SN Section A - Highlights of Power Sector Page
1 Electricity Generation for Apr 2018 (BU) 1A amp 1B
2 Generating Capacity Addition for Apr 2018 (MW) 2
3 List of Projects Commissioned in Apr 2018 3
4 All India Installed Capacity (MW) Region-wise as on 3042018 3
5 All India Installed Capacity (MW) Sector-wise as on 3042018 4
6 Transmission Lines Added during Apr 2018 (Ckms) 5
7 Transformation Capacity Addition during Apr 2018 (MVA) 6
8 Power Supply Position (Energy amp Peak) in Apr 2018 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for Apr 2018 10
11 T amp D and AT amp C Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 3042018
13 Average cost of Power amp Average Realisation
All India per capita consumption of Electricity (KWh)
15 All India Coal consumption for Power Generation (MT)
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Apr 2018 13
3 Installed Capacity in various Regions including their shares 14-19
1 Programme and Achievements of Transmission Lines in Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
1 Programme and Achievements of Sub-Stations in Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
1 Power Supply Position (Provisional) for Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 24
3 Power Supply Position (Revised) for Jan 2018 25
4 Peak Demand and Peak Met (Revised) for Jan 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since 2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA upto Apr 2018
1 Rate of sale of power for the year 2014-2015 33-41
Section H - Rate of sale of power for the year 2015-2016
Executive SumApry for the Month of Apr 2018
32
11
20
21
31
Section B - Capacity Addition
Section C - Transmission Lines
Section D - Sub Stations
Section E - Electricity Generation
Section F - Power supply position
Contents
Section G - Growth of Power Sector
SN Contents Page
1Electricity Generation (Conventional Sources) for Apr 2018 (BU) 1
2 Generating Capacity Addition for Apr 2018 (MW) 2
3 List of Projects Commissioned in Apr 2018 3
4 All India Installed Capacity (MW) Region-wise as on 3042018 3
5 All India Installed Capacity (MW) Sector-wise as on 3042018 4
6 Transmission Lines Added during Apr 2018 (Ckms) 5
7 Transformation Capacity Addition during Apr 2018 (MVA) 6
8 Power Supply Position (Energy amp Peak) in Apr 2018 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for Apr 2018 10
11 T amp D and AT amp C Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 3042018
13 Average cost of Power amp Average Realisation
14 All India per capita consumption of Electricity (KWh)
15 All India Coal consumption for Power Generation (MT)
Section A - Highlights of Power Sector
11
Achievement
Apr-18
Thermal 8956 9262
Hydro 752
Nuclear 322
Bhutan Import 0093
All India 103453 030
Type
Thermal 8956
Hydro
Nuclear
Bhutan Import
All India
1A
2500
017502
-14961018
-2188320
-1250
103140
0175
9016
8657
REF
Change
Electricity Generation During April 2017 to Apr 2018 amp April 2017 to Apr 2018 (BU)
Apr17 Apr18
-160101489103140
1 Electricity Generation for Apr 2018 (BU)
Apr-18Type
Achievement
Apr-17
Targets Change
wrt 2018
9016
02
8657
101489
320
1018
2500
103140
101489
100500
101000
101500
102000
102500
103000
103500
BU
Apr-17 Apr-18
103140 101489
0000
20000
40000
60000
80000
100000
120000
BU
Apr17 Apr18
Month
Generation from
Conventional Sources
Generation
from
Renewable
Sources
Total
Generation
from
Conventional
Sources
Generation
from
Renewable
Sources
Total
Growth in
Conventional
Generation
Growth in
Renewable
Generation
Growth in
Total
Generation
(MU) (MU) (MU) (MU) (MU) (MU) () () ()
Apr-17 103160 6932 110092 99345 5082 104427 384 3640 542
May-17 107295 8666 115961 99903 6820 106723 740 2707 866
Jun-17 97525 10228 107753 97326 8118 105444 020 2599 219
Jul-17 97912 12928 110840 96442 9554 105996 152 3532 457
Aug-17 94606 10857 105463 95237 9571 104808 -066 1344 062
Sep-17 98072 7516 105588 95741 8279 104020 243 -922 151
Oct-17 102618 6564 109182 99779 6274 106053 285 462 295
Nov-17 95605 6894 102499 93568 5030 98598 218 3706 396
Dec-17 97020 8122 105142 95251 5463 100714 186 4867 440
Jan-18 95690 7399 103089 968764 5809 974573 -9012 2737 -8942
Feb-18 91611 7525 99136 89286 5755 95041 260 3076 431
Mar-18 10229 8693 18922 11601 5942 17543 -1183 4630 7861B
Wind
Solar
Biomass
Bagasse
Small Hydro
Others
Total 869291 594199 10183949 8151165
37685 47454 769158 767212
3312 3602 35845 17714
27043 38732 340495 41983
179422 101741 1184735 996034
290676 235565 5266609 4600434
331153 167105 2587107 1349941
Electricity Generation From Renewable (source wise)
April- Mar 2018 vis-agrave-vis April- Mar 2018
Electricity Generation (Conventional amp Renewable Sources)April 2017- Mar 2017 vis-agrave-vis April 2016- Mar 2016
All Figure in MU
Source-Wise All India
Generation from Renwables
For the Month of Commulative value for the period
Mar 2018 Mar 2017 Mar 2018 Mar 2017
Generation
(April 2016- Mar 2017)
Generation
(April 2017- Mar 2018) Growth
Achievement Targets Achievement
Apr-17
Thermal 2440 0 0 -10000
Hydro 116 0 0 10000
Nuclear 0 0 0 000
All India 2556 0 0 -10000
Apr -16 to Apr17 Apr -17 to Apr-18 Change
Thermal 2440 8710 257
Hydro 116 795 100
Nuclear 0 0 NA
All India 2556 95050 272
2
2 Generating Capacity Addition for Apr 2018 (MW)
Generating Capacity Addition during April 16 to Apr 17 amp April 17 to Apr 18 (MW)
Change wrt 2018TypeApr-18
25560
000
500
1000
1500
2000
2500
3000
1Apr-17 Apr-18
2556
95050
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
1Apr -16 to Apr17 Apr -17 to Apr-18
(i)
(ii)
(iii)
Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total
Northern 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Western 7060862 1080649 000 8141511 184000 744750 2044638 11114899
Southern 4578202 647366 76158 5301726 332000 1180803 3436928 10251457
Eastern 2720164 10000 000 2730164 000 494212 103840 3328216
North-East 52002 173605 3600 229207 000 134200 28256 391663
Islands 000 000 4005 4005 000 000 1256 5261
ALL INDIA 19695750 2489746 83763 22269259 678000 4529342 6902239 34378839
Note Captive Genaration is not included in the total RES as on 31122016 3
NIL
Hydro
Thermal
Nuclear
3 List of Projects Commissioned During Apr 2018
4 All India Installed Capacity (MW) Region-wise as on 3042018
NIL
NIL
Thermal
22269259
678000
45293426902239
34378839
40726
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
40000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 34378839
Sector
Coal Gas Diesel Total
State 6445650 707895 36393 7189938 000 2985800 200337 10376075
Private 7554600 1058060 47370 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
All India 19695750 2489746 83763 22269259 678000 4529342 6902239 34378839
State 10376075
Private 15551102
Central 8451663
5 All India Installed Capacity (MW) Sector-wise as on 3042018
4
Grand TotalTHERMAL
Nuclear Hydro RES
RES as on 31122016
State 10376075 30
Private 15551102 45
Central 8451663 25
All India Installed Capacity(MW) as on 30-4-2018 (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
5
0 0
6 Transmission Lines Added during Apr 2018 (Ckms)
Apr-17 Apr-18
0 0
0 0
376 236
1271 40
152 481
1799 757
Transmission Lines Added during Apr 16 to Apr 17 amp Apr 16 to Apr18 (Ckms)
Apr 16 - Apr17 Apr 16 - Apr 18
152 481
1799 763
0 0
376 242
1271 40
1799
763
0
200
400
600
800
1000
1200
1400
1600
1800
2000
ckm
s
Apr 16 to Apr 17 Apr 17 to Apr 18
1799
757
0
200
400
600
800
1000
1200
1400
1600
1800
2000
1
ck
ms
Apr17 Apr18
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
7 Transformation Capacity Addition During Apr 2018 (MVA)
0
3000
2500
1545
0 0
Apr-17 Apr-18
7045
0
242
763
40
481
0 0
All India Transformation Capacity Addition during Apr 16 to Apr17 amp Apr
17 to Apr18 (MVA)
763
0
242
40
481
7045
3000
2500
1545
0
April 16 to Apr 17 April 17 to Apr 18
7045
763
0
1000
2000
3000
4000
5000
6000
7000
8000
MV
A
Transformation Capacity Addition during Apr 2018
Apr-17 Apr-18
7045
763
0
74520
1
MV
A
April 16 to Apr 17 April 17 to Apr 18
Apr17 Apr 18 Apr 17 Mar18 Apr17 Apr18
Northern 28389 28591 27968 28171 -15 -15
Western 32562 33371 32544 33369 -01 00
Southern 28106 29515 28091 29469 -01 -02
Eastern 11164 11634 11149 11617 -01 -01
North Eastern 1108 1187 1058 1135 -45 -43
All India 101329 104297 100810 103761 -05 -05
Apr 17 Apr 18 Apr 17 Apr 18 Apr17 Apr 18
Northern 49603 47996 48711 46959 -18 -22
Western 49850 50677 49778 50457 -01 -04
Southern 42560 45808 42535 45684 -01 -03
