John Hope Gateway Royal Botanical Gardens, Edinburgh

Architectural Technology 3.1

Page 2: AT3.1 John Hope Building

Sam Hayes 33241624 Aaron Morris 33250666 Yuen Chak Ngai 33242502 Daniel Whelan 33245349 Brad McArdle 33255523 Jan Harmens 33254426 Christopher Pepper 33250999 Stewart Craven 33259578

Page 3: AT3.1 John Hope Building

intr

od

uct

ion

Building: John Hope Gateway. Client: Royal Botanical Gardens.

Location: Edinburgh, Scotland. Architect: Edward Cullinan Architects.

Contractor: Xircon. Completion: 2009.

Value: £10,700,000.

Page 4: AT3.1 John Hope Building

intr

od

uct

ion

The John Hope Gateway is home to Edinburgh’s botanical gardens.

Building was designed by Edward Cullinan Architects and was completed in 2009. The building is situated to the north of Edinburgh

city centre. The building beautifully fits into its surrounding environment making for a stunning link between nature and

architecture.

A sustainable, low-energy, minimum-waste approach to the building's design became part of the message the Garden wished to convey to its

visitors. The Gateway has many demonstrable environmental solutions, including a biomass boiler, a green roof, rainwater

harvesting, a wind turbine, natural ventilation and passive night-time cooling.

Page 5: AT3.1 John Hope Building

KLH by the nature of its product, is a specialist in sustainable construction. The cross laminated timber is produced from spruce and fir trees. They do not release co2 in production and can be recycled and reused to make other forms of timber panels. Much of the by-product is used to manufacture our own biomass pellets which generate heat / power in the KLH factory, with the excess being sold to local CHP plants.

KLH

cro

ss-l

amin

ated

tim

ber

pan

els

Page 6: AT3.1 John Hope Building

Using KLH timber panels do not just create environmental benefits, but it can also save the cost of the building. -Lighter structure, more economic design of the substructure and foundations (less concrete)

- Reduction on the the thickness of the transfer slab(less concrete) - Prelims can be reduced due to the shortened construction programme

- Programming can be enhanced. E.g. pre-ordering windows, will be delivered to site. K

LH c

ross

-lam

inat

ed t

imb

er p

anel

s

Page 7: AT3.1 John Hope Building

Cross-laminated timber (KLH) is produced from spruce strips that are stacked crosswise on top of each other and glued to each other. Depending on the purpose and static requirement, the plates are available in 3, 5, 7 or more board layers

Exp

lora

tio

n o

f th

e cr

oss

-lam

inat

ed t

imb

er p

anel

s

Page 8: AT3.1 John Hope Building

Compared to conventional timber construction products, cross-laminated timber offers entirely new possibilities when it comes to load transfer. Not only can loads be transferred in one direction but on all sides.

Exp

lora

tio

n o

f th

e cr

oss

-lam

inat

ed t

imb

er p

anel

s

Page 9: AT3.1 John Hope Building

The crossways arrangement of the longitudinal and crosswise lamellas reduces the swelling and shrinkage in the board plane to an insignificant minimum - static strength and shape retention increase considerably.

Exp

lora

tio

n o

f th

e cr

oss

-lam

inat

ed t

imb

er p

anel

s

Page 10: AT3.1 John Hope Building

The KLH Massivholz GmbH factories in Austria, cutting and beaming of KLH solid cross laminated timber boards takes place using state-of- the-art CNC technology.

Exp

lora

tio

n o

f th

e cr

oss

-lam

inat

ed t

imb

er p

anel

s

Page 11: AT3.1 John Hope Building

Because of the cross-lamination timber , the KLH panels are stronger than conventional wood products.

Exp

lora

tio

n o

f th

e cr

oss

-lam

inat

ed t

imb

er p

anel

s

Page 12: AT3.1 John Hope Building

The CO2 is absorbed by the trees, and the carbon is stored and oxygen been released. With 1m³ of KLH panels will have approx 240-250kg of "locked-in" carbon. The John Hope Gateway Biodiversity Centre has used 674m³ of KLH timber, which has locked 161760-168500kg of carbon.

KLH

cro

ss-l

amin

ated

tim

ber

pan

els

Page 13: AT3.1 John Hope Building

Stru

ctu

re in

pla

n

Ground floor plan

Single height columns

Page 14: AT3.1 John Hope Building

Stru

ctu

re in

pla

n

Ground floor plan

Double height columns

Page 15: AT3.1 John Hope Building

Stru

ctu

re in

pla

n

Ground floor plan

Load bearing masonry

Page 16: AT3.1 John Hope Building

Stru

ctu

re in

pla

n

First floor plan

Double storey columns

Page 17: AT3.1 John Hope Building

Stru

ctu

re in

pla

n

First floor plan

Load bearing masonry

Page 18: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m –

Pri

mar

y &

sec

on

dar

y

Longitudinal section A-A

Cross section B-B

1. Concrete pad foundations 2. Concrete/Dolomite Floor 3. Cold rolled mild steel columns 4. First floor KLH beams 5. Diagonal roof bracing

A

A

B

B

Page 19: AT3.1 John Hope Building

Longitudinal section

Cross section

Stru

ctu

ral S

yste

m –

Pri

mar

y &

sec

on

dar

y

1. Concrete pad foundations 2. Concrete/Dolomite Floor 3. Cold rolled mild steel columns 4. First floor KLH beams 5. Diagonal roof bracing

Page 20: AT3.1 John Hope Building

Longitudinal section

Cross section

Stru

ctu

ral S

yste

m –

Pri

mar

y &

sec

on

dar

y

1. Concrete pad foundations 2. Concrete/Dolomite Floor 3. Cold rolled mild steel columns 4. First floor KLH beams 5. Diagonal roof bracing

Page 21: AT3.1 John Hope Building

Longitudinal section

Cross section

Stru

ctu

ral S

yste

m –

Pri

mar

y &

sec

on

dar

y

1. Concrete pad foundations 2. Concrete/Dolomite Floor 3. Cold rolled mild steel columns 4. First floor KLH beams 5. Diagonal roof bracing

Page 22: AT3.1 John Hope Building

Longitudinal section

Cross section

Stru

ctu

ral S

yste

m –

Pri

mar

y &

sec

on

dar

y

1. Concrete pad foundations 2. Concrete/Dolomite Floor 3. Cold rolled mild steel columns 4. First floor KLH beams 5. Diagonal roof bracing

Page 23: AT3.1 John Hope Building

Longitudinal section

Cross section

Stru

ctu

ral S

yste

m –

Pri

mar

y &

sec

on

dar

y

1. Concrete pad foundations 2. Concrete/Dolomite Floor 3. Cold rolled mild steel columns 4. First floor KLH beams 5. Diagonal roof bracing

Page 24: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m –

Fo

un

dat

ion

pla

te

Steel base plate - The steel base plate is set into the concrete pad

- Hessian sacks allow for tolerances needed when the column is introduced later on

Page 25: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m –

Fo

un

dat

ion

pla

te

Shuttering - Ply shuttering is put up around the base plate so the next layers of concrete do not come in contact with steel

Page 26: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m –

Fo

un

dat

ion

pla

te

Floor construction -The floor is built up around the shuttering -The column is not put in place until the top layer of concrete has dried through

Page 27: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m –

Fo

un

dat

ion

pla

te

Column connection -The main column slots over the base plate - The hessian sacks under the base plate allow for slight movement of the column

Page 28: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m –

Fo

un

dat

ion

pla

te

Grout - Grout is applied around the base plate to create a solid connection

Page 29: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m –

Fo

un

dat

ion

pla

te

Concrete back fill - The remaining gap is backfilled with concrete once the column is in the correct position

Page 30: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m –

Co

lum

n b

uild

up

1. Inner supports 2. Main column 3. Top column connection 4. Base connection 5. First floor connection 6. Flitch plate

Page 31: AT3.1 John Hope Building

1. Inner supports 2. Main column 3. Top column connection 4. Base connection 5. First floor connection 6. Flitch plate

Stru

ctu

ral S

yste

m –

Co

lum

n b

uild

up

-The inner supports prevent the column from warping - There are a total of 4 cross sections - The gap in the middle is for the later first floor connection plate

Page 32: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m –

Co

lum

n b

uild

up

1. Inner supports 2. Main column 3. Top column connection 4. Base connection 5. First floor connection 6. Flitch plate

- The outer L plates are welded onto the inner supports - These will be done to a high tolerance to ensure that when they arrive on site they can be put in place quickly

Page 33: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m –

Co

lum

n b

uild

up

1. Inner supports 2. Main column 3. Top column connection 4. Base connection 5. First floor connection 6. Flitch plate

Page 34: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m –

Co

lum

n b

uild

up

1. Inner supports 2. Main column 3. Top column connection 4. Base connection 5. First floor connection 6. Flitch plate

-The top connection plate welds into the column

Page 35: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m –

Co

lum

n b

uild

up

1. Inner supports 2. Main column 3. Top column connection 4. Base connection 5. First floor connection 6. Flitch plate

Page 36: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m –

Co

lum

n b

uild

up

1. Inner supports 2. Main column 3. Top column connection 4. Base connection 5. First floor connection 6. Flitch plate

-The bottom connection is welded onto the column

Page 37: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m –

Co

lum

n b

uild

up

1. Inner supports 2. Main column 3. Top column connection 4. Base connection 5. First floor connection 6. Flitch plate

Page 38: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m –

Co

lum

n b

uild

up

1. Inner supports 2. Main column 3. Top column connection 4. Base connection 5. First floor connection 6. Flitch plate

-The first floor connection plate should just slot through the column and be welded to the existing structure

Page 39: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m –

Co

lum

n b

uild

up

1. Inner supports 2. Main column 3. Top column connection 4. Base connection 5. First floor connection 6. Flitch plate

Page 40: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m –

Co

lum

n b

uild

up

1. Inner supports 2. Main column 3. Top column connection 4. Base connection 5. First floor connection 6. Flitch plate

-The flitch plate slots though the top welded connection -This is again welded to the existing column

Page 41: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m –

Co

lum

n b

uild

up

1. Inner supports 2. Main column 3. Top column connection 4. Base connection 5. First floor connection 6. Flitch plate

Page 42: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

Pad foundation -The pad foundation is cast with the connection plate inside it - Any required movement in the base plate is accommodated by the hessian sacks

Page 43: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

Shuttering - Ply shuttering is put up around the base plate so the next layers of concrete do not come in contact with steel

Page 44: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

Dolomite layer -Dolomite is the first layer to be poured on site - 200mm thick

Page 45: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

Blinding layer -A thin blinding layer is cast to seal the lower levels

Page 46: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

Concrete layer - A concrete base is poured for the main floor structure - 150mm thick

Page 47: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

DPM -The damp proof membrane is laid over the concrete

Page 48: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

Insulation -Rigid insulation is placed over the DPM layer - 100mm thick

Page 49: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

Final concrete layer -The top layer of concrete is polished to make it aesthetically pleasing - 100mm thick

Page 50: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

Main column -The main columns are now introduced on site once the floor build up is complete - These columns can be slightly altered due to hessian sacks in the foundations

Page 51: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

Concrete backfill -Once the column has been welded in place, concrete is poured to secure the column

Page 52: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

First floor beams - Paired 210mm x 815mm gluelam beams are lifted between the columns - There are two different sizes in columns

Page 53: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

First floor beams - Steel bolts are then put through both beams and the central connection plate - Total of 18 bolts hold both beams in place

Page 54: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

KLH floor panels - The KLH floor panels are now lifted and dropped in place individually - Each panel is 2m x 6m - 226mm thick

Page 55: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

KLH floor panels - The KLH floor panels are now lifted and dropped in place individually -Each panel is 2m x 6m - 226mm thick

Page 56: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

KLH floor panels - The KLH floor panels are now lifted and dropped in place individually -Each panel is 2m x 6m - 226mm thick

Page 57: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

KLH floor panels - The KLH floor panels are now lifted and dropped in place individually -Each panel is 2m x 6m - 226mm thick

Page 58: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

Top flitch plate - Now that the first floor is in, the top flitch plate can be prepped to receive the roof beams

Page 59: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

Roof beams - Each beam is exactly the same as tapers from 1035mm to 500mm - A slot is cut from the larger end to receive the flitch plate

Page 60: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

Roof beams - M24 bolts go through the beams and the connection plate to secure the beams in place - There are 24 bolts in total holding each beam

Page 61: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

Roof beams - M24 bolts go through the beams and the connection plate to secure the beams in place - There are 24 bolts in total holding each beam

Page 62: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

Connection plates - Each connection plate, connects four different beams together

Page 63: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

Connection plates - Each connection plate, connects four different beams together

Page 64: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

Connection plates - The arrangement of the bolts helps visitors understand the structure; a circular arrangement indicates a rotational force or movement while a vertical arrangement indicates a vertical force or shear.

