April 26, 2007
Mr. William BurrusPresidentAmerican Postal WorkersUnion, AFL-CIO
1300 L Street, NWWashington, DC 20005-4128
Dear Bill :
This is to inform you of the U .S . Postal Service's decision to consolidate certain mail processingoperations at the St . Petersburg, FL Processing & Distribution Center (P&DC) with those of theTampa, FL P&DC .
We advised you on December 15, 2005, of our intent to conduct a feasibility study . After review,we have decided this consolidation is in the best interest of the U .S. Postal Service .
U.S . Postal Service Headquarters officials reviewed and approved the proposal of SoutheastArea managers who cited that mail volume at the St . Petersburg P&DC has declined over thepast few years. Pursuant to your request, a copy of the approved AMP proposal is enclosed .
Because there has been a shift in First-Class Mail volume, the Postal Service is continuallylooking for opportunities to improve productivity and increase efficiency without reducing service .The proximity of the St. Petersburg P&DC to the Tampa P&DC will allow us to accomplish thisgoal by making better use of excess space, staffing, and equipment, and by processing mail moreefficiently .
This consolidation will result in significant savings for the Postal Service . Some affected careeremployees may be reassigned to the Tampa P&DC or to other vacant positions .
If you have questions, or need additional information, please contact Mary Hercules at (202) 268-4356 .
Sincerely,
John W . DockinsManagerContract Administration (APWU)
Enclosure
47b LENFANT PLAZA SW
d DC 20260-4100
;OM
CERTIFIED MAIL NUMBER :7001 2510 0008 2206 3546
FAX: (202) 842-4285
Postmaster(s)/Manager(Manager responsible for processing offices from which
mail is consolidate
District Manager, Customer Service(District from which mail is consolidated if different from AMP)
Plant Manager, P&D Center(Plant that will receive the mail)
District Manager, Customer Services(District from which mail is consolidated)
Senior Plant Manager(Manager responsible for the office that will receive the mail)
Reason for disapproval :
Senior Vice President, Operations
APPROVED APR 2 3 2007
Area Mail Processing
Consolidated Office Name/ZIP Code :St. Petersburg P&DC/33730-9997AMPC Facility Name/ZIP Code :Tampa P&DC /33630-9997
Type Distribution :Ougoing Distribution/Incoming Primary Distribution
Approving Signatures
Carl Downing
Mike Jordan,
Area Office,,,
Vice President, . Area Operations _Terry VVJlson,Southeast Area
Date:.00('e
Implementation Date :
(Signature)
(Title)
(Date)
AMP Worksheet 1
Date://--2 ? .-Jo-0`~'
Date:
Datat - so),;2>w ,
Date :.0,/
Date :
Executive Summary
AreeKUai!ProcesProcessing Center/Facility mmd ZIP Code : Tampa P&DC /33G3&-g@S7
Personnel
Craft Personnel Gain/Loss(64)
EAS Personnel Gain/Loss(12)
Service
FCM AOVService Commitment ONO(+~\= No Degradation
PRIORITY A[D/ Service Commitment OND No Degradation
Total Number of Pieces (FHP) to be Transferred (ADV)2,167,949
AMP Worksheet 2
Office(s) Consolidated
ZIP Code Type Distribution Miles to AMPC(Originating and/o,
Destinating)Facility
StPetersburg P&0C 33730-9997
Originating 2 0
Summary of Worksheets
Savings/Cost
Annu3!VVorkhour8av
= $3.015.07915EA8VVorkhourSavings/Cost = $971,185.60Transportation Savings/Cost = $27,856.35
Annual Associated Savings/Cost =Total Annual Savings = $4,679 '882.32
.One-Time Associated Cost = ($762,158.00)One-Time Indemnity Cost = $010
Total One-Time Cost = ($762,158.00)
Total First Year Savings = $3,917,724.32
AMP Worksheet 3
Communication DocumentationConsolidated Office
Facility :
St. Petersburg P&DC ZIP Code :
33730-9997
Notify the following :Date :
Local Employee OrganizationsMike Sullivan President, APWU, Suncoast Area Local 12/15/2005(Contact Person)
Gary Jones(Title)
President, NPMHU, Local 318 12/15/2005(Contact Person)
Diane Goldstein(Title)