Eastern 19855 20429 19662 20429 -10 00
North Eastern 2258 2600 2209 2552 -22 -18
All India 159590 158520 158393 156720 -08 -11
7
8 Power Supply Position (Energy amp Peak) in Mar 2017
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()RegionPower (MW)
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandApr 17 0 3 0 0 515 0 32 0 0
Apr 18 0 0 0 0 546 0 0 247 0
Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Haveli
Apr 17 1 0 0 48 0 0 1
Apr 18 13 11 3 99 0 0 0
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Apr17 0 0 17 9 27 0 0
Apr 18 0 56 22 39 63 24 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
546
0 0
247
00 3 0 0
515
0 32
0 0
0
400
800
Chan
dig
ar
h
Delh
i
Hary
ana
HP
Jamp
K
Pu
nj
ab
Raja
sth
an
UP
Utr
ak
hand
MW
Northern States (MW) Apr 18 Apr 17
13
11
3
99
0 0 01 0 0
48
0 0 1
0
200
Ch
attis
garh
Guja
rat
MP
Mah
ara
st
ra
Da
man amp
Diu
Da
dar
Na
gar
Ha
veliM
W
Western States (MW) Apr 18 Apr 17
0
56
2239
63
2400 0
17 927
0 00
100
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Southern State (MW) Apr 18 Apr17
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Apr17 22 0 0 0 27 0 8
Apr 18 0 0 0 0 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Apr17 4 15 1 0 1 1 0
Apr 18 13 30 7 0 9 29 41
9
0 0 0 0 0 0
4
22
0 0 0
27
0
8
0
10
20
30
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW)Apr 18 Apr17
13
30
7
0
9
29
41
4 1 0 1 1 0
0
50
Aru
na
ch
al
Assa
m
Ma
nip
ur
Meghal
aya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
Sector Apr17 Apr 18
Central 7451 7646
State 6471 5892
Private 5575 6208
ALL INDIA 6490 6466
Month PLF 2017 PLF 2018
Jan 6014 6247
Feb 6153 6259
March 6312 6533
April 6466 649
May
June
July
Aug
Sep
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Apr 2018
74
51
64
71
55
75
64
90
76
46
58
92
62
08
64
66
000100020003000400050006000700080009000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Apr 2017 and Apr 2018
Apr17 Apr 18
615
3
625
9
60
80
Ap
ril
Axis
Title
Axis Title
All India PLF Month-wise
2017 2018
2010-11 2011-12 2012-13 2013-14 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
Pump sets Energised as on 3132018
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer may not be necessary)
Figures are based on the data available in DDUGJY website
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
21212860
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 30112017
Villiages Electrified (Nos) as on 3132018
9985596556
Villages electrified
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Apr 2018 and April 2017 to Apr 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1586860 2220135 5366050 9173045
Hydro 258402 227600 61900 547902
Nuclear 200000 000 000 200000
Total 2045262 2447735 5427950 9920947
Acievement 7812 15761 11592 11205
1 Capacity Addtion Targets and Achievements in the 12th Plan
Achievement of Capacity Addition during the Current Plan upto April 2017
Achievements upto Apr 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
54
790
2
20
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9920947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 4880 2260 4880 2260 -2620
State 3546 270 850 3546 850 -2696
Pvt 2940 0 300 2940 300 -2640
Total 11366 270 3410 11366 3410 -7956
Central 800 110 330 610 330 -280
State 300 0 0 478 0 -478
Pvt 205 0 0 217 0 -217
Total 1305 110 330 1305 330 -975
Nuclear Central 500 0 0 0 0 0
Central 6180 110 2590 5490 2590 -2900
State 3846 270 850 4024 850 -3174
Pvt 3145 0 300 3157 300 -2857
Total 13171 380 3740 12671 3740 -8931
13
2 Capacity Addition Targets Achievements During Apr 2018
Apr-18 April 17 - Apr 18Schemes Sector
Target 2017-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Mar 2018
Thermal1
13
66
13
05
0
12
67
1
34
10
33
0
0
37
40
0
2000
4000
6000
8000
10000
12000
14000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2017-18Target Achievement
270
3410
110
330
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Target Achievement
MW
Targets and Achievement during Mar 2018Thermal
Hydro
Nuclear
Coal Gas Diesel Total
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Sub Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Sub Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 5301726 332000 1180803 3436928 10251457
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 103840 3328216
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Sub Total 52002 173605 3600 229207 000 134200 28256 391663
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6445650 707895 7189938 000 2985800 200337 10376075
Private 7554600 1058060 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
Total 19695750 2489746 837629 22269259 678000 4529342 6902239 34378839
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032018 is given below (in MW)
448581 3404600 2165148 6902239
A April 2018 0 MW
B April 2018 214 MW
C April 2018 0 MW
D Net Capacity
Added during
April 2018 A-B-C -214 MW
Northern Region
Western Region
870080 13830
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032018
BM PowerCogen
Bio-PowerSolar Power
Waste to EnergyWind Power
Southern Region
Eastern Region
North Eastern
Region
Small
Hydro Power
Total
Capacity
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 30042018)
Region Ownership Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
(UTILITIES)
RES
(MNRE)
1 OBRA TPS U-8 (94 MW) has been retired from the State Sector of Uttar Pradesh
2 BANDEL TPS U-3amp4(2x60=120MW) has been retired from the State Sector of West Bengal
Capacity Retired during
Capacity Derated
Capacity Added during
Islands
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 381772 20701 000 402473 10283 72309 000 485065
Sub-Total 482194 211541 000 693735 10283 72309 12157 788484
State 272000 15000 000 287000 000 108451 5930 401381
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 194821 41175 1124201
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 59723 158923
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 85384 403868
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5136 5136
Central 50639 12907 000 63547 6798 113948 000 184293
Sub-Total 50639 30407 000 81047 6798 236948 18039 342832
State 262000 15000 000 277000 000 257023 12780 546803
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 859008 41401 000 900409 19681 378165 128242 1426497
State 585000 60380 000 645380 000 108796 2385 756561
Private 388200 000 000 388200 000 10400 645579 1044179
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193097 677364 2102450
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 262191 1217824
Central 379639 54949 000 434588 28948 185493 3000 652029
Sub-Total 1797972 54949 000 1852921 28948 342103 267701 2491673
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 47953 111653
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 54740 335623
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 2520 2520
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 2520 18809
124953 29105 000 154058 23703 75145 000 252907
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Grand Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Jammu amp Kashmir
Punjab
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042018)
State Ownership Sector
Modewise breakup
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Delhi
Haryana
Himachal Pradesh
(As on 30042018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1061 1061
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1061 18758
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 704902 1877469
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 729532 3079432
State 408000 000 000 408000 000 170366 8396 586762
Private 557400 10000 000 567400 000 000 363584 930984
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1244841 35700 000 1280541 27300 322366 401980 2032187
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 000 000 200144
Sub-Total 1272344 000 000 1272344 4800 12000 53535 1342679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 824775 2175275
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 857888 4307419
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Grand Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 369412 3680 760480 000 000 642713 1403193
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 392952 3680 1452476 12727 167360 672588 2305151
State 508250 000 000 508250 000 244993 4022 757265
Private 83945 95088 000 179033 000 000 360930 539963
