2.66" INSIDE STIFFENED FLAT BOTTOM TANKS 2.66" OUTSIDE STIFFENED FLAT BOTTOM TANKS 4.00" INSIDE STIFFENED FLAT BOTTOM TANKS 4.00" OUTSIDE STIFFENED FLAT BOTTOM TANKS 2.66" COMMERCIAL HOPPER TANKS 4.00" FARM-COM HOPPER TANKS
ASSEMBLY MANUAL FORLADDERS,
SAFETY CAGES, & PLATFORMS
Owner's ManualManual# PNEG-1096PRINTED: 2/2004
PNEG-1096
3PNEG-1096 Ladder, Safety Cage, & Platforms
2.66" INSIDE STIFF. LADDER SAFETY CAGE & PLATFORM INSTR.LADDER PLACEMENT/PLATFORM SUPPORT ASSEMBLYEXTENSION RAILS/EAVE ADJUSTABLE BRACESPLATFORM & HANDRAIL ASSEMBLY/EAVE SAFETY CAGE2.66" INSIDE STIFFENED TANK LAYOUT2.66" LADDER OFFSET CHARTSAFETY CAGE BELL SECTIONSREST PLATFORM OFFSET LOCATIONINSIDE LADDER PLACEMENT AND SUPPORTS
2.66" OUTSIDE STIFF. LADDER SAFETY CAGE & PLATFORM INSTR.LADDER PLACEMENT/PLATFORM SUPPORT FOR 2-POST/3-PANELLADDER PLACEMENT/PLATFORM SUPPORT FOR 3-POST/3 & 4-PANELEXTENSION RAILS/EAVE ADJUSTABLE BRACESPLATFORM & HANDRAIL ASSEMBLY/EAVE SAFETY CAGE AND EXTENSION2.66" OUTSIDE STIFFENED TANK LAYOUT2.66" LADDER OFFSET CHARTSAFETY CAGE BELL SECTIONSINSIDE LADDER PLACEMENT AND SUPPORTS
4.00" INSIDE STIFF. LADDER SAFETY CAGE & PLATFORM INSTR.LADDER PLACEMENT/PLATFORM SUPPORT ASSEMBLYEXTENSION RAILS/EAVE ADJUSTABLE BRACESPLATFORM & HANDRAIL ASSEMBLY/EAVE SAFETY CAGE AND EXTENSION4.00" INSIDE STIFFENED TANK LAYOUT4.00" LADDER OFFSET CHARTSAFETY CAGE BELL SECTIONSREST PLATFORM OFFSET LOCATIONINSIDE LADDER PLACEMENT AND SUPPORTS
4.00" OUTSIDE STIFF. LADDER SAFETY CAGE & PLATFORM INSTR.LADDER PLACEMENT/PLATFORM SUPPORT ASSEMBLY FOR TANKS 4 - 9 RINGSEXTENSION RAILS/EAVE ADJUSTABLE BRACESPLATFORM & HANDRAIL ASSEMBLY/EAVE SAFETY CAGE AND EXTENSIONSINSIDE LADDER PLACEMENT AND SUPPORTSLADDER PLACEMENT/PLATFORM SUPPORT ASSEMBLY FOR TANKS 10 - 14 RINGSEXTENSION RAILS/EAVE ADJUSTABLE BRACESPLATFORM & HANDRAIL ASSEMBLY4.00" OUTSIDE STIFFENED TANK LAYOUT AND LADDER OFFSET CHARTEAVE SAFETY CAGE & BELL SECTIONSREST PLATFORM OFFSET LOCATIONINSIDE LADDER PLACEMENT AND SUPPORTS
2.66" COMM. HOPPER TANKS (NCHT)2.66" (NCHT) TANK LAYOUT AND LADDER OFFSET CHARTLADDER SUPPORTSACCESS TO SIDEWALL DOOR AND CONNECTED TO HOPPER COLUMNS
2.66" OUTSIDE STIFF. OPTIONAL EXTENTED PLATFORMLADDER PLACEMENTPLATFORM PACKAGE LS-6683PLATFORM PACKAGE LS-6683 CONNECTED TO HOPPER COLUMNS
400" FARM-COM HOPPER TANKS (FCHT)4.00" (FCHT) TANK LAYOUT AND LADDER OFFSET CHARTLADDER PLACEMENTACCESS TO SIDEWALL DOOR AND CONNECTED TO HOPPER COLUMNS
TABLE OF CONTENTS
10-121314-151617181920-21
22-2324-252627-2930313233-34
35-373839-404142434445-46
47-495051-5253-5455-5657585960-616263-64
65-666768
73-747576
69-707172
4 PNEG-1096 Ladder, Safety Cage, & Platforms
SAFETY GUIDELINES
DANGER indicates an imminently hazardous situationwhich, if not avoided, will result in death or serious injury.
This is the safety alert symbol. It is used to alert youto potential personal injury hazards. Obey allsafety messages that follow this symbol to avoidpossible injury or death.
WARNING indicates a potentially hazardous situationwhich, if not avoided, could result in death or serious injury.
NOTE indicates information about the equipment that youshould pay special attention to.
This manual contains information that is important for you, the owner/operator, to know and under-stand. This information relates to protecting personal safety and preventing
equipment problems. It is the responsibility of the owner/operator to inform anyoneoperating or working in the area of this equipment of these safety guidelines. To help you
recognize this information, we use the symbols that are defined below.Please read the manual and pay attention to these sections. Failure to read this manual
and it’s safety instructions is a misuse of the equipment and may lead to serious injury or death.
CAUTION indicates a potentially hazardous situationwhich, if not avoided, may result in minor or moderate injury.
CAUTION used without the safety alert symbol indicates apotentially hazardous situation which, if not avoided, mayresult in property damage.
Safety
5PNEG-1096 Ladder, Safety Cage, & Platforms
Safety
FOLLOW SAFETY INSTRUCTIONS
Carefully read all safety messages in thismanual and safety signs on your equipment.Keep signs in good condition. Replace missingor damaged safety signs. Be sure new equip-ment components and repair parts include thecurrent safety signs. Replacement safety signsare available from the manufacturer.
Never work alone.
If you do not understand any part of this manualand need assistance, contact your dealer. Read ALL Safety Information.
INSTALL EQUIPMENT PROPERLY
This equipment shall be installed in accordancewith the current installation codes andapplicable regulations which should be carefullyfollowed in all cases. Authorities havingjurisdiction should be consulted beforeinstallations are made.
FollowBuildingCodes.
STAY CLEAR OF HOISTED EQUIPMENT
Always use proper lifting/hoistingequipment when assembling ordisassembling equipment.
Do not walk or stand under hoisted equipment.
Always use sturdy and stable supports whenneeded for installation.
CrushHazard.
6 PNEG-1096 Ladder, Safety Cage, & Platforms
Safety
WEAR PROTECTIVE CLOTHING
Wear close fitting clothing and safety equipmentappropriate to the job. Keep hair, loose clothing, &shoestrings away from rotating & moving parts.
Safety glasses should be worn at all times toprotect eyes from debris.
Wear gloves to protect your hands from sharpedges on plastic or steel parts.
A respirator may be needed to prevent breathingpotentially toxic fumes and dust.
Wear hard hat and steel toe boots to help protectyour head and toes from falling debris.
Eye Protection
Gloves
Steel ToeBoots
Respirator
Hard Hat
PREPARE FOR EMERGENCIES
Make sure someone is nearby who is aware ofthe proper emergency procedures in the event ofan accident or emergency.
Be prepared if fire starts.
Keep a first aid kit and fire extinguisher handy.
Keep emergency numbers for doctors, ambu-lance service, hospital, and fire department nearyour telephone. Have Emergency
Equipment Ready.
7PNEG-1096 Ladder, Safety Cage, & Platforms
Roof Disclaimer
Roof Damage Warning and Disclaimer
THE MANUFACTURER DOES NOTWARRANT ANY ROOF DAMAGECAUSED BY EXCESSIVE VACUUMOR INTERNAL PRESSURE FROMFANS OR OTHER AIR MOVINGSYSTEMS. ADEQUATE VENTILATIONAND/OR "MAKEUP AIR" DEVICESSHOULD BE PROVIDED FOR ALLPOWERED AIR HANDLING SYSTEMS.THE MANUFACTURER DOES NOTRECOMMEND THE USE OFDOWNWARD FLOW SYSTEMS(SUCTION). SEVERE ROOF DAMAGECAN RESULT FROM ANY BLOCKAGEOF AIR PASSAGES. RUNNING FANSDURING HIGH HUMIDITY/COLDWEATHER CONDITIONS CAN CAUSEAIR EXHAUST OR INTAKE PORTS TOFREEZE.
8 PNEG-1096 Ladder, Safety Cage, & Platforms
Safety Decal
ATTENTION: The decal shown below should be present on the inside of the two ring door cover, 24"porthole door cover and the roof manway cover. If a decal has been damaged or is missing in any of theselocations contact the manufacturer for a free replacement decal.
DECALSP.O. BOX 20
ASSUMPTION, IL. 62510-0020(217) 226-4421
9PNEG-1096 Ladder, Safety Cage, & Platforms
ATTENTION: The decal shown below should be present on the outside of the two ring door cover, 24”porthole door cover and roof manway cover. If a decal has been damaged or is missing in any of theselocations contact the manufacturer for a free replacement decal.
DECALSP.O. BOX 20
ASSUMPTION, IL. 62510-00020(217)-226-4421
Safety Decal
10 PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 INSIDE STIFFENED
THIS SECTIONFOR 2.66"
CORRUGATEDGRAIN BINS
INSIDE STIFFENED
11PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 INSIDE STIFFENED
All packages have been structured with the correct components for each ring height grainbin from 6 rings to 37 rings. Be sure and follow the complete instruction sheets for correctplacement of parts. Failure to do so may result in improper fit of parts or shortage of parts. Readthrough the complete set of instructions before proceeding with erection of grain bin.Considerable thought must be given as to location of ladders and platforms in relation to otherequipment and structures.
STARTING LOCATION OF LADDERS
Ladder placement is very critical as to assure proper fit of all parts later on as safety cage isbolted in place. Locate the proper place for the roof ladder and manway this will establish thelocation of the ladder. Ladder must be centered directly below the roof ladder. Refer to the dia-gram below for proper location of field drilled holes (3/8"). Holes must be 18 3/4" apart and 8"below the top horizontal row of holes directly in line with the holes to be used for the platformmounting angle. Platform must be located 9 3/8" to the right of the ladder holes. All of thesedimensions are very critical to assure proper fit of all parts!
LADDER SAFETY CAGE, AND PLATFORM INSTRUCTIONS
REV. 9/12/-00
HOLES FOR PLATFORM
18 3/4"18 3/4"
9 3/8"
MANWAY PANEL
ROOF LADDER
FIELD DRILL3/8" HOLES (2)
12 PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 INSIDE STIFFENED
LS-369Brace Angle30 3/4"
LADDER PLACEMENT
Ladder placement on the grain bin is veryimportant at this time. Refer to the diagramat the left and follow the correct dimensions asshown. Ladder standoff must be located8" below the horizontal seam. Check yourladder to make sure the ladder rung dimplesare to the top surface. Attach ladder to thestandoffs using the holes located 6 1/4"from the end of ladder section. Use 5/16" x3/4" bin bolts for these connections. Now allstandoffs must be located in horizontal seamholes (repeating every 32") until reachingthe first rest platform. Refer to the sectionin these instructions that references the loca-tion of intermediate rest platforms for furtherhole locations.
LS-6705Mounting Angle 34"
Horizontal Seam
Ladder SectionLDR-4002
6.1/
4"8
"
8"
Roof Sheet
Outside StandoffLS-121
LS-370Support Angle
REV. 10/9/01
When starting the platform support, youmust attach the mounting angle to thesidewall of the grain bin. Refer back to thefirst page for the correct holes to be usedby the platform. Attach the angle using5/16" x 3/4" bolts and nuts, tighten at thistime. Next, bolt the support angle to themounting angle again using the properholes. Attach the brace angle to themounting angle as shown in the diagramat left. Use 5/16" x 3/4" bolts and nuts forall connections.
PLATFORM SUPPORT ASSEMBLY18 3/4''
13PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 INSIDE STIFFENED
Note: Reference previous page for thefirst ladder standoff starting location.
REF. NO. DESCRIPTION PART NO.1 END TUBE LS-66162 CENTER TUBE LS-66153 SAFETY CAGE BRACKET LS-43494 SAFETY CAGE EXT. RAIL LS-43555 LADDER SECTION LDR-40026 OUTSIDE STANDOFF LS-121
REV. 9/11/01
EXTENSION RAILS Extension rails are provided to extend the side rails of the ladder above the eave of theroof and to support the safety cage at that point. Two rails have been provided, one for eachside of the ladder. Refer to diagram above for proper location and assembly of the extensionrails in relation to the ladder. Use 5/16" x 3/4" bolts and nuts to attach the ladder. Tighten thebolts at this time.
