproved repairs are sent back to the Corrective Action module for action
– The review is not conducted: The Turf Vendor is not notified that the repairs are approved/rejected. The site will continue to appear on the Post Repair Aging report
20
Mobility Cell Site Quality Step 6 - AT&T Roles & Responsibilities
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
21
Mobility Cell Site Quality Third Party Audit Team – Performance Reporting
• Reports Communicate and Tell the Story A number of reports are generated from the Third Party Audit data
• Monthly and Semi-Annual Performance Reports Provides the overall audit results of recent performance – Distributed to Market, Region, and National Management
• Weekly Aging Reports – “Something needs to be done!” Each of the steps has a time limit – Audit Aging: Sites pending an audit report – Initial Review Aging: Sites pending an Initial Review – Corrective Action Aging: Sites pending TV action – Post Repair Review Aging: Sites pending Market review
Focused on Quality and Process Improvement
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
22
27% 26%
15%
7% 5% 4%
2% 2% 2% 2%
42%
22%
6% 7% 5% 5%
1%
0%
10%
20%
30%
40%
50%
2012
2013
• 4,055 failed SA items on 1,879 sites • Avg. = 2 findings per site
Mobility Cell Site Quality 2013 Service Affecting Audit Findings
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
23
10%
9% 9%
7% 7%
6%
5%
4% 4%
0%
8%
9% 9%
7%
6%
7%
4% 4% 4%
3%
0%
2%
4%
6%
8%
10%
12%
2012
2013
Mobility Cell Site Quality 2013 Non-Service Affecting Audit Findings
• 23,691 failed NSA items on 6320 sites • Avg. = 4 findings per site
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
24
Mobility Cell Site Quality Third Party Audit Team Interactions
Key interfaces • National Standards Team
– Receive standards, interpretations, clarifications – Receive advance notification of upcoming changes – Receive interpretations and clarifications – Provide recommendations for additions and changes – Provide suggestions to resolve issues and requests for guidance – Goal: remain current with National Standards requirements
• Cell Site Operations Team – Align requirements between teams – Assist CSO Team with standards requirements – Act as a resource to CSO Team – Interpret and clarify requirements – Answer questions – Assist with resolving issues – Participate in CSO Team discussions – Goal: maintain consistency between TPA and CSO site audits
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
25
Mobility Cell Site Quality Third Party Audit Team Interactions
Other interfaces
• Vendors (Turfs, OEMs)
• AT&T Implementation Teams
– Communicate standards requirements & interpretations
– Goal: assist AT&T construction teams with requirements knowledge
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
26
Mobility Cell Site Quality Third Party Audit Team Interactions
• Interactions with National Standards Team
• Help “bridge the interface” between standards delivery and implementation – Assist with identifying standards (what standards apply
and where they can be found) – Apply prior knowledge to current situations – Interpret and clarify requirements – Extend (recommend precedents for new applications) – Offer suggestions – Engage SMEs for direction and support – Assist with communicating solutions and updates
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
27
Mobility Cell Site Quality Third Party Audit Team Interactions
• Interactions With Cell Site Operations Team
What happens if…
• TPA audits and CSO audits do not use same standards: TPA audit may pass an item that is later failed as a defect by the CSO audit …
• “Local” quality preferences are used: TPA audits and CSO audits may be in conflict with “local” way of doing things …
Confusion and possible return visit by Turf Vendor to make late repairs
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
Cell Site Operations – Quality Checklist
28
Mobility Cell Site Quality Cell Site Operations Site Acceptance
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
• Role – Site Ready for Operations
29
National Standards Team
One team working for
common purpose
Interactions
Cell Site Operations Team
Third Party Audit (TPA)
Team
Mobility Cell Site Quality Cell Site Operations Team
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
• Audit • Extend • Feedback • Interpret • Measure & Report • Train
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
• The Cell Site Operation team (CSO) audits:
• Apply to all cell sites (100%) • Apply to all locations • Conform to National Standards
• They:
• Are mandatory! • Apply to AT&T equipment and civil installation • Allow for approved Market and OEM requirements…under
certain conditions
30
Mobility Cell Site Quality Overview
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
31
TPA – Third Party Audit • 30% of NSB/1C/LTE-1C
• Includes tower climbs
• Triggered by “Construction Complete” (MS125/126)
• Documented in SwiftTrac – Audit Master
• Overseen by National Team
• Operationalized by Market
CSO – Ops Site Acceptance • 100% of all build programs
• Does not include tower climb
• Triggered by “Integration Complete” (MS143)
• Documented in SwiftTrac - Quality Punchlist
• Operationalized by Ops Market Manager
Mobility Cell Site Quality AT&T Mobility - Quality Program Comparison
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
32
28%
17% 13%
0%
5%
10%
15%
20%
25%
30%
A B C
2013 Pass Percent
Mobility Cell Site Quality Site Acceptance Vendor Performance
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
Thank You
Q & A
33 © 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
Mobility Cell Site Quality Site Acceptance Vendor Performance
at&t Mobility training provided to Ericsson at&
t Mo
bility train
ing p
rovid
ed to
Ericsson
at&
t M
ob
ility
tra
inin
g p
rovi
ded
to
Eri
csso
n
Revision History
• 18 June 2014 – General revision
• 05 August 2014 – minor change on slide 21
34
© 2014 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Proprietary and Confidential. Do not distribute outside of AT&T
Mobility Cell Site Quality Site Acceptance Vendor Performance