Upload
town-of-ocean-city
View
217
Download
0
Embed Size (px)
Citation preview
7/30/2019 April 30, 2013 Complete Agenda
1/48
MAYORANDCITYCOUNCILWORKSESSION
Tuesday,April30,20131:00P.M.
AClosedSessionisscheduledfrom10:001:00P.M.todiscusslegalandpersonnelmatters.AGENDA
1. CALLTOORDER2. REPORTONCLOSEDSESSIONTuesday,April30,201310:00a.m.3. COMMENTSFROMTHEPUBLIC
AnypersonwhomaywishtospeakonamatterscheduledfordiscussionontheWorkSessionAgendamaybeheardduringCommentsfromthePublicforaperiodofthree(3)minutesorsuchtimeasmaybedeemedappropriatebytheCouncilPresident. Anyonewishingtobeheardshallstatetheirname,addressandtheAgendaitemonwhichheorshewishestospeak.
4. NEWBUSINESSA. RecognitionofPublicWorksMaintenanceemployeesfordevelopmentofliftingdevice
presentedbyRiskManagerB. TABUpdateandRequesttoApproveFundingpresentedbyChairmanGregShockleyC. DiscussionofPotential BannerProgramfortheRt.50BridgepresentedbyPublicWorks
DirectorD. DiscussionofBeachPatrolHeadquarterspresentedbyRecreationandParksDirectorandCity
EngineerE. UpdateonFY14FinancialOperatingPlanpresentedbyCityManagerandBudgetManager
5. ADJOURN
7/30/2019 April 30, 2013 Complete Agenda
2/48
WORK SESSION -MAYOR AND CITY COUNCILTUESDAY, APRIL 30, 2013
2. Report on Closed Session Tuesday, April 30, 10:00 a.m.Legal and Personnel Matters
7/30/2019 April 30, 2013 Complete Agenda
3/48
NOTICE OF CLOSED SESSION OF MAYOR & CITY COUNCIL OF OCEAN CITY
AUTHORITY: State Government Article: Section 10-508(a) Annotated Code of MarylandPURPOSES:
X
1. To discuss:(i) the appointment, employment, assignment, promotion, discipline, demotion,
compensation, removal, resignation or performance evaluation of
appointees, employees or officials over whom it has jurisdiction; or(ii) any other personnel matter that affects one or more specific individuals;2. To protect the privacy or reputation of individuals with respect to a matter that is
not related to public business3. To consider the acquisition of real property for the public purpose and matters
directly related thereto;4. Consider a matter that concerns the proposal for a business or industrial
organization to locate, expand or locate in the state;5. Consider the investment of public funds;6. Consider the marketing of public securities;
X 7. Consult with counsel to obtain legal advice;
8. Consult with staff, consultants or other individuals about pending or potentiallitigations;9. Conduct collective bargaining negotiations or consider matters that relate to the
negotiations;10. Discuss public security if the public body determines that public discussion
would constitute a risk to the public or public security, including;a) the deployment of fire and police services and staff; andb) the development and implementation of emergency plans
11. Prepare, administer or grade a scholastic, licensing or qualifying examination;12. Conduct or discuss an investigative proceeding on actual or possible criminal
conduct;
13. Comply with a specific constitutional, statutory or judicially imposedrequirement that prevents public disclosures about a particular proceeding ormatter; or
14. Before a contract is awarded or bids are opened, discuss a matter directly relatedto a negotiation strategy or the contents of a bid or proposal, if public discussionor disclosure would adversely impact the ability of the public body to participatein the competitive bidding or proposal process
DATE AND TIME: Tuesday, April 30, 2013 10:00 a.m.PLACE: City HallSUBJECT: Legal and Personnel MattersVOTE: UNANIMOUS
OTHER: FOR:AGAINST:ABSTAIN:ABSENT:
7/30/2019 April 30, 2013 Complete Agenda
4/48
REPORT OF CL OSED SESSION
OF THE MAYOR AND CITY COUNCIL OF OCEAN CITY
Prior to this open session of the Mayor and City Council being held on Tuesday,
April 30, 2013, a closed session was held on Tuesday, April 30, 2013 at 10:00
a.m. The following is a report of the closed session.
