Asheville Regional Airport 2019 APMS Update 1 RDM International, Inc. Chantilly, Virginia Provided by the NCDOT: Inspection Report For Asheville Regional Airport (AVL) Prepared By: FINAL SUBMISSION December 2019

Asheville Regional Airport (AVL) - NCDOT · 2020. 2. 20. · It should be noted that the section designations for AVL do not match the names shown on the current airport diagram due

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • Asheville Regional Airport 2019 APMS Update

    1

    RDM International, Inc.

    Chantilly, Virginia

    Provided by the NCDOT:

    Inspection Report

    For

    Asheville Regional

    Airport (AVL)

    Prepared By:

    FINAL SUBMISSION

    December 2019

  • Asheville Regional Airport 2019 APMS Update

    i

    Project Team Members

    Prepared By:

    RDM International, Inc.

    14310 Sullyfield Circle, Suite 600

    Chantilly, VA 20151

    (207) 620-3280

    www.rdmintlinc.com

    In Association With:

    Jacobs

    111 Corning Road, Suite 116

    Cary, NC 27518

    (919) 859-5001

    www.jacobs.com

    Prepared For:

    North Carolina Department of Transportation

    Division of Aviation

    1050 Meridian Drive

    Morrisville, NC 27560

    (919) 814-0550

    www.ncdot.gov/divisions/aviation

  • Asheville Regional Airport 2019 APMS Update

    ii

    TABLE OF CONTENTS

    INTRODUCTION .......................................................................................................................... 1

    PAVEMENT INVENTORY .......................................................................................................... 3

    Pavement Inventory Definition ................................................................................................... 3

    Pavement Inventory by Branch Use ........................................................................................... 3

    PAVEMENT CONDITION EVALUATION CRITERIA ............................................................. 5

    Pavement Condition Survey ....................................................................................................... 5

    Typical Pavement Life Cycle ..................................................................................................... 6

    Prediction Models and Condition Forecasts ............................................................................... 6

    PAVEMENT CONDITION RESULTS ......................................................................................... 8

    Overall Current Condition .......................................................................................................... 8

    Condition Forecast Results ....................................................................................................... 10

    Branch Level Deterioration Curves by Branch Use ................................................................. 11

    Summary of Condition Results ................................................................................................. 13

    PAVEMENT PROJECT IDENTIFICATION CRITERIA .......................................................... 16

    APPENDIX A - DETERIORATION CURVES......................................................................... A-1

    APPENDIX B - INSPECTION PHOTOS .................................................................................. B-1

    APPENDIX C - ASTM D5340-12 DISTRESS BOOKLET ...................................................... C-1

    LIST OF FIGURES

    Figure 1: Typical Pavement Life Cycle .......................................................................................... 6

    Figure 2: Application of Pavement Condition Deterioration Model .............................................. 7

    Figure 3: PCI Rating Distribution of All Airfield Pavements ........................................................ 8

    Figure 4: PCI Rating Distribution for 2024 Projected Conditions ............................................... 10

    Figure 5: Estimated Annual Condition Plot (Overall) .................................................................. 11

    Figure 6: Estimated Annual Condition Plot (Runways) ............................................................... 12

    Figure 7: Estimated Annual Condition Plot (Taxiways)............................................................... 12

    Figure 8: Estimated Annual Condition Plot (Aprons) .................................................................. 13

    Figure 9: Estimated Annual Condition Plot (Helipads) ................................................................ 13

    LIST OF TABLES

    Table 1: Pavement Inventory by Branch Use ................................................................................. 3

    Table 2: PCI Rating Categories and Repair Types ......................................................................... 5

    Table 3: PCI Rating Distribution of all Airfield Pavements ........................................................... 8

    Table 4: Area-Weighted Conditions by Branch Use ...................................................................... 8

    Table 5: PCI Rating Distribution for 2024 Projected Conditions ................................................. 10

    Table 6: Projected 2024 Area-Weighted Conditions by Branch Use ........................................... 11

    Table 7: Previous, Current and Projected PCI Values .................................................................. 14

    Table 8: Critical PCI Values ......................................................................................................... 16

  • Asheville Regional Airport 2019 APMS Update

    iii

    Table 9: Recommended Action Category by Pavement Section .................................................. 16

    LIST OF MAPS

    Map 1: Network Identification Map ............................................................................................... 4

    Map 2: 2019 Pavement Condition Index Map ................................................................................ 9

  • Asheville Regional Airport 2019 APMS Update

    1

    INTRODUCTION

    RDM International, Inc. (RDM) and Jacobs, under contract with the North Carolina Department

    of Transportation, Division of Aviation (NCDOA), performed an update to the Statewide Airport

    Pavement Management System (APMS). An APMS is a systematic approach to provide

    recommendations for actions required to maintain a pavement network at an acceptable level of

    service while minimizing the cost of maintenance and repair. The APMS is used to evaluate the

    present condition of pavement and predict future deterioration through the use of pavement

    condition indicators. The NCDOA has conducted routine updates to the statewide APMS since

    the 1990s to track pavement inventory and deterioration of all airfield pavements. The results of

    the APMS assist the NCDOA and individual airport management agencies to identify system

    needs and make programming decisions for funding.

    As part of this project, RDM performed a pavement inspection at Asheville Regional Airport

    (AVL) in January 2019. This inspection was performed according to the Pavement Condition

    Index (PCI) evaluation methodology set forth in the Federal Aviation Administration (FAA)

    Advisory Circular 150/5380-7B, “Airport Pavement Management Program (PMP)” and ASTM

    D5340-12, “Standard Airport Pavement Condition Index Surveys.”

    During this evaluation, the following tasks were performed:

    • Records Review: To organize, catalogue, and determine as-built pavement thickness,

    composition data, and last construction date (LCD).

    • Pavement Network Definition Update: Based on the findings of the records review, the

    pavement network was updated.

    • Pavement Condition Survey: RDM performed a pavement condition survey to

    determine the current and future functional conditions.

    o Quantify the types, severities and amount of distresses present in the pavement’s

    surface.

    o Capture photographs of typical pavement distresses and overall condition.

    • Pavement Analysis: To evaluate the pavement condition and identify maintenance and

    rehabilitation needs.

    • Maintenance and Rehabilitation (M&R) Plan Development: To develop a prioritized

    5-year comprehensive maintenance and rehabilitation program for maintaining and

    improving the overall condition of the statewide airport pavement system.

    This report presents the pavement evaluation results for Asheville Regional Airport, which can

    be used by the airport and NCDOA to assist in prioritizing and scheduling pavement

    maintenance and rehabilitation actions at the airport. Pavement that is currently under

    construction including the runway and associated taxiways are not included in this report, but

    can be assumed to have a rating of good upon completion of the project.

  • Asheville Regional Airport 2019 APMS Update

    2

    The findings and recommendations within this report are for information and planning purposes

    only. The airport sponsor shall be responsible for identifying and mitigating and/or remediating

    any areas of pavement that may present an immediate safety hazard.

  • Asheville Regional Airport 2019 APMS Update

    3

    PAVEMENT INVENTORY

    Pavement Inventory Definition

    Airport pavements are one of the largest and most important assets at an airport. Therefore, it is

    important to understand the extents and characteristics of the pavement infrastructure for each

    airport. RDM performed extensive reviews of available maintenance and rehabilitation project

    information and updated the existing pavement inventory. The airfield pavements are divided

    into a four-level inventory in accordance with FAA Advisory Circular 150/5380-7B and ASTM

    D5340:

    • Network: The network is the highest level in the PCI hierarchy and is defined as all

    airside pavements at a single airport.

    • Branch: The branch represents a pavement facility serving a single function (i.e.

    runways, taxiways, aprons, etc.)

    • Section: The section is an area of a branch with consistent characteristics such as

    pavement composition, age, condition, and traffic level.

    • Sample Units: Sections are divided into sample units for the pavement inspection.

    Airfield pavements have asphalt concrete (AC) sample units generally of 5,000 ft2 (±

    2,000 ft2) and Portland cement concrete (PCC) sample units of 20 slabs (± 8 slabs).

