18
Incepting strength towards future Arcedges Building INDIA LLP. Plot no 4,5,6 & 16,Sabar Industrial Park, Asal, Nr. Shamlaji, Dist. : Bhiloda, Gujarat - 383250 Arcedges Building INDIA LLP Contact : +91 7878012301 | +91 9427618011 www.arcedges.com Email : [email protected] | [email protected] www.abasana.in ARCEDGES ARCEDGES

ARCEDGES · We also provide Shot Blasting (Always) SA2.0 for all steel frame for every project. 3-year warranty for water-leak, 3-year material warranty, and 10-year structural warranty

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ARCEDGES · We also provide Shot Blasting (Always) SA2.0 for all steel frame for every project. 3-year warranty for water-leak, 3-year material warranty, and 10-year structural warranty

Incepting strength towards future

Arcedges Building INDIA LLP.

Plot no 4,5,6 & 16,Sabar Industrial Park, Asal, Nr. Shamlaji, Dist. : Bhiloda, Gujarat - 383250

Arcedges Building INDIA LLP

Contact : +91 7878012301 | +91 9427618011

w w w . a r c e d g e s . c o m

Email : [email protected] | [email protected]

ww

w.a

basa

na

.in

ARCEDGES

ARCEDGES

Page 2: ARCEDGES · We also provide Shot Blasting (Always) SA2.0 for all steel frame for every project. 3-year warranty for water-leak, 3-year material warranty, and 10-year structural warranty

STRUCTURES

HIGH QUALITYPRE-ENGINEERED

Arcedges Building INDIA LLP Manufactures of high quality Pre-engineered building, having facilities of international standards located at Shamlaji. Our projects are carved in such a way to satisfy customer's specic needs. Our pre-engineered metal buildings are tailor-made solutions to customer's needs, the designs are customized to meet client's various specications. These buildings are exible enough to suit different building dimensions; they are easily expandable, can withstand harsh climatic conditions and come with maintenance-free exteriors.

WE ARE

01

Our Pre-engineered buildings are suitable for both, industrial as well as commercial operations such as Warehouses, factories, aircraft hangars, cold storage, workshops, stadiums, supermarkets or any high-rise building. Our Pre-Engineered Metal Building Systems offer modern solutions to all building constructions along with the benets of superior quality, efciency, and durability.

We work in close partnership with our clients to achieve ultimate design efciency. We convert very complex applications into the safest and most secure applications to the utmost critical requirements. Many of our designs and innovations are result of our partnership with our customers to solve their difcult application problems.

We look forward to work with new customers to solve their unique needs. Give us the opportunity to prove our commitment to solve your problems and add value to your process application.

The parent group of ABIL is Dudani Group. The group has earned immense reputation and prole in terms of business and social work. The Group has started its working back in1970’s with the explosives business and since then it never looked back. The group is into explosives, construction, mining equipments, oil & fabricates, Electrical, Marbles, Granite, Natural Stones, Tiles & Sanitary ware business.

Dudani Group had made many notable buildings in Himatnagar under its real estate rm. The group also owns & surgical cotton manufacturing facility at Changodar, Ahmedabad.

The Group is in engineering consultancy since 1990 for the continues quest to achieve brilliance and excellence. Group decided to established a quality centric PEB manufacturing facility.

Page 3: ARCEDGES · We also provide Shot Blasting (Always) SA2.0 for all steel frame for every project. 3-year warranty for water-leak, 3-year material warranty, and 10-year structural warranty

OUR VISION

To provide next generation metal building and its components to Indian industry which are

of supreme quality, sustainable, energy efcient, cost effective, time saving and betting to

ones need. To leverage our modern infrastructure, technical expertise and decades of

experience to provide high quality and cost effective metal products to our customers. We

are committed to ensure rewarding experience to our customers. Our prot is when our

customer suggest us to someone in need for such solutions.

For us brand is trust. We want to build a brand that every customer trusts, for that we are

ready to serve you with all possible efforts. We desire to accomplish business excellence

through the highest standard of ethics, assuring the best quality product & services,

innovation, productivity and customer satisfaction. We endeavor to have a strong and

enduring relationship with our customers based on quality and service.

OUR MISSION

0302

ACTUAL FACTORY PHOTOGRAPH

Page 4: ARCEDGES · We also provide Shot Blasting (Always) SA2.0 for all steel frame for every project. 3-year warranty for water-leak, 3-year material warranty, and 10-year structural warranty

WE PROVIDE QUALITY

Arcedges Building (India) LLP are pioneers and leaders and making structures for

Pre Engineered Buildings for Warehouse, Factory Building, Power Plants & Heavy

Fabrications Works.