EAVE ADJUSTABLE BRACESAfter extension rails are firmly attached, the adjustable braces must be attached at this
time. A larger diameter tube and two smaller diameter tubes are used to make up oneadjustable brace. Slip the smaller tubes inside the larger tube and attach one smaller tube tothe top of the extension rail. Adjust the other smaller tube so the bottom of the flattened tubereaches the roof rib. Field drill four 5/16" holes through both large and small adjustable tubesand bolt together using 1/4" x 1.1/2" bolts and nuts. This will keep the adjustable brace fromslipping.
Attach the safety cage brackets to the extension rail and ladder as shown in thediagram. Brackets must be placed every 44". This will occur at every ladder joint. Use 5/16" x3/4" bolts and nuts.
6
12
3
4
5
FIELD DRILL 5/16'' HOLES(4) PER BRACE
LS-6696
14 PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 INSIDE STIFFENED
EXTENSION ANGLE DETAIL
LS-373Platform
LS-5283SafetyCage HoopAdapter Angle
LS-6697Safety Cage PlatformExtension Angles(Flours. Green)
LS-294End Handrail24.3/8" (White)
LS-295Front Handrail31.7/8" (Black)
LS-371Platform VerticalAngle 42" (Yellow)
LS-372Vert. Entrance Angle46" (Orange)
PLATFORM AND HANDRAILASSEMBLYStart by attaching the platform itself tothe platform support using 5/16" x 3/4"bolts and nuts. Place all the verticalangles in place, making sure to placethe vertical entrance angle to the leftfront corner of the platform. After all ver-tical angles are in place attach front andside handrails as shown in the diagram.Use 5/16" x 3/4" bolts and nuts in allconnections.
EAVE SAFETY CAGE &INTERMEDIATE REST PLATFORMBefore attaching any pieces to the lad-der or platform some preassembly willbe required. Take the safety cage hoopadjuster plate and the safety cageadapter hoop and bolt together using theproper holes, (as shown on followingpage.) Be sure the proper holes are useddepending on the diameter of the grainbin. Be sure to use the 5/16" x 3/4" boltwith the head of the bolt to the inside ofthe safety cage. Using the improperholes will make the safety cage more dif-ficult to assemble. You may now bolt thisassembly to the safety cage hoop half,tighten bolts as you go. One of the as-semblies will take 2 hoop halves and bepositioned just below the platform asshown in the diagram. Take the assem-bly and attach to the safety cage bracketand to the platform extension angle orthe hoop adapter angle. Refer to the dia-gram for more information. If holes don'talign properly go back and make surethe ladder and platform are correctly po-sitioned on grain bin in relationship to oneanother. Make any corrections necessaryto complete the assembly as shown.
REV. 9/13/01
Platform
LS-5285 SafetyCage HoopAdjuster Plate
LS-5284 Safety CageAdapter Hoop
LS-4351 Safety CageHoof Half
Extension Angle
41" (
Typ.
)
Extension Rails or Ladder(Ladder to be used onIntermediate Platform)
15PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 INSIDE STIFFENED
LS-4353 Safety Cage44" Vertical Support
REV. 9/14/01
EAVE SAFETY CAGE
After all three hoop assemblies are inplace you may attach the 44" verticalsupports from hoop to hoop. This willrequire 10 supports, 5 between eachset of hoops. Again use the trusshead bolts with bolt head to the insideof safety cage.
WHEN ATTACHING SAFETY CAGE TO PLATFORM, THE HOOP ADJUSTER PLATE MUST BE USEDTO COMPENSATE FOR THE DIFFERENT BIN CURVATURES. NOTE: (THIS PLATE IS NOT NEEDED FOR 90' & 105' DIAMETER BINS.) BOLT THE PROPER END TO THE EXTENSION ANGLE OR ADAPTERHOLE. NOW LOCATE PROPER HOLES IN HOOP ADJUSTER PLATE AND BOLT TO THE SAFETY CAGEADAPTER HOOP.
12'-15' 21'-24' 18'
30'-33' 27'
36'-42' 48' 75'-78' 72'
60'
BOLT TOEXTENSIONANGLE ORADAPTERANGLE
LS-4353 Safety Cage44" Vertical Support
LS-6697 SafetyCage PlatformExtension Angle
SAFETY CAGE EXTENSION
The safety cage extension package is designed to beadded on to the bottom of the existing safety cage aboveit. Attach the vertical support pieces to the existing hoophalves above using the 5/16" x 3/4" bolt and nuts. Fastenthe package to the safety cage brackets and attach thebottom of the vertical supports to the hoop halves andtighen bolts. Continue to use the extension packages asthe usage chart reflect on the following page.
Whereas you formerly had all extension packages bundledand listed under the LS-4365LB part number you will nowhave a combination of LS-4366LB (A package of two (2)extension kits) and LS-4365LB (The original single ex-tension kit).
LS-4351Safety CageHoop Half
LS-4349 Safety CageStandard Bracket
16P
NE
G-1096 Ladder, S
afety Cage, &
Platform
s
2.66 INS
IDE
STIFFE
NE
D
A B
A
A
A
B
B
C
C
D
2.66" INSIDE STIFFENED LADDEROFFSET AND PLATFORM LAYOUT
12 RINGS 23 RINGS 32 RINGS 34 RINGS
2nd 13th
12th
10th
2nd
2nd
22nd
19th
27th
2nd
17
LADDER, SAFETY CAGE, AND PLATFORM USAGE LOCATION CHARTTHE CHART ABOVE SHOULD BE IN CONJUNCTION WITH THE DIAGRAMS ON THE PREVIOUS PAGE. FOLLOW THE PROPER LETTERDESIGNATION FROM THE DIAGRAM TO THE CHART FINDING THE PROPER RING GRAIN BIN AND USE THE AMOUNTS OF LADDERSAND SAFETY CAGES SHOWN IN CHART BELOW. FOR SAFETY CAGE BELL SECTION SIZE (22" OR 44") SEE CHART ON FOLLOWINGPAGE.
2.66" INSIDE STIFFENED LADDER OFFSET CHART
LS
-529
3 6
Rin
gs
LS
-529
4 7
Rin
gs
LS
-529
5 8
Rin
gs
LS
-529
6 9
Rin
gs
LS
-529
7 1
0 R
ings
LS
-529
8 1
1 R
ings
LS
-529
9 1
2 R
ings
LS
-530
0 1
3 R
ings
LS
-530
1 1
4 R
ings
LS
-530
2 1
5 R
ings
LS
-530
3 1
6 R
ings
LS
-530
4 1
7 R
ings
LS
-530
5 1
8 R
ings
LS
-530
6 1
9 R
ings
LS
-530
7 2
0 R
ings
LS
-530
8 2
1 R
ings
LS
-530
9 2
2 R
ings
LS
-531
0 2
3 R
ings
LS
-531
1 2
4 R
ings
LS
-531
2 2
5 R
ings
LS
-531
3 2
6 R
ings
LS
-531
4 2
7 R
ings
LS
-531
5 2
8 R
ings
LS
-531
6 2
9 R
ings
LS
-531
7 3
0 R
ings
LS
-531
8 3
1 R
ings
LS
-531
9 3
2 R
ings
LS
-669
3 3
3 R
ings
LS
-669
4 3
4 R
ings
LS
-670
7 3
5 R
ings
LS
-670
8 3
6 R
ings
LS
-670
9 3
7 R
ings
Platform Located in Ring 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2Ladder Section (LDR-4002) 5 5 6 7 7 8 9 6 6 6 6 6 8 8 8 8 9 9 6 6 6 6 9 9 9 9 9 7 7 7 7 7
Bell Safety Cage (LS-4364LB) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Safety Cage Extension - 1 2 3 3 4 5 2 2 2 2 2 4 4 4 4 5 5 2 2 2 2 4 4 4 4 4 3 3 3 3 3
Platform Package 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Eave Safey Cage (LS-5289) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Platform Located in Ring 9 9 9 9 9 11 11 11 11 13 13 9 9 9 9 12 12 12 12 12 10 10 10 10 10Ladder Section (LDR-4002) 6 6 7 8 9 8 9 9 10 9 10 9 9 9 9 8 8 9 9 9 8 8 8 8 8
Bell Safety Cage (LS-4364LB) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Safety Cage Extension 1 1 2 3 4 3 4 4 5 4 5 4 4 4 4 3 3 4 4 4 3 3 3 3 3
Platform Package 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Eave Safey Cage (LS-5289) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Platform Located in Ring 18 18 18 18 20 20 22 22 22 19 19 19 19 19Ladder Section (LDR-4002) 7 8 9 9 9 9 8 9 10 8 8 8 8 8
Bell Safety Cage (LS-4364LB) 1 1 1 1 1 1 1 1 1 1 1 1 1 1Safety Cage Extension 2 3 3 4 3 4 3 4 5 3 3 3 3 3
Platform Package 1 1 1 1 1 1 1 1 1 1 1 1 1 1Eave Safey Cage (LS-5289) 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Platform Located in Ring 27 27 27 27 27Ladder Section (LDR-4002) 7 8 9 9 10
Bell Safety Cage (LS-4364LB) 1 1 1 1 1Safety Cage Extension 2 3 4 4 5
Platform Package 1 1 1 1 1Eave Safey Cage (LS-5289) 1 1 1 1 1
ITEM
B
C
D
PN
EG
-1096 Ladder, Safety C
age, & P
latforms
2.66 INS
IDE
STIFFE
NE
D
18 PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 INSIDE STIFFENED
ITEM
LS-
5293
6
Rin
gs
LS-
5294
7
Rin
gs
LS-
5295
8
Rin
gs
LS-
5296
9
Rin
gs
LS-
5297
10
Rin
gs
LS-
5298
11
Rin
gs
LS-
5299
12
Rin
gs
LS-
5300
13
Rin
gs
LS-
5301
14
Rin
gs
LS-
5302
15
Rin
gs
LS-
5303
16
Rin
gs
LS-
5304
17
Rin
gs
LS-
5305
18
Rin
gs
LS-
5306
19
Rin
gs
LS-
5307
20
Rin
gs
LS-
5308
21
Rin
gs
LS-
5309
22
Rin
gs
LS-
5310
23
Rin
gs
LS-
5311
24
Rin
gs
LS-
5312
25
Rin
gs
LS-
5313
26
Rin
gs
LS-
5314
27
Rin
gs
LS-
5315
28
Rin
gs
LS-
5316
29
Rin
gs
LS-
5317
30
Rin
gs
LS-
5318
31
Rin
gs
LS-
5319
32
Rin
gs
LS-
6693
33
Rin
gs
LS-
6694
34
Rin
gs
LS-
6707
35
Rin
gs
LS-
6708
36
Rin
gs
LS-
6709
37
Rin
gs
Safety Cage Bell Size 44 44 22 22 44 44 22 44 44 44 44 44 22 22 22 22 22 44 44 44 44 44 44 44 44 44 44 44 44 44 44 44
Safety Cage Bell Size 22 44 22 22 22 22 44 44 44 44 22 22 22 22 22 22 22 44 44 44 22 22 22 22 22
Safety Cage Bell Size 22 22 22 44 44 44 44 44 22 22 22 22 22 22
Safety Cage Bell Size 44 44 44 44 44
REV. 9/13/00
22" PACKAGE PART NUMBER IS LS-4363LB44" PACKAGE PART NUMBER IS LS-4364LB
LS-4354 Safety Cage22" Vertical Support
LS-4352 Safety CageBell Hoop Half (Red)
LS-4352 Safety CageBell Hoop Half (Red)
LS-4353 Safety Cage44" Vertical Support
SAFETY CAGE BELL SECTIONS (22" or 44")The safety cage bell section is to be used at the point of termination of the safety cage justabove the rest platforms or the concrete. Refer to the usage chart at the bottom of the page todetermine the correct bell section, attach the vertical supports to the existing hoop halves. Now,fasten the bell safety cage brackets (red) to the ladder (some field drilling may be necessary atthis point.) Attach the special bell safety cage hoop halves to the bell brackets and attach thevertical supports to the bell hoop halves. The vertical supports will have to be bent at the flatarea to allow for the angle of the bell section.BELL SAFETY CAGE LOCATION CHART
THE BELL SAFETY CAGE PACKAGE GOES ON THE BOTTOM OF A RUN OF SAFETY CAGE AND TERMINATESJUST ABOVE THE CONCRETE OR PLATFORM. THE CHART GIVES THE SIZE OF BELL SECTION (22" or 44")TO BE USED WITH THE RUN OF SAFETY CAGE STARTING AT THE TOP RING OF GRAIN BIN COMING DOWNAND ENDING JUST ABOVE THE PLATFORMS AND/OR CONCRETE. FOLLOW THE DIAGRAMS AND THEPROPER LETTER DESIGNATION AND REFERENCE THE CHART BELOW FOR PROPER SAFETY CAGE PLACE-MENT.
19PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 INSIDE STIFFENED
INTERMEDIATE SAFETY CAGE
Follow the instructions refering to the eave safety cage package for this assembly. The onlydifference will be the extension rails in the eave safety cage package. This package will havethe ladder instead.
REST PLATFORM OFFSET LOCATION
Follow the diagram at the left of the page verycarefully to insure proper transition of ladder toplatform to ladder offset. Some field drilling willbe necessary at this point to locate the standoffscorrectly. Pay special attention to the dimensionsgiven. (Holes to be 3/8" dia.) For platform supportassembly reference the platform supportassembly detail.
18.3/4"18.3/4"
9.3/8"
8"
DETAIL "A"
PLATFORM MOUNTING ANGLES
8"
DETAIL "A"
1.000"
REV. 2-15-95
20 PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 INSIDE STIFFENED
LS-121 LADDERSTANDOFFS
16" TYP.
18.3/4"INSIDE LADDER STANDOFFSREQUIREMENTS
Field drilling will be necessary for the standoffslocated in the middle of the sidewall sheet. Drill2 holes 3/8" diameter directly in line with thehorizontal seam holes 18 3/4" apart. Continuedown the sidewall with standoffs at every 16"spacing. Refer to the diagrams at the left.
INSIDE LADDER PLACEMENT
The inside ladder package includesthe ladders and double the amountof standoffs. Begin by positioning theladder directly under the manhole roofpanel and place the standoffs every 16"vertically on the sidewall sheets usingthe horizontal seam holes for every otherhole location. Us 5/16" x 3/4" bin boltsto attach the standoffs to the sidewall ofthe grain bin. Refer to the diagram onthe right.
Manway Sheet
Inside Ladder
INSIDE OF GRAIN BIN
REV. 5-25-95
21PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 INSIDE STIFFENED
SUPPORTS ARE NOT SUPPLIEDBY GRAIN SYSTEMS, INC.
INSIDE LADDER SUPPORTS
After completing the inside ladder it will be necessary to support the bottom of the ladderto the concrete. Depending on the actual installation, the amount of support may vary. Thesupports are not supplied by the manufacturer. Usually the supports can be made of 1" x 1" x 1/8" angle iron bolted directly to the ladder using 2 bolts 5/16" x 1". If a bin sweep is to be used inthe grain bin, other considerations may be necessary to assure there is nointerference with the equipment.
SUPPORTS ARE NOT SUPPLIED BY GSI
22 PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 OUTSIDE STIFFENED
THIS SECTIONFOR 2.66"
CORRUGATEDGRAIN BINS
OUTSIDE STIFFENED
23PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 OUTSIDE STIFFENED
REV. 9/20/00
MANWAY PANEL
ROOF LADDER
TDP-5008NFLOURS.GREEN/BLACK
FIELD DRILL3/8" HOLES (2)
18.3/4"
LADDER SAFETY CAGE, AND PLATFORM INSTRUCTIONSAll packages have been structured with the correct components for each ring height
grain bin from 25'-6" Eave to 98'-7" Eave. Be sure and follow the complete instruction sheetsfor correct placement of parts. Failure to do so may result in improper fit of parts or shortageof parts. Read through the complete set of instructions before proceeding with erection of grainbin. Considerable thought must be given as to location of ladders and platforms in relation toother equipment and structures.
STARTING LOCATION OF LADDERS
Ladder placement is very critical as to assure proper fit of all parts later on as safety cage isbolted in place. Locate the proper place of roof ladder and manway this will establish thelocation of the ladder. Ladder must be centered directly below the roof ladder. Refer to thediagram below for proper location of field drilled holes (3/8"). Holes must be 18 3/4" apart and8" below the top horizontal row of holes directly in line with the holes pre-punched in thehorizontal seam for the first 2 ladder standoff brackets. The diagrams also show that theplatform uses stiffener holes. Both platform vertical support angles must be located in thestiffener holes on 2-post tanks and 1 vertical support angles in stiffener holes on 3-post tanks,as shown in details. These dimensions and locations are very critical to assure proper fit of allparts.
2-POST
24 PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 OUTSIDE STIFFENED
Ladder SectionLDR-4002
Roof Sheet
6.1/
4"
8"
8"
Outside StandoffLS-121
FIELD DRILL3/8" HOLES
FIELD DRILL3/8" HOLES
56.1/4" 4"
18.3/4"
MANWAY SHEET
ROOF LADDER
LADDER PLACEMENTLadder placement on the grain bin is very im-portant at this time. Refer to the diagram at theleft and follow the correct dimensions as shown.Ladder standoff must be located 8" below thehorizontal seam. Check your ladder to make surethe ladder rung dimples are to the top surface.Attach ladder to the standoffs using the holeslocated 6 1/4" from the end of ladder section.Use 5/16" x 3/4" bin bolts for these connections.Now all standoffs must be located in horizontalseam holes (repeating every 32") until reachingthe first rest platform. Refer to the section in theseinstructions that references the location of inter-mediate rest platforms for further hole locations.
25PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 OUTSIDE STIFFENED
3 - POST / 4 -PANEL PER SIDEWALL SHEET
Ladder SectionLDR-4002
Roof Sheet
6.1/
4"
8"
8"
Outside StandoffLS-121
LADDER PLACEMENTLadder placement on the grain bin is very im-portant at this time. Refer to the diagram at theleft and follow the correct dimensions as shown.Ladder standoff must be located 8" below thehorizontal seam. Check your ladder to make surethe ladder rung dimples are to the top surface.Attach ladder to the standoffs using the holeslocated 6 1/4" from the end of ladder section.Use 5/16" x 3/4" bin bolts for these connections.Now all standoffs must be located in horizontalseam holes (repeating every 32") until reachingthe first rest platform. Refer to the section in theseinstructions that references the location of inter-mediate rest platforms for further hole locations.
26 PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 OUTSIDE STIFFENED
Note: Reference previous page for thefirst ladder standoff starting location.
EXTENSION RAILS Extension rails are provided to extend the side rails of the ladder above the eave of
the roof and to support the safety cage at that point. Two rails have been provided, one for eachside of the ladder. Refer to diagram above for proper location and assembly of the extensionrails in relation to the ladder. Use 5/16" x 3/4" bolts and nuts to attach the ladder. Tighten thebolts at this time.
EAVE ADJUSTABLE BRACESAfter extension rails are firmly attached, the adjustable braces must be attached at this
time. A larger diameter tube and two smaller diameter tubes are used to make up one adjust-able brace. Slip the smaller tubes inside the larger tube and attach one smaller tube to the topof the extension rail. Adjust the other smaller tube so the bottom of the flattened tube reachesthe roof rib. Field drill four 5/16" holes through both large and small adjustable tubes and bolttogether using 1/4" x 1.1/2" bolts and nuts. This will keep the adjustable brace from slipping.Attach the safety cage brackets to the extension rail and ladder as shown in the diagram.Brackets must be placed every 44". This will occur at every ladder joint. Use 5/16" x 3/4" boltsand nuts.
REV. 9/21/01
6
12
3
4
5
FIELD DRILL 5/16'' HOLES(4) PER BRACE
REF. NO. DESCRIPTION PART NO.1 END TUBE LS-66162 CENTER TUBE LS-66153 SAFETY CAGE BRACKET LS-43494 SAFETY CAGE EXT. RAIL LS-43555 LADDER SECTION LDR-40026 OUTSIDE STANDOFF LS-121
LS-6696
27PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 OUTSIDE STIFFENED
PLATFORM ASSEMBLY
NOTE: THE PLATFORM SUPPORTS SHOULD BEMOUNTED ON THE BIN FIRST. THE PLATFORM FLOORSHOULD THEN BE ASSEMBLED ONTO THE SUPPORTFRAME. LEAVE PLATFORM SUPPORT TO FLOORBRACE BOLTS LOOSE UNTIL FLOOR AND TOEPLATESARE SECURE.
Assemble the platform support frameusing 5/16" x 3/4" truss head boltsand nuts. When attaching verticalsupports to stiffeners or sidewall,locate the vertical supports accordingto the instructions on previous pages.Now, proceed to the platform floor andhandrails. Align holes on platformfloor with the holes on platform sup-ports and bolt together using 5/16" x3/4" truss head bolts and nuts. Besure and attach platform toe plates atthe same time you attach the platformfloor. Vertical entrance angle will boltto platform floor, toeplate and platformsupport. Handrail post bolts to plat-form floor and toeplate as shown.
NOTE: On 18' and smaller 3 posttanks, move platform support anglesand diagonal support angles awayfrom wall and field drill verticalsupport angle to allow stiffener clearance.
LS-6698PLATFORM SUPPORT
LS-6699 (BROWN) LEFT HANDDIAGONAL SUPPORT ANGLE
TDP-5008N(FL.GREEN/BLACK)VERTICAL SUPPORT ANGLE
LS-6700 (BLUE) RIGHT HANDDIAGONAL SUPPORT ANGLE
LS-6701 (ORANGE)FLOOR BRACE
REV. 10/3/01
LS-6621 (PINK) VERTICALENTRANCE ANGLE (46'')
LS-6702 (RED) HANDRAIL (58'')
TDP-5002 (PINK/BLACK) HANDRAIL (30'')
TDP-5011 PLATFORMTOE PLATE
LS-371 (YELLOW)HANDRAIL POST (2)
LS-6703PLATFORM FLOOR
TDP-5011 PLATFORMTOE PLATE
USE UPPER HOLE IN DIAGONAL BRACE WHENCONNECTING TO PLATFORM SUPPORT
(SEE DETAIL)
BRACE DETAIL
UPPER HOLE
28 PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 OUTSIDE STIFFENED
EAVE SAFETY CAGE
Before attaching any pieces to the ladder or platform, some preassembly will be re-quired. Take the safety cage hoop adjuster plates and bolt them onto the extension angle asshown. Bolt the safety cage adapter hoops and safety cage hoop halves together using theproper holes, as shown. Be sure to use the 5/16" x 3/4" bolt with the head of the bolt to theinside of the safety cage. You may now bolt these assemblies to the safety cage brackets andhoop adjuster plates, tighten bolts as you go. One of the assemblies will take 2 hoop halvesand be positioned just below the platform as shown in the diagram.
44'' TYP.BOTTOM TO BOTTOM
LS-4351 SAFETY CAGEHOOP HALF
LS-5284 SAFETY CAGEHOOP ADAPTERS
LS-5285 SAFETY CAGEHOOP ADJUSTER PLATE
PLATFORM ASSEMBLY
LS-6696 (GREEN)EXTENSION RAIL
LS-6697 (FL. GREEN)EXTENSION ANGLES
LS-6622 SAFETY CAGEHOOP ADJUSTER ANGLE
29PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 OUTSIDE STIFFENED
LS-4353 SAFETY CAGE44" VERTICAL SUPPORT
EXTENSION ANGLE
LS-5286 (FL. GREEN)SAFETY CAGE PLATFORM
LS-4349 SAFETY CAGESTANDARD BRACKET
LS-4353 SAFETY CAGE44" VERTICAL SUPPORT
LS-4351 SAFETY CAGEHOOP HALF
Whereas you formerly had all extension packagesbundled and listed under the LS-4365LB part numberyou will now have a combination of LS-4366LB(A package of two (2) extension kits) and LS-4365LB(The original single extension kit).
VERTICAL SUPPORTS
After all three hoop assemblies are in place youmay attach the 44" vertical supports from hoopassembly to hoop assembly, as shown. This willrequire 14 supports, 7 between each set of hoops.Bolts should have the head of the bolt to the insideof the safety cage.
SAFETY CAGE
Attach the vertical support pieces to the existinghoop halves above using the 5/16" x 3/4" boltsand nuts (with the heads on the inside of the cage).Fasten two hoop halves together and to the safetycage brackets. Bolt the safety cage brackets to theladder, the supports to the hoop halves and tightenbolts. Continue in the same manner.