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 95088 000 882895 14873 244993 365952 1508713
State 502000 000 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1228352 1426722
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 996082 69800 359980 1243885 2669747
State 000 000 15996 000 188150 15102 219248
Private 61500 17400 000 78900 000 000 17844 96744
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 245176 36200 188150 37946 507472
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 575247 000 000 1086081 1661328
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 1508607 144800 220320 1116541 2990268
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 016 016
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 016 36706
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 5301726 332000 1180803 3436928 10251457
Andhra Pradesh
Telangana
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 2567 75567
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 2972 176446
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34387 276887
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43582 1051759
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 17830 311730
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 19460 733842
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 000 39900
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5211 96214
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 103840 3328216
(As on 30042018)
Coal Gas Diesel Total
State 000 28845 000 28845 000 10000 3001 41846
Private 000 2450 000 2450 000 000 1655 4105
Central 27902 43556 000 71458 000 33123 000 104581
Sub-Total 27902 74851 000 102753 000 43123 4656 150532
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 9745 000 16897
Sub-Total 2470 4682 000 7152 000 9745 11000 27897
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 002 002
Central 3040 10969 000 14009 000 6519 000 20528
Sub-Total 3040 10969 000 14009 000 38719 3105 55833
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 6238 500 54173
Sub-Total 3740 60645 000 64385 000 6238 2110 72733
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 006 006
Central 3140 7157 000 10297 000 8893 000 19190
Sub-Total 3140 7157 3600 13897 000 8893 551 23341
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5337 000 12370
Sub-Total 2140 4893 000 7033 000 5337 3167 15537
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9419 000 15535
Sub-Total 2070 4046 000 6116 000 9419 3667 19202
7500 6362 000 13862 000 12726 000 26588
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Grand Total 52002 173605 3600 229207 000 134200 28256 391663
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
RES
(MNRE)
Bihar
Modewise breakup
Mizoram
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
State Ownership Sector
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Central - Unallocated
Total (North-
Eastern Region)
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Andaman amp
Nicobar
SN Contents Page
1Programme and Achievements of Transmission Lines in Apr 2018 and during April
2016 to Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
Section C - Transmission Lines
20
Programme
2017-18 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3665 0 236 0 236
State Sector 416 0 0 0 0
JVPrivate Sector 846 0 6 0 0
Total 4927 0 242 0 236
Central Sector 4851 28 36 28 36
State Sector 5157 99 4 99 4
JVPrivate Sector 1416 0 0 0 0
Total 11424 127 40 127 40
Central Sector 763 0 0 0 0
State Sector 5972 13 481 13 481
JVPrivate Sector 0 0 0 0 0
Total 6735 13 481 13 481
Grand Total 23086 140 763 140 757
Voltage Level 2
765
400
400
400
220
220
220
220
220
765
STATE SECTOR Sector3 Kalpaka - Maradam line
8 Sarangapur (Allahabad)PG - Phulpur line
Grand Total
4
Transmission Lines (220 kV and above) CommissionedReady for
commissioning During Apr-2018
Name of Transmission Lines
CENTRAL SECTOR Sector
Total of CENTRAL SECTOR
10 Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)
Sl No
2
9 Sohawal PG - Barabanki line
1 3
1 Parli - Solapur (PPTL - TBCB)
Parli (New) - Parli (PG) (Q) (PPTL -TBCB)
400 kV
220kV
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 17 to Apr 18Apr 18Voltage
Level
Sector
LILO of 2nd Ckt VTS- Malkaram to Suryapet
5 Ataur - Mandola Vihar line
Total of STATE SECTOR
PRIVATE SECTOR Sector
Total of PRIVATE SECTOR
6 LILO of 2nd Ckt Birsinghpur - Amarkantak line at Shahdol Ss
7 LILO of 2nd Ckt of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
SN Section A - Highlights of Power Sector Page
1 Electricity Generation for Apr 2018 (BU) 1A amp 1B
2 Generating Capacity Addition for Apr 2018 (MW) 2
3 List of Projects Commissioned in Apr 2018 3
4 All India Installed Capacity (MW) Region-wise as on 3042018 3
5 All India Installed Capacity (MW) Sector-wise as on 3042018 4
6 Transmission Lines Added during Apr 2018 (Ckms) 5
7 Transformation Capacity Addition during Apr 2018 (MVA) 6
8 Power Supply Position (Energy amp Peak) in Apr 2018 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for Apr 2018 10
11 T amp D and AT amp C Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 3042018
13 Average cost of Power amp Average Realisation
All India per capita consumption of Electricity (KWh)
15 All India Coal consumption for Power Generation (MT)
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Apr 2018 13
3 Installed Capacity in various Regions including their shares 14-19
1 Programme and Achievements of Transmission Lines in Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
1 Programme and Achievements of Sub-Stations in Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
1 Power Supply Position (Provisional) for Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 24
3 Power Supply Position (Revised) for Jan 2018 25
4 Peak Demand and Peak Met (Revised) for Jan 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since 2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA upto Apr 2018
1 Rate of sale of power for the year 2014-2015 33-41
Section H - Rate of sale of power for the year 2015-2016
Executive SumApry for the Month of Apr 2018
32
11
20
21
31
Section B - Capacity Addition
Section C - Transmission Lines
Section D - Sub Stations
Section E - Electricity Generation
Section F - Power supply position
Contents
Section G - Growth of Power Sector
SN Contents Page
1Electricity Generation (Conventional Sources) for Apr 2018 (BU) 1
2 Generating Capacity Addition for Apr 2018 (MW) 2
3 List of Projects Commissioned in Apr 2018 3
4 All India Installed Capacity (MW) Region-wise as on 3042018 3
5 All India Installed Capacity (MW) Sector-wise as on 3042018 4
6 Transmission Lines Added during Apr 2018 (Ckms) 5
7 Transformation Capacity Addition during Apr 2018 (MVA) 6
8 Power Supply Position (Energy amp Peak) in Apr 2018 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for Apr 2018 10
11 T amp D and AT amp C Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 3042018
13 Average cost of Power amp Average Realisation
14 All India per capita consumption of Electricity (KWh)
15 All India Coal consumption for Power Generation (MT)
Section A - Highlights of Power Sector
11
Achievement
Apr-18
Thermal 8956 9262
Hydro 752
Nuclear 322
Bhutan Import 0093
All India 103453 030
Type
Thermal 8956
Hydro
Nuclear
Bhutan Import
All India
1A
2500
017502
-14961018
-2188320
-1250
103140
0175
9016
8657
REF
Change
Electricity Generation During April 2017 to Apr 2018 amp April 2017 to Apr 2018 (BU)
Apr17 Apr18
-160101489103140
1 Electricity Generation for Apr 2018 (BU)
Apr-18Type
Achievement
Apr-17
Targets Change
wrt 2018
9016
02
8657
101489
320
1018
2500
103140
101489
100500
101000
101500
102000
102500
103000
103500
BU
Apr-17 Apr-18
103140 101489
0000
20000
40000
60000
80000
100000
120000
BU
Apr17 Apr18
Month
Generation from
Conventional Sources
Generation
from
Renewable
Sources
Total
Generation
from
Conventional
Sources
Generation
from
Renewable
Sources
Total
Growth in
Conventional
Generation
Growth in
Renewable
Generation
Growth in
Total
Generation
(MU) (MU) (MU) (MU) (MU) (MU) () () ()
Apr-17 103160 6932 110092 99345 5082 104427 384 3640 542
May-17 107295 8666 115961 99903 6820 106723 740 2707 866
Jun-17 97525 10228 107753 97326 8118 105444 020 2599 219
Jul-17 97912 12928 110840 96442 9554 105996 152 3532 457
Aug-17 94606 10857 105463 95237 9571 104808 -066 1344 062