We are specialize in PEB Plant, Pre Engineered Metal Building System - PEB

Designs, Heavy Fabrication Work / Steel Structures and Erection Works.

The application of Pre-Engineered Building concept to low-rise buildings is very

economical and speedy.

We are committed to produce and provide steel based products and associated

services for customers all over nation. We strive to achieve excellence in the

Quality of manufactured products and the Services provided to Customers. Our

endeavour is to create a working environment where motivated employees

communicate freely and where innovation is encouraged, to enable continual

improvement in all areas. All our employees work together to achieve “Complete

Customer Satisfaction through Total Quality Management”.

Arcedges Pre-engineered BuildingsOur pre-engineered building system is unmatched in its speed and value. Buildings to suit specic needs, are designed,

engineered, manufactured and shipped in less than 8 weeks and at a cost that is as low as 30 percent of the cost of

conventional steel buildings.

From planning to occupancy, nothing

matches Arcedges Steel’s Pre-Engineered

Building System in terms of versatility,

exibility and total value-engineering.

The pre-engineered building system is,

without doubt, one of the fastest

growing building systems in the world.

The advantages that it offers appeal to all

parties involved in the project. After all,

who can resist a building system that

offers speed, quality and value.

Clear Spans Up To 95 Meters Wide And Eave Heights As High As 40 Meters Are Possible.

Applications of pre-engineered buildings

are numerous. Described in few words,

pre-engineered buildings are ideal for

any residential & non-residential low-rise

building.

04 05*Actual factory Photograph

Page 5: ARCEDGES · We also provide Shot Blasting (Always) SA2.0 for all steel frame for every project. 3-year warranty for water-leak, 3-year material warranty, and 10-year structural warranty

WHYARCEDGES PEB ?

We have equipped ourselves with the best machineries having

international standards and we make world class PEBs that serves the

best quality and cost effectiveness.

Our pre-engineered building system is unmatched in its speed and

value. Buildings, to suit specic needs, are designed, engineered,

manufactured and shipped in less than 8 weeks and at a cost that is as

low as 30 percent of the cost of conventional steel buildings.

We also provide Shot Blasting (Always) SA2.0 for all steel frame for

every project.

3-year warranty for water-leak, 3-year material warranty, and 10-year

structural warranty.

We endeavor to create an environment where innovation is

encouraged and highly motivated employees actively participate in

work and freely express their ideas.

ISO 9001 : 2015 Accredited company.

Full Automatic Production, Fast delivery and short erection duration.

QUALITY PROCEDURE

CONCEPTUAL DESIGN

DRAWINGPROPOSAL

CONTRACTSIGNING

- RAW MATERIAL OF PURCHASE AS PER SPECIFICATIONS

- PLATE JOINING AS PER DESIGN & DRAWINGS

- PLATE SHEARING / CUTTING

- H-BEAM WELDING

- STRAIGHTENING OF FLANGES

- BASE PLATE, CLEATS AND ANGLES FABRICATION

- HOLE PUNCHING OR DRILLING IN FLANGE AND CLEATS

- FINAL WELDING & FINISHING OF THE MEMBERS

- INSPECTION & QUALITY CHECK

- SHOT BLASTING

- PAINTING

- FINAL INSPECTION & QUALITY CHECK BEFORE DISPATCH

- SECONDARY MEMBERS

- COIL SLITTING

- ROLL FORMING WITH AUTOMATIC PUNCHING

- LOADING THE MATERIAL

- INSPECTION OF LOADED MATERIAL AND FINALIZING PACKING LIST

- DISPATCHED FROM THE PLANT.

0706

QUALITY CHECK

We believe in 'Kaizen' Japanese philosophy of continuous

improvement in all aspects.

MATERIAL PROCUREMENT

IN-HOUSE MATERIAL INSPECTION AND BATCH TESTING

FINAL INSPECTION

AT SITE

* ACCORDING TO RELEVANT CODAL PROVISION

MANUFACTURING

ERECTION SHIPPING

LOADING INSPECTION

RECTIFICATION

SITE HANDOVER TO CLIENT

Page 6: ARCEDGES · We also provide Shot Blasting (Always) SA2.0 for all steel frame for every project. 3-year warranty for water-leak, 3-year material warranty, and 10-year structural warranty

Primary Framing (Main Frame)

The basic parameters that dene a pre-engineered building are :

Building Width Building Length Building Height Roof Slope

End bay Spacing Interior bay Spacing Design Loads

Structural system are the main load carrying and support members of s pre-engineering building. The shape and size vary

based on application and requirements.

