MUHAMMAD ARSHAD PERSONAL : Skupe id # arshi1975 Email # [email protected] Mob#: +92-3017818995 Mob#:+964-7823003686 Chak # 80/10-R Village Peerowal P/O Khas Tehsil & District Khanewal postal code 58150 CAREER OBJECTIVE TO SOLVE PROBLEM IN AN EFFECTIVE/CREATIVE CHALLENGING POSITION.SEEKING A RESPONSIBLE JOB WITH AN OPPORTUNITY FOR PROFESSIONAL CHALLENNBES. PERSONAL INFORMATION: Father’s Name Basheer Ahmad Date of Birth 1975 NIC No 36103-48116274-3 Domicile Khanewal Marital Status Married Nationality Pakistani Religion Islam Passport No AD1912774 ACADEMIC QUALIFICATION: Matric 1995

Arshad Resume

Embed Size (px)

Citation preview

Page 1: Arshad Resume

MUHAMMAD ARSHAD

PERSONAL:

Skupe id # arshi1975

Email # [email protected]

Mob#: +92-3017818995

Mob#:+964-7823003686

Chak # 80/10-R Village Peerowal P/O Khas

Tehsil & District Khanewal postal code 58150

CAREER OBJECTIVE TO SOLVE PROBLEM IN AN EFFECTIVE/CREATIVE CHALLENGING POSITION.SEEKING A RESPONSIBLE JOB WITH AN OPPORTUNITY FOR PROFESSIONAL CHALLENNBES.

PERSONAL INFORMATION:

Father’s Name Basheer Ahmad

Date of Birth 1975

NIC No 36103-48116274-3

Domicile Khanewal

Marital Status Married

Nationality Pakistani

Religion Islam

Passport No AD1912774

ACADEMIC QUALIFICATION:

Matric 1995

18 YEAR PROFESSIONAL EXPERIENCE:

Responsibility: PANEL INSTALLATION AND EQUIPMENT INSTALLATION ,PT,CT.CIRCUIT BREAKER, GCB ,DISCONNECT OR ,INSULATOR & TRANSFORMER , IN GREAD STATION 405MW AND FABRICATION OF CABLE TRAY

Page 2: Arshad Resume

INSTALLATION OF ,BUSBAR COUPLING AND TOURQING , CONDUCTING ,LIGHTING TUBING, CABLE TRAY,

STRUCTURE FABRICATION .CABLE LAYING AND GLANDING TERMINATION OF POWER CABLE.

Currently I am Working IN Iraq HILLA & Karbala Power Plant as

FOTP(Fuel Oil Treatment Plant)

ON GT Frame 9E with Albario engineering Pvt Ltd

From 5 June 2013 to till now…..

Experience: Descon Engineering Limited:

Ouch Power Plant Dera Murad Jamali Blochestan 480MW

Designation: LEAD MANClient: HONDAIProject: Ouch Power Plant Dera Murad JamaliDuration: 26/Nov/2012 to 15/May/2013ANDRITZ HYDRO Hydro Power Plant

Designation: LEAD MANClient: ANDRITZ HYDROProject: New Bong Escape Project Meerpur azad KashmiDuration: 30/May/2012 to 03/Oct/2012Descon Engineering Limited: Designation: LEAD MANClient: ICI PTA Port Qasim KarachiProject: ICI PTA Pollster chemical plant port qasim karachiDuration: 13/Jan/2012 to 20/May/2012ANRES COMPANY Pvt LtdDesignation: LEAD MANClient: PAK ARAB Fertilizer Pvt Ltd MultanShutdown: PAK ARAB Fertilizer Pvt Ltd Multan Duration: 10/Oct/2011 to 30/Dec/2011

Descon Engineering Limited:Designat ion: LEAD MAN

Client: BHP Bil l i ton Zam Zama oi l& Gas Plant Ltd.

Project: FEC

Durat ion: 30/Dec/2010 to 30/Sep/2011

Locat ion: Dadu, Sindh, Pakistan

Descon Engineering Limited:

Page 3: Arshad Resume

Designation: LEAD MANClient: Engro Fert i l izer Ltd.Project: EnVen 1.3 Duration: 18/Jul/2009 to 29/Oct/2011Locat ion: Daharki , Sindh, Pakis tan.

EKL Engineering Kinetics Pvt Ltd:Designat ion: LEAD MAN

Client: PPL(Pakistan Petrol iam Limited)Adhi Field Gas

Daultala Gujar Khan Rawalpindy Pakistan Shutdown: 22/June/2008 to 15/Aug/2008

Flow Tronix Pvt Ltd Lhr:Designat ion: Fabricator

Client: ICI SODA ASH

Project:

Durat ion: 15/May/2007 to 10/June/2008

Location: khaiwara Pind Daden khan

Flow Tronix Pvt Ltd Lhr:Designat ion: Fabricator

Client: MILLAT EQUIPMENT LIMITED | Millat Group Lhr

Project:

Durat ion: 20/May/2006 to 30/Mar/2007

Location: Sheikhupura Road 32 chock Lahore

Flow Tronix Pvt Ltd Lhr: Designat ion: Fabricator

Client: Consai Pant raywind sundar state lhr Project

Duration: 25/May/2003 to 01/May/2006

Location: Sheikhupura Road 32 chock Lahore

SIEMENS Pvt Ltd:Designat ion: Electr ical Welder

Client: SIEMENS

Duration: 05/05/2002 to 01/05/2003 Location: Bhitt Gas Field Development Project

SIEMENS Pvt Ltd:Designat ion: Electr ical Welder

Client: ICI Polyester Expansion Project

Duration: 01/08/2001 to 25/04/2002

Location : Sheikhupura

Flow Tronix Pvt Ltd Lhr:Designat ion: Fi t ter

Page 4: Arshad Resume

Client: Ouch Gas processing Plant at Dera Bugti

Shutdown:

Duration: 07/01/2001 to 20/02/2001

Location: Ouch Gas Dera Bugti

Flow Tronix Pvt Ltd Lhr: Designat ion: Fabricator

Work on Flow Tronix Workshop

Durat ion: 02/01/2000 to 26/12/2000

Location: Hamdard Chock Lahore

Flow Tronix Pvt Ltd Lhr:Designat ion: Fabricator

Client: Sitara Chemical

Duration: 05/07/1998 to 20/12/1999

Location: Sitara Peroxide Faisalabad

SIEMENS Pvt Ltd:Designat ion: Electr ical Welder

Client: Lal Peer Muzaffar Garh Power Plant

Duration: 20/Aug/1997 to 25/June/1998

Location: Lal Peer Muzaffar Garh Power Plant

SIEMENS Pvt Ltd:Designat ion: Fabricator

Client: SIEMENS/ABB

Duration: 15/June/1995 to 25/July/1997

Location: 500/200 KV Substation Muzaffar Garh

ARSLAN ENGINEERING Pvt Ltd:

Designat ion: Electr ical Welder

Client: ansaldo engineering

Duration: 15/June/1994 to 13/May/1995

Location: Hubco Power Plant Karachi

Descon Engineering Limited:

Designat ion: Helper

Durat ion: 15/Jan/1993 to 30/Apr/199 4

Page 5: Arshad Resume

Location: Muzaffar Garh Power Plant 2x210MW T.P.S