REPORT TO PARKS AND COMMONS COMMISSIONFROM: FRIENDS OF THE Ljm-E LOG CHURCH & MUSEUM
AT THE JULY 21ST CITY COUNCIL MEETING, MARY CROOK, JAMES KERTI AND LARRY THORNTONREPRESENTATIVES OF THE LHTLE LOG CHURCH & MUSEUM GAVE A PRESENTATION PERTAINING TOTHE RESTORATION OF OUR VILLAGE TREASURE AND REQUESTED $10,000.00 FOR A MAJORINSPECTION TO DETERMINE THE COSTS TO DO SO. OUR PLAN CHANGED FROM A COMPLETE RE-BUILDTO A PLAN CALLED, "DESIGN BUILD." THE CHANGE WAS DUE TO CONSTRUCTION COSTS ESCALATINGWHICH WOULD HAVE DOUBLED THE COSTS. A VOTE WAS CAST FAVORABLE TO OUR REQUEST, 4 TO 1.WE ARE VERY THANKFUL FOR THE SUPPORT OF THE COUNCIL AS THIS WILL GIVE US SOME REALISTICCOST FIGURES TO PRESENT TO THE CHY AND THE PUBLIC IN GENERAL. WE ARE ALSO THANKFUL OFTHE SUPPORT FROM THE PARKS AND COMMONS COMMISSION.
CARL FOSTER MILLER, PRESIDENTFRIENDS OF THE LJTTLE LOG CHURCH & MUSEUM
MCCLAINCONSTRUCTION LLC
[email protected]#: 228154
7 July 2021
Table of Contents
Section 1
Section 2
Section 3
Section 4
Section 5
Section 6
Section 7
Section 8
Section 9
Section 10
Firm Experience
Key Personnel
CM / GM Project Approach
Schedule
Cost Control
Project Safety
References
Reference Letters
Bond Letters
Key Personnel and Experience
McCLAIN CONSTRUCTION, LLCP. O. Box 51282 . Eugene, OR 97405 . (541) 636-4975
1. Firm Experience
McClain Construction is a Southern Willamette based General Contractor located in
Eugene, OR with years of experience in MEPS, construction management,preconstruction, and estimating. We have built long term relationships with most, if notall of our clients. We have a solid reputation for finishing complex projects on time andon budget. Most of our repeat-clients rely on us heavily for preconstruction planning andearly budgeting and estimating for all trades.
Our natural approach to projects is aligned with the CM/GC model for constructionwhich works very well for the owner, designer, and contractor.
Volume, Financial, and Bonding Capabilities
Volume: McClain Construction averages between $5-$7 million in construction projectsper year.
Financial Capacity: McClain Construction has a solid financial base with $700k ofcompany liquidity for consistent payment with our sub trades and suppliers.
Bonding Capacities: Total bonding is held by Market Insurance Company
Specific Facility Experience
> We are leaders in major mechanical, electrical, plumbing, and structural steelrenovations in Lane County.
> We've performed extensive work in both the Public, Private, and Governmentsectors. McClain Construction has performed projects for local school districts,healthcare, city, and county municipalities.
> We are experienced with public contract statutes and requirements as well asBOLI wage recording and accounting.
> We have performed renovations to thousands of square feet of facilities andbuildings in Oregon - including institutional, manufacturing/ industrial, andhealthcare.
> Our ultimate goal is to solicit local qualified subcontractors and vendors for youreroiect. We find that qualified local subtrades have more__dep_endable andconsistent care for their local project.
