15
PROJECT :- TULJAPUR WATER SUPPLY SCHEME 2477-5TO7/2012-13 MAHARASHTRA JEEVAN PRADHI KARAN LATUR/OSMANABAD  VIDYUT DRAWING NO. :- OWNER :-  VIDYUT CON TROLS & AUT OMATIONS P VT. LTD. MANUFACTURERS AND PROJECT ENGINEERS OF ELECT. & INSTRU. CONTROL SYSTEMS AN ISO 9001-2000 COMPANY CONSULTANT:- SIDDHI CONSULTING ENGINEERS,PUNE 16  P   E  R C      O     T    N      W   O  I O  L L R        P     O          L         E     E   G  N    P PO NO. :- MEIL/PO-4190/TULJAPUR /2012-13 EPC CONTRACTOR :- MEGHA ENGINEERING & INFRASTRUCTRES LTD. PANEL NAME. :- 225KW AUTO X'MER STARTER PANEL  ALLIANCE PARTNER OF SCHNEIDER ELECTRIC FOR MV COMPONENTS INTEGRATION REV :- 0 Number of pages MEIL DRAWING NO. :- MEIL/TUL/EQP/E05A MEIL/TUL/EQP/E05A MEIL DWG. NO.:- SIDDHI CONSULTING ENGINEERS,PUNE CONSULTANT:- 2477-5TO7/2012-13 NTS DRG. FOR APP. 0    P  N  G     E         E          L     O       P R  L L O   I   O   W N    T    O     C       R   E  P 1 MEGHA ENGINEERING & INFRASTRUCTRES LTD. 16 OF SHRUTAKIRTI TULJAPUR WATER SUPPLY SCHEME MAHARASHTRA JEEVAN PRADHIKARAN LATUR/OSMANABAD GANESH 30.10.2012 'SAHARA' 82/2, OLD N.D.A. ROAD, SHIVANE, PUNE - 411 023, Telefax :- +91-20-2529 0857 / 2529 0208, E-mail:- [email protected] / [email protected] website:www.vidyutcontrols.com H G F E D C B  A SCALE:  VIDYUT DWG. NO. COVER SHEET FOR 225KW AUTO X'MER STARTER PANEL TITLE:- PROJECT:- EPC CONTRACTOR:- OWNER:- MANUFACTURERS & PROJECT ENGINEERS OF ELECTRICAL & INSTRUMENTATION CONTROL SYSTEMS  VIDYUT CONTROLS & A UTOMATION PVT. LTD. 5 Date 2 4 3 9 8  APPD BY 6 7 0 Revision No 1 DWRN BY Description CHKD BY PAGE NO:-

ATS Drawing (R0) 30-Oct-12

Embed Size (px)

Citation preview

8/12/2019 ATS Drawing (R0) 30-Oct-12

http://slidepdf.com/reader/full/ats-drawing-r0-30-oct-12 1/16

8/12/2019 ATS Drawing (R0) 30-Oct-12

http://slidepdf.com/reader/full/ats-drawing-r0-30-oct-12 2/16

8/12/2019 ATS Drawing (R0) 30-Oct-12

http://slidepdf.com/reader/full/ats-drawing-r0-30-oct-12 3/16

8/12/2019 ATS Drawing (R0) 30-Oct-12

http://slidepdf.com/reader/full/ats-drawing-r0-30-oct-12 4/16

8/12/2019 ATS Drawing (R0) 30-Oct-12

http://slidepdf.com/reader/full/ats-drawing-r0-30-oct-12 5/16

8/12/2019 ATS Drawing (R0) 30-Oct-12

http://slidepdf.com/reader/full/ats-drawing-r0-30-oct-12 6/16

8/12/2019 ATS Drawing (R0) 30-Oct-12

http://slidepdf.com/reader/full/ats-drawing-r0-30-oct-12 7/16

8/12/2019 ATS Drawing (R0) 30-Oct-12

http://slidepdf.com/reader/full/ats-drawing-r0-30-oct-12 8/16

8/12/2019 ATS Drawing (R0) 30-Oct-12

http://slidepdf.com/reader/full/ats-drawing-r0-30-oct-12 9/16

8/12/2019 ATS Drawing (R0) 30-Oct-12

http://slidepdf.com/reader/full/ats-drawing-r0-30-oct-12 10/16

8/12/2019 ATS Drawing (R0) 30-Oct-12

http://slidepdf.com/reader/full/ats-drawing-r0-30-oct-12 11/16

8/12/2019 ATS Drawing (R0) 30-Oct-12

http://slidepdf.com/reader/full/ats-drawing-r0-30-oct-12 12/16

8/12/2019 ATS Drawing (R0) 30-Oct-12

http://slidepdf.com/reader/full/ats-drawing-r0-30-oct-12 13/16

8/12/2019 ATS Drawing (R0) 30-Oct-12

http://slidepdf.com/reader/full/ats-drawing-r0-30-oct-12 14/16

8/12/2019 ATS Drawing (R0) 30-Oct-12

http://slidepdf.com/reader/full/ats-drawing-r0-30-oct-12 15/16

8/12/2019 ATS Drawing (R0) 30-Oct-12

http://slidepdf.com/reader/full/ats-drawing-r0-30-oct-12 16/16