13
ISRAEL ELECTRIC CORPORATION LTD. RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body Assessment of IEC's Natural Gas Systems By independent inspection body Request for Information (RFI)

Assessment of IEC's Natural Gas Systems By independent ...€¦ · ISRAEL ELECTRIC CORPORATION LTD. RFI NO.535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Assessment of IEC's Natural Gas Systems By independent ...€¦ · ISRAEL ELECTRIC CORPORATION LTD. RFI NO.535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection

ISRAEL ELECTRIC

CORPORATION LTD.

RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body

Assessment of IEC's

Natural Gas Systems

By independent inspection body

Request for Information

(RFI)

Page 2: Assessment of IEC's Natural Gas Systems By independent ...€¦ · ISRAEL ELECTRIC CORPORATION LTD. RFI NO.535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection

ISRAEL ELECTRIC

CORPORATION LTD.

RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body

Table of Content

1. Definitions.

2. Project description.

3. Scope of Work.

4. Detailed Requirements.

5. Work location and schedule.

6. PFD of NG system (sample).

7. Questionnaire

Page 3: Assessment of IEC's Natural Gas Systems By independent ...€¦ · ISRAEL ELECTRIC CORPORATION LTD. RFI NO.535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection

ISRAEL ELECTRIC

CORPORATION LTD.

RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body

1. Definitions:

Where used in this RFI, each word or phrase listed below have the definition indicated:

1.1 Israel Electric Corp. Ltd.

1.2 NG – Natural Gas.

1.3 NG Power Station – Electrical Power station which consists of: Gas Valve Station,

Gas skid, Gas Burner System, NG Filters and Pre-heaters, Gas Turbine coupled with

a Steam Turbine (Combined Cycle), NG fired steam boiler, NG fired Auxiliary

Boiler.

1.4 NG distribution System.

1.5 HAZOP – Hazard And Operability study.

1.6 PRMS – Pressure Reduction and Metering System.

1.7 INGL – Israel Natural Gas Lines. (Gas Transmission System)

1.8 NGA – Natural Gas Authority (of Israel).

1.9 P&ID – Piping and Instrumentation Diagrams.

1.10 PFD – Piping Flow Diagram.

1.11 NDT – Non Destructive Testing.

1.12 WPS – Welding Procedures Specification.

1.13 PQR – Procedure Qualification Record.

1.14 WQTR – Welder Qualification Test Record.

1.15 ASME – American Society of Mechanical Engineers.

1.16 CE Stamp - indicates the compliance with European Union Legislation of a product.

1.17 UL Stamp - indicates the compliance with American Standards.

1.18 EP – Engineering plan - NG design submitted to the NGA for approval before

construction.

1.19 Gas Consumers – The final gas user such as Gas turbine, Auxiliary boiler or steam

boiler.

Page 4: Assessment of IEC's Natural Gas Systems By independent ...€¦ · ISRAEL ELECTRIC CORPORATION LTD. RFI NO.535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection

ISRAEL ELECTRIC

CORPORATION LTD.

RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body

2. Project Description:

2.1 The IEC is required by the NGA (Natural Gas Authority) to perform a comprehensive

asset integrity and condition assessment of the Natural Gas Distribution System inside

its power station by an Independent Inspection notified Body to be able to demonstrate

continued system operation at the design conditions. These assessments shall be

performed individually per specific NG power station.

2.2 The following power stations are included in the scope of work:

GAS Consumers Power Station

Two (2) gas turbines and two (2)

Auxiliary boilers

Haifa

Six (6) gas turbines and two (2) Auxiliary

boilers

Hagit

One (1) gas turbine and one (1) Auxiliary

boiler

Alon tavor

Two (2) steam boilers Reading

Six (6) gas turbines and two (2) Auxiliary

boilers

Gezer

One (1) gas turbine and one (1) Auxiliary

boiler

Tzafit

Two (2) gas turbines and one (1)

Auxiliary boilers and four (4) steam

boilers

Eshkol

Seven (7) gas turbines and one (1)

Auxiliary boilers

Ramat Hovav

2.3 Main Parameters for Gas Consumers.

2.3.1 Gas Turbine

Design Pressure: 25 to 40 bars

Design Capacity: 65,000 – 85,000 m3/hr

Design Temperature: –10 to 50°C

Gaz Pipes: 10" dia. 200 to 1,000 m long.