Sep-17 98072 7516 105588 95741 8279 104020 243 -922 151
Oct-17 102618 6564 109182 99779 6274 106053 285 462 295
Nov-17 95605 6894 102499 93568 5030 98598 218 3706 396
Dec-17 97020 8122 105142 95251 5463 100714 186 4867 440
Jan-18 95690 7399 103089 968764 5809 974573 -9012 2737 -8942
Feb-18 91611 7525 99136 89286 5755 95041 260 3076 431
Mar-18 10229 8693 18922 11601 5942 17543 -1183 4630 7861B
Wind
Solar
Biomass
Bagasse
Small Hydro
Others
Total 869291 594199 10183949 8151165
37685 47454 769158 767212
3312 3602 35845 17714
27043 38732 340495 41983
179422 101741 1184735 996034
290676 235565 5266609 4600434
331153 167105 2587107 1349941
Electricity Generation From Renewable (source wise)
April- Mar 2018 vis-agrave-vis April- Mar 2018
Electricity Generation (Conventional amp Renewable Sources)April 2017- Mar 2017 vis-agrave-vis April 2016- Mar 2016
All Figure in MU
Source-Wise All India
Generation from Renwables
For the Month of Commulative value for the period
Mar 2018 Mar 2017 Mar 2018 Mar 2017
Generation
(April 2016- Mar 2017)
Generation
(April 2017- Mar 2018) Growth
Achievement Targets Achievement
Apr-17
Thermal 2440 0 0 -10000
Hydro 116 0 0 10000
Nuclear 0 0 0 000
All India 2556 0 0 -10000
Apr -16 to Apr17 Apr -17 to Apr-18 Change
Thermal 2440 8710 257
Hydro 116 795 100
Nuclear 0 0 NA
All India 2556 95050 272
2
2 Generating Capacity Addition for Apr 2018 (MW)
Generating Capacity Addition during April 16 to Apr 17 amp April 17 to Apr 18 (MW)
Change wrt 2018TypeApr-18
25560
000
500
1000
1500
2000
2500
3000
1Apr-17 Apr-18
2556
95050
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
1Apr -16 to Apr17 Apr -17 to Apr-18
(i)
(ii)
(iii)
Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total
Northern 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Western 7060862 1080649 000 8141511 184000 744750 2044638 11114899
Southern 4578202 647366 76158 5301726 332000 1180803 3436928 10251457
Eastern 2720164 10000 000 2730164 000 494212 103840 3328216
North-East 52002 173605 3600 229207 000 134200 28256 391663
Islands 000 000 4005 4005 000 000 1256 5261
ALL INDIA 19695750 2489746 83763 22269259 678000 4529342 6902239 34378839
Note Captive Genaration is not included in the total RES as on 31122016 3
NIL
Hydro
Thermal
Nuclear
3 List of Projects Commissioned During Apr 2018
4 All India Installed Capacity (MW) Region-wise as on 3042018
NIL
NIL
Thermal
22269259
678000
45293426902239
34378839
40726
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
40000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 34378839
Sector
Coal Gas Diesel Total
State 6445650 707895 36393 7189938 000 2985800 200337 10376075
Private 7554600 1058060 47370 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
All India 19695750 2489746 83763 22269259 678000 4529342 6902239 34378839
State 10376075
Private 15551102
Central 8451663
5 All India Installed Capacity (MW) Sector-wise as on 3042018
4
Grand TotalTHERMAL
Nuclear Hydro RES
RES as on 31122016
State 10376075 30
Private 15551102 45
Central 8451663 25
All India Installed Capacity(MW) as on 30-4-2018 (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
5
0 0
6 Transmission Lines Added during Apr 2018 (Ckms)
Apr-17 Apr-18
0 0
0 0
376 236
1271 40
152 481
1799 757
Transmission Lines Added during Apr 16 to Apr 17 amp Apr 16 to Apr18 (Ckms)
Apr 16 - Apr17 Apr 16 - Apr 18
152 481
1799 763
0 0
376 242
1271 40
1799
763
0
200
400
600
800
1000
1200
1400
1600
1800
2000
ckm
s
Apr 16 to Apr 17 Apr 17 to Apr 18
1799
757
0
200
400
600
800
1000
1200
1400
1600
1800
2000
1
ck
ms
Apr17 Apr18
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
7 Transformation Capacity Addition During Apr 2018 (MVA)
0
3000
2500
1545
0 0
Apr-17 Apr-18
7045
0
242
763
40
481
0 0
All India Transformation Capacity Addition during Apr 16 to Apr17 amp Apr
17 to Apr18 (MVA)
763
0
242
40
481
7045
3000
2500
1545
0
April 16 to Apr 17 April 17 to Apr 18
7045
763
0
1000
2000
3000
4000
5000
6000
7000
8000
MV
A
Transformation Capacity Addition during Apr 2018
Apr-17 Apr-18
7045
763
0
74520
1
MV
A
April 16 to Apr 17 April 17 to Apr 18
Apr17 Apr 18 Apr 17 Mar18 Apr17 Apr18
Northern 28389 28591 27968 28171 -15 -15
Western 32562 33371 32544 33369 -01 00
Southern 28106 29515 28091 29469 -01 -02
Eastern 11164 11634 11149 11617 -01 -01
North Eastern 1108 1187 1058 1135 -45 -43
All India 101329 104297 100810 103761 -05 -05
Apr 17 Apr 18 Apr 17 Apr 18 Apr17 Apr 18
Northern 49603 47996 48711 46959 -18 -22
Western 49850 50677 49778 50457 -01 -04
Southern 42560 45808 42535 45684 -01 -03
Eastern 19855 20429 19662 20429 -10 00
North Eastern 2258 2600 2209 2552 -22 -18
All India 159590 158520 158393 156720 -08 -11
7
8 Power Supply Position (Energy amp Peak) in Mar 2017
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()RegionPower (MW)
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandApr 17 0 3 0 0 515 0 32 0 0
Apr 18 0 0 0 0 546 0 0 247 0
Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Haveli
Apr 17 1 0 0 48 0 0 1
Apr 18 13 11 3 99 0 0 0
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Apr17 0 0 17 9 27 0 0
Apr 18 0 56 22 39 63 24 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
546
0 0
247
00 3 0 0
515
0 32
0 0
0
400
800
Chan
dig
ar
h
Delh
i
Hary
ana
HP
Jamp
K
Pu
nj
ab
Raja
sth
an
UP
Utr
ak
hand
MW
Northern States (MW) Apr 18 Apr 17
13
11
3
99
0 0 01 0 0
48
0 0 1
0
200
Ch
attis
garh
Guja
rat
MP
Mah
ara
st
ra
Da
man amp
Diu
Da
dar
Na
gar
Ha
veliM
W
Western States (MW) Apr 18 Apr 17
0
56
2239
63
2400 0
17 927
0 00
100
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Southern State (MW) Apr 18 Apr17
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Apr17 22 0 0 0 27 0 8
Apr 18 0 0 0 0 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Apr17 4 15 1 0 1 1 0
Apr 18 13 30 7 0 9 29 41
9
0 0 0 0 0 0
4
22
0 0 0
27
0
8
0
10
20
30
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW)Apr 18 Apr17
13
30
7
0
9
29
41
4 1 0 1 1 0
0
50
Aru
na
ch
al
Assa
m
Ma
nip
ur
Meghal
aya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
Sector Apr17 Apr 18
Central 7451 7646
State 6471 5892
Private 5575 6208
ALL INDIA 6490 6466
Month PLF 2017 PLF 2018
Jan 6014 6247
Feb 6153 6259
March 6312 6533
April 6466 649
May
June
July
Aug
Sep
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Apr 2018
74
51
64
71
55
75
64
90
76
46
58
92
62
08
64
66
000100020003000400050006000700080009000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Apr 2017 and Apr 2018
Apr17 Apr 18
615
3
625
9
60
80
Ap
ril
Axis
Title
Axis Title
All India PLF Month-wise
2017 2018
2010-11 2011-12 2012-13 2013-14 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
Pump sets Energised as on 3132018
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer may not be necessary)
Figures are based on the data available in DDUGJY website
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
21212860
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 30112017
Villiages Electrified (Nos) as on 3132018
9985596556
Villages electrified
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Apr 2018 and April 2017 to Apr 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1586860 2220135 5366050 9173045
Hydro 258402 227600 61900 547902
Nuclear 200000 000 000 200000
Total 2045262 2447735 5427950 9920947
Acievement 7812 15761 11592 11205
1 Capacity Addtion Targets and Achievements in the 12th Plan
Achievement of Capacity Addition during the Current Plan upto April 2017
Achievements upto Apr 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
54
790
2
20
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9920947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 4880 2260 4880 2260 -2620
State 3546 270 850 3546 850 -2696
Pvt 2940 0 300 2940 300 -2640
Total 11366 270 3410 11366 3410 -7956
Central 800 110 330 610 330 -280
State 300 0 0 478 0 -478
Pvt 205 0 0 217 0 -217
Total 1305 110 330 1305 330 -975
Nuclear Central 500 0 0 0 0 0
Central 6180 110 2590 5490 2590 -2900
State 3846 270 850 4024 850 -3174
Pvt 3145 0 300 3157 300 -2857
Total 13171 380 3740 12671 3740 -8931
13
2 Capacity Addition Targets Achievements During Apr 2018
Apr-18 April 17 - Apr 18Schemes Sector
Target 2017-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Mar 2018
Thermal1
13
66
13
05
0
12
67
1
34
10
33
0
0
37
40
0
2000
4000
6000
8000
10000
12000
14000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2017-18Target Achievement
270
3410
110
330