McCLAIN CONSTRUCTION, LLCP. O. Box 51282 . Eugene, OR 97405 . (541) 636-4975
Cjjrrent Workload
. Industrial Source Phase 2 Office Addition - Springfield, ORDescription: $500,000Status: 25%Completion: May 2021
. Metro Movie Theater Phase 3 Expansion - Eugene, ORDescription: $150, 000Status: 50%Completion: March 2021
. 507 Willamette Seismic Rehabilitation - Eugene, ORDescription: $980,000Status: 10%Completion: May 2021
. Quality Metal Finishing Anodizing Line and H3 Expansion - Eugene, ORDescription: $675,000Status: 90%Completion: April 2021
Recent CM/GC Project History of Similar Size andl^cope
CM/GC Related Experience98% of our work is Design-Build or Construction Management/General Contractor.McClain Construction has been assisting engineers, architects, and owners since 2007with constructability evaluations, cost-estimating, early project development, and valueengineering.
McCLAIN CONSTRUCTION, LLCP. O. Box 51282 . Eugene, OR 97405 . (541) 636-4975
3
ProjectTriangle Lake CharterSchool Seismic Retrofit
Phase 1Summer 2019
20264 Blachly Grange Rd.
DescriptionCM/GC Preconstruction/ Construction Method
15,000 seismic retrofit of an existing school gymnasium andassociated buildings.. Preconstruction and estimating. Constructability reviews for engineer. Development and implementation of Project Schedule. Removal of all existing mechanical components com-
pletely new mechanical equipment overhaul. New sheathing and top-of-wall hold downs for entire roof. New roofing package.. Installed in-plane/ out-of-plane seismic connections and
drag beams throughout the entire area of work. Abated existing asbestos encased piping and replaced
with new
. Rehabilitation of existing glulam beams
. Undermined structure and reinforced with new concrete
footings and new full-height concrete pilasters.. Removed existing plate-glass entrance and replaced
with new storefront system with shatterproof glazing.
Architect/
EngineerZCS Engineering127 NW D St.Grants Pass, OR 97526
ClientBlachly School District#90
Contract Amount$1. 5 Million
McCLAIN CONSTRUCTION, LLCP. O. Box51282 . Eugene, OR 97405 . (541)636-4975
ProjectTriangle Lake CharterSchool Seismic RetrofitPhase 2Summer 2020
20264 Blachly Grange Rd.Blachly, OR97412
DescriptionCM/GC Preconstruction/ Construction Method
15, 000 seismic retrofit of an existing school gymnasium andassociated buildings.. Preconstruction and estimating. Constructabjlity reviews for engineer
Development and implementation of Project Schedule. Relocation of water main and main electrical feed to
building. New roof sheathing and top-of-wall hold downs for entire
roof
New 20k square foot roofing package.. Installed in-plane/ out-of-plane seismic connections,
foundation anchor plates, drag beams, and shear wallsthroughout the entire area of work
. Asbestos abatement of flooring and steam pipe
. New breezeway post and beam and seismic connections
. New 300'x 20'x5' rip rap stabilizing buttress wall
. Removed existing unreinforced brick columns, rebuilt,and replaced with corten steel.
Architect/
EngineerZCS Engineering127 NW D St.Grants Pass, OR 97526
ClientBlachly School District#90
Contract Amount$2. 2 Million
McCLAIN CONSTRUCTION, LLCP. O. Box 51282 . Eugene, OR 97405 . (541) 636-4975
5
ProjectIndustrial SourceWinter 20193500 Commercial Ave,
Springfield, OR 97478
Description45, 000 square foot H3 tenant infill of existing concrete tilt-up building and site development:
Preconstruction, estimating, permitting.. Plans, reports, compliance for Hazardous Occupancy. New public restrooms. New retail space and storefront. New sewer and storm
. New Loading Dock
. New stormwater bio swale
. New flammable liquid gases filling station
. Cryogenics piping and accessories installation
. New Server Room
. H3 mechanical full upgrade with night-purge
. PUE and Right-Away connection into City Municipalities
. Self-perform structural steel portal frame seismic up-grade, stairwells, awnings, trash enclosure.