    It should be noted that the section designations for AVL do not match the names shown on the

    current airport diagram due to the on-going construction project for the runway.

    Pavement Inventory by Branch Use

    Asheville Regional Airport pavement network consists of approximately 3,249,716 ft2 of airfield

    pavement. Table 1 shows the pavement area and age for each type of pavement (i.e. runway,

    taxiway, apron, etc.). Map 1 presents the pavement network divided into branches, sections and

    sample units along with the nomenclature used by NCDOA to identify the different pavement

    areas.

    Table 1: Pavement Inventory by Branch Use

    Branch Use Area (SF) % Area Sections %

    Sections Area-Wt. Avg. Age

    Runway 692,666 21 1 2 3

    Taxiway 875,788 27 20 36 9

    Apron 1,676,423 52 33 59 22

    Helipad 4,839 0.1 2 4 3

    Overall 3,249,716 100 56 100 14

  • APRGA:10

    APRTERM:10

    TWA:20

    RW1735:10

    APRGA:30

    RW1634:30LRW1634:30C

    RW1634:30R

    APRGA:100

    APRGA:60

    TWP:10

    APRTERM:20

    TWE:10

    TWA:40

    TWB5:10

    APRGA:70APRGA:120

    TWM:10

    TWB:10

    TWC:10

    TWA:10

    TWB2:10

    TWR:10

    RW1634:40LRW1634:10LRW1634:40C

    RW1634:10R

    RW1634:10CRW1634:40R

    APRGA:110

    TWN:10

    TWL:10

    TWB1:10APRGA:40

    APRGA:230

    TWA:30

    APRGA:50

    HP35:10HP17:10

    APRGA:130

    APRGA:140

    APRGA:150

    APRGA:20

    APRGA:160APRGA:170

    APRGA:180

    TWH:20

    APRGA:200APRGA:210

    APRGA:240

    TWK:10APRGA:220

    APRHANGS:20

    TWF:20 TWG:20

    APRGA:250

    APRGA:80

    APRHANGS:10

    TWD1:20 TWD2:20

    TWF:10 TWG:10

    APRHANGS:30

    TWH:10

    APRGA:90

    TWD1:10

    TWD2:10

    TWK:20

    TWHELI:20

    APRGA:190

    APRGAFF:10 HELIPAD:10

    HELIPAD:20

    TWHELI:10

    116

    40

    1

    121

    10

    47

    3

    1

    21

    131

    1

    2

    3

    45

    6

    11

    35

    42

    55

    62

    671

    4

    5

    6

    7

    18

    2228

    17

    221 12 79

    15112 116 118

    13 96

    2738

    2936

    13

    3034

    68

    9

    1 2

    1222

    910

    4

    21

    26

    27

    1

    3

    1015

    16

    73

    85

    91

    99

    121 1 7

    1 5

    1

    328

    30

    14 48

    3

    12

    2

    11 6 7

    2 141

    411

    1421

    2332

    3440

    4249

    5157

    5968

    7076

    7885

    8793

    95104

    106112

    114121

    123129

    2345678910 26354452536271808998

    1

    4

    1

    1

    2

    31

    2

    1

    1

    21

    1

    21

    1

    2

    1

    2

    1 12 1

    2

    70

    9

    1

    23

    12

    6

    15

    8

    1

    210

    12

    11

    192022 23

    242526

    27

    132 133134 135

    136 137138 139

    910

    12131415

    16

    1718

    28293031

    3233

    34

    36

    37

    38394041

    43444546

    4950

    5152

    5354

    565758

    596061

    63

    64

    6566

    6869

    19

    21

    24

    32

    35

    37

    39

    44

    46

    49515253

    56

    20

    25

    50

    54

    58

    777880818287

    89 90 91 92 93

    110111

    113114 104106107

    949597

    43

    45

    50

    47 7

    63

    67

    813

    20

    22

    4041596066

    7071 72 74 7576

    8384

    8687

    88 89 90 92 9398

    101 102 104108109115 116 120122123125 2 5 6

    2 67

    511121415

    1617

    1819

    232425

    27

    29

    31

    235678

    9 11 12 13

    64 23 4 5

    14 5 2

    32

    35

    6 78 9

    1012

    13 1516

    1718 19

    2022

    24 2526 27

    28 2930 31

    333536 37

    38 3941

    4344 45

    46 4748

    5052 53

    54 5556

    5860 61

    62 6364 65

    66 6769

    7172 73

    74 7577

    7980 81

    82 8384

    8688 89

    90 9192

    9496 97

    98 99100 101

    102 103105

    107108 109

    110 111113

    115116 117

    118 119120

    122124 125

    126 127128

    130140

    11112 1415171819202123242527282930313233343637383940414243454647484950515455565758596061636465666768697072737475767778798182838485868788909192939495969799100101102103104105106107108109110111112113114115

    23

    5

    1 34

    5

    79 10

    3456

    7

    34 56

    10

    876

    11

    54

    20191817

    13

    16

    14

    15

    2

    22

    67

    3 4

    5

    1198

    131214

    16

    North Carolina Department of TransportationDivision of AviationLegendSECTION LIMITSNOT INCLUDEDSAMPLE LIMITS Network Identification MapDRAWN BY: CSM

    ENGINEER: MTDSCALE: 1" = 600'

    MAP 1DATE: OCT 2019

    RWY:5-23 A

    BRANCH IDSECTION ID

    RDM International, Inc.14310 Sullyfield Circle, Ste. 600Chantilly, VA 20151(703) 709-2540www.rdmintlinc.com

    ³ Asheville Regional Airport (AVL)PAGE: 4

    403 INSPECTED SAMPLE403 UNINSPECTED SAMPLE

  • Asheville Regional Airport 2019 APMS Update

    5

    PAVEMENT CONDITION EVALUATION CRITERIA

    The objective of the condition survey is to quantify existing pavement distresses and compute the

    Pavement Condition Index (PCI) for each pavement section.

    The Pavement Condition Index (PCI) is an indicator to assist in developing and comparing

    pavement conditions in a universal manner. The PCI is a numerical rating index between 0 and

    100, with a PCI of 100 being a pavement in good condition (no distress) and a PCI of zero being

    a pavement in failed condition. A color-coded scale is used to quickly identify the condition and

    designate the level of maintenance and rehabilitation (M&R) required for each specific pavement

    section. Table 2 gives a general description of each condition rating category.

    Table 2: PCI Rating Categories and Repair Types

    PCI Range

    PCI Rating Definition General M&R Requirements

    86-100 Good Pavement has minor or no distress and should require only routine maintenance. Preventative

    Maintenance (crack sealing,

    surface treatments)

    71-85 Satisfactory Pavement has scattered low-severity distresses, which should require only routine maintenance.

    56-70 Fair Pavement has a combination of generally low and medium severity distresses. Near-term maintenance and repair needs may range from routine to major in scope.

    41-55 Poor

    Pavement has low, medium, and high severity distresses, which probably cause some operational problems. Near-term maintenance and repair needs may range from routine in nature to a requirement for reconstruction.

    Major Rehabilitation

    (reconstruction, overlay, etc.)

    26-40 Very Poor Pavement has predominantly medium and high severity distresses that cause considerable maintenance and operational problems. Near-term maintenance and repair needs will be intensive in nature.

    11-25 Serious Pavement has mainly high severity distresses, which cause operational restrictions. Immediate repairs are needed.

    0-10 Failed Pavement deterioration has progressed to the point that safe aircraft operations are no longer possible. Reconstruction is required.

    The PCI is based on several pavement distress types (failures), quantities, and severities

    commonly found in airport pavements. The pavement condition survey is the primary means of

    obtaining and recording pavement distress data and computing the PCI. By following specific

    standards, the PCI is determined in a non-subjective manner, allowing for all statewide airport

    pavements to be compared and prioritized.

    Pavement Condition Survey

    RDM performed a network level inspection at each airport. Wherever possible, RDM inspected

    the same sample units as the previous inspections and randomly selected extra sample units to be

    inspected as necessary to ensure a high-level of confidence in the calculated PCI values. The

    observed distresses in each sample unit were categorized, assigned a severity level, and

    measured. The recorded distress information was used to calculate the PCI for each pavement

    section.