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Target Achievement
MW
Targets and Achievement during Mar 2018Thermal
Hydro
Nuclear
Coal Gas Diesel Total
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Sub Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Sub Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 5301726 332000 1180803 3436928 10251457
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 103840 3328216
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Sub Total 52002 173605 3600 229207 000 134200 28256 391663
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6445650 707895 7189938 000 2985800 200337 10376075
Private 7554600 1058060 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
Total 19695750 2489746 837629 22269259 678000 4529342 6902239 34378839
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032018 is given below (in MW)
448581 3404600 2165148 6902239
A April 2018 0 MW
B April 2018 214 MW
C April 2018 0 MW
D Net Capacity
Added during
April 2018 A-B-C -214 MW
Northern Region
Western Region
870080 13830
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032018
BM PowerCogen
Bio-PowerSolar Power
Waste to EnergyWind Power
Southern Region
Eastern Region
North Eastern
Region
Small
Hydro Power
Total
Capacity
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 30042018)
Region Ownership Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
(UTILITIES)
RES
(MNRE)
1 OBRA TPS U-8 (94 MW) has been retired from the State Sector of Uttar Pradesh
2 BANDEL TPS U-3amp4(2x60=120MW) has been retired from the State Sector of West Bengal
Capacity Retired during
Capacity Derated
Capacity Added during
Islands
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 381772 20701 000 402473 10283 72309 000 485065
Sub-Total 482194 211541 000 693735 10283 72309 12157 788484
State 272000 15000 000 287000 000 108451 5930 401381
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 194821 41175 1124201
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 59723 158923
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 85384 403868
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5136 5136
Central 50639 12907 000 63547 6798 113948 000 184293
Sub-Total 50639 30407 000 81047 6798 236948 18039 342832
State 262000 15000 000 277000 000 257023 12780 546803
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 859008 41401 000 900409 19681 378165 128242 1426497
State 585000 60380 000 645380 000 108796 2385 756561
Private 388200 000 000 388200 000 10400 645579 1044179
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193097 677364 2102450
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 262191 1217824
Central 379639 54949 000 434588 28948 185493 3000 652029
Sub-Total 1797972 54949 000 1852921 28948 342103 267701 2491673
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 47953 111653
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 54740 335623
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 2520 2520
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 2520 18809
124953 29105 000 154058 23703 75145 000 252907
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Grand Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Jammu amp Kashmir
Punjab
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042018)
State Ownership Sector
Modewise breakup
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Delhi
Haryana
Himachal Pradesh
(As on 30042018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1061 1061
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1061 18758
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 704902 1877469
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 729532 3079432
State 408000 000 000 408000 000 170366 8396 586762
Private 557400 10000 000 567400 000 000 363584 930984
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1244841 35700 000 1280541 27300 322366 401980 2032187
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 000 000 200144
Sub-Total 1272344 000 000 1272344 4800 12000 53535 1342679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 824775 2175275
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 857888 4307419
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Grand Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 369412 3680 760480 000 000 642713 1403193
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 392952 3680 1452476 12727 167360 672588 2305151
State 508250 000 000 508250 000 244993 4022 757265
Private 83945 95088 000 179033 000 000 360930 539963
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 95088 000 882895 14873 244993 365952 1508713
State 502000 000 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1228352 1426722
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 996082 69800 359980 1243885 2669747
State 000 000 15996 000 188150 15102 219248
Private 61500 17400 000 78900 000 000 17844 96744
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 245176 36200 188150 37946 507472
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 575247 000 000 1086081 1661328
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 1508607 144800 220320 1116541 2990268
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 016 016
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 016 36706
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 5301726 332000 1180803 3436928 10251457
Andhra Pradesh
Telangana
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 2567 75567
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 2972 176446
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34387 276887
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43582 1051759
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 17830 311730
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 19460 733842
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 000 39900
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5211 96214
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 103840 3328216
(As on 30042018)
Coal Gas Diesel Total
State 000 28845 000 28845 000 10000 3001 41846
Private 000 2450 000 2450 000 000 1655 4105
Central 27902 43556 000 71458 000 33123 000 104581
Sub-Total 27902 74851 000 102753 000 43123 4656 150532
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 9745 000 16897
Sub-Total 2470 4682 000 7152 000 9745 11000 27897
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 002 002
Central 3040 10969 000 14009 000 6519 000 20528
Sub-Total 3040 10969 000 14009 000 38719 3105 55833
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 6238 500 54173
Sub-Total 3740 60645 000 64385 000 6238 2110 72733
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 006 006
Central 3140 7157 000 10297 000 8893 000 19190
Sub-Total 3140 7157 3600 13897 000 8893 551 23341
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5337 000 12370
Sub-Total 2140 4893 000 7033 000 5337 3167 15537
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9419 000 15535
Sub-Total 2070 4046 000 6116 000 9419 3667 19202
7500 6362 000 13862 000 12726 000 26588
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Grand Total 52002 173605 3600 229207 000 134200 28256 391663
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
RES
(MNRE)
Bihar
Modewise breakup
Mizoram
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
State Ownership Sector
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Central - Unallocated
Total (North-
Eastern Region)
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Andaman amp
Nicobar
SN Contents Page
1Programme and Achievements of Transmission Lines in Apr 2018 and during April
2016 to Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
Section C - Transmission Lines
20
Programme
2017-18 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3665 0 236 0 236
State Sector 416 0 0 0 0
JVPrivate Sector 846 0 6 0 0
Total 4927 0 242 0 236
Central Sector 4851 28 36 28 36
State Sector 5157 99 4 99 4
JVPrivate Sector 1416 0 0 0 0
Total 11424 127 40 127 40
Central Sector 763 0 0 0 0
State Sector 5972 13 481 13 481
JVPrivate Sector 0 0 0 0 0
Total 6735 13 481 13 481
Grand Total 23086 140 763 140 757
Voltage Level 2
765
400
400
400
220
220
220
220
220
765
STATE SECTOR Sector3 Kalpaka - Maradam line
8 Sarangapur (Allahabad)PG - Phulpur line
Grand Total
4
Transmission Lines (220 kV and above) CommissionedReady for
commissioning During Apr-2018