1. A statement of the time, place, and purpose of the closed session is attached.
2. A record of the vote of each member as to closing the session is attached.
3. A citation of the authority under the law for closing the session is attached.
4. (a) Topics of Discussion: Legal and Personnel Matters
(b) Persons present:
Mayor Richard MeehanCity Manager David RecorCouncil President Lloyd MartinCouncil Secretary Mary KnightCouncil Members Doug Cymek; Brent Ashley; Dennis Dare; Margaret Pillas
and Joe MitrecicCity Solicitor Guy AyresMiles & Stockbridge Principal Kathleen Pontone and Associate Julie SiegelHuman Resource Director Wayne EvansExecutive Office Associate Diana Chavis
Action(s) taken:
Motion to close meeting:
Time:
H:\Wpdoc\closedsess.wpd
7/30/2019 April 30, 2013 Complete Agenda
5/48
WORK SESSION - MAYOR AND CITY COUNCIL
TUESDAY, APRIL 30, 2013
3. COMMENTS FROM THE PUBLIC
Any person who may wish to speak on a matter scheduled for discussion on the WorkSession Agenda may be heard during Comments from the Public for a period of three(3) minutes or such time as may be deemed appropriate by the Council President.Anyone wishing to be heard shall state their name, address and the subject on whichhe or she wishes to speak.
7/30/2019 April 30, 2013 Complete Agenda
6/48
WORK SESSION - MAYOR AND CITY COUNCIL
TUESDAY, APRIL 30, 2013
4. NEW BUSINESSA. Recognition of Public Works Maintenance employees for
development of lifting device presented by Risk Manager
7/30/2019 April 30, 2013 Complete Agenda
7/48
336 TOWN OF
The White Mar lin Capital of the World
TO: The Honorable Mayor, Council President and Members of Council
THRU: David L. Recor, ICMA-CM, City ManagerFROM: Eric Lagstrom, Risk Manager
RE: Lifting device developed by Public Works employeesDATE: April 30, 2013
ISSUE(S): Lifting device developed by Public Works employees
SUMMARY: An increasing number of injuries are reported as the result of
employees lifting and moving the 350lb boardwalk benches.
Several of the injuries were severe, resulting in substantialpayments for medical treatment and permanent disability.
The following employees are to be commended for an innovativesolution to prevent injuries:
Vincent Holloway, Heavy Equipment Operator
John Morole, Heavy Equipment Operator
Terry Steimer, Maintenance WorkerFred Wimbrow, Heavy Equipment Operator
These employees took it upon themselves to design and
manufacture a hoist mounted on a lowboy trailer. Use of the lift
eliminates the opportunity for lifting injuries thus reducing theassociated costs paid by Workers Compensation. Benches cannow be moved quickly and safely.
FISCAL IMPACT: To be determined.
RECOMMENDATION: Not applicable.
ALTERNATIVES: Not applicable.
RESPONSIBLE STAFF: Noted above.
COORDINATED WITH: Joe Listman, Maintenance and Construction Supervisor
ATTACHMENT(S): Photo
Agenda Item # 4A
Council Meeting April 30, 2013
7/30/2019 April 30, 2013 Complete Agenda
8/48
7/30/2019 April 30, 2013 Complete Agenda
9/48
WORK SESSION - MAYOR AND CITY COUNCIL
TUESDAY, APRIL 30, 2013
4. NEW BUSINESSB. TAB Update and Request to Approve Funding presented by
Chairman Greg Shockley
7/30/2019 April 30, 2013 Complete Agenda
10/48
TOWN OF
The White Mar lin Capital of the World
TO: The Honorable Mayor, Council President and Members of CouncilTHRU: David L. Recor, ICMA-CM, City ManagerFROM: Donna Abbott, Tourism and Marketing DirectorRE: TAB Update and Request to Approve Funding a WebcastDATE: April 22, 2013
ISSUE(S): TAB update and request to approve webcast funding
SUMMARY: Tourism Advisory Board Chairman Greg Shockley will present anupdate on TABs April 4 meeting. TAB seeks approval from the
Mayor and Council for up to $4,000 from its allocation to supportfunding a webcast of the Eastern Surfing Associations mid-Atlantic regionals, which will be held in Ocean City May 9-12.
Ocean City has not hosted a regional competition since 2004.The regionals travel throughout the area, with each city getting aturn. Over 500 competitors and their families from Delaware toSouth Carolina will be in Ocean City during that time. ESArequested $4,000 from TAB to do a live webcast of thecompetition. During the webcast, OC will be given theopportunity to insert commercials or any plug of its choosing.
TAB unanimously voted to guarantee the $4,000 and if more
sponsorships are sold to cover the cost, then there would be noneed for funding. In exchange for the $4,000 guarantee, the ESAagrees to provide B-Roll of the event for the town to use in itsmarketing.
