Architecture Review Board Team 9 City of Los Angeles Public Safety Applicant Resource Center. Clients David Lubely , Group Supervisor Keith G Giles Information Technology Manager Kori Parraga Lead Investigating Officer Instructors Dr. Barry Boehm Dr. Supannika Koolmanojwong - PowerPoint PPT Presentation
Citation preview
Architecture Review BoardTeam 9
City of Los Angeles Public Safety Applicant Resource Center
Team MembersDivya Nalam: Operational Concept EngineerVaibhav Mathur: Project ManagerArijit Dey: Life Cycle PlannerPreethi Ramesh: Feasibility AnalystShreyas Devaraj: Requirements EngineerGaurav Mathur: BuilderRakesh Mathur: IIV & V, Quality Focal Point
ClientsDavid Lubely, Group Supervisor
Keith G GilesInformation Technology Manager
Kori ParragaLead Investigating Officer
InstructorsDr. Barry BoehmDr. Supannika KoolmanojwongNupul KukrejaDaniel Link
2
Outline• Requirements Engineering• Life Cycle Plan• Operational Concept Design• Feasibility Evidence• Architecture• Prototype Demo• Test Plan• Quality Focal Point• Team’s strong and weak points
Requirements Engineering
By Shreyas Devaraj
4
WC_2395 - As a Support staff I can enter the candidate information(Name, Last 4-digit SSN and the department) and email addresses of the references to generate emails to references quickly.
WC_2393 - As an investigator I can view reference letters
WC_2394 - As a Reference I can complete the reference letters online.
Most Significant Requirements(in the order of priority)
5
WC_2396 - As an Investigator, I can review candidates assigned to me.
WC_2454 - As a Manager I can easily see the list of candidates assigned to any Investigator.
WC_2402 - As an Investigator, I can securely log in to the system to review the references.
Most Significant Requirements(in the order of priority)
Life Cycle Plan
By Arijit Dey
7
Life Cycle PlanOutline• Introduction
• Purpose• Status
• Milestones and Products• Responsibilities• Approach
• Monitoring and Control• Methods, tools and Facilities• Project plan
• Resources• Estimation using COINCOMO • Iteration plan
8
INTRODUCTIONPurpose• The Life Cycle plan helps the stakeholders to get a clear picture of
– what are the objectives to be achieved, – when are the milestones & deadlines, – what are the products which needs to be delivered, – what are the responsibilities – what should be the approach towards it, – what resources we have, and – what are the assumptions in regard to this project.
Status– The present status of the project is at the end of Foundation phase. This LCP
presently contains the future plans, updated responsibilities for CSCI 577a and CSCI 577b teams, milestones to be encountered in the various phases, project plan and iterations to be performed. Also, an estimation of the project using COINCOMO is attached to analyze the project’s feasibility within 12 weeks.
9
Milestones and ProductsOverall Strategy• The City of Los Angeles Application Resource Center is an online
system which built following the architected agile process as we have to develop the project from scratch with minimum COTS involvement.
Products• Client Interaction Report• Valuation Commitment Package• Foundation Commitment Package• Development Commitment Package• Transition Readiness Review Package
10
ResponsibilitiesTeam members Role SkillsVaibhav Mathur Project Manager
PrototyperCurrent- ASP.Net, C#, Javascript
Arijit Dey Life Cycle PlannerRequirements Engineer
Current- JAVA, Oracle 10g, Visual Studio 2012 , HTML, UML.Required- C#, MySQL, DB2
Shreyas Devaraj PrototyperProject Manager
Current- JAVA, MySQL, JavaScriptRequired- ASP.Net, C#
Gaurav Mathur BuilderUML designer
Current-JAVA, C++,MySQLRequired-C#
Preethi Ramesh Feasibility Analyst
Requirement Engineer
Current-ASP.Net, C#
Divya Nalam Operational Concept EngineerUML designer
Current-C/C++, PythonRequired- ASP.Net, C#
Rakesh Mathur Validation and Verification of COTS Interoperability
Current- ASP.Net, C#, JavaScript
11
Skills required for team members in CSCI 577B
• C#• ASP.NET• DB2• UML• BUGZILLA• WINBOOK
12
Roles required for team members in CSCI 577B
• Project Manager• Life cycle planner• Builder• Operational Concept Engineer• Quality Focal Point• IIV & V• Tester
13
APPROACH
Monitoring and Control• Weekly meeting and after class sessions• Progress reports and project plans• BUGZILLA- To raise tasks• Emails- Reviewing• Discussions
14
APPROACH[Contd.]Methods, Tools and Facilities
Tools Usage ProviderVISUAL STUDIO 2012
Used for development of the project. MICROSOFT
SQL SERVER 2008
Used as Database for developing Prototype. MICROSOFT
DB2 Used as Database for developing Project. IBMASP.NET Framework used to develop the Project. MICROSOFTWHATSAPP Used to communicate minute information between
team member.WHATSAPP
SKYPE Screen Sharing tools are used for remote team meetings and desktop sharing
SKYPE / MICROSOFT
15
Project Plan•To track the project’s progress and future increments or events.