Name of Transmission Lines
CENTRAL SECTOR Sector
Total of CENTRAL SECTOR
10 Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)
Sl No
2
9 Sohawal PG - Barabanki line
1 3
1 Parli - Solapur (PPTL - TBCB)
Parli (New) - Parli (PG) (Q) (PPTL -TBCB)
400 kV
220kV
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 17 to Apr 18Apr 18Voltage
Level
Sector
LILO of 2nd Ckt VTS- Malkaram to Suryapet
5 Ataur - Mandola Vihar line
Total of STATE SECTOR
PRIVATE SECTOR Sector
Total of PRIVATE SECTOR
6 LILO of 2nd Ckt Birsinghpur - Amarkantak line at Shahdol Ss
7 LILO of 2nd Ckt of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
SN Contents Page
1Electricity Generation (Conventional Sources) for Apr 2018 (BU) 1
2 Generating Capacity Addition for Apr 2018 (MW) 2
3 List of Projects Commissioned in Apr 2018 3
4 All India Installed Capacity (MW) Region-wise as on 3042018 3
5 All India Installed Capacity (MW) Sector-wise as on 3042018 4
6 Transmission Lines Added during Apr 2018 (Ckms) 5
7 Transformation Capacity Addition during Apr 2018 (MVA) 6
8 Power Supply Position (Energy amp Peak) in Apr 2018 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for Apr 2018 10
11 T amp D and AT amp C Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 3042018
13 Average cost of Power amp Average Realisation
14 All India per capita consumption of Electricity (KWh)
15 All India Coal consumption for Power Generation (MT)
Section A - Highlights of Power Sector
11
Achievement
Apr-18
Thermal 8956 9262
Hydro 752
Nuclear 322
Bhutan Import 0093
All India 103453 030
Type
Thermal 8956
Hydro
Nuclear
Bhutan Import
All India
1A
2500
017502
-14961018
-2188320
-1250
103140
0175
9016
8657
REF
Change
Electricity Generation During April 2017 to Apr 2018 amp April 2017 to Apr 2018 (BU)
Apr17 Apr18
-160101489103140
1 Electricity Generation for Apr 2018 (BU)
Apr-18Type
Achievement
Apr-17
Targets Change
wrt 2018
9016
02
8657
101489
320
1018
2500
103140
101489
100500
101000
101500
102000
102500
103000
103500
BU
Apr-17 Apr-18
103140 101489
0000
20000
40000
60000
80000
100000
120000
BU
Apr17 Apr18
Month
Generation from
Conventional Sources
Generation
from
Renewable
Sources
Total
Generation
from
Conventional
Sources
Generation
from
Renewable
Sources
Total
Growth in
Conventional
Generation
Growth in
Renewable
Generation
Growth in
Total
Generation
(MU) (MU) (MU) (MU) (MU) (MU) () () ()
Apr-17 103160 6932 110092 99345 5082 104427 384 3640 542
May-17 107295 8666 115961 99903 6820 106723 740 2707 866
Jun-17 97525 10228 107753 97326 8118 105444 020 2599 219
Jul-17 97912 12928 110840 96442 9554 105996 152 3532 457
Aug-17 94606 10857 105463 95237 9571 104808 -066 1344 062
Sep-17 98072 7516 105588 95741 8279 104020 243 -922 151
Oct-17 102618 6564 109182 99779 6274 106053 285 462 295
Nov-17 95605 6894 102499 93568 5030 98598 218 3706 396
Dec-17 97020 8122 105142 95251 5463 100714 186 4867 440
Jan-18 95690 7399 103089 968764 5809 974573 -9012 2737 -8942
Feb-18 91611 7525 99136 89286 5755 95041 260 3076 431
Mar-18 10229 8693 18922 11601 5942 17543 -1183 4630 7861B
Wind
Solar
Biomass
Bagasse
Small Hydro
Others
Total 869291 594199 10183949 8151165
37685 47454 769158 767212
3312 3602 35845 17714
27043 38732 340495 41983
179422 101741 1184735 996034
290676 235565 5266609 4600434
331153 167105 2587107 1349941
Electricity Generation From Renewable (source wise)
April- Mar 2018 vis-agrave-vis April- Mar 2018
Electricity Generation (Conventional amp Renewable Sources)April 2017- Mar 2017 vis-agrave-vis April 2016- Mar 2016
All Figure in MU
Source-Wise All India
Generation from Renwables
For the Month of Commulative value for the period
Mar 2018 Mar 2017 Mar 2018 Mar 2017
Generation
(April 2016- Mar 2017)
Generation
(April 2017- Mar 2018) Growth
Achievement Targets Achievement
Apr-17
Thermal 2440 0 0 -10000
Hydro 116 0 0 10000
Nuclear 0 0 0 000
All India 2556 0 0 -10000
Apr -16 to Apr17 Apr -17 to Apr-18 Change
Thermal 2440 8710 257
Hydro 116 795 100
Nuclear 0 0 NA
All India 2556 95050 272
2
2 Generating Capacity Addition for Apr 2018 (MW)
Generating Capacity Addition during April 16 to Apr 17 amp April 17 to Apr 18 (MW)
Change wrt 2018TypeApr-18
25560
000
500
1000
1500
2000
2500
3000
1Apr-17 Apr-18
2556
95050
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
1Apr -16 to Apr17 Apr -17 to Apr-18
(i)
(ii)
(iii)
Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total
Northern 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Western 7060862 1080649 000 8141511 184000 744750 2044638 11114899
Southern 4578202 647366 76158 5301726 332000 1180803 3436928 10251457
Eastern 2720164 10000 000 2730164 000 494212 103840 3328216
North-East 52002 173605 3600 229207 000 134200 28256 391663
Islands 000 000 4005 4005 000 000 1256 5261
ALL INDIA 19695750 2489746 83763 22269259 678000 4529342 6902239 34378839
Note Captive Genaration is not included in the total RES as on 31122016 3
NIL
Hydro
Thermal
Nuclear
3 List of Projects Commissioned During Apr 2018
4 All India Installed Capacity (MW) Region-wise as on 3042018
NIL
NIL
Thermal
22269259
678000
45293426902239
34378839
40726
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
40000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 34378839
Sector
Coal Gas Diesel Total
State 6445650 707895 36393 7189938 000 2985800 200337 10376075
Private 7554600 1058060 47370 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
All India 19695750 2489746 83763 22269259 678000 4529342 6902239 34378839
State 10376075
Private 15551102
Central 8451663
5 All India Installed Capacity (MW) Sector-wise as on 3042018
4
Grand TotalTHERMAL
Nuclear Hydro RES
RES as on 31122016
State 10376075 30
Private 15551102 45
Central 8451663 25
All India Installed Capacity(MW) as on 30-4-2018 (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
5
0 0
6 Transmission Lines Added during Apr 2018 (Ckms)
Apr-17 Apr-18
0 0
0 0
376 236
1271 40
152 481
1799 757
Transmission Lines Added during Apr 16 to Apr 17 amp Apr 16 to Apr18 (Ckms)
Apr 16 - Apr17 Apr 16 - Apr 18
152 481
1799 763
0 0
376 242
1271 40
1799
763
0
200
400
600
800
1000
1200
1400
1600
1800
2000
ckm
s
Apr 16 to Apr 17 Apr 17 to Apr 18
1799
757
0
200
400
600
800
1000
1200
1400
1600
1800
2000
1
ck
ms
Apr17 Apr18
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
7 Transformation Capacity Addition During Apr 2018 (MVA)
0
3000
2500
1545
0 0
Apr-17 Apr-18
7045
0
242
763
40
481
0 0
All India Transformation Capacity Addition during Apr 16 to Apr17 amp Apr
17 to Apr18 (MVA)
763
0
242
40
481
7045
3000
2500
1545
0
April 16 to Apr 17 April 17 to Apr 18
7045
763
0
1000
2000
3000
4000
5000
6000
7000
8000
MV
A
Transformation Capacity Addition during Apr 2018
Apr-17 Apr-18
7045
763
0
74520
1
MV
A
April 16 to Apr 17 April 17 to Apr 18
Apr17 Apr 18 Apr 17 Mar18 Apr17 Apr18
Northern 28389 28591 27968 28171 -15 -15
Western 32562 33371 32544 33369 -01 00
Southern 28106 29515 28091 29469 -01 -02
Eastern 11164 11634 11149 11617 -01 -01
North Eastern 1108 1187 1058 1135 -45 -43
All India 101329 104297 100810 103761 -05 -05
Apr 17 Apr 18 Apr 17 Apr 18 Apr17 Apr 18
Northern 49603 47996 48711 46959 -18 -22
Western 49850 50677 49778 50457 -01 -04
Southern 42560 45808 42535 45684 -01 -03
Eastern 19855 20429 19662 20429 -10 00
North Eastern 2258 2600 2209 2552 -22 -18
All India 159590 158520 158393 156720 -08 -11
7
8 Power Supply Position (Energy amp Peak) in Mar 2017
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()RegionPower (MW)
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandApr 17 0 3 0 0 515 0 32 0 0
Apr 18 0 0 0 0 546 0 0 247 0
Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Haveli
Apr 17 1 0 0 48 0 0 1
Apr 18 13 11 3 99 0 0 0
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Apr17 0 0 17 9 27 0 0
Apr 18 0 56 22 39 63 24 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
546
0 0
247
00 3 0 0
515
0 32
0 0
0
400
800
Chan
dig
ar
h
Delh
i
Hary
ana
HP
Jamp
K
Pu
nj
ab
Raja
sth
an
UP
Utr
ak
hand
MW
Northern States (MW) Apr 18 Apr 17
13
11
3
99
0 0 01 0 0
48
0 0 1
0
200
Ch
attis
garh
Guja
rat
MP
Mah
ara
st
ra
Da
man amp
Diu
Da
dar
Na
gar
Ha
veliM
W
Western States (MW) Apr 18 Apr 17
0
56
2239
63
2400 0
17 927
0 00
100
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Southern State (MW) Apr 18 Apr17
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Apr17 22 0 0 0 27 0 8
Apr 18 0 0 0 0 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Apr17 4 15 1 0 1 1 0
