Arc Flash Warning Labels _ Warning Labels

  • Upload
    sesabcd

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

  • 7/24/2019 Arc Flash Warning Labels _ Warning Labels

    1/9

    30/10/2015 Arc Flash Warning Labels | Warning Labels

    http://arcflashengineering.com/arc-flash-warning-labels 1/9

    Arc Flash Engineering

    Arc Flash Compliance Made Easy! Call 1-800-381-4389

    About ITU Arc Flash

    News

    Free Stuff

    Contact Us

    Free Quote

    Home

    What is an Arc Flash?

    Electrical Injuries

    Electrical injury in the workplace

    Arc Flash Analysis

    Isan Arc Flash HazardAnalysis Required?

    What is NFPA 70E?

    Arc Flash Warning LabelsCertificate of Compliance

    Do-It-Yourself Arc Flash Analysis Software

    Arc Flash Analysis Report

    Our Recent Arc Flash Analysis Clients

    Get a Quote

    Arc Flash PPE Requirements

    Hazard Risk Category 1

    Hazard Risk Category 2

    Hazard Risk Category 3Hazard Risk Category 4

    NFPA 70E Electrical Safety Training

    NFPA 70E Training Online

    Get a Quote

    Training Equipment

    Arc Flash Analysis Terms

    FAQs

    http://arcflashengineering.com/faqshttp://trainingpanels.com/http://arcflashengineering.com/nfpa-70e-electrical-safety-traininghttp://arcflashengineering.com/hazard-risk-category-4http://arcflashengineering.com/hazard-risk-category-3http://arcflashengineering.com/free-arc-flash-quotehttp://arcflashengineering.com/arc-flash-analysis-recent-clientshttp://arcflashengineering.com/arc-flash-analysis-reporthttp://arcflashengineering.com/arc-flash-analysis-softwarehttp://arcflashengineering.com/arc-flash-warning-labelshttp://arcflashengineering.com/the-nfpa-70ehttp://arcflashengineering.com/is-an-arc-flash-analysis-requiredhttp://arcflashengineering.com/arc-flash-analysishttp://arcflashengineering.com/electrical-injurieshttp://arcflashengineering.com/what-is-an-arc-flashhttp://arcflashengineering.com/http://arcflashengineering.com/contact-ushttp://itudownloads.com/http://arcflashengineering.com/newshttp://arcflashengineering.com/about-itu-arc-flashhttp://arcflashengineering.com/http://arcflashengineering.com/http://arcflashengineering.com/faqshttp://arcflashengineering.com/arc-flash-analysis-termshttp://trainingpanels.com/http://arcflashengineering.com/free-arc-flash-quotehttp://www.workersed.com/http://arcflashengineering.com/nfpa-70e-electrical-safety-traininghttp://arcflashengineering.com/hazard-risk-category-4http://arcflashengineering.com/hazard-risk-category-3http://arcflashengineering.com/hazard-risk-category-2http://arcflashengineering.com/hazard-risk-caterory-1http://arcflashengineering.com/arc-flash-ppe-requirementshttp://arcflashengineering.com/free-arc-flash-quotehttp://arcflashengineering.com/arc-flash-analysis-recent-clientshttp://arcflashengineering.com/arc-flash-analysis-reporthttp://arcflashengineering.com/arc-flash-analysis-softwarehttp://arcflashengineering.com/certificate-of-compliancehttp://arcflashengineering.com/arc-flash-warning-labelshttp://arcflashengineering.com/the-nfpa-70ehttp://arcflashengineering.com/is-an-arc-flash-analysis-requiredhttp://arcflashengineering.com/arc-flash-analysishttp://arcflashengineering.com/electrical-injury-in-the-workplacehttp://arcflashengineering.com/electrical-injurieshttp://arcflashengineering.com/what-is-an-arc-flashhttp://arcflashengineering.com/http://arcflashengineering.com/free-arc-flash-quotehttp://arcflashengineering.com/contact-ushttp://itudownloads.com/http://arcflashengineering.com/newshttp://arcflashengineering.com/about-itu-arc-flashhttp://arcflashengineering.com/http://arcflashengineering.com/
  • 7/24/2019 Arc Flash Warning Labels _ Warning Labels