FISCAL IMPACT: Support not to exceed $4,000. TAB allocation is currently at$59,000 for FY 13.
RECOMMENDATION: Approve TAB recommendation.
ALTERNATIVES: Do not approve funding.
RESPONSIBLE STAFF: Donna Abbott, Tourism and Marketing Director
COORDINATED WITH: Greg Shockley, Tourism Advisory Board Chairman
ATTACHMENT(S): None
Agenda Item # 4B
Council Meeting April 30, 2013
7/30/2019 April 30, 2013 Complete Agenda
11/48
WORK SESSION - MAYOR AND CITY COUNCIL
TUESDAY, APRIL 30, 2013
4. NEW BUSINESSC. Discussion of Potential Banner Program for the Rt. 50 Bridge
presented by Public Works Director
7/30/2019 April 30, 2013 Complete Agenda
12/48
25166 TOWN OF
The White Marlin Capital of the World
TO: The Honorable Mayor, Council President and Members of CouncilTHRU: David L. Recor, ICMA-CM, City Manager
FROM: Hal O. Adkins, Public Works DirectorRE: Expansion of Banner Program
Consideration of New Location: Rt. 50 BridgeDATE: April 19, 2013
ISSUE(S): Potential expansion of available banner locations.
SUMMARY: With the elimination of horizontal banner locations spanning
Baltimore Avenue, event promoters are requesting considerationfor vertical banner/pennant locations on the Rt. 50 Bridgeentrance to Town.
FISCAL IMPACT: Initial purchase of suitable banner brackets @ $47.60/pole for 13
locations = $618.80 (use of in-house labor to initially install).Event banner/pennant installation/removal costs would be paid
by the Event Promoter
RECOMMENDATION: To consider whether such a location/application is one that youfeel attracts, or detracts, from the entrance to Town, and voteaccordingly to approve or deny the concept.
ALTERNATIVES: Leave the Towns Thanks for Visiting banners as is.
RESPONSIBLE STAFF: Hal O. Adkins, Public Works Director
COORDINATED WITH: John VanFossen, Deputy Public Works Director
Lisa Mitchell, Private Events Coordinator
Ken Cimino, ADE/SHA
ATTACHMENT(S): Three (3) Sample Photos and email from SHA
Agenda Item # 4C
Council Meeting April 30, 2013
7/30/2019 April 30, 2013 Complete Agenda
13/48
1
Diana Chavis
From: Diana Chavis
Sent: Wednesday, April 24, 2013 10:28 AM
To: Diana Chavis
Subject: FW: April 30th Council Agenda - Expansion of Banner Program - Consideration of New
Location RT 50 Bridge
Attachments: Ocean City Banner Sample Photos.pdf
From: Kenneth Cimino [mailto:[email protected]]
Sent: Wednesday, April 24, 2013 9:54 AM
To: Hal Adkins
Subject: RE: April 30th Council Agenda - Expansion of Banner Program - Consideration of New Location RT 50 Bridge
HiHal,
IbelievethisisanonissueforSHA. Pleaseproceedwithinstallingthebannersasshowninyour
correspondenceandinaccordancewiththeTownsnormalbusinesspractice.
KennethL.Cimino
AssistantDistrictEngineer Traffic
MarylandStateHighwayAdministration,District1
660WestRoad,P.O.Box2679
Salisbury,Maryland21802
(410)6774040office
(410)4307455cell
(410)5436598fax
7/30/2019 April 30, 2013 Complete Agenda
14/48
7/30/2019 April 30, 2013 Complete Agenda
15/48
7/30/2019 April 30, 2013 Complete Agenda
16/48
WORK SESSION - MAYOR AND CITY COUNCIL
TUESDAY, APRIL 30, 2013
4. NEW BUSINESSD. Discussion of Beach Patrol Headquarters presented by City
Engineer and Recreation and Parks Director
7/30/2019 April 30, 2013 Complete Agenda
17/48
TOWN OF
The White Mar lin Capital of the World
TO: The Honorable Mayor, Council President and Members of CouncilTHRU: David L. Recor, ICMA-CM, City ManagerFROM: Terence J. McGean, PE, City EngineerRE: Beach Patrol HeadquartersDATE: April 24, 2013
ISSUE(S): New Beach Patrol Headquarters Facility
SUMMARY: Beach Patrol currently occupies three buildings located on theSouth side of Dorchester St. between Baltimore Ave. and
Philadelphia Ave. The buildings are in disrepair and no longermeet the Beach Patrols needs. Staff would like to begin theprocess of constructing a new Beach Patrol Headquarters Facilityon the site currently owned by the OCDC between Dorchesterand Talbot Streets.