44" SAFETY CAGE BELL SECTION
The safety cage bell section is to be used at thepoint of termination of the safety cage just abovethe concrete or platform (generally 7 to 8 feet).Attach the vertical supports to the existing hoophalves. Attach the special bell safety cage hoophalves to the brackets and attach to the verticalsupports. Fasten the safety cage brackets to theladder (some field drilling may be required).Tighten all bolts at this time. The vertical supportswill have to be bent at the flat area to allow for theangle of bell section.
LS-4353 SAFETY CAGE44" VERTICAL SUPPORT
LS-4352 SAFETY CAGEBELL HOOP HALF
REV. 9/25/01
LS-6697
30P
NE
G-1096 Ladder, S
afety Cage, &
Platform
s
2.66 OU
TSID
E S
TIFFEN
ED
2.66" OUTSIDE STIFFENED LADDEROFFSET AND PLATFORM LAYOUT
A B
A
A
A
B
B
C
C
D
12 RINGS 23 RINGS 32 RINGS 34 RINGS
2nd 13th
12th
10th
2nd
2nd
22nd
19th
27th
2nd
31
LSO
-25-
06
25'-6
" EA
VE
LSO
-29-
02
29'-2
" EA
VE
LSO
-32-
1012
RIN
GS
32'-1
0" E
AV
ELS
O-3
6-06
13 R
ING
S36
'-6" E
AV
ELS
O-4
0-02
15 R
ING
S40
'-2" E
AV
ELS
O-4
3-10
16 R
ING
S43
'-10"
EA
VE
LSO
-47-
06
47'-6
" EA
VE
LSO
-51-
0219
RIN
GS
51'-2
" EA
VE
LSO
-54-
1020
RIN
GS
54'-1
0" E
AV
ELS
O-5
8-06
22 R
ING
S58
'-6" E
AV
ELS
O-6
2-02
23 R
ING
S62
'-2" E
AV
ELS
O-6
5-10
24 R
ING
S65
'-10"
EA
VE
LSO
-69-
0626
RIN
GS
69'-6
" EA
VE
LSO
-73-
0227
RIN
GS
73'-2
" EA
VE
LSO
-76-
1029
RIN
GS
76'-1
0" E
AV
ELS
O-8
0-06
30 R
ING
S80
'-6" E
AV
ELS
O-8
4-02
32 R
ING
S84
'-2" E
AV
ELS
O-8
7-10
33 R
ING
S87
'-10"
EA
VE
LSO
-91-
0334
RIN
GS
91'-3
" EA
VE
LSO
-94-
1135
RIN
GS
94'-1
1" E
AV
ELS
O-9
8-07
36 R
ING
S98
'-7" E
AV
E
Ladder Section(LDR-4002) 7 8 5 5 6 6 7 7 8 8 9 6 7 7 7 7 8 7 7 7 7Bell Safety Cage(LS-4364LB) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Safety CageExtension 3 4 1 1 2 2 3 3 4 4 5 2 3 3 3 3 4 3 3 3 3Platform Pkg.(LS-6618) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Eave Sfty. Cage(LS-6619) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Ladder Section(LDR-4002) 5 6 6 7 7 8 8 9 10 7 7 7 8 8 8 8 8 8 8Bell Safety Cage(LS-4364LB) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Safety CageExtension 1 2 2 3 3 4 4 5 5 3 3 3 4 4 4 3 3 3 3Platform Pkg.(LS-6618) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Int. Sfty. Cage(LS-6620) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Ladder Section(LDR-4002) 7 7 8 8 9 9 8 8 8 8Bell Safety Cage(LS-4364LB) 1 1 1 1 1 1 1 1 1 1Safety CageExtension 3 3 4 4 5 5 3 3 3 3Platform Pkg.(LS-6618) 1 1 1 1 1 1 1 1 1 1Int. Sfty. Cage(LS-6620) 1 1 1 1 1 1 1 1 1 1
Ladder Section(LDR-4002) 7 8 9 10Bell Safety Cage(LS-4364LB) 1 1 1 1Safety CageExtension 2 3 4 5Platform Pkg.(LS-6618) 1 1 1 1Int. Sfty. Cage(LS-6620) 1 1 1 1
2.66" OUTSIDE STIFFENED LADDER OFFSET CHART
LADDER, SAFETY CAGE, AND PLATFORM USAGE LOCATION CHARTTHE CHART ABOVE SHOULD BE IN CONJUNCTION WITH THE DIAGRAMS ON THE PREVIOUS PAGE. FOLLOW THE PROPER LETTERDESIGNATION FROM THE DIAGRAM TO THE CHART FINDING THE PROPER RING GRAIN BIN AND USE THE AMOUNTS OF LADDERSAND SAFETY CAGES SHOWN IN CHART BELOW. FOR 44" SAFETY CAGE BELL SECTION SEE FOLLOWING PAGE.
ITEM
A
B
C
D
2.66 OU
TSID
E S
TIFFEN
ED
PN
EG
-1096 Ladder, Safety C
age, & P
latforms
32 PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 OUTSIDE STIFFENED
LS-4352 Safety CageBell Hoop Half (Red)
LS-4353 Safety Cage44" Vertical Support
SAFETY CAGE BELL SECTIONSThe safety cage bell section is to be used at the point of termination of the safety cage justabove the rest platforms or the concrete. Fasten the bell safety cage brackets (red) to the ladder(some field drilling may be necessary at this point.) Attach the special bell safety cage hoophalves to the bell brackets and attach the vertical supports to the bell hoop halves. The verticalsupports will have to be bent at the flat area to allow for the angle of the bell section.
THE BELL SAFETY CAGE PACKAGE GOES ON THE BOTTOM OF A RUN OF SAFETY CAGE AND TERMINATESJUST ABOVE THE CONCRETE OR PLATFORM.
REV. 3/25/01
33PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 OUTSIDE STIFFENED
LS-121 LADDERSTANDOFFS
16" TYP.
18.3/4"
INSIDE LADDER PLACEMENT
The inside ladder package includes the ladderand double the amount of standoffs as theoutside ladder package. Begin by positioningthe ladder directly under the manhole roofpanel and place the standoffs every 16" verti-cally on the sidewall sheets using the horizon-tal seam holes for every other hole location.Use 5/16" x 3/4" bin bolts to attach the standoffsto the sidewall of the grain bin. Refer to thediagrams to the left and below.
MANWAY SHEET
INSIDE LADDER
INSIDE OF GRAIN BIN
INSIDE LADDER STANDOFFREQUIREMENTS
Field drilling will be necessary for thestandoffs located in the middle of thesidewall sheet. Drill 2 holes 3/8" diameterdirectly in line with the horizontal seamholes 18.3/4" apart. Continue down thesidewall with standoffs at every 16"spacing. Refer to the diagram.
(See note concerningCommercial Hopper Tanks)
REV. 9/20/00
34 PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 OUTSIDE STIFFENED
INSIDE LADDER SUPPORTS
After completing the inside ladder it will be necessary to support the bottom of the ladderto the concrete. Depending on the actual installation, the amount of support may vary. Thesupports are not supplied by the manufacturer. Usually the supports can be made of 1" x 1" x 1/8" angle iron bolted directly to the ladder using 2 bolts 5/16" x 1". If a bin sweep is to be used inthe grain bin, other considerations may be necessary to assure there is no interference with theequipment.
SUPPORTS ARE NOT SUPPLIEDBY GRAIN SYSTEMS, INC.
SUPPORTS ARE NOT SUPPLIED BY GSI
35PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 INSIDE STIFFENED
THIS SECTIONFOR 4.00"
CORRUGATEDGRAIN BINS
INSIDE STIFFENED
36 PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 INSIDE STIFFENED
HOLES FOR PLATFORM
18.3/4"
18.3/4" 9.3/8"
12"
FIELD DRILL3/8" HOLES (2)
MANWAY PANEL
ROOF LADDER
All packages have been structured with the correct components for each ring heightgrain bin from 4 rings to 24 rings. Be sure and follow the complete instruction sheets forcorrect placement of parts. Failure to do so may result in improper fit of parts or shortage ofparts. Read through the complete set of instructions before proceeding with erection of grainbin. Considerable thought must be given as to location of ladders and platforms in relation toother equipment and structures.
STARTING LOCATION OF LADDERS
Ladder placement is very critical as to assure proper fit of all parts later on as safetycage is bolted in place. Locate the proper place for the roof ladder and manway this willestablish the location of the ladder. Ladder must be centered directly below the roof ladder.Refer to the diagram below for proper location of field drilled holes (3/8"). Holes must be18 3/4" apart and 8" below the top horizontal row of holes directly in line with the holes to beused for the platform mounting angle. Platform must be located 9 3/8" to the right of the ladderholes. All of these dimensions are very critical to assure proper fit of all parts!
LADDER SAFETY CAGE, AND PLATFORM INSTRUCTIONS
REV. 9/18/00
37PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 INSIDE STIFFENED
LADDER PLACEMENT
Ladder placement on the grain bin is veryimportant at this time. Refer to the diagram atthe left and follow the correct dimensions asshown. Ladder standoff must be located 8"below the horizontal seam. Check your ladderto make sure the ladder rung dimples are tothe top surface. Attach ladder to the standoffsusing the holes located 6 1/4" from the end ofladder section. Use 5/16" x 3/4" bin bolts forthese connections. Now all standoffs must belocated in horizontal seam holes (repeatingevery 44") until reaching the first rest platform.Refer to the section in these instructions thatreferences the location of intermediate restplatforms for further hole locations.
Roof Sheet
Ladder SectionLDR-4002
OutsideStandoffsLS-121
8"
8"
6.1/
4"
REV.10/9/01
PLATFORM SUPPORT ASSEMBLY
Horizontal Seam
LS-6705MountingAngle 35"
LS-370Support Angle30.3/4"
LS-369Brace Angle30-3/4"
When starting the platform support, youmust attach the mounting angle to thesidewall of the grain bin. Refer back to thefirst page for the correct holes to be usedby the platform. Attach the angle using5/16" x 3/4" bolts and nuts, tighten at thistime. Next, bolt the support angle to themounting angle again using the properholes. Attach the brace angle to themounting angle as shown in the diagramat left. Use 5/16" x 3/4" bolts and nuts forall connections.
18 3/4''
38 PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 INSIDE STIFFENED
EXTENSION RAILS Extension rails are provided to extend the side rails of the ladder above the eave of
the roof and to support the safety cage at that point. Two rails have been provided, one for eachside of the ladder. Refer to diagram above for proper location and assembly of the extensionrails in relation to the ladder. Use 5/16" x 3/4" bolts and nuts to attach the ladder. Tighten thebolts at this time.
EAVE ADJUSTABLE BRACESAfter extension rails are firmly attached, the adjustable braces must be attached at this
time. A larger diameter tube and two smaller diameter tubes are used to make up oneadjustable brace. Slip the smaller tubes inside the larger tube and attach one smaller tube tothe top of the extension rail. Adjust the other smaller tube so the bottom of the flattened tubereaches the roof rib. Field drill four 5/16" holes through both large and small adjustable tubesand bolt together using 1/4" x 1.1/2" bolts and nuts. This will keep the adjustable brace fromslipping.
Attach the safety cage brackets to the extension rail and ladder as shown in thediagram. Brackets must be placed every 44". This will occur at every ladder joint. Use 5/16" x3/4" bolts and nuts.
REV. 9/25/01
Note: Reference previous page for thefirst ladder standoff starting location.
6
12
3
4
5
FIELD DRILL 5/16'' HOLES(4) PER BRACE
REF. NO. DESCRIPTION PART NO.1 END TUBE LS-66162 CENTER TUBE LS-66153 SAFETY CAGE BRACKET LS-43494 SAFETY CAGE EXT. RAIL LS-43555 LADDER SECTION LDR-40026 OUTSIDE STANDOFF LS-121
LS-6696
39PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 INSIDE STIFFENED
EAVE SAFETY CAGE &INTERMEDIATE REST PLATFORMBefore attaching any pieces to the ladder orplatform some preassembly will be required.Take the safety cage hoop adjuster plate andthe safety cage adapter hoop and bolt to-gether using the proper holes, (as shown onfollowing page.) Be sure the proper holes areused depending on the diameter of the grainbin. Be sure to use the 5/16" x 3/4" bolt withthe head of the bolt to the inside of the safetycage. Using the improper holes will make thesafety cage more difficult to assemble. Youmay now bolt this assembly to the safetycage hoop half, tighten bolts as you go. Oneof the assemblies will take 2 hoop halves andbe positioned just below the platform asshown in the diagram. Take the assembly andattach to the safety cage bracket and to theplatform extension angle or the hoop adapterangle. Refer to the diagram for more infor-mation. If holes don't align properly go backand make sure the ladder and platform arecorrectly positioned on grain bin in relation-ship to one another. Make any correctionsnecessary to complete the assembly asshown.