Architect/
EngineerPioneer Engineering1717 Centennial Blvd #9Springfield. OR 97477
ClientEugene Welders SupplyCompany1574W. 6thAve
Contract Amount$3 Million
ProjectMetro Movie TheaterSpring 2019888 Willamette St.Eugene, OR 97401
DescriptionCM/GC Preconstruction/ Construction Method
9, 500 square foot complete overhaul of existing build-ing and tenant infill of 225 seat 3 Movie Theaters, Re-strooms, Commercial Kitchen, Lobby.. Preconstruction and estimating. Complete Seismic upgrade of existing unreinforced
two-story CML) Structure. Full Commercial Kitchen
. Complete overhaul and upgrade of MEPS.
. New exterior corten facade
. New ADA entrance
Architect/
EngineerGMAArchitects
860 W Park St #300Eugene, OR 97401
ClientEdward Schiessl
Owner
Contract Amount$1 Million
McCLAIN CONSTRUCTION, LLCP. O. Box 51282 . Eugene, OR 97405 . (541) 636-4975
7
ProjectBobahead Tea
Corvallis OSU CampusMarch 2020Corvallis, OR
DescriptionCM/GC Preconstruction/ Construction Method
5, 000 square foot tenant infill for tea/ coffee shop.. Preconstruction, design, and estimating. New plumbing plan, waste water, supply lines, and
fixtures
. New electrical plan, rough-in and finish for new elec-trical fixtures and lighting
. New framing, carpentry, casework, and finishes
. HVAC commissioning and startupNew restroom
Architect/
EngineerPioneer Engineering1717 Centennial Blvd #9Springfield, OR 97477
ClientShuang HanOwner
Contract Amount$200,000
McCLAIN CONSTRUCTION, LLCP. O. Box 51282 . Eugene, OR 97405 . (541) 636-4975
ProjectABCSWinter 201990858 La Lone Rd
Springfield, OR 978478
DescriptionCM/GC Preconstruction/ Construction Method
2, 500 square foot ground-up metal building with newsteel structure for chemistry laboratory chemical plant.
. Preconstruction and estimating
. Excavated for footings and slab and poured new2, 500 square foot slab on grade
. Selected, procured, and erected engineered steelstructure
. Design/Build Mechanical, Electrical, Plumbing, andSprinkler essential to laboratory operations
. All new casework, fixtures, and finishes
. Fabricated and installed new steel casework andother steel components
Architect/
EngineerPioneer Engineering1717 Centennial Blvd #9Springfield, OR 97477
ClientABCS Inc.
Contract Amount$1 Million
McCLAIN CONSTRUCTION, LLCP. O. Box 51282 . Eugene, OR 97405 . (541) 636-4975
9
ProjectSublime Solutions, LLCFall 2018500 S. DaneboAveEugene, OR 97402
DescriptionCM/GC Preconstruction/ Construction Method
. Preconstruction and estimating
. Laboratory manufacturing Plant Tenant Infill
. Walk-ln laboratory booth and mechanical backup
Architect/
EngineerPioneer Engineering1717 Centennial Blvd #9Springfield, OR 97477
ClientJ.T. Thompson
Contract Amount$1 Million
MCCLAIN CUNb I RUC-1 ION, LLCP. O. Box 51282 . Eugene, OR 97405 . (541) 636-4975
1C
2. Key Personnel
Charlie McClain
Senior Project Manager/Project Executive
Relevant Qualificationsd Project ManagementD Cost-EstimatingD Value EngineeringD SchedulingD Occupied building experienceD Project PlanningD Fast-Track CM/GC ProjectsD K-12 seismic renovationD Rough/ Finish CarpentryD Welding and Fabncation
Extensive working-knowledgeof Mechanical, Electrical,Plumbing, Steel Fabrication/Erection, and Fire
Suppression Systems.