The main frame members are the main load carrying member of a structural system which include columns, endwall posts,

rafters and other main support members.

All structure steel sections and welded plate members shall be designed in accordance with the applicable section, relating to

design requirements and allowable stresses, of the latest edition of the American institute of Steel Construction Specication

for the design, Fabrication and Erection of the Structural Steel for Buildings.

Towards FutureARCEDGES

Tapered Column Clear Span (TCCS) Multi Gable (MG) I / II

Multi Span I Clear Span with Crane

Multi Span II Mono Slope

0908

200 mm 200 mm

FINISHEDFLOORLEVEL

RAFTER

RIDGE LINE

ROOFSHEETING

EAVE STRUTPURLIN

EAVE STRUT

WALLSHEETING

BUILDING WIDTH

EAV

E H

EIG

HT

10X

COLUMN

PURLIN SPACING(TYPICAL)

GIRT

EAV

E H

EIG

HT

Ancillary service areas required

EAV

E H

EIG

HT

EAV

E H

EIG

HT

EAV

E H

EIG

HT

EAV

E H

EIG

HT

EAV

E H

EIG

HT

Page 7: ARCEDGES · We also provide Shot Blasting (Always) SA2.0 for all steel frame for every project. 3-year warranty for water-leak, 3-year material warranty, and 10-year structural warranty

Multi Span III Lean - To

Multi Span I with Crane & Mezzanine

Buildings With Mezzanines

Standard Mezzanine Floor System consist of galvanized proled steel deck, joists, beams and intermediate support columns.

Main beam can span in lateral directions and joints in longitudinal directions.

Mezzanine Beams

Mezzanine Deck Panel

Endw

all

Stee

l Lin

e

MezzanineColumns

FramedOpening

Rigid Frame Column

Endwall Column

B

A

Endw

all

Stee

l Lin

e

Sidewall Steel Line

CSidewall Steel Line Mezzanine Joists

R.F. @ End

P & B @ End

1 2 63 4 5

Finished Floor Level

(Buil Up Section)

Mezzanine Column

Sidew

all

Stee

l Lin

e

(Buil Up Section) Sidew

all

Stee

l Lin

e

Rigid Frame

Rigid Frame Reinforced Concrete Slab

Mezzanine BeamMezzanine Joist

Column

Rafter

Mezzanine Deck Panel

A B C

Mezzanine Plan

Mezzanine Cross Section

1110

Towards FutureARCEDGES

Page 8: ARCEDGES · We also provide Shot Blasting (Always) SA2.0 for all steel frame for every project. 3-year warranty for water-leak, 3-year material warranty, and 10-year structural warranty

Staircase Details

Mid-landing Post

Stringer

Mezzanine

Sta

irca

se W

idth

Level

Tread (Typ)

Stringer Tread (Typ)

Mid-landing Platform

Mid

-la

ndin

g B

ea

m

Mid

-la

ndin

g B

ea

m

Stringer

Staircase Length

Stringer

Up

Rod Bracing

Elevation: Single Flight Staircase with Mid-landing

Single Flight Staircase

Double Flight Staircase

Length of Lower Staircase

Stringer

Finished Floor Level

Mid-landing Width

Landing PostTread

Expansion Bolts

(Typ.)

Mid

-land

ing H

eight

Expansion Bolts

Length of Upper Staircase

500

Mid-landingBeams

500

Handrail

HandrailMezzanineReinforcedConcrete Slab

Mezzanine

Handrail

Stringer

Beam

Handrail( )NS/FS

(NS/FS)

( )NS/FS

Toe Plate

Sta

irca

se H

eig

ht

Mid-landing Platform

Stringer20

0

30

0

Mid-landing Post

Va

ries Be

am

Mid-landing PlatformMid-landing Post

30

0

Tread

MezzanineUp

Stringer

Stringer

TreadStringer

Level

Mid

-la

ndin

g

Rod Bracing

(Typ)