2.3.2 Auxiliary Boilers

Design Pressure: 1 bar (approx.)

Design Capacity: 900 – 1000 m3/hr

Design Temperature: –10 to 50°C

Pipes: 4" dia., 200 m to 1,000 m long (about)

Page 5: Assessment of IEC's Natural Gas Systems By independent ...€¦ · ISRAEL ELECTRIC CORPORATION LTD. RFI NO.535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection

ISRAEL ELECTRIC

CORPORATION LTD.

RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body

2.3.3 Steam Boilers

Design Pressure: 5 to 7 bars

Design Capacity: 65,000 m3/hr (approx.)

Design Temperature: –10 to 50°C

Pipes: 16" dia. to 24", about 500 m long.

It is considered best practice that the comprehensive asset integrity and condition assessment is

undertaken every four years. The reports generated shall contain a definitive list of integrity

condition monitoring activities in association with the prescribed intervals between these activities.

3. Scope of Work: 3.1 Main

a. Contractor should perform, in the agreed time schedule, the comprehensive asset

integrity report and condition assessment of the NG piping & systems inside IEC's

Power Stations listed in Para 2.

b. Contractor shall submit an assessment integrity report for each Power Station site.

c. The NG system boundaries are:

- Start point: pipes at PRMS outlet.

- End points: flanges entering the skids of the Gas Consumers (Gas Turbines or

the auxiliary boiler or the steam boiler).

d. The NG boundaries are shown on the PFD attached (Appendix 2).

e. The report shall cover all aspect of the design, construction, maintenance, and

existing state of the NG systems.

f. Contractor shall receive and review the following documents after signing the

contract:

f.1 The NG system "Engineering Plan", approved for construction

by the NGA.

f.2 The following construction documents will be submitted:

Cathodic Protection Reports.

Pipe Book.

Page 6: Assessment of IEC's Natural Gas Systems By independent ...€¦ · ISRAEL ELECTRIC CORPORATION LTD. RFI NO.535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection

ISRAEL ELECTRIC

CORPORATION LTD.

RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body

Pressure and Leak test.

General Layout of the power stations site.

PFD and P&ID.

NDT reports.

WQTR, WPS and PQR reports.

QC documents.

Risk Assessment Reports.

"As made" drawings.

f.3 Operation Documents.

Procedures

Cathodic protection.

Running and Testing procedure.

Emergency Procedure.

System Log Book.

HAZOP reports.

3.2 Options.

Contractor shall give an optional price for:

- First repeated assessment after 4 or 5 years.

- Second repeated assessment 4 to 5 years later.

Page 7: Assessment of IEC's Natural Gas Systems By independent ...€¦ · ISRAEL ELECTRIC CORPORATION LTD. RFI NO.535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection

ISRAEL ELECTRIC

CORPORATION LTD.

RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body

4. Detailed Requirements:

4.1 The Contractor , being a "Notified Body" shall assess the Natural Gas Systems, pipelines

and related equipment and facilities, under the contract, and shall certify that the system

is constructed, tested, cold commissioned and operates in accordance with the plans,

drawings, specification and permits.

4.2 The Contractor will inspect all the supplied documents and facilities and issue the

Company an "Asset integrity and condition assessment report". This will be forwarded

to the NGA for the purpose of NG final approval.

4.3 Pipelines:

The pipelines (buried or exposed) and buried valve stations integrity assessment is to

include the following, but not limited to, as applicable:

Verification of Design, Construction and Testing:

o Design and Pressure Testing Criteria.

o Pipe As-Made Documentation and Weld Quality.

o Depth of Cover.

o Sleeves.

o Additional Impact Protection.

Site State of Development.

Operation and Maintenance:

o Annual MOP Records.

o Fatigue Life.

o Gas Quality History.

o Corrosion Control.

o Ground Movements.

o Nitrogen-Filled Sleeves.

o Valves.

o Records.

Recommendations.

Implementation Plan of The Recommendations Made.

Page 8: Assessment of IEC's Natural Gas Systems By independent ...€¦ · ISRAEL ELECTRIC CORPORATION LTD. RFI NO.535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection

ISRAEL ELECTRIC

CORPORATION LTD.

RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body

4.4 Above Ground Installations (AGI's):

For each specific AGI, the assessment is to include the following, but is not limited to, all

AGI components and equipment e.g. Pipe Spools, Valves, Filters, Meters, PSV's etc.:

Visual Inspection Report by the Independent Inspection Body.