President, NAPS, Branch 156 12/15/2005(Contact Person)
EmployeesUSPS Newsbreak
(Title)
13151005(Method of Notification)
Appropriate Level of GovernmentHonorable William Young Congressman 12/15/2005(Contact Person)
Honorable Rick Baker(Title/Location)
Mayor, St. Petersburg 13151005(Contact Person) (Title/Location)
12/15/2005(Contact Person)
MediaChris Jaddick, New Director
(Title/Location)
WETS ABC Action News 12/1512005(Contact Person)
Phil Metlin, News Director(Name of Company)
WTVT-TV Fox 13 12/15/2005(Contact Person)
Don North, News Director(Name of Company)
WFLA-TV 12/15/2005(Contact Person)
Darren Richards, New Director(Name of Company)
10 News 13151005(Contact Person)
Mike Gauteaw News Director(Name of Company)
Bay News 9 13156005(Contact Person)
Community Organizations/GroupsDennis Joyce, Metro Editor
(Name/Location of Newspaper)
Tampa Tribune 11151005(Contact Person)
Marilyn Garateix, City Editor(Name/Location of Organization)
St. Pete Times 12115/2005(Contact Person)
Major Wile'rs
Shipping Department
(Name/Location of Organization)
Val-Pak, 727-399-3165 12/15/2005(Contact Person)
Steven Dorsey(Name/Location of Organization)
Raymond James, 727-567-7047 12/152005(Contact Person)
Jeff Pinder(Name/Location of Organization)
Modern Graphic Arts, 727-579-1527 12/15/2005(Contact Person)
Mailrooom Supervisor(Name/Location of Organization)
Modern Inserting & Mailing, 727-572-6245 12/15/2005(Contact Person)
Margie Gonzales(Name/Location of Organization)
Direct Response Marketing, 727-573-1985 12/15/2005(Contact Person)
Donna Zizoff(Name/Location of Organization)
Direct Web, 727-572-7488 12/15/2005(Contact Person)
Sandy Lloyd(Name/Location of Organization)
Prime Net, 727-812-5221 12/1512005(Contact Person) (Name/Location of Organization)
Annual Workhour Savings/CostConsolidated Office Name : St. Petersburg P&DC
(BASELINE)
101081J1110r
13
16
1820
2930
40434650
606667110
114
116----]117
120
124
126
128129134136
138139150160168169170
178179180181185200208210
214230
324326328
PRESORT FCM/PERHAND CANCELLATIONSMARK II/HALF MARKFLYERADV FACER CANCELLER SYSFLAT CANCELLATIONSCANCELLING OPERATIONS MISCCOLLECTION MAIL SEPARATIONMETERED MIXED PREPARATIONMETERED LETTER PREPARATIONMETERED FLAT PREPARATIONRIFFLE LETTER MAILMANUAL LTR-OUTGOING PRIMARYFLAT MAIL PREPARATIONMANUAL LTR-OUTGOING SECONDARYMANUAL LTR-STATE DISTRIBUTIONISS - RETURN TO SENDERPRIORITY - MANUAL OUTGOINGO/G SECONDARY FLATS - PRIORITYPRIORITY- MANUAL INCOMINGMANUAL FLT-OUTGOING PRIMARYAFCS VIDEO FACING MODEAFCS CANCELLED MODE ONLYOPENING UNIT-OUTGOING PREFMANUAL TRAY SEPARATION - PREFMANUAL TRANSPORT/WEIGH (IN-HOUSEOPEN UNIT-OUTGOING STANDARDOPEN UNIT - OUTGOING STANDARDMANUAL TRAY SEPARATION - STANDARDPOUCHING - OUTGOINGPOUCHING - OUTGOING
POUCHING- INCOMINGDISPATCH UNIT - OUTGOINGDISPATCH UNIT-OUTGOINGDISPATCH UNIT - INCOMINGDISPATCH UNIT- INCOMINGOPENING/DISPATCH UNIT-ADC ONLYOPENING/DISPATCH UNIT-ADC ONLYSPBS OUTGOING PREFSPBS INCOMING PREFSPBS INCOMING STDSPBS - PRIORITY OUTGOINGSPBS - PRIORITY INCOMINGMANUAL LTR-INCOMING PRIMARYMANUAL LTR-INCOMING SECONDARYMANUAL LTR-PRIMARY BOXMANUAL LTR-SECONDARY BOXMANUAL FLT-INCOMING PRIMARYMANUAL FLT-INCOMING SECONDARYMANUAL FLT-PRIMARY BOXMANUAL FLT-SECONDARY BOXOPENING UNIT-INCOMING PREFOPENING UNIT-INCOMING PREFOPENING UNIT - INCOMING,STANDARDMANUAL PARCELS-INCOMINGSWYB/SASWYBPLATFORM-INBOUNDPLATFORM-INBOUNDPLATFORM-OUTBOUNDPLATFORM-OUTBOUNDMANUAL TRANSPORT/WEIGHEQUIPMENT OPERATOR- FORKLIFTEXPEDITERMANUAL SORTATION - SACKS/OUTSIDESDBCS/DIOSS OSS O/G PRIMARYDBCS/DIOSS OSS MANAGED MAILDBCS/DIOSS OSS I/C PRIMARYO/G PRIMARY PARCELS - PRIORITYI/C PRIMARY PARCELS - PRIORITYI/C SECONDARY PARCELS - PRIORITYPRIORITY MAIL SHAPE SEP - ORG
(3)CurrentAnnual
TPH Volumes
(4)Current
TPH AnnualWorkhours
(5 )CurrentAnnualCost
AMP Worksheet 4
Consolidated Office St. Petersburg
... .
