Upload
doantu
View
221
Download
1
Embed Size (px)
Citation preview
FYFE
S
S
S
TRANSFLEX R
Structural Design
Stay & Suspension Cablesfor Bridges, Domes & Roofs
Climbing Forms
Form Travelers Expansion Joints
Precast-PrestressedBeams
Carbon Fibers
Rebar SplicingPrestressed Concrete, Concrete-Steel Composites Bridges. Buildings, Silos & Tanks.Value and Construction Engineering.
With bare, galvanized, polyester and epoxi coated Strand.
Manual & Automatic.
For Balanced Cantilever Bridges.
For Bridge in-situ Construction.
Engineering & Systems.
Modular, Transflex, & Asphaltic.
Engineering & Installation.
With cold-swaged Couplers, #4 to #18 rebar sizes.
Multistrand with tendon capacities up to 10 000 KN. Monostrand, Bar, flat Multistrand.
Bar & Strand.Temporary & Permanent.Self-drilling & traditional.
For concrete Slabs.
Pot, Spherical & Elastomeric Pads.
Lifting, Lowering, Shifting, Pile driving, Pipe Jacking.
With listed Techniques.
Hydraulical-Electricallyoperated.
Shock Transmission Units.Dampers for Bridges & Stays.
Engineering & Systems.
Beam & Segments Launchers
Seismic ProtectionDevices
Moveable Bridges
Post-tensioning Ground Anchors
Incrementally LaunchedBridges
Preformed Seals
Advancing Shoring Bridge Bearings
Jacking Systems Structure repair & upgrade
Av Nativitas 429 • 16090 Xochimilco, D.F. • México Tel: +(52)(55) 5334 0330 • Fax +(52)(55) 5334 0331
E-mail [email protected]
Curriculum Index1. Introduction
2. General Information
3. Structural Design
4. Multistrand Post-tensioning
5. Slab Post-tensioning
6. Stay & Suspension Cables
7. Ground Anchors
8. Incrementally Launched Bridges
9. Advancing Shoring
10. Jacking Systems
11. Form Travelers
12. Climbing Forms
13. Bridge Bearings
14. Beam Launchers
15. Precast-Prestressed Beams
16. Moveable Bridges
17. Bridge Joints
18. Rebar Splicing
19. Structure Repair & Upgrade
20. Storage Tanks
21. Contractor
22. Memberships
23. Recognitions
24. Company Registers
7
8
9
15
21
24
26
29
31
32
35
37
40
43
47
50
51
58
64
68
70
71
71
72
3. Structural DesignProject Constructor/Owner Location Year
Different Structures ond the Hway.
Rojo & Blanco Bridges
D-9 Freeway interchange
Altozano Bridge
Naucalpan-Toluca Highway access
Papagayo Bridge
Vidalta Bridge
Paso de Piedra Bridge
Carrera Novena Viaduct
Bridge # 1 Supervía Poniente
Chroma Corporate Building
Platanito Bridge
Atotonilco Viaduct, Hidalgo.
CAPUFE
Acciona Infraestructura México, S.A. de C.V.SCT -Dirección General de Carreteras-
Altozano el Nuevo Tabasco, S.A. C.V.
Autopistas de Vanguardia, S.A. de C.V.
Grupo Profrezac, S.A. DE C.V.
Banca Mifel, S.A.
Construcciones ALDESEM, S.A. de C.V.
Consorcio Internacional Viaducto Carrera Novena
Coordinadora Vía Rápida Poniente SAPI, S.A. de C.V.
Inmobiliaria Coruus, S.A. de C.V.
Omega Construciones Industriales, S.A. de C.V.
Infraestructura y Saneaminto Atotonilco, S.A. de C.V.
Cuernavaca-Acapulco HwayPuebla
Puebla
Durango
Lerma, Naucalpan
Acapulco, Guerrero
Mexico City
Durango-Mazatlán Hway
Bucaramanga, Colombia
Mexico City
Monterrey, N.L.
Durango-Mazatlán Hway
Hidalgo
2015
2015
2014
2014
2013
2013
2012
2012
2012
2012
2012
2011
2011
Carrera Novena Viaduct, Bucaramanga, Colombia
Naeko Logistics, Barcelona, España
Bridge # 1 Supervía Poniente, Mexico City
Vidalta Bridge, Mexico City
E-mail: [email protected] • Tel: (52)(55) 5334 0330 • Fax: (52)(55) 5334 0331
9
3. Structural Design
10
Project Constructor/Owner Location Year
Del Parque Residential Complex
Magnolia y Periférico Bridges
El Nuevo Bridge
Punta De Agua Bridge
Galindo y Villa-Fray Bridge, Servando Teresa De Mier-Calle 8 Circuito Interior
Ventiscas-Blvd. Temoluco Av.
