S UMMARY ARB Staff Report A PPEARANCE R EVIEW B OARD Aerial Photograph Project Description The subject site is bounded on the north and west by the Coalition for the Homeless, on the east by N. Terry Avenue and the Masjid Al-Haqq Mosque, and on the south by W. Central Ave. This is an ARB Major Review for Phase One of the Tubbs Brewing Co. The review includes the façade renovation of a 16,000 s.f. warehouse space plus a new outdoor entertainment area that includes a new wall/fence, covered outdoor bar, steel pergola, bocce courts and a signature water tower feature. Project Background The project site is approximately .57 acres. The project site is zoned AC-2/T/PH There is an existing 16,215 s.f. warehouse building on the subject site that was originally constructed in 1925. Public Notice A placard advertising this ARB meeting was posted at the subject property; as of September 16th no inquiries or comments have been received on this project. November 10, 2016 Case Number ARB2016-00059 Applicant Ryan Young, President Interstruct, Inc. Owner Joel + Cathleen Springman W Central LLC Requested Action Request for a Major Certificate of Appearance Approval for a façade renovation and new outdoor entertainment area including a new wall/fence, covered outdoor bar, steel pergola, bocce courts and a signature water tower feature. Recommendation Approval, based on the condi- tions in this Staff Report. Project Planner Doug Metzger, AICP, LMT Updated: Sept. 16, 2016 A GENDA I TEM 1— 617 W. C ENTRAL A VENUE T UBBS B REWING SITE Orlando City Soccer Stadium W Central Ave. W Central Ave. W Church St. N. Terry Ave. S. Division St. Ave.

ARB2016-00059_617 W Central_Tubbs Brewing Co Nov ARB

Embed Size (px)

Citation preview

Page 1: ARB2016-00059_617 W Central_Tubbs Brewing Co Nov ARB

S U M M A R Y

ARB Staf f Repor t

A P P E A R A N C E R E V I E W B OA R D

Aerial Photograph

Project Description The subject site is bounded on the north and west by the Coalition for the Homeless, on the east by N. Terry Avenue and the Masjid Al-Haqq Mosque, and on the south by W. Central Ave. This is an ARB Major Review for Phase One of the Tubbs Brewing Co. The review includes the façade renovation of a 16,000 s.f. warehouse space plus a new outdoor entertainment area that includes a new wall/fence, covered outdoor bar, steel pergola, bocce courts and a signature water tower feature.

Project Background The project site is approximately .57 acres.

The project site is zoned AC-2/T/PH There is an existing 16,215 s.f. warehouse

building on the subject site that was originally constructed in 1925.

Public Notice A placard advertising this ARB meeting was posted at the subject property; as of September 16th no inquiries or comments have been received on this project.

November 10 , 2016

Case Number

ARB2016-00059

Applicant

Ryan Young, President Interstruct, Inc.

Owner

Joel + Cathleen Springman W Central LLC

Requested Action

Request for a Major Certificate of Appearance Approval for a façade renovation and new outdoor entertainment area including a new wall/fence, covered outdoor bar, steel pergola, bocce courts and a signature water tower feature.

Recommendation

Approval, based on the condi-tions in this Staff Report.

Project Planner

Doug Metzger, AICP, LMT

Updated: Sept. 16, 2016

AGENDA ITEM 1— 617 W. CENTRAL AVENUE

TUBBS BREWING

SITE

Orlando City Soccer Stadium

W Central Ave. W Central Ave.

W Church St.

N. Terry A

ve.

S. D

ivision S

t. Ave.

Page 2: ARB2016-00059_617 W Central_Tubbs Brewing Co Nov ARB

Page 2

P RO J E C T O V E RV I E W [ F R O M T H E A P P L I C A N T ]

Case Number ARB2016-00059—617 W. Centra l Ave.—Tubbs Brewing

This project consists of an existing 16,000 s.f. warehouse and vacant lot on the corner of W. Central and N. Terry Avenues. The ex-isting building/warehouse will be renovated, including a new façade, windows, doors and metal cladding. The interior will consist of new restroom facilities to support the outdoor event space, storage and infrastructure prep work for the phase two brewery. The vacant lot will be transformed into an outdoor space that will include a new covered outdoor bar, a new steel pergola, bocce courts, new landscape and a signature water tower feature.