(1a) (2)Current Current Current
Operation Operation AnnualFHPNumbers Names Volume
Annual Workhour Savings/Cost
Consolidated Office Name : St. Petersburg P&DC
Consolidated Office St. Petersburg(BASELINE)
334
336441445446448547549554
56056156256356456558558760761262063077679381581684184284584684786586686788188388589189289389489589689791891993002B
$27,243,55 2
AMP Worksheet 4
(1) (1a) (2) (3) (4) (5)Current Current Current Current Current Current
Operation Operation Annual FHP Annual TPH Annual AnnualNumbers Names Volume TPH Volumes Workhours Cost
AFSM100 OUTGOING PRIMARYAFSM100 OUTGOING SECONDARYAFSM100 MANAGED MAILAFSM100 INCOMING SCFAFSM100 INCOMING PRIMARYAFSM100 INCOMING SECONDARYUFSM 1000 KEYING OUTGOING PRIMARYUFSM 1000 KEYING INCOMING PRIMARYUFSM 1000 KEYING INCOMING SECONDARY
SCHEME EXAMINERSEMPTY EQUIP PROCESSINGOFFICE WORK & RECORDS-MAIL PROCOFFICE WORK & RECORDS-MAIL PROCMISC ACTIVITY-MAIL PROCMISC ACTIVITY-MAIL PROCMISC ACTIVITY-MAIL PROCMISC ACTIVITY-MAIL PROCMISC ACTIVITY-MAIL PROCTACS FUNCTION 1 OPERATION DEFAULTREGISTRY SECTIONREGISTRY SECTIONSTEWARDS - CLERKS - MAIL PROCSTEWARDS-MAIL HANDLER-MAIL PROCTRAVEL - MAIL PROCESSINGMEETING TIME-MAIL PROCLETTER MAIL LABELING MACHINEEXPRESS MAIL DISTRIBUFSM 1000 OCR - I/C PRIMARYUFSM 1000 OCR - I/C SECONDARYMLOCR CHUNKY MOD - O/G PRIMARYMLOCR CHUNKY MOD - O/G SECONDARYMLOCR CHUNKY MOD - I/C PRIMARYMLOCR CHUNKY MOD - I/C SECONDARYMLOCR CHUNKY MOD - BOX SECTIONBCS ON OCR-INCOMING PRIMARYBCS ON OCR INCOMING SECONDARYBCS ON OCR - BOX SECTIONMLOCR-ISS - OUTGOING PRIMARYMLOCR-ISS - MANAGED MAILMLOCR-ISS - INCOMING PRIMARY
DBCS/DIOSS BCS DIG SECONDARYDBCSIDIOSS BCS MANAGED MAILDBCS/DIOSS BCS I/C SCF PRIMARYDBCS/DIOSS BCS I/C PRIMARY
DBCS/DIOSS BCS BOX SECTIONDBCS/DIOSS BCS DIPS, 1ST PASSDBCS/DIOSS BCS DIPS, 2ND PASSBUSINESS REPLY/POSTAGE DUEMETERED BYPASSCurrentTotals 672,064,181 2,127,881,955 739,914
AMP Worksheet 4-1
PRESORT FCMIPERPRESORT STANDARDHAND CANCELLATIONS
ElDIVA W_'WA ZKOY-1 9IISIZIRRAM
RIFFLE LEPER LMANUAL LTR-01 DING PRIMARYFLAT MAILPREPARATION
,SPBS INCOMING STD
;WU001FAM
80
0208
209
MANUAL TRANSPORTIWEIGH (IN-HOUSE
OPENING UNIT-INCOMING PREFOPENING UNIT-INCOMING PREFMANUAL PARCELS-INCOMINGSWYB/SASWYB
PLATFORM-INBOUNDPLATFORM-INBOUND
Annual Workhour Savings/Cost
Consolidated Office Name : St. Petersburg P&DC
(BASELINE)AMPC Office
P&DC)(Tampa
(6) (6a)
(7) (8) (9) (10)Current Current
Current Current Current CurrentOperation Operation
Annual FHP Annual TPH Annual AnnualNumbers Names
Volume TPH Volumes Workhours Cost
AMPC Office (Tampa P&DC)
Annual Workhour Savings/Cost
Consolidated Office Name:St. Petersburg P&DC
444
669
8
88 6
84843844845846
8866
881
884
891892889489896899 8
028
(6a)Current
OperationNames
DBCS/DIOSS BCS DPS 1ST PASSDBCS/DIOSS BCS DPS 2ND PASS
(7)Current
AnnuaIPHPVolume
(8)CurrentAnnual
TPH Volumes
(9)Current
TPH AnnualWorkhours
(10)CurrentAnnualCost
()Totals 981,609,6545,191,516,1412,269,507$79,174,32
(E)$106,417,879Current Annual Cost >> (A + B)
AMP Worksheet 4-1
(BASELINE)
Annual Workhour Savings/Cost
10
14
16
1820
2930
40434650
606667110
114
116
12012122123124
126
L:=128129134136
138139150160168169170
178179180181185200208210
214230
324
(000)PRESORT FCM/PERHAND CANCELLATIONSMARK II/HALF MARKFLYERADV FACER CANCELLER SYSFLAT CANCELLATIONSCANCELLING OPERATIONS MISCCOLLECTION MAIL SEPARATIONMETERED MIXED PREPARATIONMETERED LETTER PREPARATIONMETERED FLAT PREPARATIONRIFFLE LETTER MAILMANUAL LTR-OUTGOING PRIMARYFLAT MAIL PREPARATIONMANUAL LTR-OUTGOING SECONDARYMANUAL LTR-STATE DISTRIBUTIONISS - RETURN TO SENDERPRIORITY - MANUAL OUTGOINGO/G SECONDARY FLATS - PRIORITYPRIORITY- MANUAL INCOMINGMANUAL FLT-OUTGOING PRIMARYAFCS VIDEO FACING MODEAFCS CANCELLED MODE ONLYOPENING UNIT-OUTGOING PREFMANUAL TRAY SEPARATION - PREF