FISCAL IMPACT: $165,000 for design of a new Beach Patrol facility$1,835,000 for construction of a new Beach Patrol facility$300,000 for construction of a parking lot at the site of theexisting Beach Patrol facility
RECOMMENDATION: 1. Negotiate an agreement in principle with the OCDC to placethe new Beach Patrol Headquarters on the proposed site.
2. Pass a resolution to authorize spending up to $165,000 fordesign of the new facility to be reimbursed in a future bond
issue.
3. Authorize the staff to begin the RFP process to hire a designfirm.
ALTERNATIVES: Take no action (not viable for more than two years).Discuss alternate sites.
RESPONSIBLE STAFF: Terence McGean, City EngineerTom Shuster, Recreation & Parks Director
Butch Arbin, Beach Patrol Captain
COORDINATED WITH: Glenn Irwin, Director Ocean City Development Corporation
ATTACHMENT(S): 1) Report2) Attachment A Proposed site with building foot print3) Attachment B Cost Estimate for Beach Patrol HQ4) Attachment C Parking layout on existing site5) Attachment D Cost estimate for parking lot construction6) Letter from Captain Arbin
Agenda Item # 4D
Council Meeting April 30, 2013
7/30/2019 April 30, 2013 Complete Agenda
18/48
BeachPatrolHeadquartersRecommendationTheOceanCityBeachPatrol(OCBP)HeadquartersiscurrentlylocatedintheoldPoliceandDistrictCourt
facilitieslocatedonDorchesterStreetbetweenPhiladelphiaAveandBaltimoreAve(fig1&2).TheOCPB
movedintothesefacilitiesin1993afterthePoliceandDistrictCourtoperationsmovedintothePublic
SafetyBuilding
at
65th
Street.
The
OCBP
and
Police
Department
currently
utilize
these
facilities
as
follows:
1. OldDistrictCourta. FirstFloor(1,500sf)PoliceDeptBikestorageandworkshopb. SecondFloor(1,500sf)Meeting/Trainingroomandoffice
2. OldPoliceGaragebehindDistrictCourta. Firstfloor
i. ATV,Jetskis,miscequipment1,100sfii. Restroom&Shower100sfiii. Workshoparea400sf
b. SecondFloor(1,100sf)Umbrella,gearbags,clothingc. Attic(800sf)raingear,paddleboards
3. OldPoliceOfficeSpacea. FirstFloor(1,300sf)Conferencerooms,computerareab. Secondfloor(1,300sf)offices,reception,dispatch
Theexistingfacilitiesareallinneedofsignificantrepairsbothcosmeticandstructural.Althougha
thoroughcodeandstructuralanalysishasnotbeenperformed,abriefexaminationoftheexisting
buildingsrevealedthefollowingissues:
NumerousADAviolations(stairs,doorwaywidths,restroomsetc).(fig5) Nonfunctioningsprinklersystemingarageareathathousesgaspoweredvehiclesinanoldwoodbuilding.
Leakingroofsneedreplacementatthestoragebuildingandofficebuilding. Waterdamageintheofficebuildinginterior.(fig12) Asbestossidingdelaminatingatstoragebuilding(fig3) CracksinexteriormasonrywallsattheoldDistrictCourtbuilding(fig4&6) CorrodedlintelsattheoldDistrictCourtBuilding(fig7) Spallingconcreteatthestoragebuilding(fig8) Overloaded2ndfloorandatticatthestoragebuilding(fig10&11) AllbuildingsfirstfloorsarebelowtheFEMABaseFloodElevation
Inadditiontotheproblemswiththeconditionoftheexistingbuildings,thefacilitiesaresimply
inadequateforthefunctionalneedsoftheBeachPatrol. Therequiredrepairsandalterationstothese
buildingswillexceed50%ofthecurrentvalueofthestructuresandthereforeeachbuildingwillhaveto
bebroughtintocompliancewithfloodcoderequirementsmeaningtheywilleitherhavetobeflood
proofedorraised.Thebottomlineisthatattemptingtoutilizetheexistingbuildingsforlongtermuseby
7/30/2019 April 30, 2013 Complete Agenda
19/48
theBeachPatrolwillbecostprohibitive.FinallythecurrentfacilityislocatedintheOCDCModelblock
aredesignatedforredevelopment.