  • Asheville Regional Airport 2019 APMS Update

    6

    It should be noted that the PCI is based on pavement failures present at the surface and is not an

    indication of structural capacity. The types of distresses identified provide an indication of the

    cause of the pavement deterioration. Understanding the causes of the observed distresses helps in

    selecting a rehabilitation alternative that addresses the source of the distress.

    Typical Pavement Life Cycle

    A key element in developing an APMS is the recognition of the fact that pavement deterioration

    is not necessarily a linear process. Beyond a certain point in a pavement’s life, the rate of

    deterioration will increase, and the future repair costs increase dramatically. It is more beneficial

    to provide funding for preventative maintenance in order to maintain pavements in good

    condition to slow the deterioration rate. The APMS is used to determine what type of repair

    should be applied and the optimal timing of the repair. Figure 1 demonstrates a pavement’s

    typical life cycle and the importance of allocating funding to maintain pavements in good

    condition.

    Figure 1: Typical Pavement Life Cycle

    Prediction Models and Condition Forecasts

    Based on past inspections and construction history data, prediction models were developed to

    estimate the future condition and deterioration of the pavements. Models were developed for all

    pavement within the state, grouped by geographic region, airport classification, and pavement

    use. These models were used to project the future pavement conditions at Asheville Regional

    Airport. Figure 2 shows how these prediction models are applied to predict future conditions.

    When a section’s current PCI versus age point does not align with the developed prediction

    curve, the software modifies the prediction curve to fit the current PCI versus age point and

    maintains the same deterioration rate for predicting future conditions.

  • Asheville Regional Airport 2019 APMS Update

    7

    Figure 2: Application of Pavement Condition Deterioration Model

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    0 5 10 15 20 25 30

    PA

    VEM

    ENT

    CO

    ND

    ITIO

    N I

    ND

    EX (

    PC

    I)

    TIME IN YEARS

    Pavement Family Prediction Model Curve

    Present PCI vs. Age Point

    Modified Prediction Curve

  • Asheville Regional Airport 2019 APMS Update

    8

    PAVEMENT CONDITION RESULTS

    Overall Current Condition

    RDM performed the PCI survey on approximately 3,249,716 ft2 of airfield pavement. The 2019

    area-weighted average condition of Asheville Regional Airport pavements is 67 (Fair). Table 3

    and Figure 3 show the distribution of the airfield pavements by PCI rating category. Table 4

    gives the area-weighted condition by branch use. Map 2 provides a color-coded map of the

    current condition for each pavement section.

    Table 3: PCI Rating Distribution of all Airfield Pavements

    PCI Range

    Rating Sections Area (SF) % Area

    86 - 100 Good 15 461,570 14.2

    71 - 85 Satisfactory 11 1,555,232 47.9

    56 - 70 Fair 7 137,379 4.2

    41 - 55 Poor 5 415,002 12.8

    26 - 40 Very Poor 11 544,651 16.8

    11 - 25 Serious 6 118,878 3.7

    0 - 10 Failed 1 17,004 0.5

    Figure 3: PCI Rating Distribution of All Airfield Pavements

    Table 4: Area-Weighted Conditions by Branch Use

    Branch Use Area (SF) % Area Sections %

    Sections Area-Wt. Avg. Age

    Area-Wt. Avg. PCI

    PCI Rating

    Runway 692,666 21 1 2 3 82 Satisfactory

    Taxiway 875,788 27 20 36 9 79 Satisfactory

    Apron 1,676,423 52 33 59 22 54 Poor

    Helipad 4,839 0.1 2 4 3 96 Good

    Overall 3,249,716 100 56 100 14 67 Fair

    0

    200,000

    400,000

    600,000

    800,000

    1,000,000

    1,200,000

    1,400,000

    1,600,000

    1,800,000

    Good(86 - 100)

    Satisfactory(71 - 85)

    Fair(56 - 70)

    Poor(41 - 55)

    Very Poor(26 - 40)

    Serious(11 - 25)

    Failed(0 - 10)

    Pav

    em

    en

    t A

    rea

    (SF)

    PCI Rating

  • APRGA:10 (29)

    APRTERM:10 (97)

    TWA:20 (80)

    RW1735:10 (82)

    APRGA:30 (47)

    RW1634:30L (NA)RW1634:30C (NA)

    RW1634:30R (NA)

    APRGA:100 (54)

    APRGA:60 (26)

    TWP:10 (NA)

    APRTERM:20 (72)

    TWE:10 (NA)

    TWA:40 (96)

    TWB5:10 (85)

    APRGA:70 (67)APRGA:120 (19)

    TWM:10 (NA)

    TWB:10 (NA)

    TWC:10 (100)

    TWA:10 (NA)

    TWB2:10 (NA)

    TWR:10 (NA)

    RW1634:40L (NA)RW1634:10L (NA)RW1634:40C (NA)

    RW1634:10R (NA)

    RW1634:10C (NA)RW1634:40R (NA)

    APRGA:110 (54)

    TWN:10 (78)

    TWL:10 (81)

    TWB1:10 (97)APRGA:40 (24)

    APRGA:230 (39)

    TWA:30 (100)

    APRGA:50 (78)

    HP35:10 (87)HP17:10 (94)

    APRGA:130 (32)

    APRGA:140 (59)

    APRGA:150 (58)

    APRGA:20 (62)

    APRGA:160 (43)APRGA:170 (10)

    APRGA:180 (44)

    TWH:20 (37)

    APRGA:200 (31)APRGA:210 (15)

    APRGA:240 (39)

    TWK:10 (12)APRGA:220 (60)

    APRHANGS:20 (95)

    TWF:20 (32)

    TWG:20 (22)

    TWF:10 (87)

    TWG:10 (87)

    APRHANGS:30 (33)

    TWH:10 (81)

    APRGA:90 (98)

    TWD1:10 (56) TWD2:10 (90) TWK:20 (80)

    TWHELI:20 (100)

    APRGA:190 (29)

    APRGAFF:10 (77) HELIPAD:10 (98)

    APRGA:250 (67)

    APRGA:80 (75)

    APRHANGS:10 (97)

    TWD1:20 (35)TWD2:20 (24)

    HELIPAD:20 (93)

    TWHELI:10 (86)

    North Carolina Department of TransportationDivision of AviationSection PCI2019 Pavement Condition Index Map

    DRAWN BY: CSMENGINEER: MTD

    SCALE: 1" = 600'MAP 2

    DATE: OCT 2019

    RDM International, Inc.14310 Sullyfield Circle, Ste. 600Chantilly, VA 20151(703) 709-2540www.rdmintlinc.com

    Asheville Regional Airport (AVL)

    PAGE: 9

    86 - 100 Good71 - 85 Satisfactory56 - 70 Fair41 - 55 Poor26 - 40 Very Poor

    11 - 25 Serious0 - 10 FailedNot InspectedClosed RWY:5-23 A (91)

    BRANCH IDSECTION IDPCI VALUE ³

  • Asheville Regional Airport 2019 APMS Update

    10

    Condition Forecast Results

    A condition analysis was performed for a period of 5-years from the 2019 inspection. Predicted

    PCIs should be used with care since all predictions are based on the accuracy of the construction

    history data and past inspections. The predicted PCIs are based on the assumption that no

    major rehabilitation will be performed and the maintenance policies and traffic at the

    airport will remain constant. The additional pavement from runway and taxiway

    construction is not included in this report and should be noted that area-weighted averages

    will change with the additional pavement.

    The area-weighted average condition of the pavements at Asheville Regional Airport is

    anticipated to deteriorate from a current condition of 67 to 56 from the 2019 inspection to 2024.

    Table 5 and Figure 4 provide the PCI rating distribution for the projected 2024 conditions. Table

    6 provides the projected 2024 area-weighted average conditions by branch use. It should be

    noted that the pavements currently under construction, including the runway and associated

    taxiways were not included in this report, but can be assumed to have a rating of good upon

    completion of the project.