URBI Santiago III Bridge
Tres Cimbres Residential Complex
Vidalta Bridge
Centenario-Av. Luis Cabrera Av.
Naeko Logistic WarehouseProyecto Ejecutivo
Inmobiliaria COPRI S A P I DE C.V.
Controladora Vía Rápida Poetas, S.A.P. I. DE C.V.
Banco Nacional de Obras y Servicios Públicos, S.n.c. Fid-358
Secretaria De Comunicaciones Y Transportes
Gobierno del Distrito Federal
Gobierno Del Distrito Federal/Secretaria De Obras Publicas/Direccion General De Obras Publicas
Urbi Construcciones Del Pacifico, S.A. De C.V.
Consorcio Inmobiliario Promotor, S.A.CV
Cia Mexicana De Gerenciamiento, S.C.
Consorcio Inmobiliario Promotor, S.A.C.V.
Losan Mecanica De Suelo, S.A.
Mexico City
Mexico City
Km 111+040 Tramo Carr. Guadalajara-Colima
Manzanillo, Colima Freeway
Mexico City
Mexico City
Tonalá, Jalisco
Mexico City
Mexico City
Mexico City
Barcelona, España
2010
2010
2009
2008
2008
2008
2008
2008
2008
2007
2007
Lomas Country, Bridge, Mexico City Albatros Bridge, Lázaro Cárdenas, Michoacan
Tlalpan Footbridge, Mexico City Papaloapan Bridge, La Tinaja - Cosoleacaque Highway
E-mail: [email protected] • Tel: (52)(55) 5334 0330 • Fax: (52)(55) 5334 0331
3. Structural Design
Executive Project “Nodo Vial Atotonilco”
Gasa de Naciones UnidasStructural Design
El Capulin InterchangeStructural Design
Bridges Without names on the Durango-Mazatlán Highway (4 Bridges)
Mexicali Highway
Papaloapan Bridge
Pedestrian Bridge on the Mexico-Cuernavaca Highway, “Tlalpan”
Baluarte Bridge
Bridge wihout name on the Durango-Mazatlan Highway.
Albatros Bridge
Secretaria De Finanzas Del Gobierno Del Estado
ARI Arquitectura, S.A. de C.V.
ARI Arquitectura, S.A. de C.V.
Secretaria de Comunicaciones y Transportes, Dirección General de Carreteras.
Omega Construcciones Industriales, S.A. de C.V.
Caminos y Puentes Federales de Ingresos y Servicios Conexos.
La Universidad Nacional Autónoma de México, Facultad de Arquitectura.
Secretaria de Comunicaciones y Transportes.
Secretaria de Comunicaciones y Transportes.
Administración Portuaria Integral de Lázaro Cárdenas, S.A. de C.V.
Guadalajara-Atotonilco Hway
Ciudad Victoria- Matamoros Hway
Jalapa, Veracruz.
Sinaloa.
Mexicali-Tijuana Freeway
La Tinaja-Isla Hway
Plaza Peaje No. 1 México- Cuernava Hway
Durango.
Sinaloa.
Lázaro Cárdenas, Michoacán.
2007
2006
2006
2006
2005
2005
2005
2005
2005
2005
11
Project Constructor/Owner Location Year
“Guapay” Bridge, Sta. Cruz , Bolivia Viaducto Tacagua, Venezuela
“Toreo” Interchange, Naucalpan, Edo. de México “Grijalva I” Bridge, Villahermosa, Tabasco
E-mail: [email protected] • Tel: (52)(55) 5334 0330 • Fax: (52)(55) 5334 0331
12
Structural Design of the construction of 3 Bridges.Structural Design of an Arch bridge Km 159+373.
Toreo bridge Structural Design, Cable Stay Bridge with L=126mts. Including necessaryfield Studies and road design.
Grijalva I BridgeStructural Design, Cable Stay bridge with L=391mts. Including necessaryfield Studies and soil mechanics.
Lomas Country IV BridgeStructural Design, Including necessaryfield Studies and soil mechanics.Balanced Cantilever. (L = 160 mts.).
Guapay Bridge (Structural Design, Including necessary) field Studies and soil mechanics.(L = 1560 mts.)
Tacagua ViaductStructural Design, Including necessaryfield Studies and soil mechanics.Incrementally Launched Bridge.(L = 980 mts.)
Dirección Genera de Planeación y Urbanización. Sec. de Desarrollo UrbanoDirección General de Carreteras Federales S.C.T.
Fideicomiso Técnico. Gobierno del Estado de México - H. Ayuntamiento Constitucional de Naucalpan de Juárez.
Junta Estatal de Caminos CAPUFE.Gob. Del Edo
ADMICORP, S.A. de C.V.
International Service Group, INC
AUCOVEN.