Years of Experience^ 25
Education/ Training^ Industrial Maintenance
Mechanic Journeyman License#0442755
.^ Limited MaintenanceElectrician JourneymanLicense #5745LME
.^ Universal TechnicianHVAC License #1563
^ Major in Psychology - 3 yearsUniversity of Oregon
McCLAIN CONSTRUCTION, LLCP. O. Box .i1?87 . Eireene, OR 97405 . (541) 636. 4975
MickeyHornbeck SiteSuperintendent/Project Manager
Relevant QualificationsD Project ManagementD Cost-EstimatingD Value EngineeringD SchedulingD Occupied building experienceD Project PlanningD Fast-Track CM/GC ProjectsD K-12 seismic renovationD Extensive knowledge of
design development andconstruction document
interpretation andconstructability.
Years of Experience^ 15
Education/ Training.^ Bachelor of Science
Interior Architecture
/\ft Institute of Pittsburgh-^ Autocad^ Revit Architecture.^ Adobe Creative Suite^ Technical Hand-Drawing^ Rough/ Finish Carpentry^ Mig Welding and Fabrication^ Locksmithing^ Laser Safety Officer Training^ OSHA 30 Training
McCLAIN CONSTRUCTION, LLCP. O. Box ̂ 1282 . Eugene. OR 97405 . f541i 636-1975
7
Denis CacanLead ConstructionForeman
Relevant QualificationsD Over 30 years Lead Equipment
Operator and CivilSuperintendent
D Preconstruction and ValueEngineering
D Expertise in Concrete Formsand Finishing
D Advanced skills in Rough/ FinishCarpentry
d Extensive site prep activitiesknowledge specializing in majorindustrial construction projects
Q Strong supplier andsubcontractor relationships forbest value
Q Extensive knowledge in Hoistingand Rigging
D Commitment to client satisfactionand post-construction warranty
D Proven cost, quality andschedule delivery methods
D High level of commitment tosafety
Years of Experience^ 40
Education/ Training^ CDL License
Expertise in operating G PSEquipment - Including JobModeling and Grade ControlExpert examination of siteconditions and soil analyses.Expert Operator ofexcavators, earth movers,graders, backhoes, and frontloaders.
Capability in supervising ateam of 4 -12 providingtraining to optimize workflowand ensure operationscomply with regulatoryrequirements
Coordinate major equipmentrepairs with vendors andperform daily safety andoperability inspectionsProven cost, quality andschedule delivery methods
^
^
^
^
^
^
P. O.McCLAIN CONSTRUCTION, LLC
Bf" 5128? . Eirepn". OP 0740'i . '541^ fi36-4975
Dan CovenConstruction Foreman
Relevant QualificationsD Over 30 years Field and Shop
Management experienceD Rough/ Finish CarpentryD Seismic/ Structural FabricationD Welding Tig, MigD Hoisting and RiggingD Extensive knowledge in
Structural steel erection and
layout
Relevant Experience -
see appendix
Years of Experience^ 40
Education/ Training^ 10 Welding Certificates for All
Position
o D11 (3) Stick and Wire -Struct Steel
o D15 Stick and Wire -Bridge
o 2G All Positiono D12 (4) Aluminum welds
^ Telescoping boom-crane SSCrane Operator Certificate
.^ Fixed-cab Crane OperatorCertificate
^ Heavy Equipment Operator^ Army Corp of Engineers
Supervisor Quality ControlCertificate
^ Machining^ Heavy Equipment Mechanic
McCLAIN CONSTRUCTION, LLCP 0. 3o<, '51232 . Eui;ene. OR 97405 . i'541i fi36. 4?75
4
3. CM/GM Project Approach
We have a very simple goal as CM/GC for the Yachats Little Log Church andMuseum: to deliver your project on-schedule, within budget, and to provide asafe environment for the community for years to come. Value-engineering for ourprojects starts in preconstruction and continues throughout the course of theproject. We are always looking for innovative ways to create savings for ourclients.
