36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ID A
ID B
ID C
36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Beam Vacuum Inner Detector Solenoid Calorimeters
Toroid Magnet Muon Spectrometer Support Structures Shielding
LAr
Barrel Toroid Coils 1-4 Barrel Toroid Coils 5-8
ID services through Muons
Muons sector 13, BMS chambers, Muon rails, gangways & services
Fiel
d m
appi
ng
Endcap cryo lines.
Endcap Cal. C testing & commissioning
Big Wheels C
Endcap Cal. C services
BT testing & commissioning
Cable chains
Barrel Calo testing and commissioning
Platforms removal
HS arches
Rel
ease
of
jack
s
Barrel Calo services
Barrel Cryo lines
Barrel Toroid services
Big Wheels C
JN C
Muon Barrel C
HS arches
preparation Muon Barrel A
Endcap Calorimeter A
Endcap Toroid AJN A
Barrel Calorimeter services, 1st fix on truck
Platf. Remov
Barrel Tile upper half assembly
BOF, BOG, BMF chambers
Endcap Cal. A services connection, testing & commissioning
(JT)
Oct '05Jun '05May '05Nov '04 Jan '05Dec '04 Oct '04
Barrel Toroid
Aug '05Feb '05Sep '04
Preparations for Barrel Toroid
assembly
Chi
mne
y
Sole
noid
Lar C
ryos
tat
LAr
Feb '06 Mar '06Aug '05 Sep '05
Endcap Calorimeter C
Preparations for BT assembly
Mar '06Mar '05 Dec '05Apr '05 Jan '06 Feb '06Jul '05 Sep '05 Nov '05
Side A
Side C
Barrel
Sep '04 Nov '04 Jul '05May '05Dec '04 Oct '04 Jun '05Jan '05 Feb '05 Oct '05 Nov '05 Jan '06Dec '05Mar '05 Apr '05
Half Barrel services
Che
ck ra
ils
ID services along Barrel
ID connection, testing & commissioning
BT full power
Schedule 7.0 Planning in the cavern (part I)
Atlas INFN
Mandelli L. CSN1-Aprile05
ATLAS Barrel Toroid Status:
BT1 Assembled in pitBT2 Assembled in pitBT3 Under test BT4 Assembled in pit. BT5 Tested. OK. In pit 10/04BT6 Tested OK.BT7 Closing almost finishedBT8 Vacuum vessel welding started, cold mass ready
Installation tools and supports are ready for coils 1 to 6, top support for 7 and 8 in fabrication.
End June-July all 8 coils in the pit
BT test in January 06
24
1
3
Atlas INFN
Mandelli L. CSN1-Aprile05
17 Marzo 2005
30 Marzo 2005
Atlas INFN
Mandelli L. CSN1-Aprile05
ATLAS Barrel Calorimeter (LAr and Tiles)
Installation of the LAr and Tile Barrel Calorimeters completed on the C-sideThe installation of services electronics and services has startedCritical points:
Em:FEB: 6m delay partly recoverablePresent plan : Barrel FEBs by August, EC FEBs by November
LV PS (MDI)Critical. Two proto in hands at BNL. Under test
HVHw Instable.Start being worrying. Task force in action
Tile:Super drawers completed and assembled by April. ok
LV PScritical but two production lines (Cern and Prague) now
Atlas INFN
Mandelli L. CSN1-Aprile05
End- Cap C cool- down
80.00
90.00
100.00
110.00
120.00
130.00
140.00
150.00
160.00
170.00
180.00
190.00
200.00
210.00
220.00
230.00
240.00
250.00
260.00
270.00
280.00
290.00
300.00
Time (days)
Tem
pera
ture
(K)
Last updated 07-02-2005
Minimum detector
temperature
Maximum detector
temperature
Cryostat filling
End-Cap C (EM ;HEC;FC )
EC cryostat covers welded.
Cool-down started end November.Filling and subcooling finished end January.
The limits on temperature differences in the detectors were respected. Presently after 8 week cold testing period it is worming up. In pit in September
Tile Extended Barrel C assembly in pit starting in September.
Dead Channels:
Em 6/31872 =0.19‰ Hec 2/3072 =0.65 ‰ FC 0.2 ‰ !!!!
