M3.0 Platform
1) Foundation – Concrete reinforced.
2) Assembly of S01 (first part of the static tower).
3) Assembly of S04 (first part of the dynamic tower – telescopic)
4) Assembly of S05/S06 (of dynamic tower).
S01 – Static.
S04,05 and 06 (dynamic)
assembled separately
M3.0 Platform
5) Assembly S02 (of static tower).
6) Assembly S07 (of dynamic tower).
7) Assembly S03 (support of hoists on static tower).
8 ) Positioning of Pulleys support device.
S02 (Static)
S03 (Static)
S07 (Dynamic)
Pulley Device
M3.0 Platform
9) Assembly of Nacelle
10 ) Assembly of rotor
11) Pre commissioning
12) Testing (YAW, Pitch)
Nacelle and Rotor
assembly
M3.0 Platform
13) Ropes connection (for climbing system).
14) Tower raising.
15) Final connection.
16) Final commissioning.
17) Final testing (YAW, Pitch, Rotation, power generation, cooling).
RopesRopes
Hoists
Pulley device
M3.0 Platform
18) Remove the hoists and cables.
19) Connect to the grid.