! P ! P ! P ! P ! P ! P ! P ! P ! P I L L I N O IS S T 16 TH ST D R A J B R O W N AV M E R I D I A N S T P E N N S Y L V A N I A S T 2 1ST ST D E L A W A R E S T C E N T R A L A V E C O L L E GE A V E CORNELL AVE 20TH ST 21ST ST YANDES ST ALLEY 1050 E 17TH ST ALLEY 1100 E ALVORD ST BELLEFONTAI CAPITOL AVE CENTER FOR INQUIRY SCHOOL 27 INDIANAPOLIS ACADEMY OF EXCELLENCE HERRON HIGH SCHOOL THE OAKS ACADEMY MIDDLE SCH. MLK JR. MEMORIAL PARK JTV HILL PARK MONON TRAIL OVER 38TH STREET - BR-18-002 Updated 9/5/2019 The Indianapolis Department of Public Works (DPW) continues to transform Indianapolis neighborhoods through the restoration of deteriorating thoroughfares, residential streets, sidewalks, and bridges, as well as addressing neighborhood drainage and flooding issues This investment continues to revitalize neighborhoods throughout Indianapolis. These projects create local jobs and increase public safety for neighborhoods and residents, which supports DPW’s commitment to make Indianapolis a more livable city. PROJECT NUMBER: BR-18-002 PROJECT STATUS: In Design ANTICIPATED CONSTRUCTION PERIOD: January 2020 - November 2020 ESTIMATED CONSTRUCTION COST: $5.55M NEIGHBORHOOD: Meridian-Kessler The Monon Trail over 38th St. is a collaboration between the Indiana Department of Transportation and the Department of Public Works. The proposed five-span bridge will improve trail safety and mobility by eliminating the crossing at 38th St. while maintaining connectivity to the existing trail system. Features include sidewalk connections and a Pacers BikeShare station. PROJECT DETAILS [email protected] 317-327-2656 • indy.gov/DPW FOR MORE INFORMATION

ARK PHALEN MONON TRAIL OVER 38TH STREET - …...CORNELL & BELLEFONTAINE - New Curb & Sidewalk PHASE II - 2019-2020!P!P!P!P!P!P!P!P!P!P!P ED-25-212 Existing Connections Red Line Purple

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ARK PHALEN MONON TRAIL OVER 38TH STREET - …...CORNELL & BELLEFONTAINE - New Curb & Sidewalk PHASE II - 2019-2020!P!P!P!P!P!P!P!P!P!P!P ED-25-212 Existing Connections Red Line Purple

ALLEY 1050 E - Widen from 10’ to 20’ with Stormwater

ALLEY 1100 E - New 10’ alley installation with Stormwater

ALVORD ST - New Road, Curb & Sidewalk with Stormwater

20TH ST - New Road, Curb & Sidewalk with Stormwater

CORNELL & BELLEFONTAINE - New Curb & Sidewalk

22ND ST - Resurface & Protected Bike Lane from Dr. AJ Brown to Capitol Ave

COLLEGE AVE - Resurface, Curb & Sidewalk (22nd to Fall Creek)

CORNELL & BELLEFONTAINE - New Curb & Sidewalk

PHASE II - 2019-2020

!P

!P

!P

!P

!P

!P

!P

!P

!P!P

!PED-25-212Existing Connections

Red Line

Purple Line

!

P Purple Line Station Locations

!

P Red Line Station Locations

Bikelane

Greenway

Multiuse

Parks

n Schools

µ0 260 520130 Feet

1 inch = 1,000 feet

!P

!P

!P

!P

!

!P

!P

!P!P

!P

22ND ST

ILLI

NO

I S S

T

22ND ST

25TH ST

16TH ST

DR

A J

BR

OW

N AV

E

ME

RID

IAN

ST

PE

NN

SY

LVA

NIA

ST

21ST ST

DE

LAW

A RE

S T

CE

NTR

A L AV

E

CO

LLE

GE

AVE

FALL CREEK

PKWY NDR

CO

RN

ELL

AV

E

20TH ST

21ST ST

YAN

DE

S S

T

ALL

EY

1050

E

17TH ST

ALL

EY

1100

EA

LVO

RD

ST

BE

LLE

FON

TAIN

E S

T

CAPI

TOL

AVE

MO

NO

N T

RAIL

FALL CREEK GREENWAY

CAPI

TOL

AVE

BIKE

LA

NE

ILLI

NO

IS S

T BI

KE L

AN

E

THE OAKSACADEMY

FALL CREEK

CARPE DIEM MERIDIAN CAMPUS

PHALEN LEADERSHIP

ACADEMY

CENTER FORINQUIRY

SCHOOL 27

TINDLEYGENESIS

ACADEMY

IVY TECHCOMMUNITY

COLLEGE

INDIANAPOLISACADEMY OFEXCELLENCE

FRANCIS W.PARKER

SCHOOL 56

HERRON HIGH

SCHOOLTHE OAKSACADEMY

MIDDLE SCH.

MLK JR.MEMORIAL

PARK

JTV HILLPARK

BART

ON

PA

RK

DO

UG

LASS

GO

LF C

OU

RSE

FRANK & JUDYO’BANNON SOCCER

FIELDS

TALBOTT &29TH PARK

16th & MONON INFRASTRUCTURE IMPROVEMENT PROJECT

MONON TRAIL OVER 38TH STREET - BR-18-002

Updated 9/5/2019

The Indianapolis Department of Public Works (DPW) continues to transform Indianapolis neighborhoods through the restoration of deteriorating thoroughfares, residential streets, sidewalks, and bridges, as well as addressing neighborhood drainage and flooding issues This investment continues to revitalize neighborhoods throughout Indianapolis.

These projects create local jobs and increase public safety for neighborhoods and residents, which supports DPW’s commitment to make Indianapolis a more livable city.

PROJECT NUMBER: BR-18-002PROJECT STATUS: In DesignANTICIPATED CONSTRUCTION PERIOD: January 2020 - November 2020 ESTIMATED CONSTRUCTION COST: $5.55MNEIGHBORHOOD: Meridian-Kessler

The Monon Trail over 38th St. is a collaboration between the Indiana Department of Transportation and the Department of Public Works. The proposed five-span bridge will improve trail safety and mobility by eliminating the crossing at 38th St. while maintaining connectivity to the existing trail system. Features include sidewalk connections and a Pacers BikeShare station.