3
Screen printing MM test, current status and plans Atsuhiko Ochi Kobe University 6, November 2012 ATLAS MicroMEGAS meeting

Atsuhiko Ochi Kobe University 6, November 2012 ATLAS MicroMEGAS meeting

Embed Size (px)

Citation preview

Page 1: Atsuhiko Ochi Kobe University 6, November 2012 ATLAS MicroMEGAS meeting

Screen printing MM test,current status and plans

Atsuhiko OchiKobe University

6, November 2012 ATLAS MicroMEGAS meeting

Page 2: Atsuhiko Ochi Kobe University 6, November 2012 ATLAS MicroMEGAS meeting

Screen printing – MM has already been assembled with gas package.◦ Readout : 1-Dimensional, 400um pitch◦ Gas gap : ~ 100 um (estimated)◦ Drift length : ~ 1cm

Operation test◦ Gas: Ar:C2H6 (7:3)◦ Signal of beta source (90Sr) were observed◦ No HV current found (<10nA)

At first, in the burn-in stage, we found steady current of a few micro ampere.

◦ Estimated gain … a few thousand Vstrip = +520V, Vdrift = -1kV

◦ We need to reduce the nise.

2012/11/6A. Ochi, Kobe Univ. 2

Status of chamber preparation

Page 3: Atsuhiko Ochi Kobe University 6, November 2012 ATLAS MicroMEGAS meeting

Site of the test◦ H6 test bench, using parasite beam

Schedule◦ Because of administration work, we will be ready to enter the test

beam site from 14th November.◦ We will check position/timing resolution for various voltages of strips

and drift plane. We will take a data for comparing to existing MMs.

◦ Estimated test term is one week Maximum, 2 weeks.

◦ Ochi and Edo will join from Kobe.◦ We need helps from test beam experts.

Materials to be need◦ Readout: Two APV25 cards and their readout system◦ HV supplies (Positive and Negative)◦ Gas system

2012/11/6A. Ochi, Kobe Univ. 3

Test plan at CERN