19
1 Ashraf AbdelKawy Waly Objective: A qualified as a Project Engineer for Management and Administration I am a self- motivated Individual person & an effective communicator who enjoys his work and study. I’ve the pleasure to apply in your reputable organization in order to have the honor of joining your successful team hoping that my qualifications will meet your needs, & the coming is my curriculum vitae: Personal Details: Gender : Male Date of Birth : 18 -10-1988 Place of Birth : Ismailia Nationality : Hungarian /Egyptian (Holding European Union Passport valid in 26 European Countries) Marital Status : Single Military Status : Exempted Religion : Muslim Mobile : +20111 435 56 04 OR +20122 445 56 04 E-mail : [email protected] Drive License : Egyptian driving License Address : Zahraa Nasr City Education: * (June 2010) B.SC in Communication Dept. from faculty of Engineering (New Cairo academy). *GPA: 2.30 (Good) *Graduation project: VOIP application. *Graduation project rank: Very Good. *Electrical Engineer for Communication and Electronics. Job Experience: Current job From November 2011 : www.tecton.co.hu *Project Engineer for Management and Administration in TECTON Architect &Consulting. (Hungary-Slovakia-Romania-Poland-Korea-Egypt)

Ashraf Waly_CV 1

Embed Size (px)

Citation preview

Page 1: Ashraf Waly_CV 1

1

Ashraf AbdelKawy Waly

Objective:

A qualified as a Project Engineer for Management and Administration I am a self-

motivated Individual person & an effective communicator who enjoys his work and

study.

I’ve the pleasure to apply in your reputable organization in order to have the honor of

joining your successful team hoping that my qualifications will meet your needs, & the

coming is my curriculum vitae:

Personal Details:

Gender : Male

Date of Birth : 18 -10-1988

Place of Birth : Ismailia

Nationality : Hungarian /Egyptian (Holding European Union Passport valid in

26 European Countries)

Marital Status : Single

Military Status : Exempted

Religion : Muslim

Mobile : +20111 435 56 04 OR +20122 445 56 04

E-mail : [email protected] Drive License : Egyptian driving License

Address : Zahraa Nasr City

Education:

* (June 2010) B.SC in Communication Dept. from faculty of Engineering (New Cairo

academy).

*GPA: 2.30 (Good)

*Graduation project: VOIP application.

*Graduation project rank: Very Good.

*Electrical Engineer for Communication and Electronics.

Job Experience:

Current job From November 2011 :

www.tecton.co.hu

*Project Engineer for Management and Administration in TECTON Architect &Consulting. (Hungary-Slovakia-Romania-Poland-Korea-Egypt)

Page 2: Ashraf Waly_CV 1

2

General Job Description:

*The company is working in the field of Architect, construction and consulting.

*Project name (SEEG VD COMPLEX) at BENI SEUF KOM ABU RADY (SAMSUNG

ELECTRONICS EGYPT FACTORY)

*Working as a project engineer and management for the entire project.

*Collect all the official papers needed to open the branch for the company at Egypt.

*Opening the branch at Egypt.

*Check tender and design drawing and arrange all procurement as per vendor approval and supervise the activity, monitor the performance of Sub-Constructors during construction and maintenance work carried out on all electrical work. Ensures activity completion is done according to time schedule and meeting the standard of quality

Technical officer & QC Responsibility

1- Checking the Electrical and civil works at the site and make reports. 2- Weekly field report for the client. 3-Controlling the running cost for Tecton Egypt. 4- Controlling the reports for supervision logs and some electrical report. 5-Attend all meetings with subcontractors and gave them the instructions. 6-Submit all the transmittals and controlling all the data. 7-Translating every document refers to our company from Arabic to English. 8-Provides technical input to Operations, Health and Safety, Projects and Maintenance regarding electrical systems, safety and planning. 9- Lead the implementation and operation of all kinds’ of recommended solutions. 10-Responsible for the mining license for buildings and plant operating license and is also responsible for dealing with all government agencies and authorities . 11- Involved in the project to finish the building permit issues.

12- Review and prepare all materials submittals. 13- Follow-up all import of shipment materials and inspect at site. 14-Develop and deliver progress reports, proposals, requirements documentation and presentations. 15-Follow-up all local materials and attend the factory test with our client and do the technical inspection by our company team. 16-Check and review the as-built drawing and submitted to approval by our team. 17- Check the subcontractor monthly payment.

*Travel to any place inside and outside Egypt, as requested by the client. *Controlling all the drawings for the permit issues. *Reporting to the managing director and project manager of the project. *Company partner is SAMSUNG and Our Company is specialist in construction, Architect and consulting.