BasedonthecurrentandfutureneedsoftheBeachPatrol,thestaffhasdevelopedabasicspace
programforanewfacility.Thisprogramestablishedtheneedforafacilityofapproximately10,700sf
comprisingoffice
space,
training
areas,
locker
rooms,
and
equipment
storage.
Overthepast3years,thestaffhasinvestigatedanumberofpossiblelocationsforanewBeachPatrol
HeadquartersFacility.Thesehaveincludedprivatepropertiesknowntobeforsaleaswellasexisting
Cityproperty.TheBeachPatroldesirestoremaindowntownincloseproximitytotheCoastGuard
Stationastheycoordinateanumberofrescues,airoperationsandboatlauncheswiththeCoastGuard.
Theywouldalsoliketohaveconvenientvehicleaccesstothebeach.
BasedonthelocationandspacerequirementsstaffwouldliketorecommendthatanewBeachPatrol
HeadquartersfacilitybeconstructedonthethreeparcelsrecentlypurchasedbytheOCDCbetween
TalbotandDorchesterStreets(fig14).Thislocationremainsdowntownwithvehicleaccesstothebeach
andboardwalk
via
Dorchester
Street.
A
three
story
L
shaped
building
could
be
constructed
on
the
Northportionofthelotwithparkingalongthenarrowsouthsection.(seeattachmentA)Thenew
10,700sffacilitywouldhousebeachpatrolalongwiththePoliceDepartmentbicyclestorageandrepair
facility.
TheestimatedCONCEPTUALcostforthenewBeachPatrolfacilityis$2million(seeattachmentB).This
includessite,building,designandanallowanceforfurnitureandequipmentbutdoesnotincludeany
landacquisitioncosts.Iwouldnotethatthesizeoftheexistingbeachpatrolparcelandtheproposed
sitecurrentlyownedbytheOCDCareapproximatelythesame(+/ 15,000sf).TheOCDCdoesstillcarry
amortgagefortheproposedlotandpaidforthedevelopmentofthetemporaryparkinglotlocated
there.
Intheshortterm,therearecurrently33parkingspacesattheproposedsite(Talbot/Dorchester).
Combiningtheoldbeachpatrolpropertywiththecurrentpropertytothewestusedasparkingwould
yieldanadditional38spacesatthatsite.Thecosttoconstructapermanentparkinglotatthatlocation
(Dorchester/Somerset)similartowhatwasrecentlyconstructedat4thstreetwouldbe$300,000.(see
attachmentsC&D)
Inordertomoveforwardwiththisproject,thenextstepswhichrequireactionfromtheMayorand
Councilare:
1. NegotiateanagreementinprinciplewiththeOCDCtoplacethenewBeachPatrolHeadquartersontheproposedsite.
2. Passaresolutiontoauthorizespendingupto$165,000fordesignofthenewfacilitytobereimbursedinafuturebondissue.
3. AuthorizethestafftobegintheRFPprocesstohireadesignfirm.
7/30/2019 April 30, 2013 Complete Agenda
20/48
Fig1ExistingLocationoffice
Fig2ExistingLocation(Meeting2ndFloor,OCPDBikeShop/Storage1stFloor)
7/30/2019 April 30, 2013 Complete Agenda
21/48
Fig3Asbestossidingshinglesandfailingroofshinglesoverstoragearea
Fig4Corrodedstairwayandmasonrycrack,southwallstoragebuilding
7/30/2019 April 30, 2013 Complete Agenda
22/48
Fig5Restroomandshoweratstoragebuilding
7/30/2019 April 30, 2013 Complete Agenda
23/48
Fig6MasonrycracksatoldDistrictCourtWestWall
Fig7FailinglintleatoldDistrictCourtMainEntrance
7/30/2019 April 30, 2013 Complete Agenda
24/48
Fig8,SpallingconcreteatStorageBuildingEastWall
Fig9StorageBuilding1stFloor
7/30/2019 April 30, 2013 Complete Agenda
25/48
Fig10StorageBuilding2ndfloor(inseasonthisroomisfilledwithgear,structuralconcern)
Fig11StorageBuilding2ndfloorcloset,loadcondition
7/30/2019 April 30, 2013 Complete Agenda
26/48
Fig12OfficeBuildingWaterDamage
Fig13OfficeBuildingComputerworkStations
7/30/2019 April 30, 2013 Complete Agenda
27/48
Fig14ProposedSite
7/30/2019 April 30, 2013 Complete Agenda
28/48
7/30/2019 April 30, 2013 Complete Agenda
29/48
Cost Estimate for Beach Patrol Headquarters at OCDC lot