Page 65: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

KLH roof panels - The roof panels are also made of KLH panels - 2m x 6m - 226mm thick

Page 66: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

KLH roof panels - The roof panels are also made of KLH panels - 2m x 6m - 226mm thick

Page 67: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

KLH roof panels - The roof panels are also made of KLH panels - 2m x 6m - 226mm thick

Page 68: AT3.1 John Hope Building

Stru

ctu

ral S

yste

m

KLH roof panels - The roof panels are also made of KLH panels - 2m x 6m - 226mm thick

Page 69: AT3.1 John Hope Building

Load Paths: A Live Load in the Office Space. The Occupier

Live

Lo

ads

Page 70: AT3.1 John Hope Building

Gravity Exerts a Vertical Load on the First Floor

Live

Lo

ads

Page 71: AT3.1 John Hope Building

Gravity Exerts a Vertical Load on the First Floor Where the Seven Laminations of 42mm Thick KLH Panels form a stable platform

Live

Lo

ads

Page 72: AT3.1 John Hope Building

Gravity Exerts a Vertical Load on the First Floor Where the Seven Laminations of 42mm Thick KLH Panels form a stable platform And Distributes the Load Evenly Across the Panels

Live

Lo

ads

Page 73: AT3.1 John Hope Building

Gravity Exerts a Vertical Load on the First Floor Where the Seven Laminations of 42mm Thick KLH Panels form a stable platform And Distributes the Load Evenly Across the Panels To 855mm Thick Beams

Live

Lo

ads

Page 74: AT3.1 John Hope Building

Gravity Exerts a Vertical Load on the First Floor Where the Seven Laminations of 42mm Thick KLH Panels form a stable platform And Distributes the Load Evenly Across the Panels To 855mm Thick Beams Which Connect to and Transfer the Load to Columns Laid on a 6m by 8m Grid Li

ve L

oad

s

Page 75: AT3.1 John Hope Building

Gravity Exerts a Vertical Load on the First Floor Where the Seven Laminations of 42mm Thick KLH Panels form a stable platform And Distributes the Load Evenly Across the Panels To 855mm Thick Beams Which Connect to and Transfer the Load to Columns Laid on a 6m by 8m Grid And then Delivers the Load to a Composite Pad and Raft Foundation

Live

Lo

ads

Page 76: AT3.1 John Hope Building

Gravity Exerts a Vertical Load on the First Floor Where the Seven Laminations of 42mm Thick KLH Panels form a stable platform And Distributes the Load Evenly Across the Panels To 855mm Thick Beams Which Connect to and Transfer the Load to Columns Laid on a 6m by 8m Grid And then Delivers the Load to a Composite Pad and Raft Foundation Where the Ground Resists With an Equal and Opposite Force

Live

Lo

ads

Page 77: AT3.1 John Hope Building

Load Paths: A Dead Load on the Roof. The Skylight

Dea

d L

oad

s

Page 78: AT3.1 John Hope Building

The Mass of the Skylight Exerts a Force

Dea

d L

oad

s

Page 79: AT3.1 John Hope Building

The Mass of the Skylight Exerts a Force Onto the Diagonal Grid Roof Beams,

Dea

d L

oad

s

Page 80: AT3.1 John Hope Building

The Mass of the Skylight Exerts a Force Onto the Diagonal Grid Roof Beams Which Transfer the Load onto the Flitch Plate of the Columns

Dea

d L

oad

s

Page 81: AT3.1 John Hope Building

The Mass of the Skylight Exerts a Force Onto the Diagonal Grid Roof Beams Which Transfer the Load onto the Flitch Plate of the Columns And Turns the Horizontal force into a Vertical Force

Dea

d L

oad

s

Page 82: AT3.1 John Hope Building

The Mass of the Skylight Exerts a Force Onto the Diagonal Grid Roof Beams Which Transfers the Load onto the Flitch Plate of the Columns And Turns the Horizontal force into a Vertical Force That Then Travels Down the Columns

Dea

d L

oad

s

Page 83: AT3.1 John Hope Building

The Mass of the Skylight Exerts a Force Onto the Diagonal Grid Roof Beams Which Transfer the Load onto the Flitch Plate of the Columns And Turns the Horizontal force into a Vertical Force That Then Travels Down the Columns And Into the Pad and Raft Composite Foundation D

ead

Lo

ads

Page 84: AT3.1 John Hope Building

The Mass of the Skylight Exerts a Force Onto the Diagonal Grid Roof Beams Which Transfer the Load onto the Flitch Plate of the Columns And Turns the Horizontal force into a Vertical Force That Then Travels Down the Columns And Into the Pad and Raft Composite Foundation Where the Ground Exerts an Equal and Opposite Force D

ead

Lo

ads

Page 85: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Basement floor -In-situ concrete is cast for the basement floor - 250mm thick

Page 86: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Basement floor -In-situ concrete is cast for the basement floor - 250mm thick

Page 87: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Basement walls -In-situ concrete walls are cast using plyboard shuttering - 250mm thick

Page 88: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Basement ceiling construction - Acroprops are put in place the support the shuttering for the ceiling poor

Page 89: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Concrete roof shuttering - Plyboard is layered to create the shuttering

Page 90: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Basement roof - 250mm thick pre-cast concrete slabs

Page 91: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Site backfill - Once the basement concrete panels have been positioned , the basement excavation is backfilled

Page 92: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Pad foundations - As a result of good load bearing underlying strata, pad foundations were the most suitable choice of main foundation - The pad foundations are positioned on a 6m x 8m grid which is shared by the primary structural system -There are two sizes of pad foundations. The larger 1500mm x 1500mm x 800mm pads support the primary structural steel columns whereas the smaller 1200mm x 1200mm x 800mm pads support the wooden cladding facade and atrium area

Page 93: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Alternative foundations -Raft foundations were used in areas of load bearing capacity such as the entrance and structural cores - Strip foundations were used for elongated load bearing retaining walls at the rear of the building

Page 94: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Shuttering - The foundation perimeter is encased with ply board shuttering

Page 95: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Dolomite/hardcore layer -A 200mm thick compacted dolomite is poured around the plyboard shuttering

Page 96: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Blinding/screed layer - A 6mm blinding layer is poured to fill and cracks and gaps within the dolomite to prevent water causing a freeze thaw effect which ultimately prevents cracking within the dolomite and concrete foundations

Page 97: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Concrete - A concrete layer is poured over reinforced steel re-bar which together act as a composite layer to help distribute uneven loads - The concrete is 150mm thick and completes the structural foundations

Page 98: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

DPC - The damp proof course is laid over the entire length of the concrete for waterproofing purposes

Page 99: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Insulation - 100mm thick Kingspan rockwool insulation is laid

Page 100: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Under floor heating - Polybutylene piping is laid out over the insulation in isolation zones to allow different areas of the building to be heated individually

Page 101: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Polished concrete -A 100mm thick layer of concrete with marble veneer finish to complete the finished floor level of 600mm

Page 102: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Remove shuttering - Now that the floor build up is complete the shuttering can be removed

Page 103: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Single storey columns - 12 columns are welded into position, attached to the pad foundations . The steel work will start in one corner and progress across site to add strength during the construction sequence

Page 104: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Entrance columns - Full height cold rolled mild steel including flitch plates are erected in the atrium area due to full height uninterrupted nature

Page 105: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Load bearing masonry - Along steel work a group of brick layers

will start laying load bearing masonry

Page 106: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

First floor beams - First floor beams are introduced while steel beams are still being erected to provide lateral strength during the build process to withstand wind loading

Page 107: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Continuation of columns and beams - Steel and load bearing masonry progress

Page 108: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Continuation of columns, beams and advanced brickwork

Page 109: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Continuation of columns and beams - Steel and load bearing masonry progress

Page 110: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Completion of columns and beams - Steel and load bearing masonry progress

Page 111: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Advanced ramp brickwork and pond concrete - The load bearings areas are completed with cavity and window and door openings - Wet tradesman will then start laying the in-situ concrete retaining walls for the water feature

Page 112: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

KLH floor panels - 2m x 6m KLH panels are added to provide horizontal support during construction

Page 113: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Diagonal roof bracing - The diaconal roof bracing is erected in a similar fashion to the columns by building from a corner and progressing across the building

Page 114: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Continuation of diagonal roof bracing - Diagonal roof bracing progress

Page 115: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Continuation of diagonal roof bracing - Diagonal roof bracing progress

Page 116: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Continuation of diagonal roof bracing - Diagonal roof bracing progress

Page 117: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Continuation of diagonal roof bracing - Diagonal roof bracing progress

Page 118: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

KLH roof panels -Each KLH panel has seven laminate layers totalling 226mm thick and are 2m x 6m - The KLH panels span a total of 100m x 50m

Page 119: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Entrance columns - Atrium glazing framework connected to steel base plates which connect to concrete raft foundations

Page 120: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Lower cladding - Lower cladding is constructed of 3000mm x 250mm x 50mm stained Scots Pine

Page 121: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Intermediate cladding -Intermediate cladding is constructed of 3000mm x 250mm x 50mm dark stained Scots Pine -- Complete with internal window glazing and 1100mm tall vertical louvre system

Page 122: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Final cladding -Final cladding is constructed of 3000mm x 250mm x 50mm stained Scots Pine and forms the structural basis of the roof parapett

Page 123: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Zinc roof -Zinc flashing completes the wooden cladding by providing a waterproof layer for the parapett roof - A zinc roof is added to toilets complete with aluminium grey water storage sistern

Page 124: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

DPC

Page 125: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Insulation - 100mm thick rigid insulation

Page 126: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Concrete tray - A corrugated 12mm thick 100mm riveted concrete in-filled tray is constructed

Page 127: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Sedum bedding tray - Several containment trays are formed as part of the Sedum roof

Page 128: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Soil - Compacted aerated soil is filled to accommodate Sedum layer

Page 129: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Pebbles - A layer of medium to fine course pebbles surround the soil filled containment rays to provide increased drainage

Page 130: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Soffit - A finishing layer of wood encases and

waterproofs the roof build up

Page 131: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

ETFE roof skylights -Steel framework, timber batons, plastic window frames, glazing and ETFE skylight roofing are added along with remaining windows to weather proof the building

Page 132: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Glazing - By starting the construction in January the building was weatherproof by the start of next winter, allowing for internal walls and first fix progression while construction is not viable due to weather

Page 133: AT3.1 John Hope Building

Co

nst

ruct

ion

bu

ild-u

p

Sedum roof - The Sedum roof is used as a dual purpose facility, it is a lightweight, cheap and efficient insulation layer. It also collects a larger volume of water for the grey water system