REV.9/25/01
EXTENSION ANGLE DETAILPLATFORM AND HANDRAILASSEMBLYStart by attaching the platform itself to theplatform support using 5/16" x 3/4" bolts andnuts. Place all the vertical angles in place,making sure to place the vertical entranceangle to the left front corner of the platform.After all vertical angles are in place attachfront and side handrails as shown in the dia-gram. Use 5/16" x 3/4" bolts and nuts in allconnections.
Safety cage platform extension angles andsafety cage hoop adapter angle will be withthe eave safety cage package. These cannow be attached to the vertical entranceangle. Refer to the diagram at the left.
LS-373Platform
LS-5283SafetyCage HoopAdapter Angle
LS-6697Safety Cage PlatformExtension Angles(Flours. Green)
LS-295Front Handrail31.7/8" (Black)
LS-371Platform VerticalAngle 42" (Yellow)
LS-372Vert. Entrance Angle46" (Orange)
Platform
LS-5285 SafetyCage HoopAdjuster Plate
LS-5284 Safety CageAdapter Hoop
LS-4351 Safety CageHoof Half
Extension Angle
41" (
Typ.
)
Extension Rails or Ladder(Ladder to be used onIntermediate Platform)
LS-294Front Handrail24.3/8" (White)
40 PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 INSIDE STIFFENED
WHEN ATTACHING SAFETY CAGE TO PLATFORM, THE HOOP ADJUSTER PLATE MUST BE USEDTO COMPENSATE FOR THE DIFFERENT BIN CURVATURES. NOTE: (THIS PLATE IS NOT NEEDED FOR 90' & 105' DIAMETER BINS.) BOLT THE PROPER END TO THE EXTENSION ANGLE OR ADAPTERHOLE. NOW LOCATE PROPER HOLES IN HOOP ADJUSTER PLATE AND BOLT TO THE SAFETY CAGEADAPTER HOOP.
30'-33' 27'
36'-42'
BOLT TOEXTENSIONANGLE ORADAPTERANGLE
EAVE SAFETY CAGE
After all three hoop assemblies are in placeyou may attach the 44" vertical supports fromhoop to hoop. This will require 10 supports, 5between each set of hoops. Again use the trusshead bolts with bolt head to the inside of safetycage.
48' 75'-78' 72'
60'
LS-4353 Safety Cage44" Vertical Support
LS-6697 SafetyCage PlatformExtension Angle
SAFETY CAGE EXTENSIONThe safety cage extension package is designed to beadded on to the bottom of the existing safety cage aboveit. Attach the vertical support pieces to the existing hoophalves above using the 5/16" x 3/4" bolt and nuts. Fas-ten the package to the safety cage brackets and attachthe bottom of the vertical supports to the hoop halvesand tighen bolts. Continue to use the extension pack-ages as the usage chart reflect on the following page.
Whereas you formerly had all extension packagesbundled and listed under the LS-4365LB part number youwill now have a combination of LS-4366LB (A packageof two (2) extension kits) and LS-4365LB (The originalsingle extension kit).
LS-4351Safety CageHoop Half
LS-4349Safety Cage StandardBracket
LS-4353 Safety Cage44" Vertical Support
REV. 9/25/01
41P
NE
G-1096 Ladder, S
afety Cage, &
Platform
s
4.00 INS
IDE
STIFFE
NE
D
4.00" INSIDE STIFFENED LADDEROFFSET AND PLATFORM LAYOUT
A
B
C
24 RINGS
10th2nd
2nd
A
A
9 RINGS 17 RINGS
2nd 9th
17thB
42P
NE
G-1096 Ladder, S
afety Cage, &
Platform
s
4.00 INS
IDE
STIFFE
NE
D
1-2 1-2 1-2 1-2 1-2 1-2 1-2 1-2 1-2 1-2 1-2 1-2 1-2 1-2 1-2 1-2 1-2 1-2 1-2 1-2 1-2
4 5 6 7 8 9 6 6 7 7 8 8 9 9 6 7 7 8 8 9 9
LDR
-401
9 4
RIN
GS
LDR
-402
0 5
RIN
GS
LDR
-402
1 6
RIN
GS
LDR
-402
2 7
RIN
GS
LDR
-402
3 8
RIN
GS
LDR
-402
4 9
RIN
GS
LDR
-402
5 1
0 R
ING
S
LDR
-402
6 1
1 R
ING
S
LDR
-402
7 1
2 R
ING
S
LDR
-402
8 1
3 R
ING
S
LDR
-402
9 1
4 R
ING
S
LDR
-403
0 1
5 R
ING
S
LDR
-403
1 1
6 R
ING
S
LDR
-403
2 1
7 R
ING
S
LDR
-403
3 1
8 R
ING
S
LDR
-403
4 1
9 R
ING
S
LDR
-403
5 2
0 R
ING
S
LDR
-403
6 2
1 R
ING
S
LDR
-403
7 2
2 R
ING
S
LDR
-403
8 2
3 R
ING
S
LDR
-403
9 2
4 R
ING
S
Platform Located in Ring
Ladder Section(LDR-4002)Bell Safety Cage(LS-4364LB)
Safety Cage Extension
Platform Package
Eave Safety Cage(LS-5289)
ITEM
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
- 1 2 3 4 5 2 2 3 3 4 4 5 5 2 3 3 4 4 5 5
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Platform Located in Ring
Ladder Section(LDR-4002)Bell Safety Cage(LS-4364LB)
Safety Cage Extension
Platform Package
Int. Safety Cage(LS-5290)
6-7 6-7 7-8 7-8 8-9 8-9 9-10 9-10 6-7 7-8 7-8 8-9 8-9 9-10 9-10
6 7 7 8 8 9 9 10 8 8 9 9 9 9 10
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
- 1 2 3 4 5 2 2 3 3 4 4 5 5 2
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Platform Located in Ring
Ladder Section(LDR-4002)Bell Safety Cage(LS-4364LB)
Safety Cage Extension
Platform Package
Int. Safety Cage(LS-5290)
1 1 1 1 1 1 1
1 1 1 1 1 1 1
1 1 1 1 1 1 1
3 3 3 3 4 4 4
8 8 8 8 9 9 9
12-13 13-1414-1515-16 15-16 16-17 17-18
4.00" INSIDE STIFFENED LADDER OFFSET CHART
LADDER, SAFETY CAGE, AND PLATFORM USAGE LOCATION CHARTTHE CHART ABOVE SHOULD BE IN CONJUNCTION WITH THE DIAGRAMS ON THE PREVIOUS PAGE. FOLLOW THE PROPERLETTER DESIGNATION FROM THE DIAGRAM TO THE CHART FINDING THE PROPER RING GRAIN BIN AND USE THE AMOUNTSOF LADDERS AND SAFETY CAGES SHOWN IN CHART.
A
B
C
43PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 INSIDE STIFFENED
SAFETY CAGE BELL SECTIONS
LS-4352 Safety Cage Bell Hoop Half (Red)
LS-4353 Safety Cage44" Vertical Support
SAFETY CAGE BELL SECTIONS
The safety cage bell section is to be used at the point of termination of the safety cage justabove the rest platforms or the concrete. Attach the vertical supports to the existing hoophalves. Now, fasten the bell safety cage brackets (red) to the ladder (some field drilling may benecessary at this point.) Attach the special bell safety cage hoop halves to the bell bracketsand attach the vertical supports to the bell hoop halves. The vertical supports will have to bebent at the flat area to allow for the angle of the bell section.
REV. 10-16-95
44 PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 INSIDE STIFFENED
PLATFORM MOUNTING ANGLES
DETAIL "B"
18.3/4"
18.3/4" 9.3/8"
12"
12"
INTERMEDIATE SAFETY CAGE
Follow the instructions refering to the eave safety cage package for this assembly. The onlydifference will be the extension rails in the eave safety cage package. This package will havethe ladder instead.
REV. 11-15-94
DETAIL "B"
13.0
00"
12.0
00"
REST PLATFORM OFFSET LOCATION
Follow the diagram at the left of the page verycarefully to insure proper transition of ladder toplatform to ladder offset. Some field drilling willbe necessary at this point to locate the standoffscorrectly. Pay special attention to the dimensionsgiven. (Holes to be 3/8" dia.)
45PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 INSIDE STIFFENED
Inside Ladder
INSIDE OF GRAIN BIN
INSIDE LADDER PLACEMENT
The inside ladder package includes the lad-ders and double the amount of standoffs.Begin by positioning the ladder directly un-der the manhole roof panel and place thestandoffs every 22" vertically on the sidewallsheets using the horizontal seam holes forevery other hole location. Us 5/16" x 3/4" binbolts to attach the standoffs to the sidewallof the grain bin. Refer to the diagram on theright.
LS-121 LADDERSTANDOFFS
22" TYP.
18.3/4"
REV. 5-25-95
INSIDE LADDER STANDOFFS REQUIREMENTS
Field drilling will be necessary for the standoffs located inthe middle of the sidewall sheet. Drill 2 holes 3/8" diameterdirectly in line with the horizontal seam holes 18 3/4" apart.Continue down the sidewall with standoffs at every 22"spacing. Refer to the diagrams at the left.
Manway Sheet
46 PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 INSIDE STIFFENED
INSIDE LADDER SUPPORTS
After completing the inside ladder it will be necessary to support the bottom of the ladderto the concrete. Depending on the actual installation, the amount of support may vary. Thesupports are not supplied by the manufacturer. Usually the supports can be made of 1" x 1" x 1/8" angle iron bolted directly to the ladder using 2 bolts 5/16" x 1". If a bin sweep is to be used inthe grain bin, other considerations may be necessary to assure there is nointerference with the equipment.
SUPPORTS ARE NOT SUPPLIEDBY GRAIN SYSTEMS, INC.
SUPPORTS ARE NOT SUPPLIED BY GSI
47PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 OUTSIDE STIFFENED
THIS SECTIONFOR 4.00"
CORRUGATEDGRAIN BINS
OUTSIDE STIFFENED
48 PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 OUTSIDE STIFFENED
LADDER SAFETY CAGE, AND PLATFORM INSTRUCTIONS4 - 9 RINGS ONLY
All packages have been structured with the correct components for each ring heightgrain bin from 4 ring to 9 ring. Be sure and follow the complete instruction sheetsfor correct placement of parts. Failure to do so may result in improper fit of parts or shortageof parts. Read through the complete set of instructions before proceeding with erection of grainbin. Considerable thought must be given as to location of ladders and platforms in relation toother equipment and structures.
STARTING LOCATION OF LADDERSLadder placement is very critical as to assure proper fit of all parts later on as safety cage isbolted in place. Locate the proper place of roof ladder and manway this will establish thelocation of the ladder. Ladder must be centered directly below the roof ladder. Refer to thediagram below for proper location of field drilled holes (3/8"). Holes must be 18 3/4" apart and8" below the top horizontal row of holes directly in line with the holes pre-punched in thehorizontal seam for the first 2 ladder standoff brackets. The diagrams also show that theplatform uses stiffener holes. Both platform vertical support angles must be located in thestiffener holes on 2-post tanks and 1 vertical support angles in stiffener holes on 3-post tanks,as shown in details. These dimensions and locations are very critical to assure proper fit of allparts.
2-POST
REV. 10/9/01
MANWAY PANELROOF LADDER
FIELD DRILL3/8" HOLES (2) 18.3/4"
12.00"
LS-6705
49PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 OUTSIDE STIFFENED
LADDER PLACEMENT
Ladder placement on the grain bin is veryimportant at this time. Refer to the diagram atthe left and follow the correct dimensions asshown. Ladder standoff must be located 8"below the horizontal seam. Check your ladderto make sure the ladder rung dimples are tothe top surface. Attach ladder to the standoffsusing the holes located 6 1/4" from the end ofladder section. Use 5/16" x 3/4" bin bolts forthese connections. Now all standoffs must belocated in horizontal seam holes (repeatingevery 44") until reaching the first rest platform.Refer to the section in these instructions thatreferences the location of intermediate restplatforms for further hole locations.
Roof Sheet
Ladder SectionLDR-4002
OutsideStandoffsLS-121
8"
8"
6.1/
4"
PLATFORM SUPPORT ASSEMBLY
When starting the platform support, youmust attach the mounting angle to thesidewall of the grain bin. Refer back to thefirst page for the correct holes to be usedby the platform. Attach the angle using5/16" x 3/4" bolts and nuts, tighten at thistime. Next, bolt the support angle to themounting angle again using the properholes. Attach the brace angle to themounting angle as shown in the diagramat left. Use 5/16" x 3/4" bolts and nuts forall connections.
