2. Travel West Midlands Road Map to the future. Gavin Harris
Regional Operations Manager Midlands, Public Safety Status update
on the progress of the Arqiva Public Safety Travel West Midlands
Radio System Upgrade Project
3. TWM Radio Refresh Project Background Project Background
Contract awarded June 2007 Duration 7-Year 3.5 million contract
extension Project Deadline 31 March 2009 Arqiva to replace existing
legacy radio: Automatic Vehicle Location (AVL) Full Voice Traffic
recording Remote Network Management Full Asset Tracking System
4. TWM Radio Refresh Project Background New Radio System 1,800
x buses of twenty-six different varieties. 11 x TWM Depot sites.
200 x hand-portable radios used by inspectors. 7 x Hill Top Radio
Sites. Project Make-up Arqiva Business Unit is the Client Arqiva
E&I acting as Project Management Arqiva Field Operations is
Principal Contractor Day-Shift = Hill Top Radio Sites Night-Shift =
Bus Radio Swaps
5. TWM Radio Refresh Coventry Phase (Radio & ACIS) Radio
Replacements at Coventry Phase 1 Coventry Garage Upgrade of over
130+ vehicle mounted radios Upgrade the local HTS Radio System
Garage based Dispatcher Computer Just to make things more
complicated ACIS RTPI vehicle mounted computers Arqiva to Install
130+ vehicles with: ACIS DT125 Computer VHF Flat Panel Aerial on
roof GPS Dome Aerial on roof
6. TWM Radio Refresh Coventry Phase What Went Well? Speed of
ACIS Antenna fits! Speed of Arqiva Radio Installs! Dedication of
Night-Shift Team. Can-Do attitude of Senior Engineer. Good support
from E&I Team at Romsley. Strong Technical fault-finding by
Field Ops Day-Shift team, to resolve System issues. Good on-going
support from VICoE. Good planning prior to start: Pre-manufactured
Cables Radio Brackets & Jigs etc.
7. TWM Radio Refresh Coventry Phase Lessons Learned? Key Radio
performance has been inconsistent! Key Radios supplied with a 470
Ohm Resistor which interfered with the TWM RS485 Installation! Key
Radio slippages have impacted on Field Ops ability to complete
entire project on time. A number of UAT/SAT issues which Key Radio
are still trying to resolve. Field Ops had to perform two KM3000
swaps-outs Quality of ACIS Antenna fits not good enough! Patchy
Quality of ACIS installations by Field Ops.
8. TWM Radio Refresh Summary Whats left to do Field Operations
to exchange all bus Radios again after Coventry SAT 6 x Hill Top
Radio Sites to be upgraded before end of March 2008 10 x Garage
Dispatcher PCs to be installed before end March 2008 1,600 x Bus
Radios to be upgraded in less than 12 months Project Completion
Deadline 30 March 2009 When youre waiting for one, three
arrive!
9. Public Transport Sector the futures bright? Where to now?
Further opportunities within the Public Transport sector that are
on the horizon: Travel Midland Metro Project starts 2008 Nottingham
City Transport First Bus Leicester First Bus Worcester Stagecoach
Super Tram Sheffield Camden Council . For these opportunities to be
successful we must learn from the TWM Project and change the way we
approach this work!