    Table 5: PCI Rating Distribution for 2024 Projected Conditions

    PCI Range

    Rating 2024 Predicted PCI

    Sections Area (SF) % Area

    86 - 100 Good 5 59,987 1.8

    71 - 85 Satisfactory 12 1,170,948 36.0

    56 - 70 Fair 10 726,671 22.4

    41 - 55 Poor 8 375,036 11.5

    26 - 40 Very Poor 6 298,799 9.2

    11 - 25 Serious 11 533,628 16.4

    0 - 10 Failed 4 84,647 2.6

    Figure 4: PCI Rating Distribution for 2024 Projected Conditions

    0

    200,000

    400,000

    600,000

    800,000

    1,000,000

    1,200,000

    1,400,000

    Good(86 - 100)

    Satisfactory(71 - 85)

    Fair(56 - 70)

    Poor(41 - 55)

    Very Poor(26 - 40)

    Serious(11 - 25)

    Failed(0 - 10)

    Pav

    em

    en

    t A

    rea

    (SF)

    PCI Rating

  • Asheville Regional Airport 2019 APMS Update

    11

    Table 6: Projected 2024 Area-Weighted Conditions by Branch Use

    Branch Use Area (SF) % Area Sections %

    Sections Area-Wt. Avg. PCI

    PCI Rating

    Runway 692,666 21 1 2 71 Satisfactory

    Taxiway 875,788 27 20 36 68 Fair

    Apron 1,676,423 52 33 59 43 Poor

    Helipad 4,839 0.1 2 4 85 Satisfactory

    Overall 3,249,716 100 56 100 56 Fair

    Branch Level Deterioration Curves by Branch Use

    Figure 5 through Figure 9 depict the area-weighted past performance and estimated deterioration

    for each branch use at Asheville Regional Airport. These curves present the past, current and

    projected area-weighted PCI for each branch use. The Last Maintenance Work and Last Major

    Rehabilitation indicators in the figures represent the last time any of the pavements within that

    respective branch use received work. Detailed deterioration curves, extrapolated distresses, and

    work history for each pavement section can be found in Appendix A. The current

    rehabilitation and construction of additional runway and taxiways is not included in the

    following estimated annual condition plots.

    Figure 5: Estimated Annual Condition Plot (Overall)

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Year

    Overall

    Current Inspeciton

    Projected Deterioraiton

    Section PCI Deterioration

  • Asheville Regional Airport 2019 APMS Update

    12

    *Does not include pavements under construction as part of reconstructing the runway.

    Figure 6: Estimated Annual Condition Plot (Runways)

    *Does not include pavements under construction as part of reconstructing the runway.

    Figure 7: Estimated Annual Condition Plot (Taxiways)

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Year

    Runways

    Current Inspeciton

    Last Maintenance Work

    Last Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Year

    Taxiways

    Current Inspeciton

    Last Maintenance Work

    Last Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

  • Asheville Regional Airport 2019 APMS Update

    13

    Figure 8: Estimated Annual Condition Plot (Aprons)

    Figure 9: Estimated Annual Condition Plot (Helipads)

    Summary of Condition Results

    Table 7 provides the current and projected conditions for each pavement section at Asheville

    Regional Airport. Details of each pavement section including the previous, current and projected

    conditions, extrapolated distresses, and deterioration graphs are included in Appendix A for each

    pavement section. Representative inspection photographs for each pavement section are included

    in Appendix B. Table 7 does not reflect the current runway and taxiway construction

    project.

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Year

    Aprons

    Current Inspeciton

    Last Maintenance Work

    Last Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Year

    Helipads

    Current Inspeciton

    Last Maintenance Work

    Last Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

  • Asheville Regional Airport 2019 APMS Update

    14

    Table 7: Previous, Current and Projected PCI Values

    Branch ID Section

    ID Surface

    Type Area (SF)

    Current Predicted PCI

    2019 2020 2021 2022 2023 2024

    APRGA 10 AC 297,901 29 27 25 22 20 18

    APRGA 20 AC 20,407 62 60 58 55 53 51

    APRGA 30 AC 202,662 47 45 43 40 38 36

    APRGA 40 AC 33,708 24 22 20 17 15 13

    APRGA 50 AC 26,305 78 76 74 71 69 67

    APRGA 60 AC 104,812 26 24 22 19 17 15

    APRGA 70 AC 40,744 67 65 63 60 58 56

    APRGA 80 AC 10,002 75 73 71 68 66 64

    APRGA 90 PCC 4,419 98 96 94 92 89 86

    APRGA 100 AC 133,834 54 52 50 47 45 43

    APRGA 110 AC 44,627 54 52 50 47 45 43

    APRGA 120 AC 42,717 19 17 15 12 10 8

    APRGA 130 AC 24,382 32 30 28 25 23 21

    APRGA 140 AC 24,165 59 57 55 52 50 48

    APRGA 150 AC 23,835 58 56 54 51 49 47

    APRGA 160 AC 17,115 43 41 39 36 34 32

    APRGA 170 AC 17,004 10 8 6 3 1 0

    APRGA 180 AC 16,764 44 42 40 37 35 33

    APRGA 190 AC 16,734 29 27 25 22 20 18

    APRGA 200 AC 14,666 31 29 27 24 22 20

    APRGA 210 AC 14,612 15 13 11 8 6 4

    APRGA 220 AC 12,948 60 58 56 53 51 49

    APRGA 230 AC 35,863 39 37 35 32 30 28

    APRGA 240 AC 14,340 39 37 35 32 30 28

    APRGA 250 AC 11,411 67 65 63 60 58 56

    APRGAFF 10 AC 12,067 77 75 73 70 68 66

    APRHANGS 10 AC 12,872 97 95 93 90 88 86

    APRHANGS 20 PCC 14,656 95 93 90 87 84 81

    APRHANGS 30 AC 6,086 33 31 29 26 24 22

    APRTERM 10 PCC 273,630 97 95 93 90 87 84

    APRTERM 20 PCC 111,351 72 68 65 61 57 54

    HELIPAD 10 PCC 2,492 98 96 94 92 89 87

    HELIPAD 20 PCC 2,347 93 91 89 86 84 82

    HP17 10 AC 19,826 94 92 90 87 85 83

    HP35 10 AC 19,958 87 85 83 80 78 76

    RW1735 10 AC 692,666 82 80 78 75 73 71

    TWA 20 AC 555,170 80 78 76 73 71 69

    TWA 40 AC 58,590 96 94 92 89 87 85

    TWB1 10 AC 38,877 97 95 93 90 88 86

    TWB5 10 AC 76,699 85 83 81 78 76 74

    TWD1 10 AC 3,869 56 54 52 49 47 45

    TWD1 20 AC 8,663 35 33 31 28 26 24

    TWD2 10 AC 3,567 90 88 86 83 81 79

    TWD2 20 AC 8,526 24 22 20 17 15 13

    TWF 10 AC 3,890 87 85 83 80 78 76

    TWF 20 AC 9,149 32 30 28 25 23 21

    TWG 10 AC 3,968 87 85 83 80 78 76

    TWG 20 AC 9,001 22 20 18 15 13 11

    TWH 10 AC 3,820 81 79 77 74 72 70

    TWH 20 AC 12,055 37 35 33 30 28 26

  • Asheville Regional Airport 2019 APMS Update

    15

    Table 7: Previous, Current and Projected PCI Values continued

    Branch ID Section

    ID Surface

    Type Area (SF)

    Current Predicted PCI

    2019 2020 2021 2022 2023 2024

    TWHELI 10 AC 1,151 86 84 82 79 77 75

    TWHELI 20 AAC 1,327 100 98 96 93 91 89

    TWK 10 AC 10,314 12 10 8 5 3 1

    TWK 20 AC 3,161 80 78 76 73 71 69

    TWL 10 AC 31,228 81 79 77 74 72 70

    TWN 10 AC 32,763 78 76 74 71 69 67

    *Does not include pavements under construction as part of reconstructing the runway.