'N SOMMEOPEN UNIT - OUTGOING STANDARDOPEN UNIT - OUTGOING STANDARDMANUAL TRAY SEPARATION-STANDARDPOUCHING - OUTGOINGPOUCHING - OUTGOINGPOUCHING - INCOMINGPOUCHING - INCOMINGDISPATCH UNIT-OUTGOINGDISPATCH UNIT-OUTGOINGDISPATCH UNIT- INCOMINGDISPATCH UNIT - INCOMINGOPEN ING/DISPATCH UNIT-ADC ONLYOPEN ING/DISPATCH UNIT-ADC ONLYSPBS OUTGOING PRESPBS INCOMING PREFSPBS INCOMING STDSPBS - PRIORITY OUTGOINGSPBS - PRIORITY INCOMINGMANUAL LTR-INCOMING PRIMARYMANUAL LTR-INCOMING SECONDARYMANUAL LTR-PRIMARY BOXMANUAL LTR-SECONDARY BOXMANUAL FLT-INCOMING PRIMARYMANUAL FLT-INCOMING SECONDARYMANUAL FLT-PRIMARY BOXMANUAL FLT-SECONDARY BOXOPENING UNIT-INCOMING PREFOPENING UNIT-INCOMING PREFOPENING UNIT - INCOMING,STANDARDMANUAL PARCELS-INCOMINGSWYB/SASWYBPLATFORM-INBOUNDPLATFORM-INBOUNDPLATFORM-OUTBOUNDPLATFORM-OUTBOUNDMANUAL TRANSPORT/WEIGHEQUIPMENT OPERATOR- FORKLIFTEXPEDITERMANUAL SORTATION - SACKS/OUTSIDESDBCS/DIOSS OSS O/G PRIMARYDBCS/DIOSS OSS MANAGED MAILDBCSIDIOSS OSS I/C PRIMARYO/G PRIMARY PARCELS - PRIORITYI/C PRIMARY PARCELS - PRIORITY
AMP Worksheet 4a
Consolidated Office Name : St . Petersburg P&DC
Consolidated Office St. Petersburg (AFTER CONSOLIDATION)
(11) (12) (13)
(14) (15)Proposed Proposed Proposed Proposed
Proposed ProposedOperation Operation Annual FHP Annual
TPH Annual AnnualNumbers Names Volume TPH Volumes
Workhours Cost
Annual Workhour Savings/Cost
Consolidated Office Name : St . Petersburg P&DC
Consolidated Office St. Petersburg(AFTER CONSOLIDATION)
AMP Worksheet 4a
ProposedOperationNumbers
326328331
334
3364414454464485475554
56056156256356456558558760761262063077679381581684184284584684786586686788188388589189289389489589689791891993002B
ProposedOperationNames(000)
I/C SECONDARY PARCELS - PRIORITYPRIORITY MAIL SHAPE SEP - ORGAFSM10 OUTGOING PRIMARYAFSM100 OUTGOING SECONDARYAFSM100 MANAGED MAILAFSM100 INCOMING SCFAFSM100 INCOMING PRIMARYAFSM100 INCOMING SECONDARYUFSM 1000 KEYING OUTGOING PRIMARYUFSM 1000 KEYING INCOMING PRIMARYUFSM 1000 KEYING INCOMING SECONDARY
SCHEME EXAMINERSEMPTY EQUIP PROCESSINGOFFICE WORK & RECORDS-MAIL PROCOFFICE WORK & RECORDS-MAIL PROCMISC ACTIVITY-MAIL PROCMISC ACTIVITY-MAIL PROCMISC ACTIVITY-MAIL PROCMISC ACTIVITY-MAIL PROCMISC ACTIVITY-MAIL PROCTACS FUNCTION 1 OPERATION DEFAULTREGISTRY SECTIONREGISTRY SECTIONSTEWARDS-CLERKS- MAIL PROCSTEWARDS-MAIL HANDLER-MAIL PROCTRAVEL - MAIL PROCESSINGMEETING TIME-MAIL PROCLETTER MAIL LABELING MACHINEEXPRESS MAIL DISTRIBUFSM 1000 OCR - I/C PRIMARYUFSM 1000 OCR - I/C SECONDARYMLOCR CHUNKY MOD - O/G PRIMARYMLOCR CHUNKY MOD - O/G SECONDARYMLOCR CHUNKY MOD - I/C PRIMARYMLOCR CHUNKY MOD - I/C SECONDARYMLOCR CHUNKY MOD - BOX SECTIONBCS ON OCR-INCOMING PRIMARYBCS ON OCR INCOMING SECONDARYBCS ON OCR - BOX SECTIONMLOCR-ISS - OUTGOING PRIMARYMLOCR-ISS - MANAGED MAILMLOCR-ISS - INCOMING PRIMARYDBCS/DIOSS BCS O/G PRIMARYDBCS/DIOSS BCS O/G SECONDARYDBCS/DIOSS BCS MANAGED MAILDBCS/DIOSS BCS I/C SCF PRIMARYDBCS/DIOSS BCS I/C PRIMARYDBCS/DIOSS BCS I/C SECONDARYDBCS/DIOSS BCS BOX SECTIONDBCS/DIOSS BCS DPS, 1ST PASSDBCS/DIOSS BCS DPS, 2ND PASSBUSINESS REPLY/POSTAGE DUEMETERED BYPASS
(12)Proposed
Annual FHPVolume
(13)ProposedAnnual
TPH Volumes
(14)Proposed
TPH AnnualWorkhours
(15)ProposedAnnualCost
PropoTotals
ed (C)193,497,046
1,033,156,168
230,876 $ 8,405,457.30
Annual Workhour Savings/CostConsolidated Office Name : St. Petersburg, FL
AMPC Office (Tampa P&DC)
PRESORTFCMIPERPSoRESORT STANDARD
10
IHAND CANCELLATIONS14
FLYER15
ADV FACER CANCELLER SYS16
FLAT CANCELLATIONS-_17
CANCELLING OPERATIONS MISC
18
COLLECTION MAIL SE19
TAMER20
METEREDMIXED PRE PARATION
21
METEREDLETTER PREPARATION22
METEREDFLAT PREPARATION29
RIFFLE LETTER MAIL30
MANUAL LTR-OUTGOING PRIMARY .35
FLAT MAIL PREPARATION40
MANUAL LTR-OUTGOING SECONDARY
43
MANUAL LTR .STATE DISTRIBUTION44465051535560666769707374100110111112114 -MANUAL TRANSPORT/WEIGH (IN-HOUSE)
115
OPEN UNIT- OUTGOING STANDARD .117
MANUALTRAYSEPARATION-STANDARD
120
POUCHING-OUTGOING
124
DISPATCH UNIT-OUTGOING126
DISPATCH UNIT-INCOMING127
DISPATCH UNIT-INCOMING128
OPENING/DISPATCH UNIT-ADC ONLY134
SPBS OUTGOING PREF136
SPBS INCOMING PREF137