Apr 18 13 30 7 0 9 29 41
9
0 0 0 0 0 0
4
22
0 0 0
27
0
8
0
10
20
30
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW)Apr 18 Apr17
13
30
7
0
9
29
41
4 1 0 1 1 0
0
50
Aru
na
ch
al
Assa
m
Ma
nip
ur
Meghal
aya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
Sector Apr17 Apr 18
Central 7451 7646
State 6471 5892
Private 5575 6208
ALL INDIA 6490 6466
Month PLF 2017 PLF 2018
Jan 6014 6247
Feb 6153 6259
March 6312 6533
April 6466 649
May
June
July
Aug
Sep
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Apr 2018
74
51
64
71
55
75
64
90
76
46
58
92
62
08
64
66
000100020003000400050006000700080009000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Apr 2017 and Apr 2018
Apr17 Apr 18
615
3
625
9
60
80
Ap
ril
Axis
Title
Axis Title
All India PLF Month-wise
2017 2018
2010-11 2011-12 2012-13 2013-14 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
Pump sets Energised as on 3132018
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer may not be necessary)
Figures are based on the data available in DDUGJY website
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
21212860
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 30112017
Villiages Electrified (Nos) as on 3132018
9985596556
Villages electrified
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Apr 2018 and April 2017 to Apr 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1586860 2220135 5366050 9173045
Hydro 258402 227600 61900 547902
Nuclear 200000 000 000 200000
Total 2045262 2447735 5427950 9920947
Acievement 7812 15761 11592 11205
1 Capacity Addtion Targets and Achievements in the 12th Plan
Achievement of Capacity Addition during the Current Plan upto April 2017
Achievements upto Apr 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
54
790
2
20
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9920947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 4880 2260 4880 2260 -2620
State 3546 270 850 3546 850 -2696
Pvt 2940 0 300 2940 300 -2640
Total 11366 270 3410 11366 3410 -7956
Central 800 110 330 610 330 -280
State 300 0 0 478 0 -478
Pvt 205 0 0 217 0 -217
Total 1305 110 330 1305 330 -975
Nuclear Central 500 0 0 0 0 0
Central 6180 110 2590 5490 2590 -2900
State 3846 270 850 4024 850 -3174
Pvt 3145 0 300 3157 300 -2857
Total 13171 380 3740 12671 3740 -8931
13
2 Capacity Addition Targets Achievements During Apr 2018
Apr-18 April 17 - Apr 18Schemes Sector
Target 2017-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Mar 2018
Thermal1
13
66
13
05
0
12
67
1
34
10
33
0
0
37
40
0
2000
4000
6000
8000
10000
12000
14000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2017-18Target Achievement
270
3410
110
330
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Target Achievement
MW
Targets and Achievement during Mar 2018Thermal
Hydro
Nuclear
Coal Gas Diesel Total
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Sub Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Sub Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 5301726 332000 1180803 3436928 10251457
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 103840 3328216
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Sub Total 52002 173605 3600 229207 000 134200 28256 391663
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6445650 707895 7189938 000 2985800 200337 10376075
Private 7554600 1058060 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
Total 19695750 2489746 837629 22269259 678000 4529342 6902239 34378839
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032018 is given below (in MW)
448581 3404600 2165148 6902239
A April 2018 0 MW
B April 2018 214 MW
C April 2018 0 MW
D Net Capacity
Added during
April 2018 A-B-C -214 MW
Northern Region
Western Region
870080 13830
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032018
BM PowerCogen
Bio-PowerSolar Power
Waste to EnergyWind Power
Southern Region
Eastern Region
North Eastern
Region
Small
Hydro Power
Total
Capacity
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 30042018)
Region Ownership Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
(UTILITIES)
RES
(MNRE)
1 OBRA TPS U-8 (94 MW) has been retired from the State Sector of Uttar Pradesh
2 BANDEL TPS U-3amp4(2x60=120MW) has been retired from the State Sector of West Bengal
Capacity Retired during
Capacity Derated
Capacity Added during
Islands
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 381772 20701 000 402473 10283 72309 000 485065
Sub-Total 482194 211541 000 693735 10283 72309 12157 788484
State 272000 15000 000 287000 000 108451 5930 401381
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 194821 41175 1124201
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 59723 158923
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 85384 403868
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5136 5136
Central 50639 12907 000 63547 6798 113948 000 184293
Sub-Total 50639 30407 000 81047 6798 236948 18039 342832
State 262000 15000 000 277000 000 257023 12780 546803
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 859008 41401 000 900409 19681 378165 128242 1426497
State 585000 60380 000 645380 000 108796 2385 756561
Private 388200 000 000 388200 000 10400 645579 1044179
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193097 677364 2102450
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 262191 1217824
Central 379639 54949 000 434588 28948 185493 3000 652029
Sub-Total 1797972 54949 000 1852921 28948 342103 267701 2491673
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 47953 111653
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 54740 335623
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 2520 2520
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 2520 18809
124953 29105 000 154058 23703 75145 000 252907
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Grand Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Jammu amp Kashmir
Punjab
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042018)
State Ownership Sector
Modewise breakup
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Delhi
Haryana
Himachal Pradesh
(As on 30042018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1061 1061
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1061 18758
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 704902 1877469
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 729532 3079432
State 408000 000 000 408000 000 170366 8396 586762
Private 557400 10000 000 567400 000 000 363584 930984
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1244841 35700 000 1280541 27300 322366 401980 2032187
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 000 000 200144
Sub-Total 1272344 000 000 1272344 4800 12000 53535 1342679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 824775 2175275
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 857888 4307419
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Grand Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 369412 3680 760480 000 000 642713 1403193
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 392952 3680 1452476 12727 167360 672588 2305151
State 508250 000 000 508250 000 244993 4022 757265
Private 83945 95088 000 179033 000 000 360930 539963
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 95088 000 882895 14873 244993 365952 1508713
State 502000 000 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1228352 1426722
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 996082 69800 359980 1243885 2669747
State 000 000 15996 000 188150 15102 219248
Private 61500 17400 000 78900 000 000 17844 96744
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 245176 36200 188150 37946 507472
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 575247 000 000 1086081 1661328
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 1508607 144800 220320 1116541 2990268
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 016 016
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 016 36706
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 5301726 332000 1180803 3436928 10251457
Andhra Pradesh
Telangana
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 2567 75567
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 2972 176446
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34387 276887
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43582 1051759
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 17830 311730