  • Asheville Regional Airport 2019 APMS Update

    16

    PAVEMENT PROJECT IDENTIFICATION CRITERIA

    The primary objective of the Statewide Airport Pavement Management System is to formulate a

    logical, cost-effective plan for maintaining and repairing airfield pavement areas over time. In

    order to utilize the calculated current and future PCIs for estimating and developing maintenance

    and rehabilitation (M&R) plans the following parameters have been established. Each section of

    airfield pavement has been assigned a critical PCI value presented in Table 8. These critical PCI

    values are based on industry standards based on the aircraft and pavement use type.

    Table 8: Critical PCI Values

    DOA Airport Classification

    Runway Taxiway Apron

    & Others

    Yellow Airport 70 60

    55

    Red Airport 65

    55 Blue Airport

    60 Green Airport

    Black Airport

    Pavements with a current PCI below the established critical PCI are considered for major repair

    and rehabilitation type projects (i.e. reconstruction, overlay, etc.). Airports should discuss

    rehabilitation options with their NCDOA Airport Project Manager.

    Pavements with a current PCI above the critical PCI and below 86 are considered for

    maintenance level activities (i.e. crack sealing, patching, surface treatments, etc.). Each airport is

    encouraged to independently perform maintenance work on all pavements to extend the

    pavement life and ensure a safe operating surface. These pavements are eligible for the Division

    of Aviation’s Safety Preservation and Maintenance Program and the airport should request

    maintenance through their NCDOA’s Airport Project Manager.

    Based on the current PCI values determined from the inspection, Table 9 provides a summary of

    the pavement sections recommended for maintenance and major repair. It should be noted that

    not all pavements currently in the maintenance category will require work at this time. These

    pavements should be monitored through future inspection cycles.

    Table 9: Recommended Action Category by Pavement Section

    Branch ID Section

    ID Surface

    Type Area (SF)

    2019 PCI

    Critical PCI

    Recommended Action Category

    (Maintenance/Major)

    APRGA 10 AC 297,901 29 55 Major

    APRGA 20 AC 20,407 62 55 Maintenance

    APRGA 30 AC 202,662 47 55 Major

    APRGA 40 AC 33,708 24 55 Major

    APRGA 50 AC 26,305 78 55 Maintenance

    APRGA 60 AC 104,812 26 55 Major

    APRGA 70 AC 40,744 67 55 Maintenance

    APRGA 80 AC 10,002 75 55 Maintenance

    APRGA 90 PCC 4,419 98 55

  • Asheville Regional Airport 2019 APMS Update

    17

    Table 9: Recommended Action Category by Pavement Section continued

    Branch ID Section

    ID Surface

    Type Area (SF)

    2019 PCI

    Critical PCI

    Recommended Action Category

    (Maintenance/Major)

    APRGA 100 AC 133,834 54 55 Major

    APRGA 110 AC 44,627 54 55 Major

    APRGA 120 AC 42,717 19 55 Major

    APRGA 130 AC 24,382 32 55 Major

    APRGA 140 AC 24,165 59 55 Maintenance

    APRGA 150 AC 23,835 58 55 Maintenance

    APRGA 160 AC 17,115 43 55 Major

    APRGA 170 AC 17,004 10 55 Major

    APRGA 180 AC 16,764 44 55 Major

    APRGA 190 AC 16,734 29 55 Major

    APRGA 200 AC 14,666 31 55 Major

    APRGA 210 AC 14,612 15 55 Major

    APRGA 220 AC 12,948 60 55 Maintenance

    APRGA 230 AC 35,863 39 55 Major

    APRGA 240 AC 14,340 39 55 Major

    APRGA 250 AC 11,411 67 55 Maintenance

    APRGAFF 10 AC 12,067 77 55 Maintenance

    APRHANGS 10 AC 12,872 97 55

    APRHANGS 20 PCC 14,656 95 55

    APRHANGS 30 AC 6,086 33 55 Major

    APRTERM 10 PCC 273,630 97 55

    APRTERM 20 PCC 111,351 72 55 Maintenance

    HELIPAD 10 PCC 2,492 98 55

    HELIPAD 20 PCC 2,347 93 55

    HP17 10 AC 19,826 94 55

    HP35 10 AC 19,958 87 55

    RW1735 10 AC 692,666 82 70 Maintenance

    TWA 20 AC 555,170 80 60 Maintenance

    TWA 40 AC 58,590 96 60

    TWB1 10 AC 38,877 97 60

    TWB5 10 AC 76,699 85 60 Maintenance

    TWD1 10 AC 3,869 56 60 Major

    TWD1 20 AC 8,663 35 60 Major

    TWD2 10 AC 3,567 90 60

    TWD2 20 AC 8,526 24 60 Major

    TWF 10 AC 3,890 87 60

    TWF 20 AC 9,149 32 60 Major

    TWG 10 AC 3,968 87 60

    TWG 20 AC 9,001 22 60 Major

    TWH 10 AC 3,820 81 60 Maintenance

    TWH 20 AC 12,055 37 60 Major

    TWHELI 10 AC 1,151 86 60

    TWHELI 20 AAC 1,327 100 60

    TWK 10 AC 10,314 12 60 Major

    TWK 20 AC 3,161 80 60 Maintenance

    TWL 10 AC 31,228 81 60 Maintenance

    TWN 10 AC 32,763 78 60 Maintenance

  • Asheville Regional Airport 2019 APMS Update

    18

    Each year the Division of Aviation produces a list of airports scheduled to receive a project

    under these programs based on detailed analysis and programming to optimize funding to best

    improve the overall statewide system condition and ensure safe operations at all airports. Actual

    project funding and selection is based on several factors including available funds, project

    priorities, the statewide system plan, and safety concerns. Coordinate closely with the Airport

    Project Manager assigned to your airport. Please forward any comments concerning this report to

    the Statewide Programs Manager at the North Carolina Department of Transportation Division of

    Aviation.

  • Asheville Regional Airport 2019 APMS Update

    A-1

    APPENDIX A - DETERIORATION CURVES

    This appendix presents historical and projected deterioration curves for each pavement section.

    The curves include the previous, current and projected PCI data as well as the extrapolated

    distress types, estimated quantities, and severities.

  • BRANCH NAME: APRONS GENERAL AVIATION PREVIOUS PCI: 2016 26

    BRANCH ID: APRGA CURRENT PCI: 2019 29

    SECTION ID: 10 PCI CHANGE/DET. RATE: 3 1.03

    RANK: P 5-YEAR PREDICTED PCI: 2024 18

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 297,901 MAJOR REHABILITATION: 1985

    LOAD RELATED DISTRESS %

    17

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    41 Alligator Cracking Medium 5,425 SqFt 1.8 35.3

    43 Block Cracking Medium 277,386 SqFt 93.1 51.6

    43 Block Cracking High 11,613 SqFt 3.9 31.0

    52 Raveling Low 173,112 SqFt 58.1 21.5

    52 Raveling Medium 118,101 SqFt 39.6 38.1

    52 Raveling High 6,648 SqFt 2.2 27.9

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    83 0

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    VERY POOR

    VERY POOR

    SERIOUS

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-2

  • BRANCH NAME: APRONS GENERAL AVIATION PREVIOUS PCI: 2016 87

    BRANCH ID: APRGA CURRENT PCI: 2019 62

    SECTION ID: 20 PCI CHANGE/DET. RATE: -25 -8.57

    RANK: P 5-YEAR PREDICTED PCI: 2024 51

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 20,407 MAJOR REHABILITATION: 2012

    LOAD RELATED DISTRESS %

    40

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    41 Alligator Cracking Medium 136 SqFt 0.7 25.4

    48 L&T Cracking Low 563 Ft 2.8 9.4

    55 Slippage Cracking Low 500 SqFt 2.5 23.0

    57 Weathering Low 20,406 SqFt 100.0 6.0

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    24 36

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    GOOD

    FAIR

    POOR

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-3

  • BRANCH NAME: APRONS GENERAL AVIATION PREVIOUS PCI: 2016 38

    BRANCH ID: APRGA CURRENT PCI: 2019 47

    SECTION ID: 30 PCI CHANGE/DET. RATE: 9 3.08

    RANK: P 5-YEAR PREDICTED PCI: 2024 36

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 202,662 MAJOR REHABILITATION: 1989

    LOAD RELATED DISTRESS %

    25

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    41 Alligator Cracking Medium 5,824 SqFt 2.9 40.5