REV.10/10/01
LS-6705MountingAngle 34''
Horizontal Seam
LS-370Support Angle30.3/4"
LS-369Brace Angle30-3/4"
50 PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 OUTSIDE STIFFENED
EXTENSION RAILS Extension rails are provided to extend the side rails of the ladder above the eave of
the roof and to support the safety cage at that point. Two rails have been provided, one for eachside of the ladder. Refer to diagram above for proper location and assembly of the extensionrails in relation to the ladder. Use 5/16" x 3/4" bolts and nuts to attach the ladder. Tighten thebolts at this time.
EAVE ADJUSTABLE BRACESAfter extension rails are firmly attached, the adjustable braces must be attached at this
time. A larger diameter tube and two smaller diameter tubes are used to make up oneadjustable brace. Slip the smaller tubes inside the larger tube and attach one smaller tube tothe top of the extension rail. Adjust the other smaller tube so the bottom of the flattened tubereaches the roof rib. Field drill four 5/16" holes through both large and small adjustable tubesand bolt together using 1/4" x 1.1/2" bolts and nuts. This will keep the adjustable brace fromslipping.
Attach the safety cage brackets to the extension rail and ladder as shown in thediagram. Brackets must be placed every 44". This will occur at every ladder joint. Use 5/16" x3/4" bolts and nuts.
REV. 9/25/01
Note: Reference previous page for thefirst ladder standoff starting location.
6
12
3
4
5
FIELD DRILL 5/16'' HOLES(4) PER BRACE
REF. NO. DESCRIPTION PART NO.1 END TUBE LS-66162 CENTER TUBE LS-66153 SAFETY CAGE BRACKET LS-43494 SAFETY CAGE EXT. RAIL LS-43555 LADDER SECTION LDR-40026 OUTSIDE STANDOFF LS-121
LS-6696
51PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 OUTSIDE STIFFENED
EAVE SAFETY CAGE &INTERMEDIATE REST PLATFORMBefore attaching any pieces to the ladder orplatform some preassembly will be required.Take the safety cage hoop adjuster plate andthe safety cage adapter hoop and bolt to-gether using the proper holes, (as shown onfollowing page.) Be sure the proper holes areused depending on the diameter of the grainbin. Be sure to use the 5/16" x 3/4" bolt withthe head of the bolt to the inside of the safetycage. Using the improper holes will make thesafety cage more difficult to assemble. Youmay now bolt this assembly to the safetycage hoop half, tighten bolts as you go. Oneof the assemblies will take 2 hoop halves andbe positioned just below the platform asshown in the diagram. Take the assembly andattach to the safety cage bracket and to theplatform extension angle or the hoop adapterangle. Refer to the diagram for more infor-mation. If holes don't align properly go backand make sure the ladder and platform arecorrectly positioned on grain bin in relation-ship to one another. Make any correctionsnecessary to complete the assembly asshown.
REV.9/25/01
EXTENSION ANGLE DETAILPLATFORM AND HANDRAILASSEMBLYStart by attaching the platform itself to theplatform support using 5/16" x 3/4" bolts andnuts. Place all the vertical angles in place,making sure to place the vertical entranceangle to the left front corner of the platform.After all vertical angles are in place attachfront and side handrails as shown in the dia-gram. Use 5/16" x 3/4" bolts and nuts in allconnections.
Safety cage platform extension angles andsafety cage hoop adapter angle will be withthe eave safety cage package. These cannow be attached to the vertical entranceangle. Refer to the diagram at the left.
LS-373Platform
LS-5283SafetyCage HoopAdapter Angle
LS-6697Safety Cage PlatformExtension Angles(Flours. Green)
LS-295Front Handrail31.7/8" (Black)
LS-371Platform VerticalAngle 42" (Yellow)
LS-372Vert. Entrance Angle46" (Orange)
Platform
LS-5285 SafetyCage HoopAdjuster Plate
LS-5284 Safety CageAdapter Hoop
LS-4351 Safety CageHoof Half
Extension Angle
41" (
Typ.
)
Extension Rails or Ladder(Ladder to be used onIntermediate Platform)
52 PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 OUTSIDE STIFFENED
WHEN ATTACHING SAFETY CAGE TO PLATFORM, THE HOOP ADJUSTER PLATE MUST BE USEDTO COMPENSATE FOR THE DIFFERENT BIN CURVATURES. NOTE: (THIS PLATE IS NOT NEEDED FOR 90' & 105' DIAMETER BINS.) BOLT THE PROPER END TO THE EXTENSION ANGLE OR ADAPTERHOLE. NOW LOCATE PROPER HOLES IN HOOP ADJUSTER PLATE AND BOLT TO THE SAFETY CAGEADAPTER HOOP.
30'-33' 27'
36'-42'
BOLT TOEXTENSIONANGLE ORADAPTERANGLE
EAVE SAFETY CAGE
After all three hoop assemblies are in placeyou may attach the 44" vertical supports fromhoop to hoop. This will require 10 supports, 5between each set of hoops. Again use the trusshead bolts with bolt head to the inside of safetycage.
48' 75'-78' 72'
60'
LS-4353 Safety Cage44" Vertical Support
LS-6697 SafetyCage PlatformExtension Angle
SAFETY CAGE EXTENSIONThe safety cage extension package is designed to beadded on to the bottom of the existing safety cage aboveit. Attach the vertical support pieces to the existing hoophalves above using the 5/16" x 3/4" bolt and nuts. Fas-ten the package to the safety cage brackets and attachthe bottom of the vertical supports to the hoop halvesand tighen bolts. Continue to use the extension pack-ages as the usage chart reflect on the following page.
Whereas you formerly had all extension packagesbundled and listed under the LS-4365LB part number youwill now have a combination of LS-4366LB (A packageof two (2) extension kits) and LS-4365LB (The originalsingle extension kit).
LS-4351Safety CageHoop Half
LS-4349Safety Cage StandardBracket
LS-4353 Safety Cage44" Vertical Support
REV. 9/25/01
53PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 OUTSIDE STIFFENED
INSIDE LADDER PLACEMENT
The inside ladder package includes theladder
and double the amount of standoffs as theoutside ladder package. Begin by positioningthe ladder directly under the manhole roofpanel and place the standoffs every 22" verti-cally on the sidewall sheets using the horizon-tal seam holes for every other hole location.Use 5/16" x 3/4" bin bolts to attach the standoffsto the sidewall of the grain bin. Refer to thediagrams to the left and below.
MANWAY SHEET
INSIDE LADDER
INSIDE OF GRAIN BIN
INSIDE LADDER STANDOFFREQUIREMENTS
Field drilling will be necessary for thestandoffs located in the middle of thesidewall sheet. Drill 2 holes 3/8" diameterdirectly in line with the horizontal seamholes 18.3/4" apart. Continue down thesidewall with standoffs at every 22"spacing. Refer to the diagram.
NOTE: In Commercial Hopper Tanks with inside ladders install brackets at 8" spacing in the bottom two rings.
REV. 9/20/00
LS-121 LADDERSTANDOFFS
22" TYP.
18.3/4"
54 PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 OUTSIDE STIFFENED
INSIDE LADDER SUPPORTS
After completing the inside ladder it will be necessary to support the bottom of the ladderto the concrete. Depending on the actual installation, the amount of support may vary. Thesupports are not supplied by the manufacturer. Usually the supports can be made of 1" x 1" x 1/8" angle iron bolted directly to the ladder using 2 bolts 5/16" x 1". If a bin sweep is to be used inthe grain bin, other considerations may be necessary to assure there is no interference with theequipment.
SUPPORTS ARE NOT SUPPLIEDBY GRAIN SYSTEMS, INC.
SUPPORTS ARE NOT SUPPLIED BY GSI
55PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 OUTSIDE STIFFENED
MANWAY PANEL
ROOF LADDER
TDP-5008NFLO. GREEN/BLACK
FIELD DRILL3/8" HOLES (2)
18.3/4"
LADDER SAFETY CAGE, AND PLATFORM INSTRUCTIONS10 - 14 RINGS ONLY
All packages have been structured with the correct components for each ring heightgrain bin from 10 ring to 14 ring. Be sure and follow the complete instruction sheetsfor correct placement of parts. Failure to do so may result in improper fit of parts or shortageof parts. Read through the complete set of instructions before proceeding with erection of grainbin. Considerable thought must be given as to location of ladders and platforms in relation toother equipment and structures.
STARTING LOCATION OF LADDERSLadder placement is very critical as to assure proper fit of all parts later on as safety cage isbolted in place. Locate the proper place of roof ladder and manway this will establish thelocation of the ladder. Ladder must be centered directly below the roof ladder. Refer to thediagram below for proper location of field drilled holes (3/8"). Holes must be 18 3/4" apart and8" below the top horizontal row of holes directly in line with the holes pre-punched in thehorizontal seam for the first 2 ladder standoff brackets. The diagrams also show that theplatform uses stiffener holes. Both platform vertical support angles must be located in thestiffener holes on 2-post tanks and 1 vertical support angles in stiffener holes on 3-post tanks,as shown in details. These dimensions and locations are very critical to assure proper fit of allparts.
2-POST
REV. 9/25/01
8 "
56 PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 OUTSIDE STIFFENED
LADDER PLACEMENTLadder placement on the grain bin is very im-portant at this time. Refer to the diagram at theleft and follow the correct dimensions as shown.Ladder standoff must be located 8" below thehorizontal seam. Check your ladder to makesure the ladder rung dimples are to the top sur-face. Attach ladder to the standoffs using theholes located 6 1/4" from the end of ladder sec-tion. Use 5/16" x 3/4" bin bolts for these connec-tions. Now all standoffs must be located in hori-zontal seam holes (repeating every 44") untilreaching the first rest platform. Refer to the sec-tion in these instructions that references the lo-cation of intermediate rest platforms for furtherhole locations.
REV. 4/19/01
Roof Sheet
Ladder SectionLDR-4002
OutsideStandoffsLS-121
8"
8"
6.1/
4"
57PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 OUTSIDE STIFFENED
EXTENSION RAILS Extension rails are provided to extend the side rails of the ladder above the eave of
the roof and to support the safety cage at that point. Two rails have been provided, one for eachside of the ladder. Refer to diagram above for proper location and assembly of the extensionrails in relation to the ladder. Use 5/16" x 3/4" bolts and nuts to attach the ladder. Tighten thebolts at this time.
EAVE ADJUSTABLE BRACESAfter extension rails are firmly attached, the adjustable braces must be attached at this
time. A larger diameter tube and two smaller diameter tubes are used to make up oneadjustable brace. Slip the smaller tubes inside the larger tube and attach one smaller tube tothe top of the extension rail. Adjust the other smaller tube so the bottom of the flattened tubereaches the roof rib. Field drill four 5/16" holes through both large and small adjustable tubesand bolt together using 1/4" x 1.1/2" bolts and nuts. This will keep the adjustable brace fromslipping.
Attach the safety cage brackets to the extension rail and ladder as shown in thediagram. Brackets must be placed every 44". This will occur at every ladder joint. Use 5/16" x3/4" bolts and nuts.
REV. 9/25/01
Note: Reference previous page for thefirst ladder standoff starting location.
6
12
3
4
5
FIELD DRILL 5/16'' HOLES(4) PER BRACE
REF. NO. DESCRIPTION PART NO.1 END TUBE LS-66162 CENTER TUBE LS-66153 SAFETY CAGE BRACKET LS-43494 SAFETY CAGE EXT. RAIL LS-43555 LADDER SECTION LDR-40026 OUTSIDE STANDOFF LS-121
LS-6696
58 PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 OUTSIDE STIFFENED
PLATFORM ASSEMBLYNOTE: THE PLATFORM SUPPORTS SHOULD BEMOUNTED ON THE BIN FIRST. THE PLATFORM FLOORSHOULD THEN BE ASSEMBLED ONTO THE SUPPORTFRAME. LEAVE PLATFORM SUPPORT TO FLOORBRACE BOLTS LOOSE UNTIL FLOOR AND TOEPLATESARE SECURE.
Assemble the platform support frameusing 5/16" x 3/4" truss head boltsand nuts. When attaching verticalsupports to stiffeners or sidewall,locate the vertical supports accordingto the instructions on previous pages.Now, proceed to the platform floor andhandrails. Align holes on platformfloor with the holes on platform sup-ports and bolt together using 5/16" x3/4" truss head bolts and nuts. Besure and attach platform toe plates atthe same time you attach the platformfloor. Vertical entrance angle will boltto platform floor, toeplate and platformsupport. Handrail post bolts to plat-form floor and toeplate as shown.
NOTE: On 18' and smaller 3 posttanks, move platform support anglesand diagonal support angles awayfrom wall and field drill verticalsupport angle to allow stiffenerclearance.