Chamela- Purificación, Jalisco, HwayMéxico- Tuxpan Hway
Naucalpan, Edo. de México
Villahermosa - Chetumal. Hway
Huixquilucan,Edo. de México
Santa Cruz, República de Bolivia
Quebrada de Tacagua,Caracas-La Guaira HwayRepública de Venezuela.
2004
2002
2002
2001
1998
1998
1998
Project Constructor/Owner Location Year
3. Structural Design
Atenquique II Bridge, Guadalajara-Colima Highway Pensil Tunnel Viaduct, México -Veracruz Railway
La Marquesa Bridge, Mexico City
E-mail: [email protected] • Tel: (52)(55) 5334 0330 • Fax: (52)(55) 5334 0331
Corredor Sur, Cd de Panamá. Design of 9 junctions.
Río Perales BridgeDetailed Design of beams
Gonzalitos- Constitución BridgeChange from presstressed to post-tensioning of 3 spans of (L = 100mts.)
Calle Pino Suárez Bridge.
Río Mula, Río Chiricagua, Río Platana and Río Lajas Bridges.Detailed beams Design.
Calle Venezuela flyover.
Río Chiriqui Grande & Río Tribique Bridge. Detailed beams Design.
Carretera Nacional Flyover. (Rehabilitación).
Papaloapan Bridge.Structural Design, Stay Cable bridge (L = 360 mts.)
Ingenieros Civiles Panamá, S.A.
Fundaciones, S.A para el M.O.P.República de Panamá.
Municipio de Monterrey, Nuevo León.
Municipio de Nuevo Laredo, Tamaulipas.
Fundaciones, S.A. para el M.O.P. República de Panamá.
Municipio de Nuevo Laredo, Tamaulipas.
Mantenimiento Aliado S.A para el M.O.P. República de Panamá.
Dirección General de Carreteras Federales.
OPSA de GMD (Concesionaria)D.G.C.F. (Propietario Final).
Panamá.
Provincia de los SantosPanamá.
Monterrey, Nuevo León.
Nuevo Laredo,Tamaulipas.
Ensanche David - ConcepciónVillalobos-Club de Golf
Laredo, Tamaulipas.
Camino Fortuna - Chiriqui Grande. Panamá.
Monterrey-Nuevo LaredoHway
La Tinaja - CosoleacaqueHway
1997-1998
1997
1997
1997
1996
1996
1996
1996
1993
13
Project Constructor/Owner Location Year
3. Structural Design
Metlac Bridge, México-Veracruz Railway
Huixquilucan Bridge, Mexico City Atenquique I, Guadalajara-Colima Highway
E-mail: [email protected] • Tel: (52)(55) 5334 0330 • Fax: (52)(55) 5334 0331
14
Cartagena Viaduct (Design of 6 Structures, Junctions and Viaducts. (L = 600 mts.)
Palo Blanco Bridge.Detailed beams Design.
Aguas Blancas Roads(AASHTO Beam Modif).
Huixquilucan Bridge.Incrementally Launched Bridge. L = 318 m
Atenquique I (L=320m) & II (L=438 m)Incrementally Launched Bridge.
La Marquesa BridgeIncrementally Launched Bridge. L = 340 m
Pensil Viaduct tunnel Balanced Cantilever (Long = 120 mts).
Badiraguato Bridge.
Atoyac Bridge. ( L = 496 mts.)Incrementally Launched Bridge.
Metlac Bridge. (L = 390 mts.)Balanced Cantilever
Obras y Proyectos S.A de C.V.
Dillon Construction Inc. para el M.O.P.República de Panamá.
Obras Públicas del Municipio de Acapulco, Guerrero.
CotremEdo. de México.
D.G.C.F.
D.G.C.F.
Dirección General de Vías Férreas
D.G. Carreteras Federales.
Dirección General de Vías Férreas.
Dirección General de Vías Férreas.
Atizapán -Venta de Carpio Hway
Provincia de David,Panamá.
Acapulco, GuerreroKm. 0+000-Km. 1+850.
HuixquilucanEdo. de México.
Guadalajara -Colima Hway
México-Toluca Hway
México - Veracruz Railway
Sinaloa, Culiacán.
México - Veracruz Railway
México - Veracruz Railway
1993
1993
1993
1992
1989
1987
1986
1983
1981
1980
Project Constructor/Owner Location Year
3. Structural Design
Zoquital Bridge, México - Tuxpan Highway
Badiraguato Bridge, Sinaloa, Culiacán.
Atoyac Bridge, México-Veracruz Railway
Paso de Piedra Bridge, Durango-Mazatlán Highway
E-mail: [email protected] • Tel: (52)(55) 5334 0330 • Fax: (52)(55) 5334 0331
Av Nativitas 429 • 16090 Xochimilco, D.F. • México Tel: +(52)(55) 5334 0330 • Fax +(52)(55) 5334 0331
E-mail [email protected]