16
Project Plan [Contd.]
17
Project Plan [Contd.]
18
Project Plan [Contd.]
19
Project Plan [Contd.]
20
Project Plan [Contd.]
21
RESOURCESThe following is module listed in the system and itsestimated size with Source Lines of Code (SLOC)No. Module Name Brief Description SLO
CREVL
1 Login Functionality Login to the system to access it. 200 8%2 Support Staff module Enter applicant details and add
references600 8%
3 Investigator Module View list of applicants, references and responses
800 5%
4 Reference Module Ability to login and fill up the reference form
300 5%
5 Manager Module Check applicants, investigators and support staff
1000 8%
6 Email Generation Generate automated emails to the references.
200 5%
22
RESOURCES[Contd.]
According to COCOMO II Estimates for CSCI577, one team member effort = 1.67 COCOMO II person months. The total effort put forward by a team of 7 members is 7*1.67=11.69 person months, which is less than the most likely effort. The pessimistic effort from the COCOMO estimation above is 16.37, so the total team members need for this project = 16.37/1.67 = 8.6NOTE:- The scale factor and cost driver details are mentioned in the LCP.
23
ITERATION PLANConstruction Phase• Iteration 1
- Focus on Capabilities with HIGH Prioritya. Email Generationb. Reference Letter Completionc. Reviewing Reference Letters
• Iteration 2- Focus on Capabilities with MEDIUM Prioritya. Reminder Email Sendingb. Manager Modulec. Assignment of Investigators
24
• Iteration3-Focus on Capabilities with LOW Prioritya. Add, Delete or Update Investigator
• Capabilities to be Tested in Iteration 3a. Email Generationb. Reference Letter Completionc. Reviewing Reference Letters
ITERATION PLAN [Contd.]
25
ITERATION PLAN [Contd.]
• Transition Phase– Perform Core Capability Drive through– Improve the System based on Client’s Feedback– Test for other low priority Capabilities
Operational Concept Design
By Divya Nalam
27
PROGRAM MODELAssumptions: The new system will be accepted by the staff of City.
Stakeholders Initiatives Value Propositions Beneficiaries References
Support Staff
Investigators
Managers
City IT staff
Developers
Develop the web based system for reference processing
Provide training to the City staff to use the new system
Maintain the web based system
• Decrease time spent on requesting and processing references
• Decrease number of personnel involved in processing reference letters
• Decrease administrative costs
• Decrease paperwork
Applicants
Supports staff
Investigators
Managers
Costs Benefits
Time spent by client in giving inputs to development team, evaluating prototypes and training staff.
Developer time
Maintenance costs (IT staff)
Hardware Costs:
i) Web Server running Windows Operating System with IIS6 or above
ii) Web Server Hosting on the World Wide Web
iii) DB2 (or SQL Server) Database (Licenses plus hardware/software)”
Decreased costs (postal charges avoided)
Decreased time in sending reference requests and receiving responses
Decreased effort for staff due to avoiding paper work and managers due to electronic monitoring of reference process
Increased efficiency of reference processing
28
BENEFIT CHAIN DIAGRAM
Increased efficiency of
reference processing
Reduced time
Reduced effort
Reduced postal cost
Developer Develop the web application
Maintain the system
Provide training to the staff
Support staff Manager Investigator
Send reference request emails
through the web application
Review investigator
assignments and references online
Review reference letter
online
Send reminder emails through
the web application
Reference
Complete reference form
online
City IT staff
Manual Work Reduced
29
SYSTEM BOUNDARY AND ENVIRONMENT
Applications: Automated Email Reference letter completion Reference letter viewing Investigator assignment
Support Infrastructure: ASP.net Visual Studio Express DB2 Structured Query Language
Reference
Investigators
Managers
Support staff
Email link to reference form
City IT staff
LA Public Safety internal network
(intranet)
Internet
Feasibility Analysis
By Preethi Ramesh
31
Business Case Analysis• Activities
Time Spent (Hours)• Exploration Phase
– Win-Win Negotiation Meetings (2 people * 4 hours + 3 people * 4 hours) 20
– Communication with development team (2 people * 2 hour)4
• Valuation Phase– ARB Meeting to review Progress
2
– Identify missing scope or requirements with Development Team10
– Commit to Hardware/Software Costs of Project – meetings plus Communication10
• Foundations Phase– Assess Prototype and give feedback about Prototype
5
– Plan for Development and Deployment of Project 40
32
Business Case Analysis• Development Phase
– Develop Release Plan with Development Team 20
– Develop Training Plan with Development Team 20
– Perform Core Capability Drive-Through 2
– Give Feedback to Development Team about Development iteration 10
– Deployment of Web System plus database Connectivity with Developer Team 30
– Provide Training for Support Staff & Background Investigators 40
– Maintenance of Database plus Web Application (recurring cost) per year 104
( 2 hours/week * 1 person * 52 weeks)
Total (for one time costs) 213
33
Hardware and Software Costs
Total Cost $0
Type Cost RationaleHosting Web Server running Windows Server with IIS 0 This is the server where the code will reside and where the users (both
internal and external) will access the System
DMZ (De-Militarized Zone) 0 Network Security Setup needed (personnel cost for setting up subnet for Web Server)