LS-6698PLATFORM SUPPORT
LS-6699 (BROWN) LEFT HANDDIAGONAL SUPPORT ANGLE
TDP-5008N(FL.GREEN/BLACK)VERTICAL SUPPORT ANGLE
LS-6700 (BLUE) RIGHT HANDDIAGONAL SUPPORT ANGLE
LS-6701 (ORANGE)FLOOR BRACE
REV. 9/24/01
LS-6621 (PINK) VERTICALENTRANCE ANGLE (46'')
LS-6702 (RED) HANDRAIL (58'')
TDP-5002 (PINK/BLACK) HANDRAIL (30'')
TDP-5011 PLATFORMTOE PLATE
LS-371 (YELLOW)HANDRAIL POST (2)
LS-6703PLATFORM FLOOR
TDP-5011 PLATFORMTOE PLATE
USE UPPER HOLE IN DIAGONAL BRACE WHENCONNECTING TO PLATFORM SUPPORT
(SEE DETAIL)
BRACE DETAIL
UPPER HOLE
59P
NE
G-1096 Ladder, S
afety Cage, &
Platform
s
4.00 OU
TSID
E S
TIFFEN
ED
4.00" OUTSIDE STIFFENED LADDEROFFSET AND PLATFORM LAYOUT
LADDER, SAFETY CAGE, AND PLATFORM USAGE LOCATION CHARTTHE CHART ABOVE SHOULD BE IN CONJUNCTION WITH THE DIAGRAMS ON THiS PAGE. FOLLOW THE PROPER LETTERDESIGNATION FROM THE DIAGRAM TO THE CHART FINDING THE PROPER RING GRAIN BIN AND USE THE AMOUNTS OFLADDERS AND SAFETY CAGES SHOWN IN CHART.
2 2 2 2 2 2 2 2 2 2 2
5 5 6 7 7 5 5 6 6 7 7
LDR
-401
9 4
RIN
GS
LDR
-402
0 5
RIN
GS
LDR
-402
1 6
RIN
GS
LDR
-402
2 7
RIN
GS
LDR
-402
3 8
RIN
GS
LDR
-402
4 9
RIN
GS
LSO
-36-
06 1
0 R
ING
S
LSO
-40-
02 1
1 R
ING
S
LSO
-43-
10 1
2 R
ING
S
Platform Located in Ring
Ladder Section(LDR-4002)Bell Safety Cage(LS-4364LB)
Safety Cage Extension
Platform Package
Eave Safety Cage(LS-5289)
ITEM
1 1 1 1 1 1 1 1 1 1 1
- 1 2 3 4 5 1 2 3 3 3
1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1
9 9 9 9 9
6 6 7 7 7
1 1 1 1 1
2 2 3 3 4
1 1 1 1 1
1 1 1 1 1
Platform Located in Ring
Ladder Section(LDR-4002)
Bell Safety Cage(LS-4364LB)
Safety Cage Extension
Platform Package
Eave Safety Cage(LS-6620)
A
B
A
B
14 RINGS
2nd
A
9 RINGS
2nd
9th
RE
V. 9/26/01
LSO
-47-
06 1
3 R
ING
S
LSO
-51-
02 1
4 R
ING
S
60 PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 OUTSIDE STIFFENED
EAVE SAFETY CAGE
Before attaching any pieces to the ladder or platform, some preassembly will be re-quired. Take the safety cage hoop adjuster plates and bolt them onto the extension angle asshown. Bolt the safety cage adapter hoops and safety cage hoop halves together using theproper holes, as shown. Be sure to use the 5/16" x 3/4" bolt with the head of the bolt to theinside of the safety cage. You may now bolt these assemblies to the safety cage brackets andhoop adjuster plates, tighten bolts as you go. One of the assemblies will take 2 hoop halvesand be positioned just below the platform as shown in the diagram.
44'' TYP.BOTTOM TO BOTTOM
LS-4351 SAFETY CAGEHOOP HALF
LS-5284 SAFETY CAGEHOOP ADAPTERS
LS-5285 SAFETY CAGEHOOP ADJUSTER PLATE
PLATFORM ASSEMBLY
LS-6698 (GREEN)EXTENSION RAIL
LS-6697 (FL. GREEN)EXTENSION ANGLES
LS-6622 SAFETY CAGEHOOP ADJUSTER ANGLE
61PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 OUTSIDE STIFFENED
LS-4353 SAFETY CAGE44" VERTICAL SUPPORT
EXTENSION ANGLE
LS-5286 (FL. GREEN)SAFETY CAGE PLATFORM
LS-4349 SAFETY CAGESTANDARD BRACKET
LS-4353 SAFETY CAGE44" VERTICAL SUPPORT
LS-4351 SAFETY CAGEHOOP HALF
Whereas you formerly had all extension packagesbundled and listed under the LS-4365LB part numberyou will now have a combination of LS-4366LB(A package of two (2) extension kits) and LS-4365LB(The original single extension kit).
VERTICAL SUPPORTS
After all three hoop assemblies are in place youmay attach the 44" vertical supports from hoopassembly to hoop assembly, as shown. This willrequire 14 supports, 7 between each set of hoops.Bolts should have the head of the bolt to the insideof the safety cage.
SAFETY CAGE
Attach the vertical support pieces to the existinghoop halves above using the 5/16" x 3/4" boltsand nuts (with the heads on the inside of the cage).Fasten two hoop halves together and to the safetycage brackets. Bolt the safety cage brackets to theladder, the supports to the hoop halves and tightenbolts. Continue in the same manner.
44" SAFETY CAGE BELL SECTION
The safety cage bell section is to be used at thepoint of termination of the safety cage just abovethe concrete or platform (generally 7 to 8 feet).Attach the vertical supports to the existing hoophalves. Attach the special bell safety cage hoophalves to the brackets and attach to the verticalsupports. Fasten the safety cage brackets to theladder (some field drilling may be required).Tighten all bolts at this time. The vertical supportswill have to be bent at the flat area to allow for tneangle of bell section.
LS-4353 SAFETY CAGE44" VERTICAL SUPPORT
LS-4352 SAFETY CAGEBELL HOOP HALF
REV. 926/01
LS-6697
62 PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 OUTSIDE STIFFENED
INTERMEDIATE SAFETY CAGEFollow the instructions refering to the eave safetycage package for this assembly. The only differencewill be the extension rails in the eave safety cagepackage. This package will have the ladder instead.
REV. 10/10/01
PLATFORM MOUNTING ANGLES
18.3/4"
18.3/4"
9.3/8"
REST PLATFORM OFFSET LOCATIONFollow the diagram above, very carefully toinsure proper transition of ladder to platform toladder offset. Some field drilling will be necessaryat this point to locate the standoffs correctly. Payspecial attention to the dimensions given. (Holesto be 3/8" dia.)
8.00''
9.3/8''
8.00''
UPPERLADDER
LOWERLADDER
63PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 OUTSIDE STIFFENED
INSIDE LADDER PLACEMENT
The inside ladder package includes the ladderand double the amount of standoffs as theoutside ladder package. Begin by positioningthe ladder directly under the manhole roofpanel and place the standoffs every 22" verti-cally on the sidewall sheets using the horizon-tal seam holes for every other hole location.Use 5/16" x 3/4" bin bolts to attach the standoffsto the sidewall of the grain bin. Refer to thediagrams to the left and below.
MANWAY SHEET
INSIDE LADDER
INSIDE OF GRAIN BIN
INSIDE LADDER STANDOFFREQUIREMENTS
Field drilling will be necessary for thestandoffs located in the middle of thesidewall sheet. Drill 2 holes 3/8" diameterdirectly in line with the horizontal seamholes 18.3/4" apart. Continue down thesidewall with standoffs at every 22"spacing. Refer to the diagram.
NOTE: In Commercial Hopper Tanks with inside ladders install brackets at 8" spacing in the bottom two rings.
(See note concerningCommercial Hopper Tanks)
REV. 9/20/00
LS-121 LADDERSTANDOFFS
22" TYP.
18.3/4"
64 PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 OUTSIDE STIFFENED
INSIDE LADDER SUPPORTS
After completing the inside ladder it will be necessary to support the bottom of the ladderto the concrete. Depending on the actual installation, the amount of support may vary. Thesupports are not supplied by the manufacturer. Usually the supports can be made of 1" x 1" x 1/8" angle iron bolted directly to the ladder using 2 bolts 5/16" x 1". If a bin sweep is to be used inthe grain bin, other considerations may be necessary to assure there is no interference with theequipment.
SUPPORTS ARE NOT SUPPLIEDBY GRAIN SYSTEMS, INC.
SUPPORTS ARE NOT SUPPLIED BY GSI
65PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 COMMERCIAL HOPPER TANKS (NCHT)
THIS SECTIONFOR 2.66" CORRUGATEDCOMMERCIAL HOPPER
(NCHT) GRAIN BINS
66 PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 COMMERCIAL HOPPER TANKS (NCHT)
A
A
B
A
B
C
ITEMSECT AION
SECT BION
SECT CION
NOTE:FIRST PLATFORM IS LOCATED INTHE SECOND RING FROM THE TOP.SEE 2.66" OUTSIDE STIFFENEDSECTION FOR GENERAL ASSEMBLY.
LSO
-25-
06
25'-6
" EA
VE
L SO
-29-
02
29'-2
" EA
VE
L SO
-32-
10
32'-1
0" E
AV
EL S
O-3
6-06
36'-6
" EA
VE
L SO
-40-
02
40'-2
" EA
VE
L SO
-43-
10
43'-1
0" E
AVE
L SO
-47-
06
47'-6
" EA
VE
L SO
-51-
02
51'-2
" EA
VE
L SO
-54-
10
54'-1
0" E
AV
EL S
O-5
8-06
58'-6
" EA
VE
L SO
-62-
02
62'-2
" EA
VE
L SO
-65-
10
65'-1
0" E
AV
EL S
O-6
9-06
69'-6
" EA
VE
L SO
-73-
02
73'-2
" EA
VE
L SO
-76-
10
76'-1
0" E
AV
ELS
O-8
0-06
80'-6
" EA
VE
LSO
-84-
02
84'-2
" EA
VE
Ladder Section(LDR-4002) 7 8 5 5 6 6 7 7 8 8 9 6 7 7 7 7 8Bell Safety Cage(LS-4364LB) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Safety CageExtension 3 4 1 1 2 2 3 3 4 4 5 2 3 3 3 3 4Platform Pkg.(LS-6618) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Eave Sfty. Cage(LS-6619) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Ladder Section(LDR-4002) 5 6 6 7 7 8 8 9 10 7 7 7 8 8 8Bell Safety Cage(LS-4364LB) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Safety CageExtension 1 2 2 3 3 4 4 5 5 3 3 3 4 4 4Platform Pkg.(LS-6618) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Int. Sfty. Cage(LS-6620) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Ladder Section(LDR-4002) 7 7 8 8 9 9Bell Safety Cage(LS-4364LB) 1 1 1 1 1 1Safety CageExtension 3 3 4 4 5 5Platform Pkg.(LS-6618) 1 1 1 1 1 1Int. Sfty. Cage(LS-6620) 1 1 1 1 1 1
67PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 COMMERCIAL HOPPER TANKS (NCHT)
44"
TYPICAL
LADDER
SUPPORTCHANNEL
SUPPORTCOLUMN
FIELD DRILL HOLE5/16" X 1.1/4" HDW.
5/16" X 3/4" HDW.
LADDER SUPPORT DETAIL
LADDERSTANDOFF
LADDERBRACKET
15'-21' 45 3 6 15'-18' 60 5 10 21' 60 6 12 24' 45 4 8 27'-30' 40 4 8 27'-30' 45 5 10 36' 40 5 10 36' 45 6 12
OR WELD TOCOLUMN
BinDiameter
Hopper LadderBrackets
No. of SupportChannels
HopperSlope
REV. 9/20/00
68 PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 COMMERCIAL HOPPER TANKS (NCHT)
THE METHOD OF ACCESSING THE SIDEWALL DOOR WILL DEPEND ON HOW THESYSTEM WAS ORDERED.
1. IF A SEPARATE ACCESS PACKAGE FOR THE SIDEWALL DOOR (ONE OF THELSCHT PACKAGES) YOU WILL SIMPLY INSTALL THE SEPARATE RUN OF LADDER,HOPPER LADDER SUPPORTS AND PLATFORM AS SHOWN IN PREVIOUS DETAILS,WITHOUT REGARD TO THE STANDARD ROOF MANWAY LADDER PACKAGE.