    43 Block Cracking Low 19,733 SqFt 9.7 16.9

    43 Block Cracking Medium 30,730 SqFt 15.2 26.9

    45 Depression Medium 442 SqFt 0.2 6.5

    48 L&T Cracking Low 3,920 Ft 1.9 7.2

    48 L&T Cracking Medium 5,964 Ft 2.9 19.3

    48 L&T Cracking High 24 Ft 0.0 7.5

    50 Patching Low 8,587 SqFt 4.2 9.0

    50 Patching Medium 305 SqFt 0.2 6.9

    57 Weathering Low 19,476 SqFt 9.6 1.7

    57 Weathering Medium 180,652 SqFt 89.1 19.6

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    71 4

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    VERY POOR

    POOR

    VERY POOR

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-4

  • BRANCH NAME: APRONS GENERAL AVIATION PREVIOUS PCI: 2016 25

    BRANCH ID: APRGA CURRENT PCI: 2019 24

    SECTION ID: 40 PCI CHANGE/DET. RATE: -1 -0.34

    RANK: P 5-YEAR PREDICTED PCI: 2024 13

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 33,708 MAJOR REHABILITATION: 1984

    LOAD RELATED DISTRESS %

    69

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    41 Alligator Cracking Medium 7,547 SqFt 22.4 66.9

    48 L&T Cracking Low 838 Ft 2.5 8.7

    57 Weathering Low 12,719 SqFt 37.7 4.2

    57 Weathering Medium 20,987 SqFt 62.3 17.0

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    31 0

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    SERIOUS

    SERIOUS

    SERIOUS

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-5

  • BRANCH NAME: APRONS GENERAL AVIATION PREVIOUS PCI: 2016 86

    BRANCH ID: APRGA CURRENT PCI: 2019 78

    SECTION ID: 50 PCI CHANGE/DET. RATE: -8 -2.74

    RANK: P 5-YEAR PREDICTED PCI: 2024 67

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 26,305 MAJOR REHABILITATION: 2012

    LOAD RELATED DISTRESS %

    0

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    48 L&T Cracking Low 82 Ft 0.3 3.6

    48 L&T Cracking Medium 507 Ft 1.9 15.4

    57 Weathering Low 26,302 SqFt 100.0 6.0

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    100 0

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    GOOD

    SATISFACTORY

    FAIR

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-6

  • BRANCH NAME: APRONS GENERAL AVIATION PREVIOUS PCI: 2016 20

    BRANCH ID: APRGA CURRENT PCI: 2019 26

    SECTION ID: 60 PCI CHANGE/DET. RATE: 6 2.06

    RANK: P 5-YEAR PREDICTED PCI: 2024 15

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 104,812 MAJOR REHABILITATION: 1983

    LOAD RELATED DISTRESS %

    72

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    41 Alligator Cracking Low 53,016 SqFt 50.6 62.9

    48 L&T Cracking Low 1,709 Ft 1.6 6.4

    48 L&T Cracking Medium 1,343 Ft 1.3 12.6

    57 Weathering Low 104,804 SqFt 100.0 6.0

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    28 0

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    SERIOUS

    VERY POOR

    SERIOUS

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-7

  • BRANCH NAME: APRONS GENERAL AVIATION PREVIOUS PCI: 2016 74

    BRANCH ID: APRGA CURRENT PCI: 2019 67

    SECTION ID: 70 PCI CHANGE/DET. RATE: -7 -2.40

    RANK: P 5-YEAR PREDICTED PCI: 2024 56

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 40,744 MAJOR REHABILITATION: 2007

    LOAD RELATED DISTRESS %

    25

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    41 Alligator Cracking Low 132 SqFt 0.3 11.3

    48 L&T Cracking Low 501 Ft 1.2 5.5

    48 L&T Cracking Medium 1,659 Ft 4.1 23.0

    57 Weathering Low 40,736 SqFt 100.0 6.0

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    75 0

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    SATISFACTORY

    FAIR

    FAIR

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-8

  • BRANCH NAME: APRONS GENERAL AVIATION PREVIOUS PCI: 2016 71

    BRANCH ID: APRGA CURRENT PCI: 2019 75

    SECTION ID: 80 PCI CHANGE/DET. RATE: 4 1.37

    RANK: P 5-YEAR PREDICTED PCI: 2024 64

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 10,002 MAJOR REHABILITATION: 2005

    LOAD RELATED DISTRESS %

    0

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    48 L&T Cracking Low 754 Ft 7.5 19.6

    57 Weathering Low 10,001 SqFt 100.0 6.0

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    100 0

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    SATISFACTORY

    SATISFACTORY

    FAIR

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-9

  • BRANCH NAME: APRONS GENERAL AVIATION PREVIOUS PCI: 2016 98

    BRANCH ID: APRGA CURRENT PCI: 2019 98

    SECTION ID: 90 PCI CHANGE/DET. RATE: 0 0.00

    RANK: P 5-YEAR PREDICTED PCI: 2024 86

    SURFACE TYPE: PCC MAINTENANCE: NA

    AREA (SF): 4,419 MAJOR REHABILITATION: 2015

    LOAD RELATED DISTRESS %

    0

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    65 Joint Seal Damage Low 10 Slabs 100.0 2.0

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    100 0

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    GOOD

    GOOD

    GOOD

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-10

  • BRANCH NAME: APRONS GENERAL AVIATION PREVIOUS PCI: 2016 64

    BRANCH ID: APRGA CURRENT PCI: 2019 54

    SECTION ID: 100 PCI CHANGE/DET. RATE: -10 -3.43

    RANK: P 5-YEAR PREDICTED PCI: 2024 43

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 133,834 MAJOR REHABILITATION: 2001

    LOAD RELATED DISTRESS %

    9

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    41 Alligator Cracking Medium 74 SqFt 0.1 10.0

    43 Block Cracking Low 3,512 SqFt 2.6 11.0

    43 Block Cracking Medium 16,413 SqFt 12.3 25.0

    48 L&T Cracking Low 5,171 Ft 3.9 12.2

    48 L&T Cracking Medium 9,469 Ft 7.1 30.8

    57 Weathering Low 16,413 SqFt 12.3 2.0

    57 Weathering Medium 117,413 SqFt 87.7 19.5

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    91 0

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    FAIR

    POOR

    POOR

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-11

  • BRANCH NAME: APRONS GENERAL AVIATION PREVIOUS PCI: 2016 55

    BRANCH ID: APRGA CURRENT PCI: 2019 54

    SECTION ID: 110 PCI CHANGE/DET. RATE: -1 -0.34

    RANK: P 5-YEAR PREDICTED PCI: 2024 43

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 44,627 MAJOR REHABILITATION: 1996

    LOAD RELATED DISTRESS %

    0

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    48 L&T Cracking Low 1,219 Ft 2.7 9.3

    48 L&T Cracking Medium 4,549 Ft 10.2 36.8

    52 Raveling Low 44,624 SqFt 100.0 26.4

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    100 0

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    POOR

    POOR

    POOR

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-12

  • BRANCH NAME: APRONS GENERAL AVIATION PREVIOUS PCI: 2016 19

    BRANCH ID: APRGA CURRENT PCI: 2019 19

    SECTION ID: 120 PCI CHANGE/DET. RATE: 0 0.00

    RANK: P 5-YEAR PREDICTED PCI: 2024 8

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 42,717 MAJOR REHABILITATION: 1980

    LOAD RELATED DISTRESS %

    55

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    41 Alligator Cracking Medium 14,712 SqFt 34.4 72.5

    43 Block Cracking Low 6,941 SqFt 16.2 19.9

    48 L&T Cracking Low 371 Ft 0.9 4.7

    48 L&T Cracking Medium 625 Ft 1.5 13.4

    57 Weathering Medium 42,713 SqFt 100.0 20.3

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    45 0

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    SERIOUS

    SERIOUS

    FAILED

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-13

  • BRANCH NAME: APRONS GENERAL AVIATION PREVIOUS PCI: 2016 32

    BRANCH ID: APRGA CURRENT PCI: 2019 32

    SECTION ID: 130 PCI CHANGE/DET. RATE: 0 0.00

    RANK: P 5-YEAR PREDICTED PCI: 2024 21

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 24,382 MAJOR REHABILITATION: 1986