Page 134: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns

Page 135: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket

Page 136: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation

Page 137: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab

Page 138: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane

Page 139: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping

Page 140: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP

Page 141: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

Page 142: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete

Page 143: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation

Page 144: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane

Page 145: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks

Page 146: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall

Page 147: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams

Page 148: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel

Page 149: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane

Page 150: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam

Page 151: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing

Page 152: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam

Page 153: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating

Page 154: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating

Page 155: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor

Page 156: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor

Page 157: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column

Page 158: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking

Page 159: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel

Page 160: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel

Page 161: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel

Page 162: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel

Page 163: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel 24) Glass

Page 164: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel 24) Glass 25) Pressed metal insulation pad

Page 165: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel 24) Glass 25) Pressed metal insulation pad 26) RWP

Page 166: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel 24) Glass 25) Pressed metal insulation pad 26) RWP 27) Stone block

Page 167: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel 24) Glass 25) Pressed metal insulation pad 26) RWP 27) Stone block 28) Dressed coping stone

Page 168: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel 24) Glass 25) Pressed metal insulation pad 26) RWP 27) Stone block 28) Dressed coping stone 29) Supports to roof

Page 169: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel 24) Glass 25) Pressed metal insulation pad 26) RWP 27) Stone block 28) Dressed coping stone 29) Supports to roof 30) Cross laminated timber panel

Page 170: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel 24) Glass 25) Pressed metal insulation pad 26) RWP 27) Stone block 28) Dressed coping stone 29) Supports to roof 30) Cross laminated timber panel 31) Sedum roof

Page 171: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel 24) Glass 25) Pressed metal insulation pad 26) RWP 27) Stone block 28) Dressed coping stone 29) Supports to roof 30) Cross laminated timber panel 31) Sedum roof 32) Timber cap

Page 172: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel 24) Glass 25) Pressed metal insulation pad 26) RWP 27) Stone block 28) Dressed coping stone 29) Supports to roof 30) Cross laminated timber panel 31) Sedum roof 32) Timber cap 33) Sedum roof build up

Page 173: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel 24) Glass 25) Pressed metal insulation pad 26) RWP 27) Stone block 28) Dressed coping stone 29) Supports to roof 30) Cross laminated timber panel 31) Sedum roof 32) Timber cap 33) Sedum roof build up

Page 174: AT3.1 John Hope Building

Caf

é ar

ea s

ecti

on

1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel 24) Glass 25) Pressed metal insulation pad 26) RWP 27) Stone block 28) Dressed coping stone 29) Supports to roof 30) Cross laminated timber panel 31) Sedum roof 32) Timber cap 33) Sedum roof build up 34) Outer flooring

Page 175: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base

Page 176: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations

Page 177: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab

Page 178: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks

Page 179: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing

Page 180: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane

Page 181: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab

Page 182: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain

Page 183: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation

Page 184: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures

Page 185: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane

Page 186: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel

Page 187: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element

Page 188: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel

Page 189: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor

Page 190: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat

Page 191: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat

Page 192: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation

Page 193: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel

Page 194: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud

Page 195: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity

Page 196: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding

Page 197: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier

Page 198: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel

Page 199: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel 24) Vertical timber stud

Page 200: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel 24) Vertical timber stud 25) Lower rail on cleats

Page 201: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel 24) Vertical timber stud 25) Lower rail on cleats 26) Slotted cleat

Page 202: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel 24) Vertical timber stud 25) Lower rail on cleats 26) Slotted cleat 27) Cross laminated timber floorboard

Page 203: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel 24) Vertical timber stud 25) Lower rail on cleats 26) Slotted cleat 27) Cross laminated timber floorboard 28) Angles to fix vertical panel to horizontal

Page 204: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel 24) Vertical timber stud 25) Lower rail on cleats 26) Slotted cleat 27) Cross laminated timber floorboard 28) Angles to fix vertical panel to horizontal 29) Insulation

Page 205: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel 24) Vertical timber stud 25) Lower rail on cleats 26) Slotted cleat 27) Cross laminated timber floorboard 28) Angles to fix vertical panel to horizontal 29) Insulation 30) Sedum roof

Page 206: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel 24) Vertical timber stud 25) Lower rail on cleats 26) Slotted cleat 27) Cross laminated timber floorboard 28) Angles to fix vertical panel to horizontal 29) Insulation 30) Sedum roof

Page 207: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel 24) Vertical timber stud 25) Lower rail on cleats 26) Slotted cleat 27) Cross laminated timber floorboard 28) Angles to fix vertical panel to horizontal 29) Insulation 30) Sedum roof 31) Vertical timber stud

Page 208: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel 24) Vertical timber stud 25) Lower rail on cleats 26) Slotted cleat 27) Cross laminated timber floorboard 28) Angles to fix vertical panel to horizontal 29) Insulation 30) Sedum roof 31) Vertical timber stud 32) Timber cap

Page 209: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel 24) Vertical timber stud 25) Lower rail on cleats 26) Slotted cleat 27) Cross laminated timber floorboard 28) Angles to fix vertical panel to horizontal 29) Insulation 30) Sedum roof 31) Vertical timber stud 32) Timber cap

Page 210: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel 24) Vertical timber stud 25) Lower rail on cleats 26) Slotted cleat 27) Cross laminated timber floorboard 28) Angles to fix vertical panel to horizontal 29) Insulation 30) Sedum roof 31) Vertical timber stud 32) Timber cap 33) Sawn larch cladding

Page 211: AT3.1 John Hope Building

Typ

ical

wal

l sec

tio

n

1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel 24) Vertical timber stud 25) Lower rail on cleats 26) Slotted cleat 27) Cross laminated timber floorboard 28) Angles to fix vertical panel to horizontal 29) Insulation 30) Sedum roof 31) Vertical timber stud 32) Timber cap 33) Sawn larch cladding 34) Window fixture

Page 212: AT3.1 John Hope Building

Gla

ss e

ntr

ance

sec

tio

n

1) Concrete base

Page 213: AT3.1 John Hope Building

Gla

ss e

ntr

ance

sec

tio

n

1) Concrete base 2) Pebble marble surface

Page 214: AT3.1 John Hope Building

Gla

ss e

ntr

ance

sec

tio

n

1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column

Page 215: AT3.1 John Hope Building

Gla

ss e

ntr

ance

sec

tio

n

1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete

Page 216: AT3.1 John Hope Building

Gla

ss e

ntr

ance

sec

tio

n

1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window

Page 217: AT3.1 John Hope Building

Gla

ss e

ntr

ance

sec

tio

n

1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels

Page 218: AT3.1 John Hope Building

Gla

ss e

ntr

ance

sec

tio

n

1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels 7) Laminated timber panel

Page 219: AT3.1 John Hope Building

Gla

ss e

ntr

ance

sec

tio

n

1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels 7) Laminated timber panel 8) Insulation

Page 220: AT3.1 John Hope Building

Gla

ss e

ntr

ance

sec

tio

n

1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels 7) Laminated timber panel 8) Insulation 9) Laminated timber panel

Page 221: AT3.1 John Hope Building

Gla

ss e

ntr

ance

sec

tio

n

1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels 7) Laminated timber panel 8) Insulation 9) Laminated timber panel

Page 222: AT3.1 John Hope Building

Gla

ss e

ntr

ance

sec

tio

n

1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels 7) Laminated timber panel 8) Insulation 9) Laminated timber panel 10) Sedum tray

Page 223: AT3.1 John Hope Building

Gla

ss e

ntr

ance

sec

tio

n

1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels 7) Laminated timber panel 8) Insulation 9) Laminated timber panel 10) Sedum tray 11) Automatic opening vent columns

Page 224: AT3.1 John Hope Building

Gla

ss e

ntr

ance

sec

tio

n

1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels 7) Laminated timber panel 8) Insulation 9) Laminated timber panel 10) Sedum tray 11) Automatic opening vent columns 12) Insulation

Page 225: AT3.1 John Hope Building

Gla

ss e

ntr

ance

sec

tio

n

1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels 7) Laminated timber panel 8) Insulation 9) Laminated timber panel 10) Sedum tray 11) Automatic opening vent columns 12) Insulation

Page 226: AT3.1 John Hope Building

Gla

ss e

ntr

ance

sec

tio

n

1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels 7) Laminated timber panel 8) Insulation 9) Laminated timber panel 10) Sedum tray 11) Automatic opening vent columns 12) Insulation 13) Pressed aluminium gutter with down pipes

Page 227: AT3.1 John Hope Building

Gla

ss e

ntr

ance

sec

tio

n

1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels 7) Laminated timber panel 8) Insulation 9) Laminated timber panel 10) Sedum tray 11) Automatic opening vent columns 12) Insulation 13) Pressed aluminium gutter with down pipes 14) Automatic opening vents

Page 228: AT3.1 John Hope Building

Gla

ss e

ntr

ance

sec

tio

n

1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels 7) Laminated timber panel 8) Insulation 9) Laminated timber panel 10) Sedum tray 11) Automatic opening vent columns 12) Insulation 13) Pressed aluminium gutter with down pipes 14) Automatic opening vents 15) Window 4m span 120x200

Page 229: AT3.1 John Hope Building

Gla

ss e

ntr

ance

sec

tio

n

1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels 7) Laminated timber panel 8) Insulation 9) Laminated timber panel 10) Sedum tray 11) Automatic opening vent columns 12) Insulation 13) Pressed aluminium gutter with down pipes 14) Automatic opening vents 15) Window 4m span 120x200 16) Pressed all internal cover by ETFE contractor

Page 230: AT3.1 John Hope Building

Gla

ss e

ntr

ance

sec

tio

n

1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels 7) Laminated timber panel 8) Insulation 9) Laminated timber panel 10) Sedum tray 11) Automatic opening vent columns 12) Insulation 13) Pressed aluminium gutter with down pipes 14) Automatic opening vents 15) Window 4m span 120x200 16) Pressed all internal cover by ETFE contractor 17) ETFE pillow fixture

Page 231: AT3.1 John Hope Building

Fire

Str

ateg

y

Ground Floor Plan

Page 232: AT3.1 John Hope Building

Fire

Str

ateg

y

Ground Floor Plan Fire Exits Doors in the fire cores are held open on electro-magnetic devices -these devices had not yet been activated when we visited. Sliding doors in the entrance and back of the building are fall safe automatic doors with a ‘break-out’ facility.

Page 233: AT3.1 John Hope Building

Fire

Str

ateg

y

Ground Floor Plan Other Exits

Page 234: AT3.1 John Hope Building

Fire

Str

ateg

y

Ground Floor Plan Capacity of Each Space

Page 235: AT3.1 John Hope Building

Fire

Str

ateg

y

Ground Floor Plan Fire Cores

Page 236: AT3.1 John Hope Building

Fire

Str

ateg

y

Ground Floor Plan Fire Travel Distances The maximum travelling distance should be 42.5meters as the building is public visitors centre

47m

30m

39m

17m

Page 237: AT3.1 John Hope Building

Fire

Str

ateg

y

Ground Floor Plan Area Outside Fire Travel Distances The space outside the fire travel distance was allowed as a timber downstand beam was put within the ceiling which will form a smoke reservoir. Therefore occupants can escape via a smoke free reservoir.

