ALLEY 1050 E - Widen from 10’ to 20’ with Stormwater
ALLEY 1100 E - New 10’ alley installation with Stormwater
ALVORD ST - New Road, Curb & Sidewalk with Stormwater
20TH ST - New Road, Curb & Sidewalk with Stormwater
CORNELL & BELLEFONTAINE - New Curb & Sidewalk
22ND ST - Resurface & Protected Bike Lane from Dr. AJ Brown to Capitol Ave
COLLEGE AVE - Resurface, Curb & Sidewalk (22nd to Fall Creek)
CORNELL & BELLEFONTAINE - New Curb & Sidewalk
PHASE II - 2019-2020
!P
!P
!P
!P
!P
!P
!P
!P
!P!P
!PED-25-212Existing Connections
Red Line
Purple Line
!
P Purple Line Station Locations
!
P Red Line Station Locations
Bikelane
Greenway
Multiuse
Parks
n Schools
µ0 260 520130 Feet
1 inch = 1,000 feet
!P
!P
!P
!P
!
!P
!P
!P!P
!P
22ND ST
ILLI
NO
I S S
T
22ND ST
25TH ST
16TH ST
DR
A J
BR
OW
N AV
E
ME
RID
IAN
ST
PE
NN
SY
LVA
NIA
ST
21ST ST
DE
LAW
A RE
S T
CE
NTR
A L AV
E
CO
LLE
GE
AVE
FALL CREEK
PKWY NDR
CO
RN
ELL
AV
E
20TH ST
21ST ST
YAN
DE
S S
T
ALL
EY
1050
E
17TH ST
ALL
EY
1100
EA
LVO
RD
ST
BE
LLE
FON
TAIN
E S
T
CAPI
TOL
AVE
MO
NO
N T
RAIL
FALL CREEK GREENWAY
CAPI
TOL
AVE
BIKE
LA
NE
ILLI
NO
IS S
T BI
KE L
AN
E
THE OAKSACADEMY
FALL CREEK
CARPE DIEM MERIDIAN CAMPUS
PHALEN LEADERSHIP
ACADEMY
CENTER FORINQUIRY
SCHOOL 27
TINDLEYGENESIS
ACADEMY
IVY TECHCOMMUNITY
COLLEGE
INDIANAPOLISACADEMY OFEXCELLENCE
FRANCIS W.PARKER
SCHOOL 56
HERRON HIGH
SCHOOLTHE OAKSACADEMY
MIDDLE SCH.
MLK JR.MEMORIAL
PARK
JTV HILLPARK
BART
ON
PA
RK
DO
UG
LASS
GO
LF C
OU
RSE
FRANK & JUDYO’BANNON SOCCER
FIELDS
TALBOTT &29TH PARK
16th & MONON INFRASTRUCTURE IMPROVEMENT PROJECT
MONON TRAIL OVER 38TH STREET - BR-18-002
Updated 9/5/2019
The Indianapolis Department of Public Works (DPW) continues to transform Indianapolis neighborhoods through the restoration of deteriorating thoroughfares, residential streets, sidewalks, and bridges, as well as addressing neighborhood drainage and flooding issues This investment continues to revitalize neighborhoods throughout Indianapolis.
These projects create local jobs and increase public safety for neighborhoods and residents, which supports DPW’s commitment to make Indianapolis a more livable city.
PROJECT NUMBER: BR-18-002PROJECT STATUS: In DesignANTICIPATED CONSTRUCTION PERIOD: January 2020 - November 2020 ESTIMATED CONSTRUCTION COST: $5.55MNEIGHBORHOOD: Meridian-Kessler
The Monon Trail over 38th St. is a collaboration between the Indiana Department of Transportation and the Department of Public Works. The proposed five-span bridge will improve trail safety and mobility by eliminating the crossing at 38th St. while maintaining connectivity to the existing trail system. Features include sidewalk connections and a Pacers BikeShare station.
PROJECT DETAILS
[email protected] • indy.gov/DPW
FOR MORE INFORMATION