Page 3: Ashraf Waly_CV 1

3

● Site work Responsibility

Management and supervision the installation work at site from beginning to handing over.

Preparing Daily, Weekly, Monthly Reports.

Responsible to do the Plan and schedule project timelines and milestones using

appropriate tools( Primavera V6,Primavera Contract Management)

Attending the meeting with subcontractors and coordination with other activities including the instructions distribution.

Responsible to fix all commits of quality audit for our client (Samsung electronics head office).

Ensuring that the site activities are being performed in accordance with the

latest approved construction documents as well as the relevant local regulations. Leading the implementation and operation of all kinds’ of recommended solutions.

PROJECT INFORMATION: Project established on area of 365,460 m2 in industrial zone in Kom Abu Rady- Beni Suef, Egypt with total budget cost 87 Million $, and 15 Million $ for Electrical work Part of project plan has been implemented in two phases over area of 111,637 m 2 from total area of 365,460 m2 as follows:

Phase ( I ) - TV Main production building, (SMD Clean room area, injection factory,

warehouse building, main production lines and office area) - Main utility building (Compressors area, dryer area and kinetin area) - EPS building, Silo building and Boilers building - Hazardous chemical materials storage buildings

Phase ( I ) Extension - LCM Clean rooms. & LCM warehouse.

Phase ( II ) - Injection building Main warehouse building

- Press building (Press machines lines, Clean room area, press warehouse and canteen area)

Phase ( II ) Extension - Extension of main production lines & New offices area

Page 4: Ashraf Waly_CV 1

4

Achievements:

- Supervising on all construction work at the site.

-Gave final certificate to use the factory.

-Finish building permit building certificate to the client .

-Finish Use permit Certificate to Samsung Electronics Egypt.

Projects:

1) The Project´s information: (01st of July 2012 until 01st of July 2013) Project Name: SEEG COMPLEX VD (SAMSUNG ELECTRONICS EGYPT FACTORY) Project Location: Kom Abu Rady- Beni Suef, Egypt Floor Area: 32.000 m2 Production Type: LCD Factory Summary of Objects: - Main building (Main line, Storage, Assembly with some clean room, Injection, on

ground floor, and storages on mezzanine floor) - EPS building, utility building, guard house building, waste storage building and

chemical storage building - Open shelter, Connecting Bridges, Cooling water tank, Site Utilities, Road and paving. - with following responsibilities:

1) Controlling and coordinating the internal administration of Consultant (internal

company administration). 2) Checking of Electrical, Mechanical and Civil construction works at the site regarding

standard codes. 3) Preparing Daily, Weekly, Monthly Reports. 4) Preparing Weekly field inspection report. 5) Reviewing the reports for supervision logs. 6) Attending the meetings with subcontractors, including the instructions distribution. 7) Submitting the Transmittals Sheets. 8) Translating the documents (Arabic / English / Hungarian). 9) Transferring technical information referring to Construction, Health and Safety,

Projects and Maintenance regarding electrical systems, safety and planning, based on Consultant´s instructions.

10) Ensuring that the site activities are being performed in accordance with the latest approved construction documents as well as the relevant local regulations. Leading the implementation and operation of all kinds’ of recommended solutions.

Page 5: Ashraf Waly_CV 1

5

11) Participating on Permit process for buildings (Building Permit and Use Permit License) including the coordination during permit process between the involved government agencies and authorities, including the drawings coordination.

12) Reporting (via weekly reports, site inspection reports) to the Local Consultant and Client regarding to the status of field construction works and administration.

2) The Project´s information: (01st of August 2013 until 01st of September 2013) Construction work Project Name: SEPM – New Storage Project Project Location: Adama Mickiewicza 52, 64-510 Wronki, Poland Floor Area: 5.000 m2 Summary of Objects: - Main building (Storage Area, Social / Administration Area) - Site Utilities, Road and paving, Truck Parking.

With following training schedule:

- Assistance for internal company administration for Design-Builder. - Assistance for Civil, Mechanical and Electrical Works coordination. - Assistance for Sub-Contractors´ works coordination. - Assistance for reporting, including internal reporting, reporting to Owner (daily,

Weekly, Monthly reports) - Assistance for Submittals and Transmittals Sheets.

3) The Project´s information: (01st of September 2013 until 01st of November 2014) Project Name: SEEG-Metal Press Factory Project (SAMSUNG ELECTRONICS

EGYPT FACTORY) Project Location: Kom Abu Rady- Beni Suef, Egypt Floor Area: 36.000 m2 Production Type: LCD Factory Summary of Objects: - Main building-Press Building (Main line, Storage, Assembly with some clean room,

canteen area, and storages on mezzanine floor) - Injection building (office area, injection, on ground floor ) - Warehouse building, utility building, waste storage building and chemical storage

building - Open shelter, Connecting Bridges, Cooling water tank, Site Utilities, Road and paving.