SPBS INCOMING SM.150
MANUAL LTR-INCOMING PRIMARY154
APPSSINGLE INDUCTION . O/G PREF156
APPSSINGLE INDUCTION - I/jEatlf
157
APPSSINGLE INDUCTION - I/C STD159
APPSSINGLE INDUCTION-PRIORITY I/C
160
MANUAL LTRANCOMING SECONDARY168
MANUAL LTR-PRIMARY BOX169
MANUAL LTRAECONDAMRAY BBOXX
170
MANUAL FLT-INCOMING PRIMARY175
MANUAL FLT-INCOMING . SECONDARY .178
MANUAL FLT-PRIMARY BOX179
MANUAL FLT-SECONDARY BOX
180
OPENING UNIT-INCOMING PREF
181
OPENING UNIT-INCOMING PREF
200
MANUAL PARCELS-INCOMING
208
SWYBISASWYB
209
(16a)ProposedOperationNames
NA/KS
''.PLATFORM-INBOUND
SM100 INCOMING SCF336
AFSM100INC MINGSECONDARY
441
UFSM 1000 KEYING OUTGOING PRIMARY442
UFSM 1000 KEYING OUTGOING SECONDARY
443
UFSM 1000 KEYING MMP444
UFSM 1000 KEYING SCF
AMP Worksheet 4a-1
------- (AFTER CONSOLIDATION)
(17) (18) (19) (20)Proposed Proposed Proposed Proposed
Annual FHP Annual TPH Annual AnnualVolume TPH Volumes Workhours Cost
Annual Workhour Savings/Cost
Consolidated Office Name : St. Petersburg, FL
AMPC Office (Tampa P&DC)
(AFTER CONSOLIDATION)
(16)P oposedOpe a ionN mbers
669
816
842843844845
865866
8 6
8888488
892
8949
8968979 8
0
)16a)ProposedOperationNames
DBCSIDIOSS BCS OPS 1ST PASS
CLEARWATER DDC
(17)ProposedAnnualFHPVolume
(18)ProposedAnnual
TPH Volumes
(19)Proposed
TPH AnnualWorkhours
(20)ProposedAnnualCost
(D)Totals 2,338,086,2806,488,880,8512,698,11$94,397,343
(F)$ 102,802,800 .34
C re
Proposed Annual Cost >> (C + D)
Proposed Annual Savings >> (E - F)
AMP Worksheet 4 a-1
$3,615,079
Impact On Craft Personnel
AMP Worksheet 5
Consolidated Office StaffingConsolidated Office Name/ZIP Code : St . Petersburg P&DC/33730-9997
jjjgff.fM~ Pro osed 111KMMna Pro osed jjjljjnj~ Pro osed
Clerk
Mail Processor 17
16
303 6
Mail Handler 8
4
75 38
ET 22
MPE 8 4
Custodial 30 30
Other 22 15
Total
0 0
25
20
460 158(A)
Total Current (A)+(C)+(E) :
(B)
(C)
(D)
(E)
485
Total Proposed (B)+(D)+(F) :
(F)
178(G) (H)
Difference (+1-) at Consolidated Office (H-G) :
-307al
DDC Office StaffingAMPC Facility Name/ZIP Code : Clearwater Main Office
Pro osed Pro osed Pro osed
Clerk 1 5 5
32 32
Mail Processor 0 0
0 12
0 0
Mail Handler
ET 0 0
0 0
0 0
MPE 0 0
0 0
1
Custodial 0 0 0
3 3
Other
Total
( 1 1
5 17
36 36 ,(J) (K)
(L) (M)
(N) (0)
Total Current (J)+(L)+(N): 42
Tota roposed (K)+(M)+(O) : 54(P) (Q)
Difference (+1-) at DDC Facility (Q-P) : 12(Y)
AM C Office Sta IngAMPC Facility Name/ZIP Code : Tampa P&DC /33630-9997
Pro osed Pro osed Pro osed
Clerk
Mail Processor 226 702 854
Mail Handler -- 62 45 410
ET 48 56
MPE 38 42
Custodial ---- 58 58
Other 60 63
Total
0
0 288 ®® 1483(J)
(K)
(L)
(M)
(N) (0)
Total Current (J)+(L)+(N) :
1509
Total Proposed (K)+(M)+(O): 1740(P) (Q)
Difference (+1-) at AMPC Facility (Q-P):
231(Y)
Total Personnel Impact (X+Y) :
-64
Impact on EAS
Consolidated Office Name/ZIP Code:St. Petersburg P&DC/33730-9997
Total 38 66880 19360 $2,935,574.40 $826,619 .20
Position Gain/Loss (B-A)(A)
-27
(M)
(B) (C) (D)
(E)
(F)
Workhour Gain/Loss (D-C) :-47520(N)
Annual Savings/Cost (E-F) : $2,108,955.20(o)
Consolidated Office Name/ZIP Code : Clearwater Main Office
Total 0 0 1760 $0 .00 $71,878 .40
Position Gain/Loss (B-A)(A)
1(M)
(8) (C) (D)
(E)
Workhour Gain/Loss (D-C):
Annual Savings/Cost (E-F):
(F)
1760(N)
($71,878,40)(o)
AMPC Facility Name/ZIP Code : Tampa P&DC /33630-9997
AMP Worksheet 6
rsonnel
EAS Staffin . Positions Annual Workhours Annual Cost
Position/Level Pro osed Proposed Pro sed
Plant Mana .er/PCES-1 ~~ 1760 1760 $169,893 $169,893
MDOIEAS-24 ©© 8800 8800 $376,640 $376,640
M O/EAS-22 © 3520 5280 $150,656 $225,984
SDO/EAS-17 59 68 103840 119680 $4,444,352 $5,122,304
ASP/EAS-15 ©® 5280 5280 $225,984 $225,984
M.rTrans .ortation/EAS-21 II 1760 1760 $76,736 $76,736
S .vr Trans .ortation/EAS-17 ©© 5280 5280 $230,208 $230,208
Networks S .ecialists/EAS-16 ©© 3520 3520 $153,472 $153,472
Mana .er, Maintenance/EAS-25 II 1760 1760 $124,520 $124,520
MMO/EAS-23 ©© 5280 5280 $230,208 $230,208