Database Back-End DB2 instance which will allow for multiple connections
0 This is the database where all data will be stored.
Disk Space to store Database Back-End DB2 data 0 This is the disk space that will be needed to store database data
Hosting Environment with connectivity to the Internet and World Wide Web
0 Networking and Internet Services Provider costs
34
Quantitative Benefits
Total Cost 3200 hours/ year
Current Activities & Resources Used % Reduce
Time Saved (Hours/Year)
For each candidate, create (type and print) one or multiple ‘Reference Request’ letters Assuming 30 minutes for each application type and print, 2000* 30 minutes = 6000 hours per year 100 1000
Post each letter by mail to the ReferenceAssuming 15 minutes to put reference form into envelope and carrying to be posted, 2000 * 15 minutes
= 500 hours per year100 500
Gather (printed) Reference Request Responses in candidate physical folder Assuming 15 minutes to open reference and properly file it, 2000* 15 minutes = 500 hours per year 100 500
Track References and Reference Letters for candidates in candidate physical folderAssuming 15 minutes to find candidate folder and find reference in folder by Background Investigator,
2000*15 minutes = 500 hours per year 100 500
Assigning Candidates to Background InvestigatorsAssuming 10 minutes to assign candidates and noting assignment in Excel Spreadsheets, 2000*10
minutes, but since assignment still needs to be done, saving is 50 % of that which is 50/100 * (2000*10 minutes) = 167 hours
50 167
Management of Background Investigators and Candidates (done by Managers)Assuming 20 minutes to change/re-assign candidates by looking up physical file and Excel Spreadsheets,
2000*20 minutes, but since re-assignment decisions still need to be made, saving is 80 % of that which is 80/100 * (2000*20 minutes) = 533 hours 80 533
35
Cost Benefit Analysis Worksheet• In our Win-Win negotiations, the Dept. of Public Safety estimated that they process 2000 (two
thousand) applications per year. The values for the benefits derived are based on this number.• Nonrecurring Costs
– System Development & Deployment $8520
($40 per hour, total costs = 213 * 40 = $8520)
• Recurring Costs– Server Maintenance Personnel Cost
$4160 per year
(104 hours per year * $40 per hour = $4160 per year)
● Tangible Benefits – Cost Avoidance
$48000 per year
(3200) * $15 / hr on average = $48000 per year
36
ROI AnalysisYear Cost Benefit
(Effort Saved) Cumulative Cost Cumulative Benefit ROI
2013 8520 0 8520 0 -1
2014 4160 48000 12680 48000 2.78548896
2015 4576 48000 17256 96000 4.56328234
2016 5033.6 48000 22290 144000 5.46041203
2013 2014 2015 2016
-2
-1
0
1
2
3
4
5
6
-1
2.78548896
4.56328234
5.46041203
ROI
Year
ROI
37
Risk Assessment
RisksRisk Exposure
Risk MitigationPotential Magnitude
Probability of Loss
Risk Exposure
Developers not continuing course next semester 10 10 100
This risk cannot be addressed. The project is very likely to be terminated at the end of the Fall Semester.
Schedules for Fall Semester Deliverables 10 7 70Incremental development, negotiate what is deliverable with the client at the end of Fall Semester
Administrator Requirements incomplete - - - Based on top two risks this risk is now moot.
