56
arch132 reginald galvan lata winter 2015 norman humberto california polytechnic state university, san luis obispo

ARCH 132 | Humberto | Reginald Lata

Embed Size (px)

DESCRIPTION

Winter Quarter 2015

Citation preview

Page 1: ARCH 132 | Humberto | Reginald Lata

arch132reginald galvan lataw i n t e r 2 0 1 5norman humberto

california polytechnic state university,san luis obispo

Page 2: ARCH 132 | Humberto | Reginald Lata
Page 3: ARCH 132 | Humberto | Reginald Lata

contents0 // biography1 // slipCASE2 // SLOscope3 // paraSITE4 // bonus5 // reflection

Page 4: ARCH 132 | Humberto | Reginald Lata

reginald galvan lata

Page 5: ARCH 132 | Humberto | Reginald Lata

august 12, 1996 | long beach, ca | filipinostill loves photography, dancing, food, sleeping, maroon, and PCE <3

Page 6: ARCH 132 | Humberto | Reginald Lata
Page 7: ARCH 132 | Humberto | Reginald Lata

slipCASEproject 1

_excavations_drawings_conJOIN_grip+slip

Page 8: ARCH 132 | Humberto | Reginald Lata
Page 9: ARCH 132 | Humberto | Reginald Lata
Page 10: ARCH 132 | Humberto | Reginald Lata
Page 11: ARCH 132 | Humberto | Reginald Lata
Page 12: ARCH 132 | Humberto | Reginald Lata

conjoin, [kuh n-join] verb. 1. to make contact or come together. 2. to join together, unite, combine, or associate.

Page 13: ARCH 132 | Humberto | Reginald Lata
Page 14: ARCH 132 | Humberto | Reginald Lata
Page 15: ARCH 132 | Humberto | Reginald Lata
Page 16: ARCH 132 | Humberto | Reginald Lata

SLOscopeproject 2

_sketches _joiner

_scopes_drawings

SLOscope Site MapDowntown San Luis Obispolata, reginald | humberto | winter 2015

SLOscope S i te

*located in between

Makers & Allie

s

&

Steven Stuart Architects*Higuera St.

Higuera St.

Marsh St.

Marsh St.

Santa Rosa St.

Santa Rosa St.

Page 17: ARCH 132 | Humberto | Reginald Lata
Page 18: ARCH 132 | Humberto | Reginald Lata
Page 19: ARCH 132 | Humberto | Reginald Lata

exploring downtown san luis obispo

Page 20: ARCH 132 | Humberto | Reginald Lata
Page 21: ARCH 132 | Humberto | Reginald Lata
Page 22: ARCH 132 | Humberto | Reginald Lata

framing

Page 23: ARCH 132 | Humberto | Reginald Lata
Page 24: ARCH 132 | Humberto | Reginald Lata

_site analysis_development_construction_installation_paraSITE

Page 25: ARCH 132 | Humberto | Reginald Lata

paraSITEfinal project

Page 26: ARCH 132 | Humberto | Reginald Lata
Page 27: ARCH 132 | Humberto | Reginald Lata

team200 _ reginald lata_ john lin_ mitchell rincon_ chris leo

Page 28: ARCH 132 | Humberto | Reginald Lata
Page 29: ARCH 132 | Humberto | Reginald Lata

s i t e 2 0 0

Page 30: ARCH 132 | Humberto | Reginald Lata

site analysisjoiners + studies

Page 31: ARCH 132 | Humberto | Reginald Lata
Page 32: ARCH 132 | Humberto | Reginald Lata

developmentmodels + drawings

goal: skew the vertical elements and create a new view of the site

Page 33: ARCH 132 | Humberto | Reginald Lata
Page 34: ARCH 132 | Humberto | Reginald Lata
Page 35: ARCH 132 | Humberto | Reginald Lata
Page 36: ARCH 132 | Humberto | Reginald Lata

digital modelgoogle sketchup

inspired by:

Page 37: ARCH 132 | Humberto | Reginald Lata
Page 38: ARCH 132 | Humberto | Reginald Lata

construction

Page 39: ARCH 132 | Humberto | Reginald Lata

construction // shout out to the red shirts and the professors who helped out in the shop. we couldn’t have fin-ished this project without you guys.

Page 40: ARCH 132 | Humberto | Reginald Lata
Page 41: ARCH 132 | Humberto | Reginald Lata
Page 42: ARCH 132 | Humberto | Reginald Lata

installation

Page 43: ARCH 132 | Humberto | Reginald Lata
Page 44: ARCH 132 | Humberto | Reginald Lata

installation start: 6:00 PM

Page 45: ARCH 132 | Humberto | Reginald Lata

installation finish: 12:00 AM

Page 46: ARCH 132 | Humberto | Reginald Lata

}}}

Page 47: ARCH 132 | Humberto | Reginald Lata

3 0 0

2 0 0

1 0 4}}}

lata, reginaldleo, chrislin, johnrincon, mitchell

choy, leesarose, hailey-raeroth, calvinturek, sharon

camacho, andreahalim, ayulynch, josephpuig guijarro, marianawiley | am

wiley | am

humberto | pm

final

para

SITE

(s)

“the connection between two projects”

Page 48: ARCH 132 | Humberto | Reginald Lata
Page 49: ARCH 132 | Humberto | Reginald Lata
Page 50: ARCH 132 | Humberto | Reginald Lata
Page 51: ARCH 132 | Humberto | Reginald Lata
Page 52: ARCH 132 | Humberto | Reginald Lata

bonus work

Page 53: ARCH 132 | Humberto | Reginald Lata

0 ’ - 0 ”

1 ’ - 0 ”

2 ’ - 0 ”

3 ’ - 0 ”

4 ’ - 0 ”

5 ’ - 0 ”

6 ’ - 0 ”

7 ’ - 0 ”

Page 54: ARCH 132 | Humberto | Reginald Lata
Page 55: ARCH 132 | Humberto | Reginald Lata

refle

ctio

nadapting to “archiculture”boy was winter quarter a rollercoaster of emotions. this quarter definitely wasn’t easy, but it necessarily wasn’t too difficult. this quarter could’ve been so much worse, but professor humberto is an angel sent from heaven. he’s an amazing professor and i am extremely sad that i won’t be able to take his studio next quarter. i learned so much from his teachings and critiques. i feel that i’ve improved so much since fall and i’m extremely greatful.

it was just tough getting through this quarter. slipcase was a fun project, but it was so tedious. sloscope was fun, i loved going downtown everyday to revisit my site, but perspectives kill me. fi-nally, parasite is just a project i can’t even explain. my group was amazing, our project was amazing. it was just the whole process of getting to the end that was extremely difficult. in the end, it was definitely worth it.

but now winter quarter is finally over and i look forward to spring quarter. i’m ready to tackle on design village and all the struggles that come my way. that being said, i’m excited to learn from pro-fessor brockett.

thank you to professor humberto, my parasite group, and just everyone in studio. you guys helped me get through this hectic quarter.

peace out, arch 132. bring it on, arch 133.

Page 56: ARCH 132 | Humberto | Reginald Lata