Average values: - Speed: 0.2 K/h - Heat transferred: 5.4 kW
Atlas INFN
Mandelli L. CSN1-Aprile05
End-Cap A (EM,HEC,FC)
Integration status:-All calo’s inserted and cabled-Welding of closed vessel almost finished (now)-Closure of warm vessel in April-Start cryo operations in June-In pit end November (only two weeks tests in B180)
-Tile- EB A assembly start in pit in November
End-Cap cryostat A before closure
FCAL A ready for insertion
Atlas INFN
Mandelli L. CSN1-Aprile05
MDT Chamber Production (w/o EE)
0
200
400
600
800
1000
1200
Jan 00 Jan 01 Jan 02 Jan 03 Jan 04 Jan 05 Jan 06Time
No
. Ch
amb
ers
Bare MDTPlan Bare MDTMDT with FCPlan MDT with FCIntegrated MDTPlan Integrated MDTReady for Installation MS
Precision Muon chamber production
MDT (B & EC) progressing well22 muon stations (MDT + RPC) already installed
CSC ( at large already finished in September
Atlas INFN
Mandelli L. CSN1-Aprile05
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
ID A
ID B
ID C
Pixe
l
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Bea
m p
ipe
Side A
Barrel
Side C
Big Wheel A, step 1
Big Wheels A
Ful
l mag
net t
est
JF
EO, side C
May '07Nov '06Apr '06
Endcap Toroid A cooldown & testing
ID connection, testing & commissioning
Oct '06Apr '06 Jul '06May '06 Jun '06 Aug '06 Sep '06
Jun '06Mar '06
Dec '06Mar '06
Small Wheel C
Oct '06
Endcap Cal. A services connection, testing & commissioning
(JT)
VT
Jan '07Aug '06 Sep '06Jul '06May '06 Apr '07
glob
al te
sts,
pum
p do
wn
& b
ake
out
Dec '06
VJ
Feb '07 Mar '07
JF
EO, side A JF
VA VT
Endcap Toroid A
JF
(JT)
VA VJ
Endcap Toroid C cooldown & testing
May '07Nov '06 Jan '07 Apr '07Mar '07Feb '07
JTA
JT C
Small Wheel A
Endcap Cal. C testing & commissioning
Big Wheels CEndcap Toroid C
Global Commissioning
Cosmic Tests
BT full powerFull magnet test
Installation activity planning in the cavern (part II)
Atlas INFN
Mandelli L. CSN1-Aprile05
Inner Detector- Barrel:
Pixels: Progress on all aspects of the sub-system for 3 layers On
schedule (v. C.Meroni)
SCT: Module assembling of the 4 barrel cylinders ongoing B3 finished, tested, and is
now at CERN. 3/‰ dead channelsB5&B6 in time. B4 late. Recovery plan
TRT: All modules mounted and tested into support structure. Electronic and cooling partially installed
Barrel tracker in the pit March 06
TRT barrel support with all modules
First complete SCT barrel cylinder
Atlas INFN
Mandelli L. CSN1-Aprile05
End-CapTRT
End Cap-C: All wheels produced. Stacking advanced and will terminate in April
End Cap-A: Stacking will start in May . Critical but “still ok”
C-type wheels remain staged (funding)It is possible that Atlas will never have C-Wheels ( Stop workshops, Materials etc.) If done insertion could be 2012 but than….
End-Cap SCT
End Cap-C : Disk 8&9 completed. Others are following. Tight but ok.
End Cap-A : Late by 5m. Recovery plan in construction
EC-C in pit May 06
EC-A in pit June 06
Atlas INFN
Mandelli L. CSN1-Aprile05
ATLAS End-Cap Toroids
All 16 coils for both ECTs are impregnated (where 10 in Assisi), and the last ones will be delivered to CERN now.