Routine Check Records.

Functional Check Records.

Major Overhaul Records.

Records of Replacement of Major Items of Equipment.

Valve Maintenance Records.

Control System Check Records.

Equipment and Component Integrity Examination Records.

Corrosion Control/Maintenance Painting Records.

Recommendations and Plan for Implementation.

Page 9: Assessment of IEC's Natural Gas Systems By independent ...€¦ · ISRAEL ELECTRIC CORPORATION LTD. RFI NO.535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection

ISRAEL ELECTRIC

CORPORATION LTD.

RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body

5. Work Location and Schedule:

5.1 The work will include all the Company's NG Power Stations in Israel per the attached map

showing the site location of each power station (see Ap. 1).

5.2 The Contractor will have about 3 months of work to inspect all the necessary facilities and

equipment and issue the relevant approvals for submission.

Page 10: Assessment of IEC's Natural Gas Systems By independent ...€¦ · ISRAEL ELECTRIC CORPORATION LTD. RFI NO.535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection

ISRAEL ELECTRIC

CORPORATION LTD.

RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body

6. PFD of NG system (sample):

Page 11: Assessment of IEC's Natural Gas Systems By independent ...€¦ · ISRAEL ELECTRIC CORPORATION LTD. RFI NO.535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection

ISRAEL ELECTRIC

CORPORATION LTD.

RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body

7. Questionnaire:

1.1 The following information shall be submitted to IEC

Company Information & contact Details

Company Information Point of contact:

Name: Name:

Address: Position:

City / State / Zip: Telephone #:

Website: Email:

1.2 Capabilities

1.3 Company Notification certificates.

Please attach all required documents showing compliance with the work

requested.

1.4 Company description

Year of incorporation:

Area of expertise:

Employees:

Previous Experience (add reference list):

1.5 Budget prices and time schedule

1.5.1 Please describe your preliminary plans for performing the required

"AUDITING".

7.5.2 What could be the expected time table, for each site, to perform:

Page 12: Assessment of IEC's Natural Gas Systems By independent ...€¦ · ISRAEL ELECTRIC CORPORATION LTD. RFI NO.535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection

ISRAEL ELECTRIC

CORPORATION LTD.

RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body

a. Auditing:

b. First site report, submitted for IEC review, comments, and necessary

repairs.

c. Final site report, submitted for the Natural Gas Authority.

7.5.3 Company Budget price for completing the work required, for all eight (8)

sites.

Page 13: Assessment of IEC's Natural Gas Systems By independent ...€¦ · ISRAEL ELECTRIC CORPORATION LTD. RFI NO.535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection

ISRAEL ELECTRIC

CORPORATION LTD.

RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body

SUBMISSION OF RESPONSES :

The responses shall be submitted to ( moshe shitrit)

via the following e – mail: ([email protected]).

DEADLINE FOR SUBMISSION OF RESPONSES:

The deadline for submission is:

DATE: 12/04/2015

TIME: 14:00 (Israeli Time)

LEGAL STATUS OF THIS RFI:

IEC shall be under no obligation to enter any transaction with any party whomsoever

who responds to or participates in any procedure for the Receipt of Information to be

used for the purposes of acquisition of services/equipment/systems/goods or data which

is the subject of the Request for Information (hereinafter referred to as: "RFI") or for

purposes of their development, application, production or construction. . IEC shall be entitled to use the information obtained by way of the RFI, as well as any

data, solution, process, technique or suggestion contained in any of the responses or

documents/response material submitted to IEC related thereto. Without derogating from

the above, IEC shall keep any information/data received from any person responding to

the RFI in strict confidence and shall not permit the use or use same for any purpose than

for its own needs unless such information must be disclosed subject to a right granted by

law.

A response to an RFI shall not bestow upon any person responding thereto (hereinafter

referred to as the "Respondent") any advantage in any procurement procedure, if such

procedure should be publicized at all, and IEC shall not be obliged to include the

Respondent in the procurement process. Any exceptions, changes or additions to these above instructions (whether contained in

any response to the RFI or otherwise) shall be devoid of validity and legal effect and

shall not obligate IEC.

The IEC wishes to thank you for your anticipated participation and cooperation in the successful

completion of this RFI.

Yours sincerely,

Israel Electric Corporation Ltd.