    LOAD RELATED DISTRESS %

    61

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    41 Alligator Cracking Low 9,184 SqFt 37.7 58.7

    47 Joint Reflection Cracking Low 261 Ft 1.1 3.1

    48 L&T Cracking Low 503 Ft 2.1 7.6

    52 Raveling Low 24,379 SqFt 100.0 26.4

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    39 0

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    VERY POOR

    VERY POOR

    SERIOUS

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-14

  • BRANCH NAME: APRONS GENERAL AVIATION PREVIOUS PCI: 2016 32

    BRANCH ID: APRGA CURRENT PCI: 2019 59

    SECTION ID: 140 PCI CHANGE/DET. RATE: 27 9.25

    RANK: P 5-YEAR PREDICTED PCI: 2024 48

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 24,165 MAJOR REHABILITATION: 1986

    LOAD RELATED DISTRESS %

    0

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    43 Block Cracking Low 24,165 SqFt 100.0 35.6

    52 Raveling Low 24,165 SqFt 100.0 26.4

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    100 0

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    VERY POOR

    FAIR

    POOR

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-15

  • BRANCH NAME: APRONS GENERAL AVIATION PREVIOUS PCI: 2016 32

    BRANCH ID: APRGA CURRENT PCI: 2019 58

    SECTION ID: 150 PCI CHANGE/DET. RATE: 26 8.91

    RANK: P 5-YEAR PREDICTED PCI: 2024 47

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 23,835 MAJOR REHABILITATION: 1986

    LOAD RELATED DISTRESS %

    0

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    43 Block Cracking Low 8,095 SqFt 34.0 25.2

    48 L&T Cracking Low 875 Ft 3.7 11.7

    48 L&T Cracking Medium 759 Ft 3.2 20.1

    52 Raveling Low 23,833 SqFt 100.0 26.4

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    100 0

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    VERY POOR

    FAIR

    POOR

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-16

  • BRANCH NAME: APRONS GENERAL AVIATION PREVIOUS PCI: 2016 58

    BRANCH ID: APRGA CURRENT PCI: 2019 43

    SECTION ID: 160 PCI CHANGE/DET. RATE: -15 -5.14

    RANK: P 5-YEAR PREDICTED PCI: 2024 32

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 17,115 MAJOR REHABILITATION: 1998

    LOAD RELATED DISTRESS %

    0

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    48 L&T Cracking Medium 1,919 Ft 11.2 38.5

    48 L&T Cracking High 310 Ft 1.8 26.0

    52 Raveling Low 17,115 SqFt 100.0 26.4

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    100 0

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    FAIR

    POOR

    VERY POOR

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-17

  • BRANCH NAME: APRONS GENERAL AVIATION PREVIOUS PCI: 2016 63

    BRANCH ID: APRGA CURRENT PCI: 2019 10

    SECTION ID: 170 PCI CHANGE/DET. RATE: -53 -18.16

    RANK: P 5-YEAR PREDICTED PCI: 2024 0

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 17,004 MAJOR REHABILITATION: 2001

    LOAD RELATED DISTRESS %

    0

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    43 Block Cracking Medium 5,068 SqFt 29.8 33.9

    43 Block Cracking High 4,184 SqFt 24.6 53.9

    48 L&T Cracking Medium 250 Ft 1.5 13.5

    48 L&T Cracking High 466 Ft 2.7 31.5

    52 Raveling Medium 16,119 SqFt 94.8 55.5

    52 Raveling High 883 SqFt 5.2 41.9

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    100 0

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    FAIR

    FAILED

    FAILED

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-18

  • BRANCH NAME: APRONS GENERAL AVIATION PREVIOUS PCI: 2016 64

    BRANCH ID: APRGA CURRENT PCI: 2019 44

    SECTION ID: 180 PCI CHANGE/DET. RATE: -20 -6.85

    RANK: P 5-YEAR PREDICTED PCI: 2024 33

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 16,764 MAJOR REHABILITATION: 2001

    LOAD RELATED DISTRESS %

    0

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    43 Block Cracking Medium 10,557 SqFt 63.0 44.5

    48 L&T Cracking Medium 373 Ft 2.2 16.6

    52 Raveling Low 16,764 SqFt 100.0 26.4

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    100 0

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    FAIR

    POOR

    VERY POOR

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-19

  • BRANCH NAME: APRONS GENERAL AVIATION PREVIOUS PCI: 2016 59

    BRANCH ID: APRGA CURRENT PCI: 2019 29

    SECTION ID: 190 PCI CHANGE/DET. RATE: -30 -10.28

    RANK: P 5-YEAR PREDICTED PCI: 2024 18

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 16,734 MAJOR REHABILITATION: 1998

    LOAD RELATED DISTRESS %

    0

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    43 Block Cracking Medium 13,454 SqFt 80.4 48.8

    43 Block Cracking High 1,271 SqFt 7.6 38.2

    48 L&T Cracking Medium 164 Ft 1.0 11.1

    52 Raveling Low 16,732 SqFt 100.0 26.4

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    100 0

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    FAIR

    VERY POOR

    SERIOUS

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-20

  • BRANCH NAME: APRONS GENERAL AVIATION PREVIOUS PCI: 2016 52

    BRANCH ID: APRGA CURRENT PCI: 2019 31

    SECTION ID: 200 PCI CHANGE/DET. RATE: -21 -7.20

    RANK: P 5-YEAR PREDICTED PCI: 2024 20

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 14,666 MAJOR REHABILITATION: 1995

    LOAD RELATED DISTRESS %

    0

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    43 Block Cracking Medium 6,749 SqFt 46.0 39.6

    43 Block Cracking High 1,567 SqFt 10.7 42.3

    47 Joint Reflection Cracking Medium 205 Ft 1.4 12.1

    48 L&T Cracking Medium 703 Ft 4.8 25.1

    52 Raveling Low 14,664 SqFt 100.0 26.3

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    100 0

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    POOR

    VERY POOR

    SERIOUS

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-21

  • BRANCH NAME: APRONS GENERAL AVIATION PREVIOUS PCI: 2016 17

    BRANCH ID: APRGA CURRENT PCI: 2019 15

    SECTION ID: 210 PCI CHANGE/DET. RATE: -2 -0.69

    RANK: P 5-YEAR PREDICTED PCI: 2024 4

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 14,612 MAJOR REHABILITATION: 1980

    LOAD RELATED DISTRESS %

    40

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    41 Alligator Cracking Medium 3,602 SqFt 24.7 68.2

    48 L&T Cracking Medium 751 Ft 5.1 26.1

    50 Patching Low 2,168 SqFt 14.8 17.7

    52 Raveling Low 5,550 SqFt 38.0 18.1

    52 Raveling Medium 6,892 SqFt 47.2 41.1

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    60 0

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    SERIOUS

    SERIOUS

    FAILED

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-22

  • BRANCH NAME: APRONS GENERAL AVIATION PREVIOUS PCI: 2016 63

    BRANCH ID: APRGA CURRENT PCI: 2019 60

    SECTION ID: 220 PCI CHANGE/DET. RATE: -3 -1.03

    RANK: P 5-YEAR PREDICTED PCI: 2024 49

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 12,948 MAJOR REHABILITATION: 2001

    LOAD RELATED DISTRESS %

    0

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    48 L&T Cracking Low 166 Ft 1.3 5.6

    48 L&T Cracking Medium 958 Ft 7.4 31.5

    52 Raveling Low 12,946 SqFt 100.0 26.3

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    100 0

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    FAIR

    FAIR

    POOR

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-23

  • BRANCH NAME: APRONS GENERAL AVIATION PREVIOUS PCI: 2016 20

    BRANCH ID: APRGA CURRENT PCI: 2019 39

    SECTION ID: 230 PCI CHANGE/DET. RATE: 19 6.51

    RANK: P 5-YEAR PREDICTED PCI: 2024 28

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 35,863 MAJOR REHABILITATION: 1980