Tota

l Sta

irca

se W

idth

Sta

irca

se W

idth

Sta

irca

se W

idth

Mid

-la

ndin

g B

eam

Mid

-la

ndin

g B

eam

Elevation: Double Flight Staircase with Mid-landing

Plan: Single Flight Staircase with Mid-landing

Plan: Single Flight Staircase with Mid-landing

Jack Beam

ISOMETRIC: Jack Beam at Sidewall

ISOMETRIC: Jack Beam at Interior Column Location

Finished Floor Level

Expansion BoltsExpansion Bolts

Mid-landing Width

Staircase Length

Mid-landing Beams

Mid-landing Post

Mezzanine

Concrete

Beam

Mid

-la

ndin

g H

eig

htSt

air

case

Hei

ght

MezzanineReinforced

Stringer

Handrail

Handrail

Toe Plate

Handrail

Stringer

Tread(Typ)

(Ns/fs)

(Ns/fs)

(Ns/fs)

Slab

Rigid Frame Column

Rigid Frame RafterEave Strut

Purlin

Purlin

Rigid Frame Rafter

Eave Strut

Rigid Frame Column

Jack Beam

1312

Supporting Rafter

Jack Beam

Page 9: ARCEDGES · We also provide Shot Blasting (Always) SA2.0 for all steel frame for every project. 3-year warranty for water-leak, 3-year material warranty, and 10-year structural warranty

Types of Fascia Canopy Details

Typical Sidewall Section forFlush Fascia

Typical Endwall SectionFlush Fascia

for

Inside FoamClosure

Roof Panel

Fascia BracketFixed To Rigid Frame ColumnW/ High Strength Bolts

Top Plate

Back-up Panel

Cap FlashingTop Girt

Girt Clip

Valley Gutter

Sidewall Panel

SidewallGirt

SidewallSteel Line

Rigid FrameColumn

Eave Strut

Rigid Frame Rafter

Purlin

Endwall

TopPlate

Top Girt

GableAngle

EndwallPanel

EndwallGirt

Girt Clip

Steel Line

Endwall Post

Endwall Rafter

Cap Flashing

Back-up Panel

CounterFlashing

Roof Panel

Gable Angle

Spanner

Purlin

Typical Sidewall Section Typical Endwall Section

Varies

200600

Cap FlashingTop Girt

Back-upGirt

FasciaPanel

BottomGirt

Fascia Bracket

Backup Panel

Valley Gutter Roof Panel

Rigid FrameRafter

Rigid FrameColumn

Bracket

Edge Trim

Outside Foam Closure

SidewallSteel Line

Varies

200600

Cap FlashingTop Girt

FasciaBracket

Backup Panel

Back-upGirt

FasciaPanel

BottomGirt

High StrengthBolt

SidewallSteel Line

Edge Trim

Outside FoamClosure

Roof PanelGable Trim

Flowable MasticFlashing

Radius=50

0

Radius=50

0

Typical Sidewall SectionFlushed Fascia with Box Gutter

Typical Endwall SectionFlushed Fascia with Box Gutter

Masonry NailsRoof Panel

Rigid FrameColumn

Purlin

Rigid Frame Rafter

Eave StrutBlockwall

Masonry Nails

Flowable Mastic

Closure Trim

Valley Gutter Inside FoamClosure

Rigid FrameRafter

Closure Trim

Counter Flashing

Flowable Mastic

Roof Panel

Purlin

Blockwall

Typical Sidewall Section Typical Endwall Section

Varies

200600

Cap FlashingTop Girt

Back-upGirt

Fascia Panel

BottomGirt

Sill Trim

Soft Panel(Optional)

SoftEdge Trim Sidewall

Steel Line

Outside Foam ClosureBracket

Rigid FrameColumn

Rigid Frame Rafter

Roof PanelInside Foam Closure

ValleyGutter

Fascia Bracket

Backup Panel

EndwallSteel Line

Varies

200600

FasciaBracket

Cap FlashingTop Girt

OutsideFoamClosure

Back-upGirt

FasciaPanel

BottomGirt

Sill Trim

Soft Panel

SoftEdge Trim

Endwall Post

Outside FoamClosure

High Strength Bolt

Roof PanelGable Trim

Flowable MasticFlashing

Backup Panel

Section: Bottom Curved Fascia with Valley GutterFlush Fascias with Eave Gutter

FLUSHED FASCIA OR PARAPET FASCIASection : Vertical Fascia with Valley Gutter,

Back Panel & Soft

Rigid Frame Column

Rigid Frame Rafter

Purlin

Roof Panel

Sheeting Angle

Bead Mastic

R=500

100 100-600

Sidewall Girt

Drip Trim

Blockwall

Curved EavePanel

2000 M

AX

(Roof Extension)