Unit Extend
Item # Description Quan Unit Price Price Notes
Site Work -$
Building Pad 8,200 sf 1.00 8,200$
Electric service 1 ls 15,000.00 15,000$
water/sewer 1 ls 5,000.00 5,000$ in house
Stormwater system 15,000 sf 2.00 30,000$
Silt fence 600 lf 2.50 1,500$
Const Entrance 1 ls 1,500.00 1,500$
Concrete curb raised 313 lf 22.00 6,886$
Concrete curb - flush 140 lf 18.00 2,520$
Pervious Pavers, w/prep 2,500 sf 8.00 20,000$
GAB under asphalt 2,925 sf 0.75 2,194$
Asphalt 3" in place 53 ton 70.00 3,710$
site lighting 1 ls 5,000.00 5,000$
landscaping/cam fee 15,000 sf 1.00 15,000$
sidewalk remove/replace 1,500 sf 10.00 15,000$
vinyl fence 165 lf 17.00 2,805$flag poles 1 ea 3,500.00 3,500$
Basic Office Space NIC Lockers 2,156 sf 125.00 269,500$
Training Facility NIC Locker Rooms 2,000 sf 125.00 250,000$
Locker Rooms/shower 1,000 sf 175.00 175,000$
Storage Facilities - beach patrol 3,500 sf 80.00 280,000$
Police bike storage and work area 1,000 sf 80.00 80,000$
Misc Hallways Mech rooms etc 1,000 sf 125.00 125,000$
Subtotal Construction 1,317,315$
Construction Contingency 5% 5% 65,866$
Total Construction 1,383,180$
Design Costs 12% 165,982$
FFE Costs 10% 138,318$
Subtotal Project Cost 1,687,480$
Planning Contingency 15% 15% 253,122$
Total Project Cost NIC Land 1,940,602$
Land Cost sf 0 -$
Total project with land costs 1,940,602$
Say $2 million
7/30/2019 April 30, 2013 Complete Agenda
30/48
7/30/2019 April 30, 2013 Complete Agenda
31/48
Beach Patrol Parking Lot Conversion
By: T. McGean
23-Apr-13
Unit Ext
Item Description Qty Unit Price Price
24116.1 Bldg Demo, wood frame, 2.5 story 3,500 sf 5.00 17,500$24116.2 Bldg Demo, masonry 2 story (dc) 105,000 cf 0.40 42,000$
24116.3 Bldg Demo, masonry 2 story (office) 65,000 cf 0.40 26,000$
24116.41 Asbestos removal/disposal 2,040 sf 2.00 4,080$
24113.2 Concrete slab on grade demo 1,000 sy 11.00 11,000$
24113.3 Sidewalk Demo 600 sf 1.00 600$
24113.4 Remove chain link fence - lf 3.50 -$
24113.5 Remove light poles - ea 150.00 -$
311110.1 General clear and strip 6" 2,228 sy 1.40 3,119$
311110.2 Rough grade 2,228 sy 1.75 3,899$
312323.1 Haul material to airport 380 cy 6.00 2,280$
312513.1 Silt Fence 600 lf 2.50 1,500$
312513.2 Construction Entrance 1 ea 1,500.00 1,500$321313.1 New concrete sidewalk 600 sf 9.00 5,400$
321613.1 New concrete curb - flush 200 lf 18.00 3,600$
321613.1 New Concrete curb raised 600 lf 22.00 13,200$
321123.1 Graded aggregate base material 500 ton 18.00 9,000$
321123.2 Graded aggregate base install 1,777 sy 2.80 4,976$
321123.3 57 stone under pavers material 125 ton 20.00 2,500$
321123.4 57 stone under pavers install 444 sy 2.90 1,288$
321123.5 filter fabric under/over 57 stone 888 sy 1.77 1,572$
321216.1 Asphalt pavement 2" - in place 195 ton 70.00 13,650$
321416.1 Pervious Pavers Materials 4,000 sf 3.00 12,000$
321416.2 Pervious Pavers Install 4,000 sf 3.75 15,000$
329113.1 Planting Mulch/shrub/grass 422 sy 7.50 3,165$
329343.1 Trees 10 ea 300.00 3,000$160005.1 Lights 5 ea 1,500.00 7,500$
160030.1 Sign 1 ea 8,000.00 8,000$
160020.1 New cale machines 1 ea 7,500.00 7,500$
subtotal 224,828$
Contingency 0.15 33,724$
Design fees 10,000$
Total Estimate 268,552$
Size 20,053 sf 13.39
Spaces 50 spaces 5,371.05
7/30/2019 April 30, 2013 Complete Agenda
32/48
Beach Patrol Headquarters
1. The current location of our Beach Patrol headquarters has been designatedas a temporary location and will be used at some time in the future for
downtown development.
