Artificial Lift dBase
Content
1. What is ALD.
2. Benefits of ALD Application.
3. ALD Concept.
4. Major Process Covered in ALD.
5. Features.
6. Outputs & Reports.
7. Concerns.
8. ALD Managed Challenges.
9. Way Forward & Vision.
Artificial Lift Database (ALD) is a web based application using an Oracle database. It is built in-house in 2004.
It meets PDO’s business requirement to support ESP contracts by capturing financial and technical functionalities and reports such as Run-Life, failure trends, pump trips, KPIs, Installation, Commission, FSR, Pull reports, lease calculation …etc.
What is ALD
Accurate Data.
Easy accessibility.
Standard and regular reporting.
Quick decision making.
Cost visibility and improve on contract management.
Insuring regular flow of documents.
Efficient cost management.
Benefits of ALD Application
ESP/ESPCP• Admin• Controls• Master Data
ESP Tech. ESP Financial
ESPAnalysis
BP/PCPTech.
BP/PCPView
BP/PCP
Artificial Lift dBase (ALD)
ALD Concept
Failure Analysis
KPI‘s (RL & Population)
ESP/ESPCP/BP/PCP
Reports
Automatic Calculations
Penalties
Miscellaneous Cost IPC Generation
Payments
Major Process Covered in ALD
Installation Commission Fail Pulled
Main events for an ESP
ESPTrips
ESPFail Code
Generators
Trip & Failures
Events
Quotation and Contractual Information
Strong LinkBetween Quotation
and Installation Date
Well validationIn Contractual Transaction
Features
Integration between financial and technical.
Integration of documents through well life cycle.
Automatic calculation for key figures such as Run-Life.
Ability to attach, and link documents.
Having 26 reports and KPIs
Outputs & Reports
Run-Life.
Population.
KPI’s.
Failure Analysis.
Financial.
Equipment Tracking.
Well History & Technical.
Run-Life
Run-Life
Population
KPI
Failure Analysis
Test
Failure Analysis
Test
Financial - Quotation Details
Financial - Contractual Transaction
Equipment Tracking
Technical - Installation Report
Technical - Field Service Report
ALD Managed Challenges
Collecting the key contractual information while updating Quotations.
Introducing link between Quotation and Run-life.
Approvals on key reports such as installation, commission…etc
Collecting relevant Trips information from a cooperate dbase and calculating contractual conditions Automatically such as Buy-out, actual running time …etc.
Quotation approval process will be available On-line.
Assigning Responsibility while capturing failure analysis.
Built in validation to insure correct data flow and quality.
Concerns
Communication between client and the server due to Web set-up.
To get ESP vendors more involved in using ALD.
To be able to design ESP in ALD.
To be able to do ESP Diagnosis with in ALD.
Further expansion on reports, and KPIs
Way Forward & Vision