Upload
doankhanh
View
224
Download
0
Embed Size (px)
Citation preview
Cement International No. 1/2009 Article: „Increasing the clinker Capacity at Sharjah Cement, UAE, by modernizing a long dry kiln and erecting a 5-stage cyclone preheater with calziner“ S.K. Sur, Sharjah Cement Factory, United Arab Emirates Eng. O. Michelswirth, Eng. Dr. H. Moeser, D. Schmidt, Intercem Engineering GmbH, Oelde, Germany