Maint En .ineerin . S .ec ./EAS-19 1760 3520 $80,256 $160,512
M.r Maint O .erations Su . .ort/EAS-20~~
1760 $76,736 $76,736
M.r Field Maint O.erations/EAS-18 ~~ 1760 1760 $74,730 $74,730
SMO/EAS-17 10 17600 19360 $816,992 $898,691
Mana .er, In-Plant Su--ort/EAS-25 II 1760 1760 $124,520 .00 $124,520 .00
O .erations Su- .ort S .ecialist/EAS-20 I I 1760 1760 $84,884 .80 $84,884 .80
O .erations Su- .ort S .ecialist/EAS-18 4 7040 7040 $339,539 .20 $339,539 .20
o .erations Su . .ort S-ecialist/EAS-17 6 7040 10560 $339,539 .20 $490,195 .20
Qualit Im-rovement S .ecialist/EAS-17 II 1760 1760 $75,750 .40 $75,750 .40
Directo Anal st S .ecialist/EAS-16 1760 1760 $75,750 .40 $75,750 .40
Total 104 118 183040 207680 $8,101,474 $9,167,364.80
EAS Staffin . Positions Annual Workhours Annual CostPosition/Level Pro osed Pro osed Proposed
Plant Mana .er/EAS-25 $140,202 $0MDOIEAS-22 © 0 3520 0 $143,757 $0MDO/EAS-19 0 1760 0 $71,878 $0
SDO/EAS-17 18 6 31680 10560 $1,293,811 $431,270
M .rTrans -ortation/EAS-20 I 0 1760 0 $68,552 $0
S.vrTrans .ortation/EAS-17 ~~ 1760 1760 $68,552 $68,552
Mana.er, Maintenance/EAS-22 II 1760 1760 $81,699 $81,699
MMO/EAS-19 © 0 1760 0 $81,699 $0
MMOS/EAS-19 I 0 1760 $81,699 $0
SMO/EAS-17 ®© 8800 5280 $408,496 $245,098
Mana.er, In-Plant Su- .ort/EAS-21 I 0 1760 0 $100,038.40 $0.00
O .erations Su . .ort S .ecialist/EAS-18 I 0 1760 $82,843.20 $0.00
O .erations Su . .ort S .ecialist/EAS-17 © 0 3520 0 $165,686.40 $0.00
Quell lm-rovement S .ecialist/EAS-17 I 0 1760 0 $70,910.40 $0.00
Directo Anal st S .ecialist/EAS-16 0 1760 0 $75,750 .40 $0.00
EAS Staffin . Positions Annual Workhours Cost~~'Annual
Position/Level Pro osed Pro osed t
.reStt- Pro .osed
SDO/EAS-17 0 0 1760 $0 $71,878_
Position Gain/Loss (H-G) : 14 Workhour Gain/Loss (J-I):
24640(o)
Annual Savings/Cost (K-L): -$1,065,891 .20(P)
(R)
Total EAS Personnel Gain/Loss -12M+P
Total Annual Workhours Gain/Loss -21120N+Q
Total Savings/Cost $971,185 .60O+R
FCM Service CommitmentsOvernight and Two-Day Service Areas
C Facility/ZIP Code:Tampa P&DC /33630-9997Consolidated Office/ZIP Code : St. Petersburg P&DC/33730-9997
(B)
ODIS Data Period :
Overnight 2-Day Change
B-A:
2-Day 3-Day Change
D-C:
(A)
AMP Worksheet 7
(C) (D)
Overnight 12 Day Changes 2-Day / 3-Day ChangesOrigin3-Digit
ZIP Codeor ADC
(1)
Dest.3-Digit
ZIP Codeor ADC
(2)
OvernightAverage DailyVolume (Pcs .)Before AMP
(3)
OvernightAverage DailyVolume (Pcs .)After AMP
(4)
Two-DayAverage DailyVolume (Pcs .)Before AMP
(5)
Two-DayAverage DailyVolume (Pcs .)After AMP
(6)
N/A N/A
TOTALS 01 01[:_ 01 011
Priority Mail Service CommitmentsOvernight and Two-Day Service Areas
AMPC Facility/ZIP Code : Tampa P&DC /33630-9997
Consolidated Office/ZIP Code : St. Petersburg P&DC/33730-9997
AMP Worksheet 7a
Origin3-Digit
ZIP Codeor ADC
Deb.3-Digit
ZIP Codeor ADC
Overnight 2 Day Changes Why / 3-Day ChangesOvernight
Average DailyVolume (Pcs.)Before AMP
OvernightAverage DailyVolume (Pcs .)After AMP
Two-DayAverage DailyVolume (Pcs .)Before AMP
Two-DayAverage DailyVolume (Pcs .)After AMP
N/A N/A
01 01 ~0(A)
(B)
ODIS Data Period :
(C) (D)
Overnight I 2-Day Change (+1-) B-A : UI 0K 8
2-Day / 3-Day Change
D-C: I 0 I
Customer comments (Express, Priority, and 2C only) :
Service Commitments
Explain in detail any downgrades to services for other mail classes :
Distribution Changes
AMP Worksheet 8
DMM Labeling List L002 - 3 Digit ZIP Code Prefix Matrix
2:2!2j!.KLFj_ Column A - Label to Column B - Label to Column C - Label to
DMM Labeling List L005 - 3-Digit ZIP Code Prefix Groups - SCIF Sortation
NhA
Losing Facility : St Petersburg, FL P&DC 337OriginatingType of Distribution:
Annual Transportation Savings and One-Time Indemnity Costs
Destinating El Both F1
Gaining Facility :Distributions Network Contact :CET for Operation 010:
AMP Worksheet 9
Tampa, FL P&DC TPA
Peter Welch and Troy Adair
CT for 0 s . 8941895 :
A oDa e0
C acDa a
sR e
be s mber
4C rrenA n a
eage
ropos dAnnua
leag
10One-TimeIndemnity
Cost
P ov ded6 6 ?