Soft Trim

ClosureOutside Foam

Rigid Frame

Wall Panel

Roof Panel

Roof ExtensionBracket

Building Width

Roof Extension

Roof Extension RafterPanel

Canopy Trim

Inside Foam Closure

PurlinsSoft

Eave Gutter

Canopy Trim

Inside Foam Closure

(Roof Extension)

ClosureOutside Foam

Rigid Frame

Eave Trim

Wall Panel

Roof Panel

Roof ExtensionBracket

Building Width

Roof ExtensionPurlins

Roof Extension Rafter

Eave Gutter

Column

Sheeting Angle

Cle

ar

HT

Roof Panel

Canopy Rafter

Wall Panel

Inside Foam Closure

FlashingOutside Foam Closure

Eave Gutter

Drip Trim

150

Canopy

Eq. Spaced

Column

Sheeting Angle

Cle

ar

HT

Roof Panel

Canopy Curved Panel

Canopy Clip

Drip TrimCanopy Rafter

Wall Panel

Inside Foam Closure

FlashingOutside Foam Closure

342

150

Canopy

Eq. Spaced

Column

Soft

Cle

ar

HT

Sheeting AngleRoof Panel

Canopy Curved Panel

Canopy Clip

Drip TrimCanopy Rafter

Wall Panel

Flashing

Inside Foam Closure

Outside Foam Closure

Soft Trim

342

150

Canopy

Eq. Spaced

Isometric : Curved Eaves

Canopy with Curved Eaves with Bottom Soft

Section : Curved Eave

Canopy with Curved Eaves without Soft

Canopy with Gutter & Downtake without Soft Roof Extension at Eave (with Soft)

Roof Extension at Eave (without Soft)

1514

Page 10: ARCEDGES · We also provide Shot Blasting (Always) SA2.0 for all steel frame for every project. 3-year warranty for water-leak, 3-year material warranty, and 10-year structural warranty

Fascias and CanopiesARCDEGES provides fascias specially designed to your requirements. These can be either vertical,

horizontal or with curved sheeting to enhance the architectural look of your building. Wall canopies

at eaves, endwall, over doors and windows are also available.

Crane Beams

Top Running Crane Along Building Length

Underhung Crane Jib Crane and Monorail Crane

Finished Floor Level

Eave

Hei

ght

Varies

Hoist

Crane Bridge

Crane Width

Ma

xim

um H

ook

Hei

ght

Hei

ght

of

Cra

ne B

eam

Crane Beam

Building Span

Varies

Finished Floor Level

Monorail Beam

Hei

ght

Jib Crane

Ma

x. H

ook

Cra

ne B

rack

et H

eig

ht

Eave

Heig

ht

Building Span

Rigid Frame Rafter

Monorail Crane

Hoist

Varies

FrameColumn

Rigid

Monorail Crane

Jib CraneFinished Floor Level

Crane Span To of Rails

Building SpanVaries

Eave

Hei

ght

Rigid Frame Rafter

RigidFrameColumn

Hoist Crane Bridge

Cra

ne B

rack

et H

eig

ht

Ma

xim

um H

ook

Hei

ght

Varies

1716

Towards FutureARCEDGES

Crane Bracketor corbels Crane Bracket

or corbels

Page 11: ARCEDGES · We also provide Shot Blasting (Always) SA2.0 for all steel frame for every project. 3-year warranty for water-leak, 3-year material warranty, and 10-year structural warranty

Secondary Framing (Z And C Sections)

Purlins, girts and eave struts are cold formed steel members which have a minimum yield strength of 345 MPa

(50,000 psi) and will conform to the physical specications of ASTM 572 (Grade 50) or ASTM A653 (Grade 50) or

equivalent.

Purlins and girts are roll formed Z sections, 200 mm deep with 64 mm anges

shall have a 16 mm stiffening lip formed at 45˚ to the ange. They are

supported on columns, rafters or building walls. They can be lapped and

nested at the supports which creates a continuous beam conguration. They

are placed on the roof and perimeter of the building. Hence they serve as a

support to the roof sheeting and wall cladding.

200m

m

74mm

Typical “Z” Section

20

0m

m

85mmTypical “C” Section

C-Sections are 200 mm deep with a 100 mm ange. The anges are

perpendicular to the web and have a 24 mm stiffening lip.