    2/9

    30/10/2015 Arc Flash Warning Labels | Warning Labels

    http://arcflashengineering.com/arc-flash-warning-labels 2/9

    Arc Flash / Arc Fault

    Hazard Risk Analysis

    Electrical Safety Standards

    Personal Protective Equipment (PPE)

    Safety Grounds

    Approach Boundaries

    Energized Electrical Work Permit

    Electrical Safety EquipmentLockout-Tagout

    Voltmeters

    Electrical Maintenance Terminology

    Arc Flash Warning Labels

    NEC (National Electrical Code) mandates that hazardous equipment installed or modified after 2002 be required to carry an arc flash warning label. NEC

    110.16 specifically mentions switchboards, panel boards, industrial control panels, and motor control centers that are likely to require examination,adjustment, servicing, or maintenance while energized.

    NFPA 70E 2015 (National Fire Protection Agency) requires labels to contain the following information:

    Nominal System Voltage, Arc Flash Boundary, and at least one of the following:

    Available incident energy and the corresponding working distance, or the arc flash ppe in Table 130.7(C)(15)(A)(b) or Table 130.7(C)(15)(B) for the

    equipment, but not both

    Minimum arc rating clothing

    Site-specific level of PPE

    These values are determined by an arc flash hazard analysis (available through ITU), and need to be calculated separately for each piece of equipment labeled.

    NFPA 70E also states that arc flash warning labels must be the proper size (at least 4x 6 recommended to meet required font sizes), ANSI Z535 approved,

    and be placed so as to be visible to personnel before beginning maintenance or inspection.

    http://arcflashengineering.com/electrical-maintenance-terminologyhttp://arcflashengineering.com/voltmetershttp://arcflashengineering.com/lockout-tagouthttp://arcflashengineering.com/electrical-safety-equipmenthttp://nfpasafety.com/http://arcflashengineering.com/approach-boundarieshttp://arcflashengineering.com/safety-groundshttp://arcflashengineering.com/personal-protective-equipment-ppehttp://arcflashengineering.com/electrical-safety-standardshttp://arcflashengineering.com/hazard-risk-analysishttp://arcflashengineering.com/arc-flash-arc-fault
  • 7/24/2019 Arc Flash Warning Labels _ Warning Labels

    3/9

    30/10/2015 Arc Flash Warning Labels | Warning Labels

    http://arcflashengineering.com/arc-flash-warning-labels 3/9

    A.These durable UV and chemical resistant 3.2 mil laminated vinyl labels include a High-Tack adhesive and rounded corners to prevent peeling. The life span of

    these labels is 5 years in normal conditions and are capable of withstanding temperatures beyond 165 F and -50 F. Sufficient label durability is now a

    requirement as of the November 2011 NEC (National Electrical Code) update and ITUs arc flash warning labels more than exceed this requirement.

    B.Flash Hazard Category: Represents the level of danger depending on the incident energy. Ratings range in number from 0-4. 0 represents little or no risk while

    4 signifies greatest risk. For more information about the different arc flash hazard risk categories click here.

    C. Minimum Arc Rating Clothing: Identifies the arc performance of a material or system of materials (PPE) and are expressed in calories per centimeter squared.

    D.PPE: Identifies the Personal Protective Equipment that MUST be used according to the hazard category rating.

    E.Equipment ID: Identifies panel location within facility.

    F.Arc flash warning labels must have the word WARNING in black with an orange background and include the standard warning symbol (orange

    exclamation point with solid black triangle background).

    http://arcflashengineering.com/wp-content/uploads/2012/10/New_Warning_Label_72dpi.png
  • 7/24/2019 Arc Flash Warning Labels _ Warning Labels

    4/9

    30/10/2015 Arc Flash Warning Labels | Warning Labels

    http://arcflashengineering.com/arc-flash-warning-labels 4/9

    G.Flash Protection Boundary: This is the closest anyone can approach the equipment that has the potential for arc flash, without the use of PPE (Personal

    Protective Equipment).

    H.Limited Approach Boundary: This boundary may only be crossed by a qualified person who has been trained in the hazards of the component or equipment

    being serviced.