Page 238: AT3.1 John Hope Building

Fire

Str

ateg

y

Ground Floor Plan Exits to Assembly Points

Page 239: AT3.1 John Hope Building

Fire

Str

ateg

y

Ground Floor Plan Assembly Points

Page 240: AT3.1 John Hope Building

Fire

Str

ateg

y

Ground Floor Plan Fire Zone 1

Page 241: AT3.1 John Hope Building

Fire

Str

ateg

y

Ground Floor Plan Fire Zone 2

Page 242: AT3.1 John Hope Building

Fire

Str

ateg

y

Ground Floor Plan Fire Zone 3

Page 243: AT3.1 John Hope Building

Fire

Str

ateg

y

Ground Floor Plan Fire Zone 4

Page 244: AT3.1 John Hope Building

Fire

Str

ateg

y

Ground Floor Plan Fire Zone 5

Page 245: AT3.1 John Hope Building

Fire

Str

ateg

y

Ground Floor Plan 60 min Protected Zone

Page 246: AT3.1 John Hope Building

Fire

Str

ateg

y

Ground Floor Plan 60 min Protected Walls and Doors

Page 247: AT3.1 John Hope Building

Fire

Str

ateg

y

Ground Floor Plan 30 min Protected Walls and Doors

Page 248: AT3.1 John Hope Building

Fire

Str

ateg

y

Ground Floor Plan Access For Emergency Services

Page 249: AT3.1 John Hope Building

Fire

Str

ateg

y

Ground Floor Plan Emergency Services Turning Circles These must be a minimum of 14m in diameter.

Page 250: AT3.1 John Hope Building

Fire

Str

ateg

y

Ground Floor Plan Smoke Detectors and Sprinklers

Page 251: AT3.1 John Hope Building

Fire

Str

ateg

y

First Floor Plan

Page 252: AT3.1 John Hope Building

Fire

Str

ateg

y

First Floor Plan Fire Exits

Page 253: AT3.1 John Hope Building

Fire

Str

ateg

y

First Floor Plan Other Exits

Page 254: AT3.1 John Hope Building

Fire

Str

ateg

y

First Floor Plan Capacity of Each Space

Page 255: AT3.1 John Hope Building

Fire

Str

ateg

y

First Floor Plan Fire Cores

Page 256: AT3.1 John Hope Building

Fire

Str

ateg

y

First Floor Plan Fire Travel Distances

16m

28m

16m

37m

Page 257: AT3.1 John Hope Building

Fire

Str

ateg

y

First Floor Plan Fire Zone 1

Page 258: AT3.1 John Hope Building

Fire

Str

ateg

y

First Floor Plan Fire Zone 2

Page 259: AT3.1 John Hope Building

Fire

Str

ateg

y

First Floor Plan Fire Zone 3

Page 260: AT3.1 John Hope Building

Fire

Str

ateg

y

First Floor Plan Fire Zone 4

Page 261: AT3.1 John Hope Building

Fire

Str

ateg

y

First Floor Plan Fire Zone 5

Page 262: AT3.1 John Hope Building

Fire

Str

ateg

y

First Floor Plan 60 min Protected Zone

Page 263: AT3.1 John Hope Building

Fire

Str

ateg

y

First Floor Plan 60 min Protected Walls and Doors

Page 264: AT3.1 John Hope Building

Fire

Str

ateg

y

First Floor Plan 30 min Protected Walls and Doors

Page 265: AT3.1 John Hope Building

Fire

Str

ateg

y

First Floor Plan Smoke Detectors and Sprinklers

Page 266: AT3.1 John Hope Building

Fire

Str

ateg

y

First Floor Plan Hazardous Zone The kitchen

Page 267: AT3.1 John Hope Building

Spring: Autumn:

Summer: Winter:

> 480 460 - 480 440 - 460 420 - 440 400 - 420 380 - 400 380 - 380 340 - 360 < 340

> 640 600 - 640 560 - 600 520 - 560 480 - 520 440 - 480 400 - 440 360 - 400 < 360

> 170 160 - 170 150 - 160 140 - 150 130 - 140 120 - 130 110 - 120 100 - 110 < 100

> 320 300 - 320 280 - 300 260 - 280 240 - 260 220 - 240 200 - 220 180 - 200 < 180

Average Values (Hours) Average Values (Hours)

Average Values (Hours) Average Values (Hours)

Sola

r A

nal

ysis

Sunshine Duration Averages:

Page 268: AT3.1 John Hope Building

25

20

15

10

05

0

-05

-10

-15

-20

-25

Average Min and Max Temperature Degrees Celsius: Extreme Min and Max Temperature Degrees Celsius:

Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec

25

20

15

10

05

0

-05

-10

-15

-20

-25

Sola

r A

nal

ysis

Temperature Averages:

The general solar analysis shows that the site averages temperatures above 0 degrees Celsius throughout the year Occasional extreme temperatures may occur and the building should factor in these extremes Advantages: The relatively steady temperature should inform accurate predictions for building systems Disadvantages: the occasional extreme temperature could occur and preparations for such days should be factored

Page 269: AT3.1 John Hope Building

9.00, March

There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden

Sola

r A

nal

ysis

Shadow Study:

Page 270: AT3.1 John Hope Building

12.00, March

There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden

Sola

r A

nal

ysis

Shadow Study:

Page 271: AT3.1 John Hope Building

15.00, March

There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden

Sola

r A

nal

ysis

Shadow Study:

Page 272: AT3.1 John Hope Building

18.00, March

There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden

Sola

r A

nal

ysis

Shadow Study:

Page 273: AT3.1 John Hope Building

9.00, July

There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden

Sola

r A

nal

ysis

Shadow Study:

Page 274: AT3.1 John Hope Building

12.00, July

There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden

Sola

r A

nal

ysis

Shadow Study:

Page 275: AT3.1 John Hope Building

15.00, July

There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden

Sola

r A

nal

ysis

Shadow Study:

Page 276: AT3.1 John Hope Building

18.00, July

There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden

Sola

r A

nal

ysis

Shadow Study:

Page 277: AT3.1 John Hope Building

9.00, September

There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden

Sola

r A

nal

ysis

Shadow Study:

Page 278: AT3.1 John Hope Building

12.00, September

There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden

Sola

r A

nal

ysis

Shadow Study:

Page 279: AT3.1 John Hope Building

15.00, September

There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden

Sola

r A

nal

ysis

Shadow Study:

Page 280: AT3.1 John Hope Building

18.00, September

There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden

Sola

r A

nal

ysis

Shadow Study:

Page 281: AT3.1 John Hope Building

9.00, December

There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden

Sola

r A

nal

ysis

Shadow Study:

Page 282: AT3.1 John Hope Building

12.00, December

There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden

Sola

r A

nal

ysis

Shadow Study:

Page 283: AT3.1 John Hope Building

15.00, December

There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden

Sola

r A

nal

ysis

Shadow Study:

Page 284: AT3.1 John Hope Building

18.00, December

There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden

Sola

r A

nal

ysis

Shadow Study:

Page 285: AT3.1 John Hope Building

Summer: Winter:

> 25 20 - 25 15 - 20 10 - 15 8 - 10 6 - 8 < 6

Average Values (Knots) > 25 20 - 25 15 - 20 10 - 15 8 - 10 6 - 8 < 6

Average Values (Knots)

Win

d A

nal

ysis

Mean Wind Speed Averages:

The wind analysis shows that the site may experience winds which average 10-25 knots throughout the year Advantages: strong winds can be used by wind turbines to generate power Disadvantages: the shape of the building may cause adverse wind deflections

Page 286: AT3.1 John Hope Building

Jan: May: Sept:

Feb: June: Oct:

Mar: July: Nov:

Apr: Aug: Dec:

Win

d A

nal

ysis

Month By Month:

Page 287: AT3.1 John Hope Building

N

S

E W

Win

d A

nal

ysis

Year Overall:

The wind analysis shows that the site may experience strong winds, predominantly from the north-east and south-west

Page 288: AT3.1 John Hope Building

The large trees around the site can channel the wind into narrow spaces and increase wind forces and speed

Win

d A

nal

ysis

Wind Channels:

Page 289: AT3.1 John Hope Building

Win

d A

nal

ysis

South West:

Strong winds often approach the site from the south-west

Page 290: AT3.1 John Hope Building

Win

d A

nal

ysis

South West:

1. Winds approach from the south-west

Page 291: AT3.1 John Hope Building

Win

d A

nal

ysis

South West:

1. Winds approach from the south-west 2. As wind is forced through channels speeds increase

Page 292: AT3.1 John Hope Building

Win

d A

nal

ysis

South West:

1. Winds approach from the south-west 2. As wind is forced through channels speeds increase

Page 293: AT3.1 John Hope Building

Win

d A

nal

ysis

South West:

1. Winds approach from the south-west 2. As wind is forced through channels speeds increase 3. Wind disperses into more open ground

Page 294: AT3.1 John Hope Building

Win

d A

nal

ysis

South West:

As the wind passes by the large trees areas of negative pressure Positive pressure Negative pressure

Page 295: AT3.1 John Hope Building

Win

d A

nal

ysis

South West:

As the wind passes by the large trees areas of negative pressure Positive pressure Negative pressure

Page 296: AT3.1 John Hope Building

Win

d A

nal

ysis

South West:

As the wind passes by the large trees areas of negative pressure Positive pressure Negative pressure

Page 297: AT3.1 John Hope Building

Win

d A

nal

ysis

South West:

As the wind passes by the large trees areas of negative pressure Positive pressure Negative pressure

Page 298: AT3.1 John Hope Building

Win

d A

nal

ysis

North East:

Strong winds often approach the site from the north-east

Page 299: AT3.1 John Hope Building

Win

d A

nal

ysis

North East:

1. Winds approach from the north-east

Page 300: AT3.1 John Hope Building

Win

d A

nal

ysis

North East:

1. Winds approach from the north-east 2. As wind is forced through channels speeds increase

Page 301: AT3.1 John Hope Building

Win

d A

nal

ysis

North East:

1. Winds approach from the north-east 2. As wind is forced through channels speeds increase

Page 302: AT3.1 John Hope Building

Win

d A

nal

ysis

North East:

1. Winds approach from the north-east 2. As wind is forced through channels speeds increase 3. Wind disperses into more open ground

Page 303: AT3.1 John Hope Building

Win

d A

nal

ysis

North East:

As the wind passes by the large trees areas of negative pressure Positive pressure Negative pressure

Page 304: AT3.1 John Hope Building

Win

d A

nal

ysis

North East:

As the wind passes by the large trees areas of negative pressure Positive pressure Negative pressure

Page 305: AT3.1 John Hope Building

Win

d A

nal

ysis

North East:

As the wind passes by the large trees areas of negative pressure Positive pressure Negative pressure

Page 306: AT3.1 John Hope Building

Win

d A

nal

ysis

North East:

As the wind passes by the large trees areas of negative pressure Positive pressure Negative pressure

Page 307: AT3.1 John Hope Building

Spring: Autumn:

Summer: Winter:

> 800 600 - 800 500 - 600 400 - 500 300 - 400 250 - 300 200 - 250 150 - 200 < 150

> 800 600 - 800 500 - 600 400 - 500 300 - 400 250 - 300 200 - 250 150 - 200 < 150

> 800 600 - 800 500 - 600 400 - 500 300 - 400 250 - 300 200 - 250 150 - 200 < 150

> 800 600 - 800 500 - 600 400 - 500 300 - 400 250 - 300 200 - 250 150 - 200 < 150

Average Values (mm) Average Values (mm)

Average Values (mm) Average Values (mm)

Wat

er A

nal

ysis

Rainfall Averages:

Page 308: AT3.1 John Hope Building

Mean Monthly Rainfall (mm):

Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec

130

120

110

100

90

80

70

60

50

40

30

20

10

Wat

er A

nal

ysis

Rainfall Averages:

Rainfall analysis shows that the site experiences a large amount of rainfall throughout the year Advantages: rainwater may be harvested for utilities Disadvantages: the building will need to be very weather tight and damp conditions may restrict material choice

Page 309: AT3.1 John Hope Building

Spring: Autumn:

Summer: Winter:

> 40 30 - 40 20 - 30 15 - 20 10 - 15 5 - 10 < 5

< 0.5

> 40 30 - 40 20 - 30 15 - 20 10 - 15 5 - 10 < 5

> 40 30 - 40 20 - 30 15 - 20 10 - 15 5 - 10 < 5

Average Values (mm) Average Values (mm)

Average Values (days) Average Values (mm)

Wat

er A

nal

ysis

Lying Snow Averages:

Page 310: AT3.1 John Hope Building

26

24

22

20

18

16

14

12

10

08

06

04

02

26

24

22

20

18

16

14

12

10

08

06

04

02

Average No. Days Ground Frost: Average No. Days Air Frost:

Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec

Wat

er A

nal

ysis

Frost:

Snow and frost analysis shows that the site may experience severe cold spells Advantages: no significant advantages Disadvantages: lying snow will need to be accounted for in room loading, colder conditions may not be suitable for some environmental conditions

Page 311: AT3.1 John Hope Building

Wat

er A

nal

ysis

River Location:

The site is located on raised ground to the north of the Water of Leith

Page 312: AT3.1 John Hope Building

Wat

er A

nal

ysis

Flood Zone:

Flood analysis shows that the site should not experience any significant flooding should the river burst its banks. Please note: localised flooding could occur if drains are not properly maintained and cleared due to the large volume of rainfall the site experiences.

