ATLAS SCT Barrel PAR M. Tyndel 114-May-2003
ATLAS SCT Barrel PAR - Introduction
Over-view of the Barrel SCT Modules LM tapes & optical harnesses Cooling Support structures Assembly
Schedule
Critical issues
Modules LM tapes & optical harnesses Cooling Support structures Assembly
ATLAS SCT Barrel PAR M. Tyndel 314-May-2003
Modules
FE ASICs (6+6)FE ASICs (6+6)
Kapton HybridKapton Hybrid
Silicon detectorsSilicon detectors
Thermal Carbon/BerylliaThermal Carbon/Berylliabaseboardbaseboard
ATLAS SCT Barrel PAR M. Tyndel 414-May-2003
Modules - Gain, Offset & Noise extracted from threshold scan
ATLAS SCT Barrel PAR M. Tyndel 914-May-2003
Project engineer fixing brackets Dogleg + LM tape sample
Dummy moduleQA!
AssemblyAssembly
ATLAS SCT Barrel PAR M. Tyndel 1314-May-2003
Critical issues
Modules Schedule
• Start-up & production rates of module clusters Assembly yield
LM tapes & optical harnesses Schedule
• Start-up of production Validation of mechanical spec & performance In-situ repair/rework
Cooling Continuing design changes
• Isolators• Capillary interface
Support structures Complexity/No. of (small) parts
Assembly Schedule