    I.Restricted Approach Boundary and Prohibited Approach Boundary: Only a qualified person using adequate shock prevention equipment and techniques

    may cross these boundaries.

    J.Maximum Available Fault Current: This is one of the new NEC required features as of November 2011. All the required safety information provided on the

    label is based on the max. available fault current. If the system is altered in any way resulting in this value to change than the data must be re-

    evaluated. Companies or utilities will often make changes in the electrical system to be more efficient or to increase capacity. When this is done the max. available

    fault current changes. As a result the PPE (Personal Protection Equipment) category and the approach boundary information becomes inaccurate and is no

    longer compliant. Inaccurate information could easily result in serious injury or even death in which the company would be held liable for.

    K.The date that the fault current calculation was performed must now be on the label. This is another new feature required by NEC as of November 2011. Arc

    flash warning labels expire after 5 years. Before labels are replaced an arc fault calculation should be performed to insure that the data on the labels is still

    accurate. The electrical systems one line diagrams must be updated when any changes are made.

  • 7/24/2019 Arc Flash Warning Labels _ Warning Labels

    5/9

    30/10/2015 Arc Flash Warning Labels | Warning Labels

    http://arcflashengineering.com/arc-flash-warning-labels 5/9

    ITU's Turn-Key Arc Flash Analysis (Arc Flash Risk Assessment) and Labeling Service includes:

    No hidden charges , One Quote Thats the price!

    Our own employees do the work. No hired contractors.

    We label your required electrical panels. (Yes, we put the labels on for you.. turnkey!)

    We provide you with a Complete Arc Flash Analysis Report and Updated Electrical One Line Drawings.

    Most common facilities completed in about a week.

    Analysis conducted by experienced Electrical Engineers.Free Safety Training to educate your workers about your new safety program!

    Why is ITU so successful? We make it easy for you No Headaches, No Hassles, from start to finish. We make it easy!

    We offer the most effective, NFPA. IEEE, and OSHA approved process to get your company in compliance with NFPA70e and OSHA cfr29-1910, AND we

    do it at the lowest possible cost to you!

    Give us a call Toll Free: 800-381-4389 or click the button to get a free quote!

    FREE Safety Downloads

    10 Steps of an Effective Arc Flash Analysis

    http://arcflashengineering.com/free-arc-flash-quote
  • 7/24/2019 Arc Flash Warning Labels _ Warning Labels

    6/9

    30/10/2015 Arc Flash Warning Labels | Warning Labels

    http://arcflashengineering.com/arc-flash-warning-labels 6/9

    Click to Download

    PPE Category Level Chart Toolbox Poster

    http://itudownloads.com/10-steps-to-an-arc-flash-safety-program.htmlhttp://itudownloads.com/10-steps-to-an-arc-flash-safety-program.html
  • 7/24/2019 Arc Flash Warning Labels _ Warning Labels

    7/9

    30/10/2015 Arc Flash Warning Labels | Warning Labels

    http://arcflashengineering.com/arc-flash-warning-labels 7/9

    Click to Download

    Arc Flash Approach Boundaries

    http://itudownloads.com/ppe-category-chart.htmlhttp://itudownloads.com/ppe-category-chart.html
  • 7/24/2019 Arc Flash Warning Labels _ Warning Labels

    8/9

    30/10/2015 Arc Flash Warning Labels | Warning Labels

    http://arcflashengineering.com/arc-flash-warning-labels 8/9

    Click to Download

    Energized Electrical Work Permit

    http://itudownloads.com/approach-boundaries.htmlhttp://itudownloads.com/approach-boundaries.html
  • 7/24/2019 Arc Flash Warning Labels _ Warning Labels

    9/9

    30/10/2015 Arc Flash Warning Labels | Warning Labels

    http://arcflashengineering.com/arc-flash-warning-labels 9/9

    Click to Download

    Arc Flash | Arc Flash Analysis, Studies and Surveys

    Copyright 2015 All Rights Reserved

    Arc Flash Engineeringby ITU

    Terms and Conditions

    http://arcflashengineering.com/terms-and-conditionshttp://www.goitu.com/http://arcflashengineering.com/http://itudownloads.com/energized-electrical-work-permit-eewp.htmlhttp://itudownloads.com/energized-electrical-work-permit-eewp.html