    LOAD RELATED DISTRESS %

    77

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    41 Alligator Cracking Low 23,738 SqFt 66.2 67.0

    48 L&T Cracking Low 294 Ft 0.8 4.6

    48 L&T Cracking Medium 245 Ft 0.7 9.5

    57 Weathering Low 35,858 SqFt 100.0 6.0

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    23 0

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    SERIOUS

    VERY POOR

    VERY POOR

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-24

  • BRANCH NAME: APRONS GENERAL AVIATION PREVIOUS PCI: 2016 48

    BRANCH ID: APRGA CURRENT PCI: 2019 39

    SECTION ID: 240 PCI CHANGE/DET. RATE: -9 -3.08

    RANK: P 5-YEAR PREDICTED PCI: 2024 28

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 14,340 MAJOR REHABILITATION: 1993

    LOAD RELATED DISTRESS %

    44

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    41 Alligator Cracking Low 1,219 SqFt 8.5 41.6

    43 Block Cracking Low 3,711 SqFt 25.9 23.1

    48 L&T Cracking Low 558 Ft 3.9 12.3

    48 L&T Cracking Medium 181 Ft 1.3 12.5

    57 Weathering Low 14,340 SqFt 100.0 6.0

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    56 0

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    POOR

    VERY POOR

    VERY POOR

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-25

  • BRANCH NAME: APRONS GENERAL AVIATION PREVIOUS PCI: 2016 77

    BRANCH ID: APRGA CURRENT PCI: 2019 67

    SECTION ID: 250 PCI CHANGE/DET. RATE: -10 -3.43

    RANK: P 5-YEAR PREDICTED PCI: 2024 56

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 11,411 MAJOR REHABILITATION: 2008

    LOAD RELATED DISTRESS %

    0

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    48 L&T Cracking Low 274 Ft 2.4 8.5

    48 L&T Cracking Medium 724 Ft 6.3 29.1

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    100 0

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    SATISFACTORY

    FAIR

    FAIR

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-26

  • BRANCH NAME: GENERAL AVIATION FIRE APRON PREVIOUS PCI: 2016 79

    BRANCH ID: APRGAFF CURRENT PCI: 2019 77

    SECTION ID: 10 PCI CHANGE/DET. RATE: -2 -0.69

    RANK: P 5-YEAR PREDICTED PCI: 2024 66

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 12,067 MAJOR REHABILITATION: 2005

    LOAD RELATED DISTRESS %

    0

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    43 Block Cracking Low 65 SqFt 0.5 6.4

    48 L&T Cracking Low 145 Ft 1.2 5.4

    48 L&T Cracking Medium 134 Ft 1.1 11.8

    57 Weathering Low 12,065 SqFt 100.0 6.0

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    100 0

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    SATISFACTORY

    SATISFACTORY

    FAIR

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-27

  • BRANCH NAME: APRONS HANGARS SOUTH PREVIOUS PCI: 2016 9

    BRANCH ID: APRHANGS CURRENT PCI: 2019 97

    SECTION ID: 10 PCI CHANGE/DET. RATE: 88 30.16

    RANK: P 5-YEAR PREDICTED PCI: 2024 86

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 12,872 MAJOR REHABILITATION: 1978

    LOAD RELATED DISTRESS %

    0

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    48 L&T Cracking Low 17 Ft 0.1 2.6

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    100 0

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    FAILED

    GOOD

    GOOD

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-28

  • BRANCH NAME: APRONS HANGARS SOUTH PREVIOUS PCI: 2016 97

    BRANCH ID: APRHANGS CURRENT PCI: 2019 95

    SECTION ID: 20 PCI CHANGE/DET. RATE: -2 -0.69

    RANK: P 5-YEAR PREDICTED PCI: 2024 81

    SURFACE TYPE: PCC MAINTENANCE: NA

    AREA (SF): 14,656 MAJOR REHABILITATION: 2014

    LOAD RELATED DISTRESS %

    0

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    65 Joint Seal Damage Low 147 Slabs 100.0 2.0

    70 Scaling High 1 Slabs 0.7 4.2

    74 Joint Spall Medium 1 Slabs 0.7 0.8

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    29 71

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    GOOD

    GOOD

    SATISFACTORY

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-29

  • BRANCH NAME: APRONS HANGARS SOUTH PREVIOUS PCI: 2016 9

    BRANCH ID: APRHANGS CURRENT PCI: 2019 33

    SECTION ID: 30 PCI CHANGE/DET. RATE: 24 8.23

    RANK: P 5-YEAR PREDICTED PCI: 2024 22

    SURFACE TYPE: AC MAINTENANCE: NA

    AREA (SF): 6,086 MAJOR REHABILITATION: 1978

    LOAD RELATED DISTRESS %

    30

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    41 Alligator Cracking Medium 50 SqFt 0.8 27.3

    43 Block Cracking Medium 5,850 SqFt 96.1 52.2

    52 Raveling Medium 10 SqFt 0.2 4.4

    57 Weathering Low 5,890 SqFt 96.8 5.9

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    70 0

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    FAILED

    VERY POOR

    SERIOUS

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-30

  • BRANCH NAME: APRONS TERMINAL PREVIOUS PCI: 2016 97

    BRANCH ID: APRTERM CURRENT PCI: 2019 97

    SECTION ID: 10 PCI CHANGE/DET. RATE: 0 0.00

    RANK: P 5-YEAR PREDICTED PCI: 2024 84

    SURFACE TYPE: PCC MAINTENANCE: NA

    AREA (SF): 273,630 MAJOR REHABILITATION: 2014

    LOAD RELATED DISTRESS %

    4

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    62 Corner Break Low 1 Slabs 0.2 0.8

    65 Joint Seal Damage Low 197 Slabs 44.9 2.0

    65 Joint Seal Damage High 20 Slabs 4.6 12.0

    73 Shrinkage Cracking N/A 5 Slabs 1.1 0.3

    74 Joint Spall Low 12 Slabs 2.7 0.9

    74 Joint Spall High 1 Slabs 0.2 3.0

    75 Corner Spall Low 2 Slabs 0.5 0.4

    75 Corner Spall Medium 2 Slabs 0.5 0.9

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    69 27

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    GOOD

    GOOD

    SATISFACTORY

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026

    Pav

    em

    en

    t C

    on

    dit

    ion

    Ind

    ex

    (PC

    I)

    Current Inspeciton

    Maintenance Work

    Major Rehabilitation

    Critical PCI

    Projected Deterioraiton

    Section PCI Deterioration

    A-31

  • BRANCH NAME: APRONS TERMINAL PREVIOUS PCI: 2016 71

    BRANCH ID: APRTERM CURRENT PCI: 2019 72

    SECTION ID: 20 PCI CHANGE/DET. RATE: 1 0.34

    RANK: P 5-YEAR PREDICTED PCI: 2024 54

    SURFACE TYPE: PCC MAINTENANCE: NA

    AREA (SF): 111,351 MAJOR REHABILITATION: 2003

    LOAD RELATED DISTRESS %

    4

    CURRENT ESTIMATED TOTAL DISTRESS QUANTITIES

    Distress Code Description Severity Quantity Units Density (%) PCI Deduct Value

    62 Corner Break Low 5 Slabs 1.7 1.3

    69 Pumping N/A 14 Slabs 5.0 5.2

    74 Joint Spall Low 9 Slabs 3.3 1.1

    75 Corner Spall Medium 9 Slabs 3.3 2.8

    76 ASR Low 278 Slabs 100.0 21.8

    CLIMATE RELATED DISTRESS % OTHER RELATED DISTRESSES (%)

    0 96

    SECTION HISTORICAL AND PROJECTED CONDITIONS

    ASHEVILLE REGIONAL AIRPORT (AVL) SECTIONS

    SECTION INFORMATION

    From Previous Inspection

    PERCENT OF DEDUCT VALUES BASED ON DISTRESS MECHANISM

    NORTH CAROLINA STATEWIDE AIRPORT PAVEMENT MANAGEMENT SYSTEM

    PAVER™ Analysis Section Level Output

    SATISFACTORY

    SATISFACTORY

    POOR

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    10