Page 313: AT3.1 John Hope Building

Borehole Sample Map: G

eolo

gy A

nal

ysis

Page 314: AT3.1 John Hope Building

Borehole Sample 130m:

0m

5m

10m

Topsoil Soft Silt And Sandy Clay Medium Dense Brown Clay Firm Dark Gray Gravelly Clay Gravel And Sand Sand With Broken Sandstone Fire Clay

Cobble Sets Mudstone Red Clay With Burnt Shale Concrete Compacted Brick Fill Boulders / Broken Rock Paraffin Shale

Medium Sand Mixed With Stone Weak Weathered Mudstone Tarmac Broken Stone Firm Sandstone Black Ash Filling Black Sand

Key:

Geo

logy

An

alys

is

Page 315: AT3.1 John Hope Building

Topsoil Soft Silt And Sandy Clay Medium Dense Brown Clay Firm Dark Gray Gravelly Clay Gravel And Sand Sand With Broken Sandstone Fire Clay

Cobble Sets Mudstone Red Clay With Burnt Shale Concrete Compacted Brick Fill Boulders / Broken Rock Paraffin Shale

Medium Sand Mixed With Stone Weak Weathered Mudstone Tarmac Broken Stone Firm Sandstone Black Ash Filling Black Sand

Key:

0m

5m

10m

15m

Geo

logy

An

alys

is

Borehole Samples:

Page 316: AT3.1 John Hope Building

Topsoil Soft Silt And Sandy Clay Medium Dense Brown Clay Firm Dark Gray Gravelly Clay Gravel And Sand Sand With Broken Sandstone Fire Clay

Cobble Sets Mudstone Red Clay With Burnt Shale Concrete Compacted Brick Fill Boulders / Broken Rock Paraffin Shale

Medium Sand Mixed With Stone Weak Weathered Mudstone Tarmac Broken Stone Firm Sandstone Black Ash Filling Black Sand

Key:

0m

5m

10m

15m

Geo

logy

An

alys

is

Borehole Samples:

Page 317: AT3.1 John Hope Building

Key: 1: Clay and Large Stones 2:Clay 3: Broken Rock and Boulders 4: Coarse Gravel and Boulders 5: Black Sand 6: Sandstone 7: Clay 8: Paraffin Shale 9: Sandstone 10: Clay 11: Sandstone 12: Clay with Boulders and Gravel 13: Sandstone 14: Clay 15: Sandstone 16: Fireclay 17: Sandstone and Quartz

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

0 - 9.14m 9.14 - 13.1m 13.1 - 15.24m 15.24 - 22.55m 22.55 - 25.29m 25.29 - 30.17m 30.17 - 30.78m 30.78 - 40.23m 40.23 - 53.64m 53.64 - 54.25m 54.25 - 57.30m 57.30 - 67.05m 67.05 - 86.56m 86.56 – 87.17m 87.17 - 118.87m 118.87 - 122.52m 122.52 - 129.54m

Geo

logy

An

alys

is

Geological Build-Up 130m:

Geological analysis shows that the site sits on approx. 25m of clay and sand. After 25m there are significant deposits of sandstone. Around the site the smaller bore hole samples suggest that a lot of man made spoil could occur. This should not be a problem for the specific site because of the age of the gardens. We would suggest that pad foundations would be suitable for these geological conditions.

Page 318: AT3.1 John Hope Building

Entrance foyer - Natural lighting from the two side glass facade and ETFE roofing - Artificial lighting system is using spot light to shire from the floor up to the roof and from the roof coming down, when the outside is dark - Naturally Ventilated by passive ventilation

Ground Floor Zo

nin

g –

Pri

nci

pal

Sp

aces

Page 319: AT3.1 John Hope Building

Toilet - Although natural light enter the area from the small glazing on the roof, but artificial lighting is still required - Mechanical ventilated space

Ground Floor Zo

nin

g –

Pri

nci

pal

Sp

aces

Page 320: AT3.1 John Hope Building

Open plan space - Natural light enter the space from the glass facade and ETFE roofing - Artificial lighting is also required to increase the luminosity - Passive Ventilated from automatically controlled vents - Mechanical ventilation will be use when its needed - Under floor heating is used

Ground Floor Zo

nin

g –

Pri

nci

pal

Sp

aces

Page 321: AT3.1 John Hope Building

Toilet - Natural and artificial lighting are both used to light up the space - Mechanical ventilated space - Under floor heating is used

Ground Floor Zo

nin

g –

Pri

nci

pal

Sp

aces

Page 322: AT3.1 John Hope Building

Circulation and Storage -Glazing are installed but due to small openings artificial lighting is mostly used - Spaces are mechanical ventilated - Under floor heating is used

Ground Floor Zo

nin

g –

Pri

nci

pal

Sp

aces

Page 323: AT3.1 John Hope Building

Plant room - Artificial lighting is constantly needed due to lack of windows, but with the space being not having a lot of human access, the light will not required to be on for a long period of time - Mechanically ventilated through vents controlled by extractor fans

Ground Floor Zo

nin

g –

Pri

nci

pal

Sp

aces

Page 324: AT3.1 John Hope Building

Open plan spaces - Natural light enter the space from the glass facade and ETFE roofing - Artificial lighting is also required to increase the luminosity - Passive Ventilated from automatically controlled vents - Mechanical ventilation will be use when its needed - Under floor heating is used

First Floor Zo

nin

g –

Pri

nci

pal

Sp

aces

Page 325: AT3.1 John Hope Building

Office - Natural and artificial lighting are both used in this space - On the facade glazing, white light reflectors are installed to reflect all available sunlight into the space to reduce the need for artificial lighting - The top of the internal walls are also made of glass which allows light enter from the roof atrium - Mechanical ventilated space - Under floor heating is used

First Floor Zo

nin

g –

Pri

nci

pal

Sp

aces

Page 326: AT3.1 John Hope Building

Kitchen - Natural and artificial lighting are both used to light up the space - It is assume that it is mechanically ventilated, because of the function of the space and the lack of window - Under floor heating is used

First Floor Zo

nin

g –

Pri

nci

pal

Sp

aces

Page 327: AT3.1 John Hope Building

Toilet - Artificial lighting is used in the enclosed space - Mechanical ventilated space - Under floor heating is used

First Floor Zo

nin

g –

Pri

nci

pal

Sp

aces

Page 328: AT3.1 John Hope Building

Circulation and Storage - The space is mainly artificial lighted. Although there are glazed opening, but the opening is not big enough to have the space totally naturally lighted - Mechanical ventilated space - Under floor heating is used

First Floor Zo

nin

g –

Pri

nci

pal

Sp

aces

Page 329: AT3.1 John Hope Building

Education room - Natural and artificial lighting are both used to light up the space - Natural ventilation is controlled by the automatically controlled vents - Mechanical ventilation will be use when its needed - Under floor heating is used

First Floor Zo

nin

g –

Pri

nci

pal

Sp

aces

Page 330: AT3.1 John Hope Building

First Floor Plan Public Spaces

Zon

ing

– P

rin

cip

al S

pac

es

Page 331: AT3.1 John Hope Building

First Floor Plan Private Spaces

Zon

ing

– P

rin

cip

al S

pac

es

Page 332: AT3.1 John Hope Building

Ground Floor Plan Public Spaces

Zon

ing

– P

rin

cip

al S

pac

es

Page 333: AT3.1 John Hope Building

Ground Floor Plan Private Spaces

Zon

ing

– P

rin

cip

al S

pac

es

Page 334: AT3.1 John Hope Building

Due to the buildings orientation to the sun,

there is very little direct sunlight allowed into the

building one measure implemented to allow sunlight into the office

spaces are these Louvre's. They work by bouncing a

subdued sunlight into the offices

The building internal atriums are lit by roof light

which have a polymer cover on them. This is to give a more uniform and

bright light rather than direct intense sun light. As there is gallery space with

in the atriums this polymer helps to block out

UV rays.

Nat

ura

l Lig

hti

ng Lighting Systems:

Page 335: AT3.1 John Hope Building

Nat

ura

l Lig

hti

ng Lighting Systems:

Due to the buildings orientation to the sun,

there is very little direct sunlight allowed into the

building one measure implemented to allow sunlight into the office

spaces are these Louvre's. They work by bouncing a

subdued sunlight into the offices

The building internal atriums are lit by roof light

which have a polymer cover on them. This is to give a more uniform and

bright light rather than direct intense sun light. As there is gallery space with

in the atriums this polymer helps to block out

UV rays.

Page 336: AT3.1 John Hope Building

Nat

ura

l Lig

hti

ng Lighting Systems:

Due to the buildings orientation to the sun,

there is very little direct sunlight allowed into the

building one measure implemented to allow sunlight into the office

spaces are these Louvre's. They work by bouncing a

subdued sunlight into the offices

The building internal atriums are lit by roof light

which have a polymer cover on them. This is to give a more uniform and

bright light rather than direct intense sun light. As there is gallery space with

in the atriums this polymer helps to block out

UV rays.

Page 337: AT3.1 John Hope Building

Nat

ura

l Lig

hti

ng Lighting Systems:

Due to the buildings orientation to the sun,

there is very little direct sunlight allowed into the

building one measure implemented to allow sunlight into the office

spaces are these Louvre's. They work by bouncing a

subdued sunlight into the offices

The building internal atriums are lit by roof light

which have a polymer cover on them. This is to give a more uniform and

bright light rather than direct intense sun light. As there is gallery space with

in the atriums this polymer helps to block out

UV rays.

Page 338: AT3.1 John Hope Building

Nat

ura

l Lig

hti

ng Lighting Systems:

Due to the buildings orientation to the sun,

there is very little direct sunlight allowed into the

building one measure implemented to allow sunlight into the office

spaces are these Louvre's. They work by bouncing a

subdued sunlight into the offices

The building internal atriums are lit by roof light

which have a polymer cover on them. This is to give a more uniform and

bright light rather than direct intense sun light. As there is gallery space with

in the atriums this polymer helps to block out

UV rays.

Page 339: AT3.1 John Hope Building

Despite the buildings position in relation to the sun, it has been designed to make the most of

the suns natural light throughout the day.