Eave struts are 200 mm deep with a 104 mm wide top ange, a 118 mm wide

bottom ange, both are formed parallel to the roof slope. Each ange has a 24

mm stiffener lip. These are located along the sidewall; at the intersection of

the planes of the roof and wall. It is constructed from cold formed C-Section

and is rolled to suit the roof slope. This member transmits longitudinal wind

force on the end walls from roof brace rods to wall brace rods.

These are long span load carrying trusses suitable for direct support of oors

and roof decks in the buildings. The system consists of crimped angles welded

to the top and bottom chords.

Cable bracing is made of extra high strength seven strand cable and can be

designed to accommodate any length to ensure the stability of the building

against forces in the longitudinal and lateral direction due to wind, cranes and

earthquakes. It is made of a cable which is forged into a rod terminal and this

arrangement is then xed on a structure using a hill side washer, nut washer

and a nut.

This member is designed to ensure the stability of building against forces in

the longitudinal and lateral direction due to wind, cranes, and earthquakes. It

is made of round bar which is forged into a rod terminal and this arrangement

is then xed on a structure using a hill side washer, nut washer and nut.

Angle bracing shall have a minimum yield strength of 250MPa(36,000 psi)

and will conform to the physical specication of ASTM A-36 or equivalent.

PURLINS & GIRTS

C SECTION

EAVE STRUT

OPEN WEB JOISTS

CABLE BRACING

ROD BRACING

ANGLE BRACING

1918

20

0m

m

100mm

Page 12: ARCEDGES · We also provide Shot Blasting (Always) SA2.0 for all steel frame for every project. 3-year warranty for water-leak, 3-year material warranty, and 10-year structural warranty

TYPE EFFECT WIDTH FEEDING WIDTH THICKNESS SECTION INERTIA SECTION RESISTANC

YX 13-1863.-1100 1100mm 1220mm 0.3-0.8mm5.18(0.5mm)

6.76(0.6mm)

2.68(0.5mm)

3.62(0.6mm)

TYPE EFFECT WIDTH FEEDING WIDTH THICKNESS SECTION INERTIA SECTION RESISTANC

YX 25-209-1045 1045mm 1220mm 0.3-0.8mm9.18(0.5mm)

10.76(0.6mm)

4.68(0.5mm)

5.62(0.6mm)

Cladding System

Arcdeges standard steel panels are 0.5 mm or 0.6 mm thick and have a minimum yield strength of 345 MPa. Steel panels

are hot dipped and galvanized with zinc or zin caluminium coating. Galvanized materials conform to G90 for 275 grams

per square metre according to ASTM A653. Zinc-Aluminium coated materials conform to AZ150 according to ASTM A792.

Arcdeges panels are prepared with a multilayered coating system to ensure long life and optimum coating adherence. The

base material is pretreated, before applying a corrosion resistant primer and top coat. The combined thickness of the

painted lm is 25 microns on the front side and 12 microns on the reverse side.

Arcdeges Roof prole is strong and cost effective and was developed

specically for roong applications. The bearing leg design permits easier

installation and maintenance, supports thicker layers of insulation and allows

easier curvature for a visually appealing nish.

Coverage Area : 1045 mm

Rib Depth : 32 mm

ARCDEGES RIB / ROOF

ARCDEGES ROOF & ARCDEGES WALL

2120

Arcdeges Wall is a cost effective, partially concealed fastener panel with a

sculptured valley shape between the major ribs for a superior architectural

look for external walls.

Coverage Area : 1100 mm

Rib Depth : 26 mm

ARCDEGES WALL

1100

13

183.3

1045

209

25

Page 13: ARCEDGES · We also provide Shot Blasting (Always) SA2.0 for all steel frame for every project. 3-year warranty for water-leak, 3-year material warranty, and 10-year structural warranty

2322

Insulated Panels

Inside Foam Closure

Wall Exteriror Panel

Wall Insulation

Downspout

Gutter Strap

Eave Gutter

Eave Trim

Eave Strut

Side Wall Girt

Roof Exterior Panel

Roof Insulation

Purlin

Outside FoamClosure

Inside Foam Closure

Wall Exteriror Panel

Sub-girt

Wall Insulation

Downspout

Gutter Strap

Eave Gutter

Eave Trim

Wall Interior Panel

Eave Strut

Side Wall Girt

Roof Exterior Panel

Roof Insulation

Roof Interior Panel

Purlin

Sub-purlin

Outside FoamClosure

ROOF AND WALL DOUBLE SKIN WITH INSULATION BY USING SUB-GIRT/PURLIN

ROOF AND WALL SINGLE SKIN WITH INSULATION

Roof Monitor Ridge Vents Turbo Vents Skylights S-Type Louvers | Gutter | Downtake| | | |

