3
Asec Rodolfo Demosthenes Santillan Asec Rodolfo Demosthenes Santillan

Asec Rodolfo Demosthenes Santillan

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Asec Rodolfo Demosthenes Santillan

Asec Rodolfo Demosthenes SantillanAsec Rodolfo Demosthenes Santillan

Page 2: Asec Rodolfo Demosthenes Santillan

Complacency unfamiliarit

Last strong typhoon p y

of the residents to

unfamiliarity with storm

surge

ypexperience

was evacuate surgeNovember 26,

1912

Government Government caught

unprepared prepositioned

logistics unprepared for the “new

normal”

logistics washed out

Response d R

“Chaotic”L l d E tiand Recovery

measures unfit for the

Local and International Humanitaria

ErraticLogistics

management unfit for the situation

Humanitarian response

management

Page 3: Asec Rodolfo Demosthenes Santillan

Information • Early Warning

Evacuation and Advocacy

Campaign

System(Project NOAH)

• Pre Disaster Risk Plan (SMS,

Bulletins)

• Pre Disaster Risk Assessment (PDRA)

• Sunset Review RA 10121

• Enhancement of the • Enhancement of the Prepared Plan

• Development of Contingency Plan

Prepositioning of Logistics

Contingency Plan• Public - Private

PartnershipD l t P li

• Enhancement of the

• Development Policy on International Humanitarian Response

• Policy Guidelines on the Logistics Response Plan• Incident Command

System in placed

• Policy Guidelines on the Interoperability of Incident Management Teams (IMS) and the

Logistics Management

System in placed Teams (IMS) and the Response Clusters