Maximum sun angle 73 degrees

Nat

ura

l Lig

hti

ng Summer 9am:

Page 340: AT3.1 John Hope Building

Summer 12pm

Maximum sun angle 73 degrees

Nat

ura

l Lig

hti

ng Summer 12pm:

Page 341: AT3.1 John Hope Building

Maximum sun angle 73 degrees

Nat

ura

l Lig

hti

ng Summer 5pm:

Page 342: AT3.1 John Hope Building

Minimum sun angle 20 degrees

Nat

ura

l Lig

hti

ng Winter 9am:

Page 343: AT3.1 John Hope Building

Minimum sun angle 20 degrees

Nat

ura

l Lig

hti

ng Winter 12pm:

Page 344: AT3.1 John Hope Building

Minimum sun angle 20 degrees

Nat

ura

l Lig

hti

ng Winter 5pm:

Page 345: AT3.1 John Hope Building

The restaurant light system consists of fluorescent tubes

suspended from the ceiling and integrated into panels that aid

acoustics' and contain heating and ventilation pipes.

Restaurant:

Exhibition Space:

In the exhibition space no lighting could be integrated into the

structural beams or walls this means all the lighting is suspended

within a neat panel system that also contains all of the heat and

ventilation ducts. The lighting in this space

comprises of spot lights that can be moved along tracks to alter the

space depending on what the exhibition requires.

Art

ific

ial L

igh

tin

g Lighting - Space By Space:

Page 346: AT3.1 John Hope Building

The restaurant light system consists of fluorescent tubes

suspended from the ceiling and integrated into panels that aid

acoustics' and contain heating and ventilation pipes.

In the evening the space is

transformed by atmospheric blue LED lighting that is contained

within the same suspended ceiling panels.

Restaurant:

Exhibition Space:

In the exhibition space no lighting could be integrated into the

structural beams or walls this means all the lighting is suspended

within a neat panel system that also contains all of the heat and

ventilation ducts. The lighting in this space

comprises of spot lights that can be moved along tracks to alter the

space depending on what the exhibition requires.

Art

ific

ial L

igh

tin

g Lighting - Space By Space:

Page 347: AT3.1 John Hope Building

The exterior lighting consists of LED units that illuminate up the blue slate wall. This create and

interesting effect of shadows and highlight using the natural form of

the stone work.

Exterior Lighting:

Timber Staircase:

The stairs are one of the most outstanding features within the building. The lighting engineers

worked with architects and manufacturers to integrate an LED

lighting system that would compliment the sculptural form. The LED strips are built into the

treads of the stair and illuminate both the top and bottom of the

staircase.

Art

ific

ial L

igh

tin

g Lighting - Space By Space:

Page 348: AT3.1 John Hope Building

Section to show the use of lighting throughout the building

Art

ific

ial L

igh

tin

g Lighting - Building Overall:

Page 349: AT3.1 John Hope Building

The buildings primary ventilation strategy is the use of windows and vents along side atriums and opening roof lights to create a chimney

stack effect to naturally cool the volume.

Nat

ura

l Ven

tila

tio

n

Page 350: AT3.1 John Hope Building

The buildings primary ventilation strategy is the use of windows and vents along side atriums and opening roof lights to create a chimney

stack effect to naturally cool the volume.

Nat

ura

l Ven

tila

tio

n

Page 351: AT3.1 John Hope Building

There is no air conditioning or air pumped within the building, instead the building relies

on allowing air to enter the building through air vents that are automatically controlled by comparing outside temperatures with the

temperatures inside the building

Nat

ura

l Ven

tila

tio

n

Page 352: AT3.1 John Hope Building

This safes energy and has the additional benefit of allowing us to breathe fresh air instead of

recycled ‘second hand’ air.

Nat

ura

l Ven

tila

tio

n

Page 353: AT3.1 John Hope Building

This safes energy and has the additional benefit of allowing us to breathe fresh air instead of

recycled ‘second hand’ air.

Nat

ura

l Ven

tila

tio

n

Page 354: AT3.1 John Hope Building

The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed

throughout the structure. The plant room also services the heating cooling and ventilation systems.

Plant Room Location: Se

rvic

e R

un

s

Page 355: AT3.1 John Hope Building

The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed

throughout the structure. The plant room also services the heating cooling and ventilation systems.

Plant Room Location: Se

rvic

e R

un

s

Page 356: AT3.1 John Hope Building

The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed

throughout the structure. The plant room also services the heating cooling and ventilation systems.

Plant Core Location: Se

rvic

e R

un

s

Page 357: AT3.1 John Hope Building

The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed

throughout the structure. The plant room also services the heating cooling and ventilation systems.

Plant Core Location: Se

rvic

e R

un

s

Page 358: AT3.1 John Hope Building

The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed

throughout the structure. The plant room also services the heating cooling and ventilation systems.

Service Run Locations: Se

rvic

e R

un

s

Page 359: AT3.1 John Hope Building

Serv

ice

Ru

ns Service Run Locations:

The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed

throughout the structure. The plant room also services the heating cooling and ventilation systems.

Page 360: AT3.1 John Hope Building

Serv

ice

Ru

ns Service Run Locations:

The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed

throughout the structure. The plant room also services the heating cooling and ventilation systems.

Page 361: AT3.1 John Hope Building

The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed

throughout the structure. The plant room also services the heating cooling and ventilation systems.

Service Run Locations: Se

rvic

e R

un

s

Page 362: AT3.1 John Hope Building

The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed

throughout the structure. The plant room also services the heating cooling and ventilation systems.

Service Run Locations: Se

rvic

e R

un

s

Page 363: AT3.1 John Hope Building

The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed

throughout the structure. The plant room also services the heating cooling and ventilation systems.

Service Run Locations: Se

rvic

e R

un

s

Page 364: AT3.1 John Hope Building

Serv

ice

Ru

ns

The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed

throughout the structure. The plant room also services the heating cooling and ventilation systems.

Service Run Locations:

Page 365: AT3.1 John Hope Building

Serv

ice

Ru

ns Service Run Locations:

The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed

throughout the structure. The plant room also services the heating cooling and ventilation systems.

Page 366: AT3.1 John Hope Building

The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed

throughout the structure. The plant room also services the heating cooling and ventilation systems.

Service Run Locations: Se

rvic

e R

un

s

Page 367: AT3.1 John Hope Building

The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed

throughout the structure. The plant room also services the heating cooling and ventilation systems.

Service Run Locations: Se

rvic

e R

un

s

Page 368: AT3.1 John Hope Building

The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed

throughout the structure. The plant room also services the heating cooling and ventilation systems.

Service Run Locations: Se

rvic

e R

un

s

Page 369: AT3.1 John Hope Building

Serv

ice

Ru

ns Heating and Cooling System:

The heating and cooling system on the ground floor is a flat line

radiant system manufactured by Zehnder. The system is an efficient

way of maintaining an ambient temperature. It does this by using

convection to move air through the unit which dependent on

requirements can heat or cool the effected space. The system uses

hot or cold water pumped through the system to either heat or cool

the space depending on the requirement of the gallery.

Page 370: AT3.1 John Hope Building

Serv

ice

Ru

ns Heating and Cooling System:

The heating and cooling system on the ground floor is a flat line

radiant system manufactured by Zehnder. The system is an efficient

way of maintaining an ambient temperature. It does this by using

convection to move air through the unit which dependent on

requirements can heat or cool the effected space. The system uses

hot or cold water pumped through the system to either heat or cool

the space depending on the requirement of the gallery.

Page 371: AT3.1 John Hope Building

Serv

ice

Ru

ns Heating and Cooling System:

The heating and cooling system on the ground floor is a flat line

radiant system manufactured by Zehnder. The system is an efficient

way of maintaining an ambient temperature. It does this by using

convection to move air through the unit which dependent on

requirements can heat or cool the effected space. The system uses

hot or cold water pumped through the system to either heat or cool

the space depending on the requirement of the gallery.

Page 372: AT3.1 John Hope Building

Heating and Cooling System:

The heating and cooling system on the ground floor is a flat line

radiant system manufactured by Zehnder. The system is an efficient

way of maintaining an ambient temperature. It does this by using

convection to move air through the unit which dependent on

requirements can heat or cool the effected space. The system uses

hot or cold water pumped through the system to either heat or cool

the space depending on the requirement of the gallery.

Serv

ice

Ru

ns

Page 373: AT3.1 John Hope Building

Nat

ura

l Lig

hti

ng

Sect

ion

4 -

Su

stai

nab

ility

A - Wind Turbine B - Sedum Roof C - Rainwater Harvesting D - Solar Panels E - Bio-mass Boiler

Page 374: AT3.1 John Hope Building

Win

d T

urb

ine Current Wind Turbine System:

Current System: Computer control system (Uses a gust tracking algorithm to detect the behaviour of the wind. This information is then used to gain maximum power from the wind during gusts, to optimize the turbine performance.)

Compact size (Five metres high and three metres in diameter makes it compact and easy to integrate)

One moving part (Limits maintenance and inspection)

Wire safety system (Built in wire tensile system to prevent parts coming away from the turbine in the event of structural failure)

A

Page 375: AT3.1 John Hope Building

Turbine specification: Physical dimensions 5.5m tall, 3.1m diameter Generator Direct drive, mechanically integrated, weather sealed permanent magnet generator Power control Peak power tracking constantly optimises turbine output for all sites and wind speeds Power The projected peak power at 16m/s is: 8.5kW aerodynamic; 7.0kW DC; 6.5kWh at 7m/s Annual energy yield 4197kWh at 5m/s to BWEA standards Up to 12729kWh at 7m/s No reduction in power output at up to 40% turbulence intensity Operating wind speeds Cut in at sustained 5m/s; Cut out sustained 26m/s Design life 25 years (annual inspections recommended) Rotor construction Carbon fibre Power Regulation and shutdown Power regulation above 13.5m/s wind speed, auto shutdown in high wind speeds (above 26m/s) Roof mounting 6m mast Tower mounting 18m mast Remote monitoring Event log can be accessed via PC. Remote monitoring stores operation, average wind speeds and kW hours of electricity generated Warranty Two years on components

Win

d T

urb

ine Current Wind Turbine System - Statistics:

A

Page 376: AT3.1 John Hope Building

Win

d T

urb

ine

The turbine can generate around 4000 to 10000kWh per year, energy enough to supply an office which has 15-20 men.

Current Wind Turbine System: A

Page 377: AT3.1 John Hope Building

Designed as a quiet solution of consuming wind energy. Because of its quietness, it can be installed in urban areas.

Win

d T

urb

ine Current Wind Turbine System:

A

Page 378: AT3.1 John Hope Building

Win

d T

urb

ine Wind Turbine Does Not Work:

The wind turbine is not currently working Possible reasons for turbine failure could be: Too strong / weak wind strength Wind blocked by trees Hardware or software failure A

Page 379: AT3.1 John Hope Building

The Turbine will work at speeds between 5m/s and 26m/s Speeds below 5m/s are shown in Red, The grey areas show up to an optimum speed of approx 16m/s Analysis shows that the site experiences suitable wind speeds for turbine operation

Win

d T

urb

ine Wind Strength?:

Jan: May: Sept:

Feb: June: Oct:

Mar: July: Nov:

Apr: Aug: Dec:

A

Page 380: AT3.1 John Hope Building

= Turbine Location

Win

d T

urb

ine Turbine Positioning?:

The Turbine will work with winds from any direction As shown in the wind analysis the site experiences strong channels of wind around and over the building Analysis indicates the turbine should not be blocked from the wind and have strong channels passing A

Page 381: AT3.1 John Hope Building

Win

d T

urb

ine Computer System?:

The chosen turbine incorporates a sophisticated computer system which: Determines when to spin turbine to start Determines when to brake in high winds Decides when to shut down Production of event logs for analysis Predictive controller learns site wind analysis over time Remote monitoring

Analysis shows under the environmental conditions of the site the turbine should operate. Because conditions are adequate we would suggest that the turbine may have malfunctioned due hardware or software problems.