Architecture Diagrams
By Gaurav Mathur
39
Outline• System Context Diagram• Behavior Diagram• Sequence Diagram• Artifacts Diagram• Deployment Diagram• Hardware Component Diagram• Software Component Diagram
40
System Context Diagram
41
Behaviour Diagram
42
SEQUENCE DIAGRAMINVESTIGATOR MODULE
43
Sequence Diagram MANAGER MODULE
44
Sequence Diagram SUPPORT STAFF MODULE
45
Sequence Diagram REFERENCE MODULE
46
Artifacts and Information Diagram
47
Deployment Diagram
48
Hardware Component Design
49
Software Component Design
Prototype Demo
By Vaibhav Mathur
51
Win-Conditions addressed in Functional Prototype
• As a Support staff I can enter the candidate information and email addresses of the references to generate emails to references quickly.
• As a Reference I can complete the reference letters online.
• As an investigator I can view reference letters• As an investigator I can identify the email that were not
responded to and resend the reminder emails.
52
53
54
55
56
Test Plan and Test Cases
By Rakesh Mathur
58
Test Plan• Combination of Code Inspection and Test Plan with Cases is being
used to test the application. • Inspection of the code was done in Buddy/Peer review • Test Plan and Cases were developed based on Functional
Requirements of Project (included in our Test Plan & Cases document)
• Testing done so far is mostly inspection on the code: • Method: Data – Driven tests to test functionality• Levels: Unit Testing and Integration Testing (Big Bang) *• We have not reached the stage of Systems and Acceptance
Testing yet
59
Test Plan (Contd.)
• Strategy used was ‘Requirements-test traceability’, each MMF (Minimum Marketable Feature) was mapped to corresponding Capability Goals (OC) and then Test Cases for those Capability Goals were created.
• Prioritization of Test Cases is Value – Neutral
60
Requirements/ Capability goals Verification Type Test Case ID (if applicable)
WC-2395 Testing TC-1: Email generation
WC-2394 Testing TC-2: Reference response submission
WC-2393 Testing TC-3: Reference response retrieval
WC-2393 Testing TC-4: Reference status review – investigator
WC-2404 Testing TC-5: Reminder sending to reference
WC-2454, WC-2583 Inspection TC-6: Manager reviews
WC-2586 Inspection TC-7: Assignment information submission
WC-2453 Inspection TC-8: Investigator table update
OC-8: Language options Inspection TC-9: Language option for references
Requirements Traceability
61
Test IdentificationTC-1: Email GenerationTC-2: Reference response submissionTC-3: Reference response retrievalTC-4: Reference status reviewTC-5: Reminder sending to referenceTC-6: Manager reviewsTC-7: Assignment information submissionTC-8: Investigator table updateTC-9: Language option for references
62
Example Test Case Test Case Number TC-01-01 Check candidate details update
Test Item The Support staff module is tested by this case. The feature that is tested is the provision for support staff to add new candidate details to the database.
Test Priority M
Pre-conditions The user should be logged in as support staff
Post-conditions The candidate details should be updated in the Candidate Table.
Input Specifications - Candidate first name, last name and last four digits of SSN are should be entered in the support staff homepage.
- Submit button needs to be clicked.
Expected Output Specifications - The candidate details submitted will appear in non-editable form on the screen.- Provision for adding more references to the candidate will be displayed on the screen.
Pass/Fail Criteria Pass criteria: - The candidate details are added to the candidate table if not already present.Fail criteria:- Database update fails and the new candidate details are not added to the Candidate table.
Assumptions and Constraints The user submits only after filling all the fields on the home page.
Dependencies
Traceability WC-2395
63
Traceability MatrixOperational Capability Requirements/ Win Conditions Architecture (SSAD) Test Case
OC-1 WC_2395 UC – Support Staff Module TC-1ATF – Reference Tracking System, ATF – Support Staff
OC-2 WC_2394, WC_2407 UC – Reference USCD TC-2ATF – Reference, ATF – Reference Tracking System, ATF – Reference Form
OC-3 WC_2393 UC - Investigator Module TC-3, TC-4ATF – Investigator, ATF – Reference Tracking System
OC-4 WC_2404 UC - Investigator Module TC-5ATF – Investigator, ATF – Reference Tracking System
OC-5 WC_2583, WC_2454 UC – Manager Module TC-6ATF – Manager, ATF – Reference Tracking System
OC-6 WC_2586, WC_2396, WC_2402 UC – Investigator Module TC-7ATF – Investigator, ATF – Reference Tracking System
OC-7 WC_2453 UC – Manager Module TC-8ATF – Manager, ATF – Reference Tracking System
OC-8 WC_2840
QFP
By Rakesh Mathur
65
Two Sets of Metrics (Burndown Chart)
1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 73 76 79 820
10
20
30
40
50
60
Burndown Chart
Completed TasksRemaining TasksIdeal Burndown
Win-Win Negotiation Session 1
FCR ARB
Win-Win Negotiation Session 2
66
Two Sets of Metrics – (Burndown Chart)
The Burndown chart plots “Number of tasks remaining” vs. the week in which the task was completed. The tasks were taken from Bugzilla and each task corresponds to a ‘bug’ in
Bugzilla. The tasks are of all types: defect, enhancement, task, Team Activity etc.