ARB Staff sees many good aspects of this project: the renovation, stabilization and re-use of a 1925-era warehouse building in the Parramore Neighborhood, upgrades to the façade and mechanical systems, and the creation of an outdoor entertainment area. Add in a new business with new jobs and new economic opportunities in the Parramore Neighborhood and this project is easy to support. The project’s design characteristics are interesting and exciting. The use of corten steel panels, standing seam metal siding and the installation of a new storefront system will bring new life to the long vacant building frontage. A masonry block and corten steel fence, along with the proposed water tower and steel pergola features, will enhance the project character along the W. Central front-age. The streetscape, is also being upgraded with new sidewalks, street trees and double acorn street lights in conjunction with util-ity improvements related to the construction of the new soccer stadium. ARB Staff supports the plan even though there are still a few missing details in the project submittal. The details include: a lighting plan, mechanical equipment details and a drainage plan that might effect the site layout. To ensure the integrity of the plan and the intent of the project appearance, ARB staff has included conditions requiring additional ARB Staff review prior to issuance of building permits, commencement of construction and during the construction program for the subject property.

ARB Staff recommends approval of the request for a Major Certificate of Appearance Approval with the following conditions: 1. Streetscape

A. Streetscape Design Guidelines i. All improvements in the streetscape zone, including new driveway cuts, are required to comply with the design

and construction requirements of the Downtown Orlando Streetscape Design Guidelines, as they may be amended from time-to-time.

ii. City Services Easement—For City maintenance purposes, a city services easement shall be provided by the appli-cant for any portion of the streetscape zone outside of the right-of-way.

iii. Corner Clip—In order to accommodate a signal mast arm at the corner of W. Central and Terry Ave., the applicant must provide a 12-foot corner clip. This will avoid the location of the mast arm in the sidewalk area.

iv. Driveway Cut—The driveway cut on W. Central Blvd. shall be removed, but the pedestrian entry gate into the out-door entertainment area may remain.

v. Pedestrian Crossings—The pedestrian crossing at the proposed driveway cut on N. Terry Avenue shall be level and at the same grade as the sidewalk on either side of the driveway.

2. Architecture

A. Design Intent i. ARB Staff fully supports the architectural direction and theme of the Tubbs Brewing project. ii. Final architectural plans, elevations, materials and finishes shall be reviewed by ARB staff during the building permit

process. B. General Architecture Comments

i. W. Central Avenue Planters – The proposed planters along the W. Central façade, because of the lack of sufficient streetscape width, shall not be permitted to encroach into the W. Central right-of-way.

ii. Entry Canopy – The bottom of the proposed entry canopy shall be a minimum of 12-feet above finished grade. The applicant will need to secure a right-of-way encroachment agreement with the City for any portion of the canopy that extends into the W. Central Ave. right-of-way.

iii. Window Surrounds and W Beams – The proposed 10-inch projecting window surrounds and vertical “W” beams shall be permitted so long as the applicant can demonstrate that these features do not extend into the W. Central Ave. right-of-way.

ARB S TA F F R E V I E W [ U P DAT E D N OV . 2016 ]

ARB C O N D I T I O N S O F A P P ROVA L

Page 3: ARB2016-00059_617 W Central_Tubbs Brewing Co Nov ARB

Page 3 Case Number ARB2016-00059—617 W. Centra l Ave.—Tubbs Brewing

iv. Exterior Doors—A minimum 4”x6” security view panels shall be provided in all pedestrian accessible exterior doors including emergency exit doors to provide visibility and security for pedestrians exiting the building.

v. Windows—A minimum of 15% transparency shall be provided on all floors facing the street. All glass at the ground level shall be clear. Minimum light transmittance shall be 80%. High performance or Low-e glass with a minimum transmittance of 60% may be considered as an alternative. No windows at the ground floor level shall be dry-walled or have permanent partitions installed on the interior to block natural surveillance. Tinted, reflective, or spandrel glass does not count towards meeting the transparency requirements.

vi. Outdoor Dining Area—Final detailing and layout of the proposed outdoor dining area will be reviewed by ARB Staff during the building process.