A

Page 382: AT3.1 John Hope Building

Quietrevolution QR5 Windspire Gyromill Venturi Turbine Ropatec Vertical

Cut in: 5m/s 4m/s 2m/s 1.94m/s

Optimum: 16m/s 5.4m/s 5m/s 13.88m/s

Max: 26m/s 45m/s 40m/s 75m/s

kW/hr: 9600 2000 500 2300

Features: Low Noise Predictive Controller Auto Shut Down Low Vibration

Low Noise Small Scale Self Starting High Strength

Low Noise Almost continuous Low Cost Ideal for Low Speeds

Low Noise Low Maintenance Aerodynamic braking system

Win

d T

urb

ine Correct Turbine Choice?:

Our Suggestion: We believe alternative vertical turbines would be suited to the site. A turbine which does not rely on computer systems would eliminate the chance of software failure.

A

Page 383: AT3.1 John Hope Building

Win

d T

urb

ine Alternative Turbine Choice?:

Our Suggestion: A system using the Ropatec Vertical turbine would be more suited to the site.

Ropatec Vertical Turbine Quietrevolution QR5

Operates at lower speed Requires higher speeds

Able to operate at higher speeds Unable to operate at highest speeds

Optimum speed is higher Optimum speed is lower

Generates less power Generates more power

Aerodynamic braking system Computerised braking system

Although the Quiet revolution produces more power and it optimal at lower speeds, we believe that the Ropatec would be better suited due to its ability to work in lower and higher winds. Also by eliminating a reliance on complex computer systems will minimise failure.

More desirable traits are highlighted in red

A

Page 384: AT3.1 John Hope Building

Win

d T

urb

ine Alternative Turbine Choice?:

Our Suggestion: Using two Ropatec Vertical turbines would give more power generation and produce approx. 2/3 of the power from the Quietrevolution QR5 system

We would suggest utilising both wind channels and putting a second turbine on the south-east corner Although 2 Ropatec turbines only produce 4600kW/hr compared to 9600kW/hr of the Quietrevolution QR5 system we believe the ability to run at lower and higher speeds would make up for some of this loss

= Turbine Location

A

Page 385: AT3.1 John Hope Building

Green roof is a roof that is partially or completely covered with vegetation and a growing medium. Green roof has a longer lifespan than conventional roof, with roofs are under constant ultra-violet light. In it’s first summer the roof was colonised by butterflies, insects and birds

Gre

en

Ro

of Current Roof System:

B

Page 386: AT3.1 John Hope Building

Gre

en

Ro

of Green Roof Section:

Key: 1. Sedum Roof 2. Rock Fill 3. Growing Medium 4. Primary Filter Layer 5. Secondary Filter Layer Drainage Layer 6. Root Barrier 7. Insulation 8. Vapour Control Layer 9. Cross Laminated Timber

1 3 4 6 7 8 9

2 5

B

Page 387: AT3.1 John Hope Building

Green roof provide a sustainable drainage as it reduce the immediate storm-water run off, by trapping the water within the soil and plants.

Gre

en

Ro

of Drainage:

B

Page 388: AT3.1 John Hope Building

Green roof has a longer lifespan than conventional roof, with roofs are under constant ultra-violet light.

Gre

en

Ro

of Life Span:

B

Page 389: AT3.1 John Hope Building

Gre

en

Ro

of

During the summer, solar energy is utilised by plants for evapotranspiration, reducing the temperature of the green roof and the surrounding microclimate.

Summer Winter

During the winter months, a green roof can add to the insulating qualities of the roof. Water has a negative effect on thermal conductance. So in damp winter climate, such as the UK, a green roof will add little to the overall thermal performance of the roof.

Thermal Properties: B

Page 390: AT3.1 John Hope Building

Gre

en

Ro

of

Sedums herbs Sedums herbs perennials Perennials grasses shrubs Grasses shrubs trees 76 – 102 mm 127 – 178 mm 203 -279 mm 305 + mm

The roof currently has a thinner growing medium which is only suitable to plants such as sedum, we believe that the roof could benefit biodiversity by having different plant species.

Green Roof Depth Analysis:

The thickness of the growing medium will be depends on the vegetation. The taller and bigger the vegetation , the thicker the growing medium. This is because of the taller and bigger the plants, the more and longer the roots they will have to keep them stable.

B

Page 391: AT3.1 John Hope Building

Gre

en

Ro

of Potential Biodiversity Promotion :

Our Suggestion: The botanical gardens could help bio-diversity by having a green roof incorporating plants which help endangered insect species. However, as discussed on the previous page this would increase the loading on the roof if a thicker growing medium was needed. We suggest a tiered system to enable more diverse planting. This would minimise growing medium thickness and maintain a reduced loading on the structure

B

Page 392: AT3.1 John Hope Building

Large Heath Butterfly (Coenonympha tullia)

Habitat: Bog moss Hare’s-tail Cottongrass Cross-leaved Heath

Northern Brown Argus (Aricia artaxerxes)

Habitat: Drained and unimproved grasslands Rock-rose Sheltered scrub Patches of bare ground

Gre

en

Ro

of Potential Biodiversity Promotion - Priority Species in UK Biodiversity Action Plan:

The roof has already been colonised by some common butterflies and insects. However the area around the site is home to the following endangered butterflies which we feel can benefit from different roof planting

B

Page 393: AT3.1 John Hope Building

Small Pearl-bordered Fritillary (Boloria selene)

Habitat: Bracken Pteridium aquilinum Damp grassland Flushes and moorland Open wood-pasture

Dark Green Fritillary (Argynnis aglaja)

Habitat: Flower-rich grassland Patches of scrub Bracken Pteridium aquilinum

Gre

en

Ro

of Potential Biodiversity Promotion - Priority Species in UK Biodiversity Action Plan:

The roof has already been colonised by some common butterflies and insects. However the area around the site is home to the following endangered butterflies which we feel can benefit from different roof planting

B

Page 394: AT3.1 John Hope Building

Current System: 2x 7000 litre tanks (5000 litre per tank dedicated to rainwater)

Simple filter system (Because the rainwater is only being use as toilet water, large and complex filter system can be avoid, Gravity treatment cyclonic filters are used to the north)

Part gravity fed (Harvesting to the north toilet drum is gravity fed)

Part pumped (Harvesting to the south end of the building is pumped with the booster set to allow all WC’s in building to be served)

Low maintenance Low running cost

Rai

nw

ater

Har

vest

ing Current Rainwater Harvesting From Roof Area:

C

Page 395: AT3.1 John Hope Building

On this building, the rainwater is collected from the roof and used for flushing the toilets.

Rai

nw

ater

Har

vest

ing Current Rainwater Harvesting From Roof Area:

C

Page 396: AT3.1 John Hope Building

Rai

nw

ater

Har

vest

ing Current Rainwater Harvesting From Roof Area:

Some of the rainwater being store away, the large drainage system for the rainwater will not be required, as another solution on reducing the cost on the construction of the building.

C

Page 397: AT3.1 John Hope Building

Rai

nw

ater

Har

vest

ing Current Rainwater Harvesting From Roof Area:

This system reduces the amount of water needed to flush the toilet by at least 36% a year.

36%

C

Page 398: AT3.1 John Hope Building

Rai

nw

ater

Har

vest

ing Potential Rainwater Harvesting From Roof Area:

Our Suggestion: We believe that the rainwater harvesting system can be more efficient than 36% Surface area of roof =1630.099817m2 Based of the following criteria: Adequate drainage can be used to collect 100% of the water The green roof does not consume a large quantity of the water C

Page 399: AT3.1 John Hope Building

Rai

nw

ater

Har

vest

ing

Jan = 195,610 Feb = 138,560 Mar = 163,010 Apr = 130,410 May = 154,860 Jun = 179,310

Jul = 187,460 Aug = 171,160 Sept = 203,760 Oct = 220,060 Nov = 187,460 Dec = 203,760

Potential Rainwater Harvesting From Roof Area:

Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec

22,000

20,000

18,000

16,000

14,000

12,000

10,000

8,000

6,000

4,000

2,000

Key: = 2000 Litres Collected

We believe the surface area of the roof and average rainfall for Edinburgh can provide 100% of the water for the building

C

Page 400: AT3.1 John Hope Building

Rai

nw

ater

Har

vest

ing

No. Visitors 2010 = 707,244 visitors Public Buildings require = 3-10 litres per person 100% rainwater harvesting system requires = 2,121,732 litres Summer total (April to September) = 1,273,039.2 litres Winter total (October – March) = 848,692.8 litres Summer month = 212,173.2 litres Winter month = 141,448.8 litres

22,000

20,000

18,000

16,000

14,000

12,000

10,000

8,000

6,000

4,000

2,000

Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec

(We will allow 3 litres per visitor because not all visitors to the park will use the facilities) (As there are more visitors in summer 60% of the total will be required and 40% in winter)

Required Rainwater for 100% Rainwater Usage:

Key: = Required

C

Page 401: AT3.1 John Hope Building

Rai

nw

ater

Har

vest

ing

22,000

20,000

18,000

16,000

14,000

12,000

10,000

8,000

6,000

4,000

2,000

Key: = Harvested = Stored = Shortage

Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec

Jan = +54,161.2 Feb = -2888.8 Mar = +21561.2 Apr = -81763.2 May = -57313.2 Jun = -32863.2

Jul = -24713.2 Aug = -41013.2 Sept = -8413.2 Oct = +78611.2 Nov = +46011.2 Dec = +62311.2

Yearly shortage = -19,465.6 Rainwater harvesting from roof Yearly capacity = 99.08%

Collected Water Vs Required Water: C

Page 402: AT3.1 John Hope Building

The roof falls just short of providing 100% water for the building. Our Suggestion: Harvesting water from the car park to provide any extra water Supplying the missing 0.92% Provide in times of low rain Allow extra water for the green roof

(Car park would be only suitable for flushing toilets due to potential contamination from cars)

Rai

nw

ater

Har

vest

ing How to Achieve 100% Rainwater Harvesting:

Surface area of car park area = 407.374491m2 C

Page 403: AT3.1 John Hope Building

Utilising rainwater from both the roof and car park should supply a large surplus which can be utilised in other ways

Our Suggestion: If car park water is used as first choice for toilets, the large surplus of water collected from the roof could use a UV sterilisation system to produce safe drinking water.

Advantages: No chemicals added to the water Low running costs Simple maintenance Safe and environmentally friendly

Rai

nw

ater

Har

vest

ing

Rain water harvested from roof

Secondary filtration with a minimum of 5 micron filter to remove any remaining sediment

Pre-filtration 10 micron filter to remove larger sediment

UV sterilisation systems to kill bacteria and viruses making the water suitable for drinking

Safe dinking water produced

Making Rainwater Safe to Drink: C

Page 404: AT3.1 John Hope Building

Photovoltaic and solar hot water heating panels are installed on the south side of the roof.