ACCESSORIES

ROOF MONITOR TURBOVENT FIXING DETAIL

S-TYPE LOUVER DETAIL

BladesFixed Louver

Screen

Lou

ver

Hei

ght

B

A

Louver Width

Elevation : Louver Exterior

Fixed Louver Blades

Self Drilling FastenerSl2-4.8 X 20

Wall Panel

Louver Width

120

At 300mm O.C

Steel Line

Section-A

Lou

ver

Hei

ght

Self DrillingFastener

Louver Header Trim

Accessory Gir

Wall Panel

Steel Line

Fixed LouverBlade (typ)

Girt

RIDGEVENT SYSTEM

Bird Scre

en

End Plate

End Fla

shing

LengthEnd

Flashin

g

A

Top PlateW

ind Band

Throat Flashing

ThroatOpening

Top Plate

Wind Band

Th Roat Flashing

Bird Screen Rain InHot Air Out

Rain Water OutRain Water Out

Spaced At 1500 M

m

The Downsp

out and Shoe

Located and Fixed At

Downspout S

trap

Downspout E

lbow

*

Wall Panel

Downspout S

trap

*(All Around

)

MasticFlowable

RivetPop

Gutter

Gutter / Downspout Fixing To Wallpanel Using Strap SKY LIGHTS AND WALL LIGHTS

Roof Panel

Roof Panel

Standard

Skylig

ht Pa

nel L

ength

Roof Purlin (Typ)

Skylight

R=500

425

Rigid Frame

Bird Screen

Drip Trim

Roof Monitor Width

425

Rafter

O.W

.2

Roof

Mon

itor

Hei

ght

Curved PanelClip (typ)

Roof Monitor

Roof MonitorPurlin

Roof Monitor Ridge PanelRoof Monitor Rafter

Roof Purlin

Self DrillingFastener

Roof Panel

RoofMonitor Post

Sheeting

10X(slope)

Roof Monitor

Angle

300Opening Width 300

Panel

(O.W.)

(min

.)

O.W.2(min.)

O.W

.2

(min

.)

100

100100Self Drilling

Bead Mastic

Roof Panel

Purlin

Fastener

Purlinr SpacingSheeting Angle

100

Page 14: ARCEDGES · We also provide Shot Blasting (Always) SA2.0 for all steel frame for every project. 3-year warranty for water-leak, 3-year material warranty, and 10-year structural warranty

Material Specication

Roof and Wall Panels are roll-formed from 0.5 mm(nominal)thick cold-rolled

steel coated with an Aluminum - Zinc alloy (Zinvalume). The material

conforms to ASTM A 792M SS Grade 340 Class2, with metallic coating

AZM150(or equivalent), having a minimum yield strength of 340 MPa

(50ksi). The coating is achieved through a hot-dip process, which is 55%

Aluminum 1.6% silicon by weight and the balance is Zinc.

Roof & Wall Panels

Roof and Wall Panels are mill painted(Pre-Painted). Paint lm thickness shall

be 25 microns of (weather) face and interior face.

ARCDGES Steel has two Types of paint systems. They are (ASP & APF):icon by

weight and the balance is Zinc.

Arcdeges Standard Colors

Cactus Green (CG) Royal Blue (RB)

Arabian Beige (AB)Frost White (FW)

The structural steel has traditionally been fabricated onsite mainly due to lack of infrastructure for transporting

heavy sections from an off-site workshop to project site. Moreover, there is often insufcient space at a site to set

up a fabrication workshop and skilled labor Is available at a premium. These issues can always be mitigated by

workshop made steel structures which are provide to be more efcient in terms of quality and timelines. This

helps to reduce the time and cost of execution, and is expected to fuel the demand for steel structures in future.

The speed of execution is critical factor for any large industrial or infrastructure project & is a driver for shift

towards the factory made fabrication. The projects that took longer period to complete a few years ago are being

executed in much lesser time thereby resulting in consideration will propel the industry towards factory made

steel structures and owners and consultants will realize the advantages in terms of uniformity of nish and better

quality, as steel producers align their rolling section as per the design needs.

Our Services

2524

Towards FutureARCEDGES

*Any optional Ral colour available on request

Page 15: ARCEDGES · We also provide Shot Blasting (Always) SA2.0 for all steel frame for every project. 3-year warranty for water-leak, 3-year material warranty, and 10-year structural warranty

List of Projects

- Vestas blades manufacturing plant in Ahmedabad.