Organizing the Project
> We take a common-sense approach to managing our projects from thebeginning. Our construction managers are all field-trained professionalswho start the project during estimating/preconstruction and manage theproject until the end. We have a very unique construction managementteam that works effectively in all areas of construction - from generallabor, carpentry, miscellaneous construction, to estimating, scheduling,and managing.
> Most problems that arise during construction can be avoided througheffective communication. Our team is well-versed in communication
methods with engineers and construction subcontractors alike. We believethis allows us to avoid common problems that arise during constructionthrough miscommunication.
> We will create an early construction schedule outlining any items with longlead times. Your project at the Yachats Little Log Church and Museummay require early procurement for some crucial building elements, whichwill be included an early work package and schedule. It may be crucial toget a jump on these items to complete the project in a timely schedule.
> Because of our dynamic construction team, McClain Construction haswide-ranging abilities to self-perform demolition, plumbing, HVAC,structural and architectural steel fabrication, rough carpentry, finishcarpentry, earthwork and concrete work.
> Often times an Owner will develop a "Wishlist" of facility improvementneeds that may or may not fall outside the parameters of the designdevelopment stage of the project. Having this list accessible to the CM/GCteam will make it easier for us to allocate savings in the budget to otherareas.
Phasing and Bid Packaging
> Phasing of the project plays a crucial role in rehabilitation work in historicalbuildings. We fully understand that there are some areas of your facilitythat need to be finished with construction and occupied earlier than others.
McCLAIN CONSTRUCTION, LLCP. O. Box 51282 . Eucene. OR 97405 . (5411 636-4975
We recommend identifying the areas of work and their phasing early inpreconstruction. We will help you categorize which areas of your facilitymay be ready for construction before others.
> We have very good relationships with our local sub-trades. As we workthrough constructability reviews, our sub-trades are quickly updated withany changes so that pricing and schedule can be adjusted as needed. Weadvise the selection of sub-trade contractors as early as possible.
Project Management
> The purpose of Project Management is to plan, initiate, implement andtake the project to closure. Our Project Managers have a multitude ofresponsibilities to ensure the project's success.
> We believe the best management of a construction project happens atclose-range. A McClain Construction Project Manager presides over theplanning/preconstruction phases, is on site during construction, andcommunicates progress to the team. This allows open-communication ofproject components to happen in real time, which assists the Project Teamin confidently tracking project schedules and budgets.
>
Organizational Tools
McClain Construction uses project control system task protocol which is afancy way of saying we use check lists on all of our projects. It allows us toassign responsibilities to necessary tasks and attach scheduling andprocesses to it. When the tasks are finished, the responsible party closesout the action item. We manage Requests for Information (RFI's) from theengineer in a very similar fashion.The project control task is also utilized during preconstruction to identifyestimating items and other early construction work items, which can belinked to construction tasks.
>
Problem Solvinfl
Problem solving is really where McClain Construction excels, because wetruly enjoy complex projects that require clean solutions. Our team has adesign and construction knowledge-base that spans most of theconstruction trades.
We firmly believe that the entire team is accountable when solving aproblem, which makes communication the most integral facet to our
McCLAIN CONSTRUCTION, LLCP C. 3'-/ ^1/^/ . F. iy; n,-. i-, ^ r. /4, 's . .^y , :^ ;^.. -. c-5
}
u>a.-ccoc0
.+->
ro
£E(U 0
II'U Eil.1 ^ro d)c s'CO CL
II-s'Im <uJ: a).*.' ^
§sm .§'s ?y croSt
ro od V
</)
s ^ -sS-E"^ESCT 0
" 0c
lsi" i^
0" inPl-Q -n Q9-| mCL ro Q.
,u
j;i JLi
ill
Ill
S I J
iJilSi I i
!.]
u'
r
1U
u
_J
z0I-0=3cr:I-l/^z
Q0^
<
uu
s
U~)rk~-
0^^
0m^0
-^in
%
in
9r-^0'Q;
Ons'c<u-an^
LU.
(Ncor^
inx0
co
;) III