2. The Beach Patrol has never had a facility designed and constructed for theirexclusive use. We have always been moved into an existing facility and
needed to make it meet our needs.
3. The current configuration is not an efficient use of space due to the spacebeing spread over three separate buildings.
4. As one of the most visible Town of Ocean City Departments and asambassadors for the Town, the Beach Patrol should be in a facility that is
well maintained and visually pleasing.
5. The current facility has structural, physical and environment issues thatwould be costly to correct.
OCBPPreference for location of new HQ South OC east of Philadelphia
Needs for new HQ
Administrative offices Operations center Garage Workroom/shop Training Room Uniform Storage Equipment Storage
7/30/2019 April 30, 2013 Complete Agenda
33/48
Laundry facilities Locker room Conference room Workout area/weight room Computer lab File/computer/copy
Benefits of South OC east of Philadelphia
Close to employee housing
In the event of an off hours emergency we can access a large number of trained
SRTs and quickly deploy them with readily available resources.
Close to Inlet
This is a unique training location due to the continual presence of currents and
other water hazards. This is also an area that has had a disproportionate number
of off-duty water related incidents.
Close to Pier
This is a unique training location due to the continual presence of currents and
other water hazards. This is the only location in OC that allows us to do some
specialized training.
Close to USCG
This location provides us with 5 distinct advantages.
1. Quick access to floating dock to launch rescue watercraft2. Access to forward deployment of MSP helicopter3. Access to controlled deep water training basin
7/30/2019 April 30, 2013 Complete Agenda
34/48
4. Access to USCG vessel for SAR missions5. Closest access for retrieving personnel and victims recovered from ocean
Close to west OC
Access to Rt. 50 for access to West OC and West OC boat launch ramp with direct
access to ocean
Close to beach without crossing Philadelphia
Since much of our training has both a classroom and skills practice component,
moving from the training room to the beach does not require crossing
Philadelphia.
Junior Beach Patrol can access the beach without crossing a major highway
Close to public restrooms on beach
We hold camps and JBP in the area of Dorchester to North Division and having the
Caroline Street comfort station is convenient for the use by campers
Beach access
Dorchester Street gives the best access in the south end beach and allows us toenter and exit quickly for movement of personnel and equipment and fast access
in emergency situations. In the event of an off duty emergency we can access a
large number of staff and equipment and enter the beach to respond to the
scene.
7/30/2019 April 30, 2013 Complete Agenda
35/48
Deep Water training at USCG Station Ocean City
7/30/2019 April 30, 2013 Complete Agenda
36/48
Forward Deployment of MSP Trooper 4 at USCG Station Ocean City
7/30/2019 April 30, 2013 Complete Agenda
37/48
Storage for large equipment and ATVs
7/30/2019 April 30, 2013 Complete Agenda
38/48
Staging area for issued equipment
7/30/2019 April 30, 2013 Complete Agenda
39/48
Junior Beach Patrol Access to Beach without crossing a major highway, close
access to public restroom
7/30/2019 April 30, 2013 Complete Agenda
40/48
Training room used for multiple purposes allows classroom instruction to be
followed by on the beach skill practice and then return to classroom for follow-up.
7/30/2019 April 30, 2013 Complete Agenda
41/48
Unique training conditions caused by the inlet jetty
7/30/2019 April 30, 2013 Complete Agenda
42/48
Unique training conditions caused by pier currents
7/30/2019 April 30, 2013 Complete Agenda
43/48
Beach Patrol has 3 rescue watercraft staged at USCG Station Ocean City
7/30/2019 April 30, 2013 Complete Agenda
44/48
Unique training with USCG and MD-DNRP
7/30/2019 April 30, 2013 Complete Agenda
45/48
WORK SESSION - MAYOR AND CITY COUNCIL
TUESDAY, APRIL 30, 2013
4. NEW BUSINESSE. Update on FY 14 Financial Operating Plan presented by
City Manager and Budget Manager
7/30/2019 April 30, 2013 Complete Agenda
46/48
TOWN OF
The White Mar lin Capital of the World
TO: The Honorable Mayor, Council President and Members of CouncilTHRU: David L. Recor, ICMA-CM, City ManagerFROM: Jennie Knapp, Budget ManagerRE: FY 14 Budget UpdateDATE: 4/25/13
ISSUE(S): FY 14 Budget Update
SUMMARY: A summary of changes made to the FY 14 budget since the 4/19
wrap up meeting has been provided. Through re-evaluation ofrevenue and further expense reductions, the tax rate has beenreduced from the proposed rate of .4864 to .472.