2. IF THEY ARE USING THE LSO-ACESPLTF PACKAGE TO ACCESS YOURSIDEWALL DOOR YOU MUST PRECISELY LAYOUT THE ROOF MANWAY AND SIDEWALLMANWAY LOCATIONS SO THAT THE SIDEWALL DOOR MAY BE ACCESSED FROM THELADDER PATH OF ASCENT.
3. DOOR ACCESS PLATFORMS WILL BE MOUNTED DIRECTLY TO THE HOPPERTANK COLUMNS. (AS SHOWN BELOW).
ACCESS TO SIDEWALL DOOR ON COMMERCIAL HOPPER TANK
LS-6698PLATFORM SUPPORT
LS-6699(BROWN) LEFT HAND
DIAGONAL SUPPORT ANGL
TDP-5008N (FL. GREEN/BLACKVERTICAL SUPPORT ANGLE
3-1/2''MINIMUM
LS-6700(BLUE) RIGHT HAND
DIAGONAL SUPPORT ANGLE
LS-6701(ORANGE)
FLOOR BRACE
1/8 6''-24''1/8
FIELD WELD BOTH ANGLES(TDP-5008N) (3 PLCS, 6''LONG @ 24'' C/C EA. SIDE)WHEN ATTACHING THESIDEWALL ACCESS DOORPLATFORM ONLY. PAINTALL FEILD WELDS
6''-24''
REV. 10/3/01
69PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 FARM-COM. HOPPER TANK
THIS SECTIONFOR 4.00" CORRUGATED
FARM-COM HOPPER(FCHT) GRAIN BINS
70 PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 FARM-COM. HOPPER TANK
LSO
-25-
06
25'-6
" EA
VE
LSO
-29-
02
29'-2
" EA
VE
LSO
-32-
10
32'-1
0" E
AV
ELS
O-3
6-06
36'-6
" EA
VE
LSO
-40-
02
40'-2
" EA
VE
LSO
-43-
10
43'-1
0" E
AV
ELS
O-4
7-06
47'-6
" EA
VE
Ladder Section(LDR-4002) 7 8 5 5 6 6 7Bell Safety Cage(LS-4364LB) 1 1 1 1 1 1 1Safety CageExtension 3 4 1 1 2 2 3Platform Pkg.(LS-6618) 1 1 1 1 1 1 1Eave Sfty. Cage(LS-6619) 1 1 1 1 1 1 1
Ladder Section(LDR-4002) 5 6 6 7 7Bell Safety Cage(LS-4364LB) 1 1 1 1 1Safety CageExtension 1 2 2 3 3Platform Pkg.(LS-6618) 1 1 1 1 1Int. Sfty. Cage(LS-6620) 1 1 1 1 1
SECT AION
ITEM
SECT BION
BA
A
NOTE: REFERENCE 4.00"OUTSIDE STIFFENEDSECTION FOR GENERALASSEMBLY.
71PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 FARM-COM. HOPPER TANK
44"
TYPICAL
LADDER
SUPPORTCHANNEL
SUPPORTCOLUMN
FIELD DRILL HOLE5/16" X 1.1/4" HDW.
5/16" X 3/4" HDW.
LADDER SUPPORT DETAIL
LADDERSTANDOFF
LADDERBRACKET
15'-21' 45 3 6 15'-18' 60 5 10 21' 60 6 12 24' 45 4 8
OR WELD TOCOLUMN
BinDiameter
Hopper LadderBrackets
No. of SupportChannels
HopperSlope
REV. 9/26/01
72 PNEG-1096 Ladder, Safety Cage, & Platforms
4.00 FARM-COM. HOPPER TANK
THE METHOD OF ACCESSING THE SIDEWALL DOOR WILL DEPEND ON HOW THESYSTEM WAS ORDERED.
1. IF A SEPARATE ACCESS PACKAGE FOR THE SIDEWALL DOOR (ONE OF THELSCHT PACKAGES) YOU WILL SIMPLY INSTALL THE SEPARATE RUN OF LADDER,HOPPER LADDER SUPPORTS AND PLATFORM AS SHOWN IN PREVIOUS DETAILS,WITHOUT REGARD TO THE STANDARD ROOF MANWAY LADDER PACKAGE.
2. IF THEY ARE USING THE LS0-ACESPLTF PACKAGE TO ACCESS YOUR SIDEWALLDOOR YOU MUST PRECISELY LAYOUT THE ROOF MANWAY AND SIDEWALL MANWAYLOCATIONS SO THAT THE SIDEWALL DOOR MAY BE ACCESSED FROM THE LADDERPATH OF ASCENT.
3. DOOR ACCESS PLATFORMS WILL BE MOUNTED DIRECTLY TO THE HOPPERTANK COLUMNS. (AS SHOWN BELOW).
ACCESS TO SIDEWALL DOOR ON COMMERCIAL HOPPER TANK
LS-6698PLATFORM SUPPORT
LS-6699(BROWN) LEFT HAND
DIAGONAL SUPPORT ANGL
TDP-5008N (FL. GREEN/BLACKVERTICAL SUPPORT ANGLE
3-1/2''MINIMUM
LS-6700(BLUE) RIGHT HAND
DIAGONAL SUPPORT ANGLE
LS-6701(ORANGE)
FLOOR BRACE
1/8 6''-24''1/8
FIELD WELD BOTH ANGLES(TDP-5008N) (3 PLCS, 6''LONG @ 24'' C/C EA. SIDE)WHEN ATTACHING THESIDEWALL ACCESS DOORPLATFORM ONLY. PAINTALL FEILD WELDS
6''-24''
REV. 10/3/01
73PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 (OPTIONAL)
THIS SECTION FOR 2.66"CORRUGATED GRAIN BINS
OPTIONAL - EXTENDEDOUTSIDE STIFFENED
LADDER AND PLATFORMINSTRUCTIONS FOR
COMMERCIAL TANKS ANDCOMMERCIAL HOPPER
TANKS
THE FOLLOWING PAGES SHOW AN OPTIONAL LADDER ANDPLATFORM INSTRUCTIONS.
IF YOU HAVE ANYTHING DIFFERENT FROM WHAT IS TALKEDABOUT IN THIS MANUAL PLEASE CALL THE MANUFACTURER
74 PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 (OPTIONAL)
LADDERSECTIONLDR-4002
LADDER PLACEMENTLadder placement on the grain bin is very important at this time. Refer to the diagrams above andfollow the correct dimensions as shown. Ladder extension must be located 8" below the horizon-tal seam. Check your ladder to make sure the ladder rung dimples are to the top surface. Attachextension bracket (LS-6676) to sidewall. Extension bracket brace and ladder standoff will attachto upper hole in extension bracket, refer to diagrams for orientation. Attach ladder to the standoffsusing the holes located 6 1/4" from the end of ladder section. Use 5/16" x 3/4" bin bolts for theseconnections. Now all extension brackets must be located in horizontal seam holes (repeatingevery 32") until reaching the first rest platform. Extension bracket braces (LS-6704) attach atevery other horizontal seam. Refer to the section in these instructions that references the locationof intermediate rest platforms for further hole locations.
LADDEREXTENSION BRACKET LS-6676
OUTSIDESTAND-OFF LS-121
LADDER EXTENSION BRACKET BRACE
LS-6704
REV. 10/9/01
75PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 (OPTIONAL)
When starting the platform support, you must attach the mounting angle to thesidewall of the grain bin. Refer back to the first page for the correct holes to beused by the platform. Attach the angle using 5/16" x 3/4" bolts and nuts, tightenat this time. Next, bolt the support angle to the mounting angle again using theproper holes. Attach the brace angle to the mounting angle as shown in thediagram at left. Use 5/16" x 3/4" bolts and nuts for all connections.
PLATFORM PACKAGE LS - 6683
ENTRANCE ANGLE (1)LS-6621 58 in. HANDRAIL (2)
LS-6702
38 in. HANDRAIL (2) LS-6677
FLOOR BRACE (4)LS-6701
TOE PLATE (2)LS-6682
RIGHT HAND DIAGONALSUPPORT ANGLE LS-6700
SUPPORT ANGLE (2)LS-6679
SIDEWALL SUPPORT (2)TDP-5008N
76 PNEG-1096 Ladder, Safety Cage, & Platforms
2.66 (OPTIONAL)
FLOOR BRACE (4)LS-6701
SIDEWALL SUPPORT (2)TDP-5008N
SUPPORT ANGLE (2)LS-6679
RIGHT HAND DIAGONALSUPPORT ANGLE LS-6700
HOPPER COLUMN
3. 1/2 in. MINIMUM
PLATFORM PACKAGE LS - 6683 CONNECTION TO A HOPPER TANK
LEFT HAND DIAGONALSUPPORT ANGLE LS-6699
9101239_1_CR_rev7.DOC (revised July 2009)
Limited Warranty
The GSI Group, LLC. (“GSI”) warrants products which it manufactures to be free of defects in materials and workmanship under normal usage and conditions for a period of 12 months after sale to the original end-user or if a foreign sale, 14 months from arrival at port of discharge, whichever is earlier. The end-user’s sole remedy (and GSI’s only obligation) is to repair or replace, at GSI’s option and expense, products that in GSI’s judgment, contain a material defect in materials or workmanship. Expenses incurred by or on behalf of the end-user without prior written authorization from the GSI Warranty Group shall be the sole responsibility of the end-user.
Warranty Extensions: The Limited Warranty period is extended for the following products:
Product Warranty Period
AP Fans and Flooring
Performer Series Direct Drive Fan Motor 3 Years
All Fiberglass Housings Lifetime All Fiberglass Propellers Lifetime
Cumberland Feeding/Watering Systems
Feeder System Pan Assemblies 5 Years ** Feed Tubes (1.75" & 2.00") 10 Years * Centerless Augers 10 Years * Watering Nipples 10 Years *
Grain Systems Grain Bin Structural Design 5 Years Grain Systems Farm Fans Zimmerman
Portable & Tower Dryers 2 Years Portable & Tower Dryer Frames and Internal Infrastructure † 5 Years
GSI further warrants that the portable and tower dryer frame and basket, excluding all auger and auger drive components, shall be free from defects in materials for a period of time beginning on the twelfth (12th) month from the date of purchase and continuing until the sixtieth (60th) month from the date of purchase (extended warranty period). During the extended warranty period, GSI will replace the frame or basket components that prove to be defective under normal conditions of use without charge, excluding the labor, transportation, and/or shipping costs incurred in the performance of this extended warranty.
* Warranty prorated from list price: 0 to 3 years – no cost to end-user 3 to 5 years – end-user pays 25% 5 to 7 years – end-user pays 50% 7 to 10 years – end user pays 75% ** Warranty prorated from list price: 0 to 3 years – no cost to end-user 3 to 5 years – end-user pays 50% † Motors, burner components and moving parts not included. Portable Dryer screens included. Tower Dryer screens not included.
Conditions and Limitations: THERE ARE NO WARRANTIES THAT EXTEND BEYOND THE LIMITED WARRANTY DESCRIPTION SET FORTH ABOVE. SPECIFICALLY, GSI MAKES NO FURTHER WARRANTY OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING, WITHOUT LIMITATION, WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE OR USE IN CONNECTION WITH: (i) PRODUCT MANUFACTURED OR SOLD BY GSI OR (ii) ANY ADVICE, INSTRUCTION, RECOMMENDATION OR SUGGESTION PROVIDED BY AN AGENT, REPRESENTATIVE OR EMPLOYEE OF GSI REGARDING OR RELATED TO THE CONFIGURATION, INSTALLATION, LAYOUT, SUITABILITY FOR A PARTICULAR PURPOSE, OR DESIGN OF SUCH PRODUCTS.
GSI shall not be liable for any direct, indirect, incidental or consequential damages, including, without limitation, loss of anticipated profits or benefits. The sole and exclusive remedy is set forth in the Limited Warranty, which shall not exceed the amount paid for the product purchased. This warranty is not transferable and applies only to the original end-user. GSI shall have no obligation or responsibility for any representations or warranties made by or on behalf of any dealer, agent or distributor.
GSI assumes no responsibility for claims resulting from construction defects or unauthorized modifications to products which it manufactured. Modifications to products not specifically delineated in the manual accompanying the equipment at initial sale will void the Limited Warranty.
This Limited Warranty shall not extend to products or parts which have been damaged by negligent use, misuse, alteration, accident or which have been improperly/inadequately maintained. This Limited Warranty extends solely to products manufactured by GSI.
Prior to installation, the end-user has the responsibility to comply with federal, state and local codes which apply to the location and installation of products manufactured or sold by GSI.
P.O. Box 20Assumption, Il. 62510-0020PHONE: (217)226-4421FAX: (217)226-4420