- Surca India Limited’s Laminate plant in Himatnagar.

- IBIS Ceramics plant in Morbi.

- Shamaliya Food court in Shamlaji.

- Baldi Metals scrap processing unit in Jamnagar.

- Siyaram Impex Brass Ceramic cartridge plant in Jamnagar.

- Strawberry Fresh foods cold storage in Idar.

- Swati switch gears expansion building in Bawla, Ahmedabad.

Page 16: ARCEDGES · We also provide Shot Blasting (Always) SA2.0 for all steel frame for every project. 3-year warranty for water-leak, 3-year material warranty, and 10-year structural warranty

Our Machinery

Hydraulic DecoilerShot Blasting Machine With 8 Blasting Heads 5-Axis CNC Press Break Machine With Auto Crowning

Shearing Machine

C-Z Interchangeable Machine Double Layer Roll Forming Machine

C-Frame Press Threading Machine

2726

Plate Joining Machine With 5m WidthOXY-FUEL And Plasma Cutting Machine

H-Beam Welding line with hydraulic straightness

*Actual factory Photograph

Total Plant Area 1,35,000 Sq.Ft

*Actual factory Photograph

Page 17: ARCEDGES · We also provide Shot Blasting (Always) SA2.0 for all steel frame for every project. 3-year warranty for water-leak, 3-year material warranty, and 10-year structural warranty

Quality Assurance

Our Integrated approach to Quality with-out Question results in real value to all team

members. Here's how:

Schedule control procedures at ABIL are critical in achieving success for the client and ABIL These procedures

establish project safety, cost, schedule and quality plans. During project execution, the status of the project is

periodically evaluated to identify deviations from these plans. Management can then identify the actions or

adjustments that may be necessary to keep the overall project on target.

Our schedules are tracked by comparing actual progress to the baseline control plan. It's basically a balance

between work sequencing and manpower allocation that allows us to accomplish desired work progress.

For Owners:

Value through clear design documents resulting in lower bids, integrated construction quality activities eliminating rework,

earlier completion schedules, tested & veried system and assembly performance eliminating operational issues, and

ultimately reducing operating costs.

For Engineers:

Value through clear design documents reducing requests for information and eliminating change orders, an integrated

punch list process, & reduced efforts on your part to have to review and approve project components.

For Sub-contractors:

Value through clear understanding of quality expectations, a provided means to achieve these through mock-up

construction & testing, streamlined work-ow, and elimination of the end-of-project issues you typically encounter.

For End-Users:

Value through a project that meets your needs without delays or nuisance issues during your rst year of use, positive

impressions of the project and your productive use of the owner's investment.

OUR PROCESS FOR CONTROLLING SCHEDULE IS THE FOLLOWING:

QUALITY WITH-OUT QUESTION

The Value Of Quality

THE CULTURE OF QUALITY

At project initiation, the baseline control schedule is developed. This is the reference

document for planning & is modied only as a result of Owner approved change orders.

The design of the schedule is such that it is realistic & a positive planning tool & facilitates

the roll up of gross details into successively larger categories.1

Weekly working schedules are prepared which are updates of the control schedule to

reect progress to date. During preparation of the weekly work schedule, variations from

the control schedule are accessed & adjustments & actions to steer progress towards the

established milestones are implemented. In all cases, the working schedule is planned to

keep the project as close to the control schedule as possible.

2

Pre-engineered building. The baseline control schedule is revised when change orders

that affect schedule are received.3The end result achieves, on time delivery and on time project completion which is the

ultimate goal for quality. 42928

The commitment to quality on ABIL projects stands equally as high. All ABIL employees and tradespeople are provided the

training and tools to produce the best possible results on every project. More than a program, ours is an approach focused

on identifying and eliminating potential issues together, so the quality standards achieved on each and every ABIL project

are truly quality with-out question.

At ABIL, "quality" is not a single activity, rather a series of many linked activities integrated into our day-to-day industrial

construction & project management process. These are probatively planned, performed & tracked from the earliest stages

of a project during preconstruction, through construction & past nal completion. With quality activities taking place

throughout our process, we are better able to focus on building the project right the rst time, not adding layers of

departments & management.

Page 18: ARCEDGES · We also provide Shot Blasting (Always) SA2.0 for all steel frame for every project. 3-year warranty for water-leak, 3-year material warranty, and 10-year structural warranty

ARCEDGES