$252 $0 .00MJN~NMZSM-~ 53 6 $415,130 .97
$2.70
208 3
$529$4 .22
$
3 75 $0 .0011EMMEEM11~®®
P A- 88,04
9 ,6 0$33,987 .11'
$250,666 .23
$2.74
22,440
$
$256$
2 56$0 .00$0.002/10 Emm P B- 2 97 628~ $ 28 64 930 E
$0$000- 0---_--$164
DIVIO$1,864,142.72_0 0-
$000_
®- $1$000- ( $000-
0---_-
$0 00-
$
$0 0--_-_-$000
$0 00-====;;;~$0 00-
o oo-0 0 _
$0 00----_-$0 00-
$
$00000-
0 00$o$0 .00-_® $2,786,099.78
4 0,948 $2, 58 .24
$671
11A ofDa
Co racData
P ov ded
12ListRoute
Numbers
r
mbe s
4rrent
An a
leage
15
16Current
CurrentAnnual
Cost per
Cost
Mile
-
17
18
19Proposed
Proposed
ProposedAnnual
Annual
Cost per
Mileage
Cost
Mile
20One-TimeIndemnity
Cost
-~_-$0.00
$0.001--
$0 .00
$0.00---_-_$0.00-
$$0.00
so,000 .00
$0.00
~_
-----
$0.00
$0.00==-$0.00
$0.00
--$0
$0 .00
.000-
--_-- $0.00
)o$0 .00
0_--_-0
0
$0.o0
0$0.00
00-$0.00~-
$0.00
$0.00$0.00- $0.00
-_~ $0.00 ®~ $0.00 $0 .00
Was a PVS Zero Base review completed?Is PS Form 4533, MVS Schedule, attached?
YES QYES
NONO
Annual Savings (5-8) :
$27,856 .35 Annual Savings (15-18) : $0 .00(B)(A)
Annual Transportation Savings (A+B) : 27,856.35 This number carried forward to Worksheet 2 .
One-Time Indemnity Cost (10+20) : 0 .00 This number carried forward to Worksheet 2 .
Annual Associated Costs
AMP Worksheet 10
Consolidated Office Name/ZIP Code : St . Petersburg P&DC/33730-9997 AMPC Facility Name: Tampa P&DC /33630-9997
Consolidated Office AMPC FacilityCurrentCost
Proposed(After AMP)
Difference(*1-)
CurrentCost
Proposed(After AMP)
Difference(+1-)
Automation Maintenance $2,368,577 $1,439,484 $929,093 Automation Maintenance $4,413,030 $5,277,390 ($864,360)
Mechanization Maintenance $307,786 $259,805 $47,981 Mechanization Maintenance $1,313,277 $1,360,656 ($47,379)
Other Equipment Maintenance $0 Other Equipment Maintenance $2,113,010 $2,113,010 $0
Building Maintenance $2,400,956 $2,400,956 $0 Building Maintenance $4,998,063 $4,998,063 $0
Annual Maintenance Training Costs $97,000 $97,000 $0 Annual Maintenance Training Costs $140,000 $140,000 $0
Annual Scheme/Machine Training Costs $0 $0 $0 Annual Scheme/Machine Training Costs $0 $0 $0
Annual Electrical Expense $532,767 $529,657 $3,110 Annual Electrical Expense $1,082,353 $1,085,037 ($2,684)
Annual HVAC Fuel Expense $0 Annual HVAC Fuel Expense
Changes in Other Annual Support Costs $0 Changes in Other Annual Support Costs
Reduced Annual REC Cost $0 Increased Annual REC Cost
Total Difference (+l-) $5,707,086 $4,726,902 $980,184 Total Difference (+1-) $14,059,733 $14,974,155 ($914,422)
39.2315.59
Total Difference (+1-)
Consolidated Office :
$980,184(A)
AMPC Facility:
($914,422)(B)
Total AMP Difference (+/-)
$65,761(C)
One-Time Associated CostsEmployee RelocationEquipment Relocation
$286,040Equipment Reconfiguration Cost
$6,618Other*
$469,500Total
(S762,158)
Please Explain Other $150,000 VFS relocation for three unitsBDS prepare three units
$2,175 Transport BDS Cabinets$4,407 Install BDS units at gaining site
$6,300 Relocation of Tampa Manual Letter Operations within the facility .$300,000 Relocation of Feed System (Estimated at 100,000 per machine)
$6,618 Relocation of Tampa BCS within the facility$469,500 Total
Consolidated Office Name : St. Petersburg P&DC133730-9997
Equipment RelocationAMPC Facility Name : Tampa P&DC 133630-9997
(9)
Relocation of three St . Pete AFCSswith Feed System, VFS and BIDSrequirements to Tampa P&DC
Relocation of Tampa BCS within theFacility
Relocation of Manual Letter Operations within the facility
Excessing of one SPBS
AMP Worksheet 1Oa
AMPC Facility Name : Clearwater Main Office
(1)
EquipmentType
(2)
CurrentNumber
(3)
ProposedNumber
(4)
Difference
~© 0 (3)
MICRO MARK 0 ~I
MLOCR-ISSMPBCS-OSS 0 0 0