Page 6: Ashraf Waly_CV 1

6

4) The Project´s information: (01st of June 2014 until 01st of November 2014)

Project Name: – New Extension Building Project Location: Kom Abu Rady- Beni Suef, Egypt Floor Area: 5.000 m2 Summary of Objects: - Main building (Storage Area, Social / Administration Area/HR Area) - Site Utilities, Road and paving, Truck Parking.

My position was upgraded to Senior Project Engineer for Management and

Administration in November 2014

July 2010 – October 2011

* A sales Engineer in Global Advanced System

* Technical Engineer and assistant director in Global Advanced System.

Job Description:

*The company is working in the field of engineering supplies in (Civil, Communication,

Electronics, Mechanical and Medical Engineering)

*Working to solve the problems of the corporate network.

*Participate in all tenders of the company.

*Work on the applications required by customers. Example: (new equipment or parts,

whether original in any field of engineering) through searching on the Internet.

*Showing prices on managers.

*Travel to any place inside and outside Egypt, as requested by the client.

*Work in the field of maintenance, especially in the field of printing press, and Metro

Card.

Technical Proficiencies :

* Routers (3000, 2600, 2500)

* Cisco Switches (3500, 2900)

* Cisco Pix Firewalls, VPN Concentrator, Cisco IOS Firewall

Page 7: Ashraf Waly_CV 1

7

* Routing Protocol (BGP4, OSPF, EIGRP, IGRP, RIPv1, v2, IS-IS), Routed Protocol

(TCP/IP, IPv6 IPX/SPX).

* Implementation of HSRP, DHCP, DNS, FTP, TFTP.

Achievements:

- Supervising on manufacturing (inverter and rectifier Equipments) to connect the 2nd

line Metro with the 1st line Metro in Cairo / Egypt.

- Manufacturing cabins consist of (static switch and inverter) used in Metro line in Cairo

/ Egypt.

- Supervising on the production of (PCP multilayer cards) for Metro cards.

Courses:

*(2007) I have successfully completed the ICDL Course at the American University in

Cairo, Grade: 96%.

*( 2009 ) I took a CCNA ( Cisco Certified Network Associate) on progress.

*( 2010 ) I took a CCIP ( Cisco Certified Internetworking Professional ) on progress.

*( 2010 ) I took a C-voice on progress.

*(2015) PMP (Project Management Professional) preparation course. (January-

March,2015).

*(2015) PRIMVERA PROJECT MANAGEMENT LEVEL 1(April.2015)

*(2015) PRIMVERA PROJECT MANAGEMENT LEVEL2 (May 2015)

*(2015) PRIMVERA CONTRACT MANAGEMENT (PCM) (June 2015)

Languages:

English: Fluent in spoken and written.

Hungarian: Fluent in Spoken and written

Arabic: Native Language.

Computing Skills and personal Qualities:

*Proficient user of Microsoft Word and Excel.

*Hard working reliable.

*Cheerful and excellent in a team environment.

*Willing to train and gain further qualifications.

*Keen and enthusiastic.

* Punctual and accurate.

Page 8: Ashraf Waly_CV 1

8

Summary of Training Experience:

* I took a training course in SUEZ OIL COMPANY from July 7th.08: July 14th. 08

*I have attended a theoretical training course and technical visit in water desalination and

treatment in HUNGARY from July 2nd. 2007: July 16th.2007.

* I took training from 2012~2013 for company internal administration, project

management and site works assistance in Tecton Hungary Kft at HUNGARY.

Hobbies:

Reading, Listening to Music, swimming & traveling.

""II HHOOPPEE MMYY QQUUAALLIIFFIICCAATTIIOONNSS MMEEEETT YYOOUURR RREEQQUUIIRREEMMEENNTTSS""

Page 9: Ashraf Waly_CV 1

9

Page 10: Ashraf Waly_CV 1

10

Page 11: Ashraf Waly_CV 1

11

Page 12: Ashraf Waly_CV 1

12

Page 13: Ashraf Waly_CV 1

13

Page 14: Ashraf Waly_CV 1

14

Page 15: Ashraf Waly_CV 1

15

Page 16: Ashraf Waly_CV 1

16

Page 17: Ashraf Waly_CV 1

17

Page 18: Ashraf Waly_CV 1

18

Page 19: Ashraf Waly_CV 1

19