3. Site Plan and Landscaping

A. Perimeter Walls and Fencing i. Fence/Wall Height – VAR2016-00111 was approved by the Board of Zoning Adjustment in October of 2016. The-

maximum height of the wall on W. Central and the fence on N. terry is permitted to be 8-feet in height. ii. Masonry/Corten Steel Wall – The proposed masonry/corten steel wall shall run the entire length of the W. Central.

The wall shall be setback 2-feet from right-of-way line along W. Central. The proposed entry gate on W. Central shall be no more than 12-feet tall.

iii. Green Screen Fence— the green screen fence along N. Terry Ave. and shall be no more than 8-feet tall. The pro-posed N. Terry gate shall be no more than 12-feet tall.

iv. Other Fencing -- Any other fencing on the site shall be an open, CPTED-approved fence, such as architectural mesh, welded wire or aluminum-picket fencing. Chain link fencing is prohibited.

v. North Property Line Landscape— The landscape treatment along the north property line must be extended from it’s terminus in the proposed landscape plan to the west property line.

B. Loading/Delivery Area i. Paving -- The loading/delivery area shall, at a minimum, be paved with asphalt. ii. Separation – The loading and delivery area shall be clearly delineated and separated from the outdoor entertain-

ment area through the use of concrete vertical curbing or a concrete ribbon curb with bollards. C. Dumpster Enclosure – The dumpster area shall be enclosed by masonry walls with decorative metal gates. The enclo-

sure shall have a smooth stucco finish and shall be painted to match the color of the warehouse building. 4. Lighting — A lighting plan compliant with the City’s lighting regulations [Chapter 63 2M.], including photometrics and all pro-

posed exterior lighting fixtures, shall be submitted for ARB Staff review and approval prior to issuance of building permits.

5. Mechanical Equipment A. Venting & Exhaust—All potential venting and exhaust shall be directed to the roof of the building and shall not be visible

from the public right-of-way. If visible from the right-of-way the equipment shall be sreened with louvers or architectural mesh that extends to the full height of the equipment. Exhaust venting is not permitted on any street facing building façade. All other venting and exhaust for mechanical equipment and other utilities shall be a minimum of 12 ft. above grade, shall be integrated with the building design so as to be seamless with the overall architecture of the building, and must not be directed over pedestrian areas. Exterior vent panels shall be painted to match the building façade color surrounding them.

B. Transformer Area Screening—Transformer areas outside the building envelope shall be screened on three sides with a hedge that is 36-inches tall at the time of planting and maintained at the height of the transformer.

C. Mechanical Equipment—All ground mounted and rooftop mechanical equipment shall be screened from view and meet the screening conditions of the Land Development Code. An interior screen wall or parapet for rooftop mechanical equipment mat be required. The interior screen wall or parapet shall be the same height as the installed mechanical equipment height.

D. Backflow Preventer—Backflow preventer[s] shall be located so as to not be directly visible from the right-of-way and should be screened from view where necessary. They shall be clearly identified on the final utilities plan.

E. Final Elevations—The location and configuration of all exterior venting and mechanical equipment shall be depicted on the building elevations. Final building elevations with venting depicted on the elevations shall be submitted for ARB Staff review prior to issuance of building permits.

ARB C O N D I T I O N S O F A P P ROVA L [ C O N T . ]

Page 4: ARB2016-00059_617 W Central_Tubbs Brewing Co Nov ARB

Page 4 Case Number ARB2016-00059—617 W. Centra l Ave.—Tubbs Brewing

6. Signage The signage as presented in this application is generally acceptable. However, prior to submittal of sign permits the appli-cant shall submit a Master Sign Plan for ARB Minor Review depicting all proposed on-site signage. The Master Sign Plan shall include the design, size, square footage and type of all proposed exterior signage for the building and the outdoor entertainment area.

7. ARB Approvals and Construction Observation

A. ARB approval does not grant permission to begin or to construct any proposed improvements. All required building and engineering permits must be obtained prior to commencement of construction.

