Upload
quentin-fox
View
218
Download
0
Tags:
Embed Size (px)
Citation preview
Argavand Highway Shirak Street
Karmir Blur Sketch of a Multi Purpose Space
Yerevan Municipality - Ministry of Culture
•YEREVAN SUSTAINABLE URBAN TRANSPORT PROJECTYEREVAN SUSTAINABLE URBAN TRANSPORT PROJECT
B. Gasparyan – M. Popesco – L. GodinFurther Development 31th. May 2010
Amenities Justified if attractive
development actions
Basic amenities reception building
desk
cafeteria
derivates…
1
1
2
2
Exhibition
Interpretation
Research
• citadel wall
between two restored walls
using “updated” old materials
blend of “ancient” / “modern”
raised floor respecting remains
3
3 Animation centre outside activities
day / night shows
Tours
4 Tour 4 - 3.8kmExtension of tour 3 by 500m
Implies some environmental
Urban improvement along
Hrazdan river and Karmir
Blur neighborhood (Popov
Street)
4
4
2 Tour 2 - 2.0kmExtension of tour 1by 500m
Visit of the pre-urartian remains
2
Tour 3 - 3.3kmExtension of tour 2 by 1.3km
Implies restoration of one cave
joining the right bank of
Hrazdan river until viewpoint
on ramparts
3
3
Tour 1 - 1.5km Implies partial restoration
of the basalt/
mudbricks wallRampart walk going through
Interpretation / exhibition /
derivates rooms
1
1
Location 1.
General Layout
2
3
1. Shirak Street2. Argavand Highway3. Cemetery6. Old Museum
P. YSUTP - Project 2
1
P
6
Location 2.
Overview from East
4. Hrazdan River
P. YSUTP - Project 2
4
P
Location 3.
RESTORATION OF THE TWO RANKS WALLS
Excavations
PLANNED EXCAVATION WORKS
Phase 1
BASALTIC BASE
Phase 2STEEL COLUMNSAnchored in basaltic base
6 spans 14.5m x 5.0m
Phase 3STEEL COMPOUND BEAMS7 units - span 14.5m
Phase 4STEEL COMPOUND TRUSSES7 units - span 14.5m
Phase 5GLASS ROOF9m raised over ground
Phase 6SECONDARY FRAMEGround Floor
Phase 7PRECAST GROUND FLOOR14 components 2.5m x 14.5m
Viewpoint on excavation works
and dug up remains
Phase 8RESTORED WALLSColumns embedded in mud bricks
Phase 9CURTAIN WALLMain framework
Phase 10CURTAIN WALL / MEZZANINESecondary framework
Phase 11MEZZANINE / SECOND FLOORDeveloped on four spans
Phase 12CURTAIN WALL CLADDINGAlternation of glassed and opaque parts
FRONT VIEW
ENTRANCE
Ground floor will be connected to the pedestrian way
both sides leading to the walk wall - tours 1/2/3/4
INNER VIEW
INNER VIEW
Viewpoint on excavations - Access to the second floor
INNER VIEW - Total floor area = 320m2
1rst. Floor = exhibition / interpretation 8.0m x30.0m = 240m2
2nd. Floor = working / meeting rooms = 4.0m x 20.0m= 80m2
FIRST ORIENTATIONS TO BE DEVELOPED
Thank You