DBCS ®~_®
CIOSS ©_© 0DBCS-OSS 3-© 0
EC-DBCS 0 0 0
EC-DIOSS 0 0
AFSM 100
UFSM 1000
0 (1)0 0
LIPS 0 0 0
®© 0-~ ]BDS © -®DPRC 0.I
(5)
EquipmentType
(6)
CurrentNumber
(7)
ProposedNumber
(8)
Difference
8MICRO MARK 0MLOCR-ISS 6 6 0
MPBCS-OSS©© 0
DBCS 30 30
DIOSS 0 0 0
DBCS-OSS ®© 0
EC-DBCS 1 0EC-DIOSS 0 0AFSM 100
UFSM 1000 ® -®1 0
0LIPS 0 0 0VFS 8
BDS 8U 3DPRC 2
(9)
EquipmentType
(10)
CurrentNumber
(11)
ProposedNumber
(12)
Difference
0 0 0
MICRO MARK 0 0MLOCR-ISS 0 0 0MPBCS-OSS 0 0 0
DBCS 0©©
DIOSS 0 0 0DBCS-OSS 0 0 0
EC-DBCS 0 0EC-DIOSS 0 0 0AFSM 100 0 0 0
UFSM 1000 0 00 0 00 0 00 0 00 0 0
BDS 0 0 0DPRC 0 0 0
__-
∎-®-~
St. Petersburg P&DC/33730-9997Chattanooga RECN/AN/A
(1)
DC
1010
(2)
OperationNumber
082387388389
$010
TOTAL779
Consolidated Office Name :Associated REC Name (Letters/Flats) :
Associated REC Name (APPS) :Associated REC Name (PARS) :
C CERTIFIED MTSC COSTD CONTRACTOR COST
IPU Hardware (NIP,NOP, . . . .)
Contractor CostsVDTsVDT TrunksFIRES/FRESAPPS Servers and VDTsPARS Servers and VDTsOther -
CD
CERTIFIED MTSC COSTCONTRACTOR COST
Consolidated Office Reductions
Remote Enconding Center OperationsAnnual Image Processing Savings/Cost
Annual REC Cost Changes>> (A-B)
Equipment Reconfigurations
Equipment DescriptionICU Hardware (NIP,NOP,
Contractor Costs0200RCRT1 LinesFIRES/FRESAPPS ServersPARS ServersOther-
Upgrade Type and/or Quantity
Remove IPSS,RCR
Associated REC Reductions
Equipment Description Upgrade Type and/or Quantity
Remove Consoles, IPUs
One Time Equipment Configuration Change Costs-
AMP Worksheet 10b
(6)
DC
(7)
OperationNumber
770927081082387
388389775
--------------- -
$0 .00
0015
15155
15
OTA9
Tampa P&DC/33630-9997Chattanooga RECBeaumont RECN/A
$0 .00
AMPC Facility Name:Associated REC Name (Letters/Flats) :
Associated REC Name (APPS):Associated REC Name (PARS):
$0 .00
ICU Hardware (NIP,NOP,Contractor Costs0200RCRT1 LinesFIRES/FRESAPPS ServersPARS ServersOther -
I Install IPSS, Upgrade RCR
C CERTIFIED MTSC COSTD CONTRACTOR COST
C CERTIFIED MTSC COSTD CONTRACTOR COST
TOTAL C & D
AMPC Facility Additions
Associated REC Additions
I Equipment DescriptionIPU Hardware (NIP,NOP
Contractor CostsVDTsVDT TrunksFIRES/FRESAPPS Servers and VDTsPARS Servers and VDTsDow-
Upgrade Type and/or Quantity
Install IPU, Add Partitions
FACILITY WO K OOR EVALUATION (CONSOLIDATED FACILITY)
(17) Describe Plans to Effectively use the gained SF at the Consoldiated Facility
Upon an AMP approval, the Suncoast Computerized Forwarding System (CFS) can be relocated into the available space so that CFS and PARS are colocated in the same facility . This mayallow another facility within the Suncoast District to be consolodated and annual lease costs to be avoided . At this time, the annual savings of this option and the cost of implementing thissolution have not been fully evaluated and therefore have not been included in the financial justification of the study .
(18) CommentsNone
AMP WS 1 1
(1) Name, Address, State, ZIP Code :_
St. Petersburg P&DC
3135 1st Ave N
St. Petersburg, FL 33730
(2) Facility Type :
P&DC
(3) Facility (OWN/LEASE)
Lease
(4) Annual Lease Cost
$
828,222
(5) Lease Options/Terms (6) Lease ExpirationDate
12/31/2017
(7) Present Facility SF :
154,100
(8) Facility SF Gain as aResult of AMP
Approximately 29,000
(9) Current # Carriers :(Rural, City)
N/A
(10) Accommodate AdditionalCarrier Routes as a Result ofGained SF (List 5-Digits)
N/A
(11) Number of CarriersRelocated to the AMPedFacility as a Result ofGained SF (Describe Planbelow)
(12), Project Savings
(13) Project Cost (14) Net Savings
$
(15) Reviewed by: (Name and Title) (16) Date :
Steve Martin, Operations Requirement Specialist 12/15/2006