Sola

r Po

wer

Current Solar Power System:

D

Page 405: AT3.1 John Hope Building

Sola

r Po

wer

Photovoltaic Panel Charge Controller

Charge Controller

Electric Meter

Battery Electrical Device

National Grid

Solar Power System: D

Page 406: AT3.1 John Hope Building

Key: 1.) N-type silicon 2.) Junction 3.) P-type silicon

4.) Photons 5.) Electron flow 6.) ‘Hole’ flow

Sola

r Po

wer

Solar Power System - Panel Build-Up:

1 2 3

4 5

6

Photons in sunlight strike PV and may be absorbed by atom Energy of the photon transferred to the electron of the atom that receives that energy. Cell materials (semiconductors) N-type, – charge (lot of nearly free electrons) P-type, + charge (lot of "Holes“ - when an electron has left its place) When an electron is free to move and has a negative charge it will try to catch a positive charge Although the charges are attracted it is impossible for electrons to pass the junction The only way to find a Hole is by going out from the solar cell, through an electrical device and toward the P-Type semiconductor. Thus creating electricity. D

Page 407: AT3.1 John Hope Building

When a visible light strike a solar cell, three things would happen: 1) Pass straight through 2) Be reflected 3) Be absorbed

Sola

r Po

wer

1) 2) 3)

Solar Power System: D

Page 408: AT3.1 John Hope Building

11sqm of photovoltaic panel on the roof Generate 1400 kWh per year, which is equal saving 600kg of carbon dioxide per year

Sola

r Po

wer

Solar Power System:

D

Page 409: AT3.1 John Hope Building

Sola

r Po

wer

Evacuated tube solar thermal panels

Water pump

Hot water

Boiler

Solar Heating System: D

Page 410: AT3.1 John Hope Building

Key: 1.) Evacuated Tube 2.) Copper Heat Pipe 3.) Non-toxic Liquid So

lar

He

atin

g Solar Heating System - Panel Build-Up:

Infra-red radiation from the sun is absorbed by this sealed heat pipe which contains an anti-freeze liquid. As heat rises, hot vapours from the antifreeze rise up to the top of the heat pipe where its copper tip connects with a header pipe through which more antifreeze flows This hot antifreeze is pumped through pipes inside the hot water tank with the end result that the water gets hotter and the antifreeze cooler

1

3

2

Hot vapour rises to heat pipe tip

Cold vapour liquefies and returns to bottom

D

Page 411: AT3.1 John Hope Building

15sqm of solar hot water panels can generate 12 kV of warm water, which will provide enough hot water for 100000 hand wash or 1500 showers per year

Sola

r H

eat

ing Solar Heating System:

D

Page 412: AT3.1 John Hope Building

The photovoltaic and the solar hot water heating panels both do not work. During us visit to the building, the panels were protected We suggest an alternative method of heating could be more appropriate

Sola

r H

eat

ing Solar Heating System:

D

Page 413: AT3.1 John Hope Building

He

atin

g A

lter

nat

ive

Alternative Heating Method:

Ground Source Heat Pump: 1.) Energy absorbed from the ground 2.) Transferred to the refrigerant 3.) Refrigerant turns to gaseous state 4.) Refrigerant compressed, reducing its volume causes temperature rise

5.) Heat exchanger extracts heat from refrigerant to heat water 6.) After loss of heat energy refrigerant turns back to liquid 7.) Cycle begins again

1

2

3

4

5

6

D

Page 414: AT3.1 John Hope Building

Our Suggestion: Ground source heat pumps require a large space to lay pipes, to minimise damaging the site gardens we suggest the use of a bore hole heat pump.

He

atin

g A

lter

nat

ive

Alternative Heating Method:

The geology study shows it is relatively easy to drill a borehole to a depth of approx. 25m. Which will be sufficient for the ground source heat pump.

25m

D

Page 415: AT3.1 John Hope Building

He

atin

g A

lter

nat

ive

Alternative Heating Method - Heat Pump Efficiency:

Standard Gas Boiler:

Ground Source Heat Pump:

The ratio of output energy compared to input energy is called co-efficiency of performance (COP). Most standard boilers have a COP of 1 (i.e. 1kW energy is turned into 1kW heat energy). Ground source heat pumps often achieve a COP of 4. At temperature of 35-45 degrees Celsius COP 5 can be achieved.

D

Page 416: AT3.1 John Hope Building

Co

olin

g A

lter

nat

ive Alternative Heating Method – Combined Passive Cooling System

Our Suggestion: The bore hole can also be utilised in combination with the water tank to provide passive cooling

Summer Cooling: 1.) Rainwater collected 2.) Rainwater transferred to storage tank 3.) Cold energy absorbed from the water tank 4.) Cold transferred via distribution system

Winter Heating: 5.) Heat energy absorbed 6.) Transferred to the refrigerant 7.) Refrigerant turns to gaseous state 8.) Refrigerant compressed 9.) Heat exchanger extracts heat from refrigerant to heat water 10.) After loss of heat energy refrigerant turns back to liquid 11.) Cycle begins again

1

2 3

4

5

6

7

8

9

10

11

h Summer (Cold used for cooling)

Winter h (Heat used for compressor)

D

Page 417: AT3.1 John Hope Building

Bio

mas

s B

oile

r

The Biomass Boiler is used to heat water and the building . The waste ash is then mixed into the soil and acts as fertilizer. The Botanical Garden uses a closed loop system of burning trees and waste from the garden and then replanting any trees used.

E Utilising Waste From The Biomass Boiler:

Page 418: AT3.1 John Hope Building

Bio

mas

s B

oile

r

Advantages -Biomass is a sustainable fuel source if managed correctly, i.e. trees need to be planted to replace those used. -It is virtually carbon neutral. -If they are well maintained and run they will produce very little smoke. -Biomass is a good way of using up waste wood. It is used by the Royal Botanical Gardens for a large proportion of their garden waste. Disadvantage -The main disadvantage of using biomass boilers is the need for a regular supply of wood however this is over come by the building being a Botanical garden Centre. Fact -12 cubic metres of wood chips can produce similar levels of heat to 1000 litres of heating oil. For your information, 4.8 cubic metres (approx 4.8 tonnes) of raw wood makes 12 cubic metres of chips.

E Advantages and Disadvantages of Biomass Boilers:

Page 419: AT3.1 John Hope Building

The Use of KLH Panels

Co

ncl

usi

on

Structure: KLH panels are manufactured to specific sizes and thicknesses which means bulk producing is easy In the event of a fire, the laminations of the panels make it difficult for the fire to spread throughout the building The panels are easily assembled and connected on site, reducing labour costs and construction time Compared to other structural systems, they are very small/thin which means thin load bearing walls are possible They are manufactured from a sustainable wood source and are a storage of carbon

Structure: During the construction of the building there were relatively few problems with the build up. This was due to the standardised KLH panelling system. The first floor, roof and beams were all built offsite and simply delivered to be bolted onto the columns. This consequently meant that the building could be constructed extremely quickly and with relatively low skilled labourers. This not only made it cheaper to build but it also meant that there were a limited number of human errors during construction. Although the building is now structurally complete, the main contractor Xircon went into liquidation towards the end of the build. This has consequently meant that many small finishing bits on the building are either yet to be done or a later contractor had to finish.

Page 420: AT3.1 John Hope Building

Wind Turbine: The current wind turbine is not working due to a technical fault. From our analysis we believe the malfunction could be due to the complex computer system that controls the turbine. We suggest an alternative vertical turbine would be more suited to the site because a turbine which does not rely on computer systems would eliminate the chance of software failure. After analysing several vertical turbines we would suggest a system using the Ropatec Vertical turbine would be more suited to the site. The Ropatec would work under both lower and higher wind speeds. The wind analysis shows that the site could experience high wind due to channelling. The downside to the Ropatec turbine is that is produces less power. To make up for this loss we suggest using two Ropatec Vertical turbines would produce approx. 2/3 of the power from the Quietrevolution QR5 system. The wind analysis shows that the site could be suited to a second turbine to the south of the building, we would suggest locating the second Ropatec turbine here.

Sustainability Conclusion:

Sedum Roof: One of the key objectives of the botanical gardens is to promote biodiversity. We feel that the roof of this building has missed an opportunity to help struggling species of insects and birds. We suggest a green roof which incorporates plants which help endangered insect species would be more suited. New species of plants on the roof may require deeper growing medium which would in turn increase the loading on the building. In order to have both deeper growing medium yet maintain a lower loading force we suggest a tiered system could be suitable and enable more diverse planting. The roof has already been colonised by some common butterflies and insects. Our research showed that there are several species of endangered butterfly which are a priority for government biodiversity targets. We suggest selective planting could create a suitable habitat for these endangered butterflies.

We suggest that the following changes and additions could greatly increase the sustainability of the building:

Co

ncl

usi

on

Page 421: AT3.1 John Hope Building

Rainwater Harvesting: Currently the rainwater harvesting system provides 36% of the toilet water. We believe that the rainwater harvesting system can be utilised better and become more efficient than 36%. Our aim is to increase the amount of water harvested to provide 100% of the water for the building. Based on our calculations with the size of the roof, the amount of average rain on the site and the average consumption of water per visitor it is possible to harvest almost 100% of the water for the building. Because rain amounts fluctuate we also suggest harvesting water from the car park would provide extra water to supply the 0.92% shortfall from the roof, provide in times of low rain and also provide water to feed the green roof. If the building had a system which could utilise rainwater from both the roof and the car park our research shows that 100% of the needed water would be achieved. This can be achieved by increasing the size of the storage tanks and the area of water harvesting.

Car park water would be used as first choice for toilets. We suggest installing a UV filtration system so that the large surplus of water collected from the roof could be sterilised to produce safe drinking water. This filtration and sterilisation system would also be more suited than the current filtration system which leaves the water yellow and has resulted in complaints from the visitors.

Solar panels: The current solar panel system is not working due to a technical fault. The specific fault is unknown, but we suggest that by using several systems together will provide a back-up to cover such times. Based on our geological research we suggest that the site is suitable for a ground source heat pump. Commonly ground source heat pumps require a large space to lay pipes, we suggest that to minimise damaging the site gardens the use of a bore hole heat pump would be more suitable. The geological research shows that a bore hole of 25m should be easy to drill before reaching sandstone. By combining the suggested ground source heat pump with both the bio mass boiler and the solar heating (when it becomes active) the building would be more covered for all eventualities. Ground source heat pumps are also one of the most efficient ways to heat the building and has significant environmental advantages over traditional heating systems. The bore hole system can also be used in reverse to provide additional cooling in the summer. By using the borehole in combination with the water tank the building should be able to cool the passing liquid enough to provide passive cooling to the building

We suggest that the following changes and additions could greatly increase the sustainability of the building:

Sustainability Conclusion: C

on

clu

sio

n

Page 422: AT3.1 John Hope Building

http://www.edwardcullinanarchitects.com/ http://www.rbge.org.uk/ http://www.journal-online.co.uk/article/7493-visitor-numbers-for-botanics-on-the-rise http://www.metoffice.gov.uk/climate/uk/es/print.html http://www.solaruk.net/lazer2_solar_thermal_collectors.asp?gclid=CL3njZ7X7KwCFSFItAod_2CLHQ http://www.coste53.net/downloads/Edinburgh/Edinburgh-Presentation/78.pdf http://www.architecture.com/SustainabilityHub/Casestudies/5-RoyalBotanicGardenEdinburgh.aspx http://www.petervaldivia.com/technology/energy/solar-power.php http://www.energ.co.uk/gshp-technology http://www.britishbutterflies.co.uk/protected.asp http://www.windfinder.com/windstats/windstatistic_edinburgh.htm http://www.quietrevolution.com/index.htm?gclid=CJOGmdvh76wCFdEhtAodPmZfPw http://peswiki.com/index.php/Directory:Vertical_Axis_Wind_Turbines http://www.zae-bayern.de/english/division-2/projects/archive/regenerative-cooling-system.html www.speirsandmajor.com www.zehnder.co.uk www.edwardcullinanarchitects.co.uk www.rbge.org.uk