FISCAL IMPACT: The FY 14 budget is balanced at a tax rate of .472 with $247,066coming from fund balance to fund street paving. The proposedbudget for street paving in FY 14 is $1,417,066.
RECOMMENDATION: Approval of proposed budget for first reading on May 20, 2013.
ALTERNATIVES: Further discussion
RESPONSIBLE STAFF: Jennie Knapp, Budget Manager
COORDINATED WITH: Department Heads
ATTACHMENT(S): Budget reconciliation
Agenda Item # 4E
Council Meeting 4/30/13
7/30/2019 April 30, 2013 Complete Agenda
47/48
Wrap-Up Reconciliation:
Tax Revenue at .4864: 41,403,913
Tax Revenue at .472 40,178,140
1,225,773
Net Reductions During Budget Review (703,339)
Amount Needed to Reduce the Tax Rate to .472 522,434
Changes During Wrap Up 4/19/13:
Items Added Back:
Appropriation to Delmarva Cat Connection 1,500
Appropriation to Cricket Center 14,333
Computer Program for Additional Public Works position 2,098
3 Seasonal Positions (PW Maintenance) 39,878
Conversion of Part-Time PW Position to Full-Time 11,124
Interest on Bonds for Roof Replacement 15,750
84,683
Revenue Changes Made 4/19/13:
Parking - South 1st to N Div West side 35,750
Parking - 49th Street 31,000
Parking 131st Street 24,700
Parking 146th Street 24,000
Parking - Inlet Lot Fee increase 116,000
Skateboard Park Revenue Reduction (6,397)
225,053
Expense Reductions Made 4/19/13:
Skateboard Park Add'l Reduction in Hours 12,810
Private Events Coordinator (Remains Part-Time) 30,419
Elimination of Winter 3rd Shift Bus Service 62,659
105,888
Amount Needed to Reduce the Tax Rate to .472 276,176
Changes Since Wrap Up:
Items Added Back:
Uniform Shoes for 6 new EMS positions 600
Verizon Start up Fees for Cale Meters 2,070
Web Access Fees for Additional Cale Meters 4,140
FICA for Museum (budgeted incorrectly) 354
7,164
Amount Needed to Reduce the Tax Rate to .472 283,340
7/30/2019 April 30, 2013 Complete Agenda
48/48
Amount Needed to Reduce the Tax Rate to .472 283,340
Revenue Increases:
Business Licenses 1,000
Cable Television Franchise 5,000
Passport Application Fee 714
Recycling Sales 5,000
Miscellaneous 132Capital Asset Sales 5,000
Boardwalk Train Revenue Estimate 10,000
Total Revenue Increases: 26,846
Amount Needed to Reduce the Tax Rate to .472 256,494
Expense Reductions:
IT Services 4,125
Customer Service Training (HR) 4,000
Beach Replenishment Labor 4,304
Orthographic Imagery (P&Z) 10,000
Postage (Police) 1,000
Communications (Police) 1,000
Printing (Police) 1,000
Tasers - 7 (Police) 12,719
Canine, Food, Electronic Collar (Police) 10,200
Part-Time Salaries (Communications) 1,079
Energy (Communications) 700
APCO conference (Electronics) 2,305
Overhead Door Replacement (Fire Company) 15,863
SCBA Testing and Maintenance (Fie Co.) 17,758
Operational Supplies (Fire Company) 10,000
Fire Gear (Fire Company) 15,000Part-Time Salaries (EMS) 26,325
Overtime (EMS) 27,500
Hurricane Conference (PW Administration) 2,260
Solar Arrow Board (Public Works - Streets) 4,550
Part-Time Salaries (Public Works - Boardwalk) 6,000
Credit Card Fee Estimate (PW Parking) 5,000
Painting of Vehicles (2) (Solid Waste) 40,000
Shower Stall Replacement (Recreation) 6,000
Credit Card Fee Estimate (Recreation) 1,000
Contracted Services (Recreation - Programs) 4,000
Part-Time Salaries & FICA (Beach Patrol) 11,842
Energy (Winterfest) 1,659
Advertising of Cultural Arts Center (Conv Ctr) 5,000
Overtime (Convention Center) 4,305
256,494