The chart starts at maximum number of tasks, even though tickets were not all opened at the beginning of week 5
A ‘step’ pattern is observed, the size of steps points to how much progress was made in that week.
Inputs: data from Bugzilla report from the Bugzilla online tool Outputs: Expect to know progress week – by – week Benefits: Map progress to figure out where improvements can be made.
67
Two Sets of Metrics (Time Spent on Activity)
05
1015202530
Operational Concept Development
010203040506070
System and Software Requirements De-velopment
05
101520253035
System and Software Architecture Devel-opment
Wk3 Wk 4 Wk5 Wk6 Wk7 Wk8 Wk9 Wk10 Wk11 Wk12 Wk13 Wk140
5
10
15
20
Life Cycle Planning
Hour
s spe
nt b
y Te
am
68
Two Sets of Metrics (Time Spent on Activity)
05
10152025
Feasibility Evidence Description
0
5
10
15
20
Quality Management
020406080
100
Implementation
Wk3 Wk 4 Wk5 Wk6 Wk7 Wk8 Wk9 Wk10 Wk11 Wk12 Wk13 Wk14012345
Testing
Hour
s spe
nt b
y Te
am
69
Two Sets of Metrics (Time Spent on Activity)
Wk3 Wk 4 Wk5 Wk6 Wk7 Wk8 Wk9 Wk10 Wk11 Wk12 Wk13 Wk1405
10152025
Project Administration
Wk3 Wk 4 Wk5 Wk6 Wk7 Wk8 Wk9 Wk10 Wk11 Wk12 Wk13 Wk140
20
40
60
80
100
120
Total
Hour
s spe
nt b
y Te
am
70
Two Sets of Metrics (Time Spent on Activity)
The Time Spent on Activity chart plots the time (in hours) spent by our Team on each Activity weekly. The tasks were taken from the Weekly Effort Report submitted by all team members. Charts indicate how our efforts for various activities have changed over the course of
the semester Milestones:
VC Package: 9/27 (Week 4) FCR ARB: 10/17 (Week 8) DC Package: 10/23 (Week 9) DCR ARB: 12/5 (Week 15)
Inputs: data from the Effort Reporting online tool Outputs: graphs show change in effort based on weekly progression over semester Benefits: Graphs indicate effort that has been spent and can be used to figure out whether
we can focusing on the appropriate activities based on the phase we are in.
71
Technical DebtDebt accumulated for web application developed so far• Debt Accumulated
– Use of text string for database queries and updates in ASP.NET instead of SQL Data Layer objects
– Use of SQL queries instead of stored procedures which results in compilation overhead and need for validation of SQL statements using ASP.NET C# code.
– Not using ‘Master page’ in ASP.NET framework thereby having to re-code UI for all pages
• Type: Intentional Technical Debt• Cause: Pressure to complete possible features for delivery by
end of Fall Semester, 2013
Team’s strong points
By Rakesh Mathur
73
Team Strong and Weak PointsTeam Strengths
– Fairly cohesive and highly focused on completing deliverables
– Better communication between Developers and Client
Team Weaknesses– Scheduling issues due to larger team & varying class
schedules– Time Management – finishing work close to deadline
74
Project Concerns
Technical ConcernsAbility to deliver working code without Systems Testing
Solution: Test the functionality while we are developing it which is what we have been doing.
Operational ConcernsNone of the current set of students are continuing with the course next
semester. Solution: This two semester project most likely will not be developed by another team in the Spring of 2014. This risk is not addressable.
75
Project ConcernsSources of Observation
– Client Interaction– Client Site Visits– Team Meetings– Team Communication– Evaluation of FC package
• FED (Feasibility Evidence Description)• OCD (Operational Concept Description)• LCP (Life Cycle Plan)• SSAD (System & Software Architecture Description)
Thank you!