Both ECT vacuum vessels have been at CERN since long, including thermal shields and super-insulations, as well as all components for the assembly of the first ECT
The cold mass (single) assembly for the first one (ECT-A) has started in Hall 191. Scheduled for cold mass completion in May, insertion into vacuum vessel in summer (on schedule), in the pit in March06. EC-C will follow. Completion in November 2005, in the pit in June06. No cryo test on surface
Atlas INFN
Mandelli L. CSN1-Aprile05
TGC end-cap trigger chamber production is nearing completion
Tooling available at CERN Preassembly starting in B180
72 TGC sectors and 32 MDT have to pre assembled from Q2 2005 to Q3 2006 (15 months)
Pre-assembly of the end-cap muon ‘Big-Wheels’
Big-Wheel sector assembly tooling
Atlas INFN
Mandelli L. CSN1-Aprile05
Overall summary installation schedule version 7.0
Atlas INFN
Mandelli L. CSN1-Aprile05
No either good or bad news on financial status: cash flow problemexpected, CtC confirmed, deferrals mechanism slowly in action etc. Updating expected at next RRB
85% Total Commisioned.
Perc
en
tag
e C
om
ple
ted
0
10
20
30
40
50
60
70
80
90
100
1998 1999 2000 2001 2002 2003 2004
tile
LAr
Mu
IDTDAQ
CP
Total
Financial situation
Atlas INFN
Mandelli L. CSN1-Aprile05
ATLAS combined test beam in 2004
x
z
y
Geant4 simulation of test-beam set-up
All ATLAS sub-detectors integrated and run together with common DAQ.
Gained lot of operation experience during ~ 6 month runCommon ATLAS software used to analyze the data
~ 90 million events collected ~ 4.5 TB of data:
e, 1 250 GeV , , p up to 350 GeV ~ 30 GeV B-field = 0 1.4 T
Atlas INFN
Mandelli L. CSN1-Aprile05
9 GeV pion track in Pixels, SCT, TRT (B=1.4 T)
ATLAS
LVL1 trigger vs ECAL energy25 ns beam structure
ATLAS
150 GeV , =1.2
z-position: muon system vs Inner Detector
ECAL vs HCAL energyATLAS
ATLAS
A few very preliminary
results
Atlas INFN
Mandelli L. CSN1-Aprile05
ATLAS Appointments(March 2005)
ATLAS Plenary Meeting
Collaboration Board(Chair: S. BethkeDeputy: C. Oram)
Resources ReviewBoard
Spokesperson(P. Jenni
Deputies: F. Gianottiand S. Stapnes)
Technical Co-ordinator
(M. Nessi)
Resources Co-ordinator(M. Nordberg)
Executive Board
CB Chair AdvisoryGroup
Inner Detector(L. Rossi,
K. EinsweilerM. Tyndel, F. Dittus)
Tile Calorimeter(B. Stanek)
Magnet System(H. ten Kate)
ComputingCo-ordination
(D. Barberis,D. Quarrie)
ElectronicsCo-ordination
(P. Farthouat)
LAr Calorimeter(H. Oberlack,D. Fournier,J. Parsons)
Muon Instrum.(G. Mikenberg,
F. Taylor,S. Palestini)
Trigger/DAQ(C. Bee, N. Ellis,
L. Mapelli)
PhysicsCo-ordination
(G. Polesello)
AdditionalMembers(H. Gordon,A. Zaitsev)
INFN:3/28 ok !
Atlas INFN
Mandelli L. CSN1-Aprile05
ATLAS Italia
ResponsabileL.Mandelli
PixelC.Meroni
LArG.Costa
TilesDelPrete
MagneteG.Volpini
MDTM.Livan
Tri-DAQV.Vercesi
RPCR.Santonico
Comp-SWL. Luminari
Ricercatori: 147 FTE / 179Tecnologi: 29 FTE / 47
Atlas INFN
Mandelli L. CSN1-Aprile05
ATLAS progredisce bene e pianifica la chiusura del rivelatore per Aprile 2007
Tutti i rivelatori stanno facendo il massimo per rispettare la tempistica della V7.0 anche se obbiettivamente i tempi sono molto stretti, si stanno anche prendendo dei rischi e non ci sono margini
Sicuramente con un sistema così complesso arriveranno inconvenienti, ma fino ad oggi la collaborazione ha mostrato una grande capacità di reazione.
Il lungo periodo di costruzione sta terminando e l’atmosfera si fa eccitante
Atlas Italia (giovani e meno giovani) è pienamente motivata
Abbiamo bisogno della vostra critica, ma anche del vostro pieno supporto (come già avuto ) per mettere a frutto il notevolissimo contributo dato fino ad oggi
Conclusions