B. Prior to the commencement of construction the general contractor, developer and architect will schedule a coordina-tion meeting with ARB Staff to review the ARB conditions of approval and the ARB review process for any proposed changes that may occur during construction.

C. The general contractor shall schedule periodic meetings with the ARB Staff, as needed, to update staff on the project progress and any potential ARB compliance issues.

ARB C O N D I T I O N S O F A P P ROVA L [ C O N T . ]

S I T E A E R I A L

OC Soccer

Stadium

SITE

W. Central Ave.

W. Church St.

S. terry Ave.

Page 5: ARB2016-00059_617 W Central_Tubbs Brewing Co Nov ARB

Page 5 Case Number ARB2016-00059—617 W. Centra l Ave.—Tubbs Brewing

S I T E P H O T O S

Looking South from N. Terry Ave.

Looking west from W. Central and Terry Ave. with the soccer stadium in the background.

Page 6: ARB2016-00059_617 W Central_Tubbs Brewing Co Nov ARB

Page 6 Case Number ARB2016-00059—617 W. Centra l Ave.—Tubbs Brewing

S I T E P H O T O S

Existing warehouse looking east from W. Central Ave.

Rendering of proposed Tubbs facade

Page 7: ARB2016-00059_617 W Central_Tubbs Brewing Co Nov ARB

Page 7 Case Number ARB2016-00059—617 W. Centra l Ave.—Tubbs Brewing

P A R C E L P L A N S I T E P L A N

Inte

rior

Bui

ld-O

ut

Pha

se 2

Serv

ice

& D

eliv

erie

s Se

rvic

e &

Del

iver

ies

Rem

ove

Driv

eway

Cut

New

Cor

ner C

lip

Page 8: ARB2016-00059_617 W Central_Tubbs Brewing Co Nov ARB

Page 8 Case Number ARB2016-00059—617 W. Centra l Ave.—Tubbs Brewing

L A N D S C A P E P L A N

Inte

rior

Bui

ld-O

ut

Pha

se 2

Serv

ice

& D

eliv

erie

s

Con

tinu

e la

ndsc

apin

g al

ong

nort

h pr

oper

ty li

ne

Page 9: ARB2016-00059_617 W Central_Tubbs Brewing Co Nov ARB

Page 9 Case Number ARB2016-00059—617 W. Centra l Ave.—Tubbs Brewing

B E E R G A R D E N C H A R AC T E R A N D M AT E R I A L I M AG E S

Page 10: ARB2016-00059_617 W Central_Tubbs Brewing Co Nov ARB

Page 10 Case Number ARB2016-00059—617 W. Centra l Ave.—Tubbs Brewing

S I T E F U R N I S H I N G S

Page 11: ARB2016-00059_617 W Central_Tubbs Brewing Co Nov ARB

Page 11 Case Number ARB2016-00059—617 W. Centra l Ave.—Tubbs Brewing

W. C E N T R A L B U I L D I N G E L E VAT I O N

Page 12: ARB2016-00059_617 W Central_Tubbs Brewing Co Nov ARB

Page 12 Case Number ARB2016-00059—617 W. Centra l Ave.—Tubbs Brewing

W. C E N T R A L E N T E R TA I N M E N T A R E A E L E VAT I O N

Page 13: ARB2016-00059_617 W Central_Tubbs Brewing Co Nov ARB

Page 13 Case Number ARB2016-00059—617 W. Centra l Ave.—Tubbs Brewing

P E R S P E C T I V E R E N D E R I N G S

Aerial Perspective

Terry Avenue Frontage

Page 14: ARB2016-00059_617 W Central_Tubbs Brewing Co Nov ARB

Page 14 Case Number ARB2016-00059—617 W. Centra l Ave.—Tubbs Brewing

S T RU C T U R A L D E TA I L S

Page 15: ARB2016-00059_617 W Central_Tubbs Brewing Co Nov ARB

Page 15 Case Number ARB2016-00059—617 W. Centra l Ave.—Tubbs Brewing

C O N C E P T UA L S I G N AG E