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 19460 733842
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 000 39900
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5211 96214
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 103840 3328216
(As on 30042018)
Coal Gas Diesel Total
State 000 28845 000 28845 000 10000 3001 41846
Private 000 2450 000 2450 000 000 1655 4105
Central 27902 43556 000 71458 000 33123 000 104581
Sub-Total 27902 74851 000 102753 000 43123 4656 150532
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 9745 000 16897
Sub-Total 2470 4682 000 7152 000 9745 11000 27897
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 002 002
Central 3040 10969 000 14009 000 6519 000 20528
Sub-Total 3040 10969 000 14009 000 38719 3105 55833
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 6238 500 54173
Sub-Total 3740 60645 000 64385 000 6238 2110 72733
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 006 006
Central 3140 7157 000 10297 000 8893 000 19190
Sub-Total 3140 7157 3600 13897 000 8893 551 23341
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5337 000 12370
Sub-Total 2140 4893 000 7033 000 5337 3167 15537
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9419 000 15535
Sub-Total 2070 4046 000 6116 000 9419 3667 19202
7500 6362 000 13862 000 12726 000 26588
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Grand Total 52002 173605 3600 229207 000 134200 28256 391663
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
RES
(MNRE)
Bihar
Modewise breakup
Mizoram
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
State Ownership Sector
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Central - Unallocated
Total (North-
Eastern Region)
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Andaman amp
Nicobar
SN Contents Page
1Programme and Achievements of Transmission Lines in Apr 2018 and during April
2016 to Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
Section C - Transmission Lines
20
Programme
2017-18 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3665 0 236 0 236
State Sector 416 0 0 0 0
JVPrivate Sector 846 0 6 0 0
Total 4927 0 242 0 236
Central Sector 4851 28 36 28 36
State Sector 5157 99 4 99 4
JVPrivate Sector 1416 0 0 0 0
Total 11424 127 40 127 40
Central Sector 763 0 0 0 0
State Sector 5972 13 481 13 481
JVPrivate Sector 0 0 0 0 0
Total 6735 13 481 13 481
Grand Total 23086 140 763 140 757
Voltage Level 2
765
400
400
400
220
220
220
220
220
765
STATE SECTOR Sector3 Kalpaka - Maradam line
8 Sarangapur (Allahabad)PG - Phulpur line
Grand Total
4
Transmission Lines (220 kV and above) CommissionedReady for
commissioning During Apr-2018
Name of Transmission Lines
CENTRAL SECTOR Sector
Total of CENTRAL SECTOR
10 Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)
Sl No
2
9 Sohawal PG - Barabanki line
1 3
1 Parli - Solapur (PPTL - TBCB)
Parli (New) - Parli (PG) (Q) (PPTL -TBCB)
400 kV
220kV
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 17 to Apr 18Apr 18Voltage
Level
Sector
LILO of 2nd Ckt VTS- Malkaram to Suryapet
5 Ataur - Mandola Vihar line
Total of STATE SECTOR
PRIVATE SECTOR Sector
Total of PRIVATE SECTOR
6 LILO of 2nd Ckt Birsinghpur - Amarkantak line at Shahdol Ss
7 LILO of 2nd Ckt of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Achievement
Apr-18
Thermal 8956 9262
Hydro 752
Nuclear 322
Bhutan Import 0093
All India 103453 030
Type
Thermal 8956
Hydro
Nuclear
Bhutan Import
All India
1A
2500
017502
-14961018
-2188320
-1250
103140
0175
9016
8657
REF
Change
Electricity Generation During April 2017 to Apr 2018 amp April 2017 to Apr 2018 (BU)
Apr17 Apr18
-160101489103140
1 Electricity Generation for Apr 2018 (BU)
Apr-18Type
Achievement
Apr-17
Targets Change
wrt 2018
9016
02
8657
101489
320
1018
2500
103140
101489
100500
101000
101500
102000
102500
103000
103500
BU
Apr-17 Apr-18
103140 101489
0000
20000
40000
60000
80000
100000
120000
BU
Apr17 Apr18
Month
Generation from
Conventional Sources
Generation
from
Renewable
Sources
Total
Generation
from
Conventional
Sources
Generation
from
Renewable
Sources
Total
Growth in
Conventional
Generation
Growth in
Renewable
Generation
Growth in
Total
Generation
(MU) (MU) (MU) (MU) (MU) (MU) () () ()
Apr-17 103160 6932 110092 99345 5082 104427 384 3640 542
May-17 107295 8666 115961 99903 6820 106723 740 2707 866
Jun-17 97525 10228 107753 97326 8118 105444 020 2599 219
Jul-17 97912 12928 110840 96442 9554 105996 152 3532 457
Aug-17 94606 10857 105463 95237 9571 104808 -066 1344 062
Sep-17 98072 7516 105588 95741 8279 104020 243 -922 151
Oct-17 102618 6564 109182 99779 6274 106053 285 462 295
Nov-17 95605 6894 102499 93568 5030 98598 218 3706 396
Dec-17 97020 8122 105142 95251 5463 100714 186 4867 440
Jan-18 95690 7399 103089 968764 5809 974573 -9012 2737 -8942
Feb-18 91611 7525 99136 89286 5755 95041 260 3076 431
Mar-18 10229 8693 18922 11601 5942 17543 -1183 4630 7861B
Wind
Solar
Biomass
Bagasse
Small Hydro
Others
Total 869291 594199 10183949 8151165
37685 47454 769158 767212
3312 3602 35845 17714
27043 38732 340495 41983
179422 101741 1184735 996034
290676 235565 5266609 4600434
331153 167105 2587107 1349941
Electricity Generation From Renewable (source wise)
April- Mar 2018 vis-agrave-vis April- Mar 2018
Electricity Generation (Conventional amp Renewable Sources)April 2017- Mar 2017 vis-agrave-vis April 2016- Mar 2016
All Figure in MU
Source-Wise All India
Generation from Renwables
For the Month of Commulative value for the period
Mar 2018 Mar 2017 Mar 2018 Mar 2017
Generation
(April 2016- Mar 2017)
Generation
(April 2017- Mar 2018) Growth
Achievement Targets Achievement
Apr-17
Thermal 2440 0 0 -10000
Hydro 116 0 0 10000
Nuclear 0 0 0 000
All India 2556 0 0 -10000
Apr -16 to Apr17 Apr -17 to Apr-18 Change
Thermal 2440 8710 257
Hydro 116 795 100
Nuclear 0 0 NA
All India 2556 95050 272
2
2 Generating Capacity Addition for Apr 2018 (MW)
Generating Capacity Addition during April 16 to Apr 17 amp April 17 to Apr 18 (MW)
Change wrt 2018TypeApr-18
25560
000
500
1000
1500
2000
2500
3000
1Apr-17 Apr-18
2556
95050
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
1Apr -16 to Apr17 Apr -17 to Apr-18
(i)
(ii)
(iii)
Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total
Northern 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Western 7060862 1080649 000 8141511 184000 744750 2044638 11114899
Southern 4578202 647366 76158 5301726 332000 1180803 3436928 10251457
Eastern 2720164 10000 000 2730164 000 494212 103840 3328216
North-East 52002 173605 3600 229207 000 134200 28256 391663
Islands 000 000 4005 4005 000 000 1256 5261
ALL INDIA 19695750 2489746 83763 22269259 678000 4529342 6902239 34378839
Note Captive Genaration is not included in the total RES as on 31122016 3
NIL
Hydro
Thermal
Nuclear
3 List of Projects Commissioned During Apr 2018
4 All India Installed Capacity (MW) Region-wise as on 3042018
NIL
NIL
Thermal
22269259
678000
45293426902239
34378839
40726
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
40000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 34378839
Sector
Coal Gas Diesel Total
State 6445650 707895 36393 7189938 000 2985800 200337 10376075
Private 7554600 1058060 47370 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
All India 19695750 2489746 83763 22269259 678000 4529342 6902239 34378839
State 10376075
Private 15551102
Central 8451663
5 All India Installed Capacity (MW) Sector-wise as on 3042018
4
Grand TotalTHERMAL
Nuclear Hydro RES
RES as on 31122016
State 10376075 30
Private 15551102 45
Central 8451663 25
All India Installed Capacity(MW) as on 30-4-2018 (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
5
0 0
6 Transmission Lines Added during Apr 2018 (Ckms)
Apr-17 Apr-18
0 0
0 0
376 236
1271 40
152 481
1799 757
Transmission Lines Added during Apr 16 to Apr 17 amp Apr 16 to Apr18 (Ckms)
Apr 16 - Apr17 Apr 16 - Apr 18
152 481
1799 763
0 0
376 242
1271 40
1799
763
0
200
400
600
800
1000
1200
1400
1600
1800
2000
ckm
s
Apr 16 to Apr 17 Apr 17 to Apr 18
1799
757
0
200
400
600
800
1000
1200
1400
1600
1800
2000
1
ck
ms
Apr17 Apr18
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
7 Transformation Capacity Addition During Apr 2018 (MVA)
0
3000
2500
1545
0 0
Apr-17 Apr-18
7045
0
242
763
40
481
0 0
All India Transformation Capacity Addition during Apr 16 to Apr17 amp Apr
17 to Apr18 (MVA)
763
0
242
40
481
7045
3000
2500
1545
0
April 16 to Apr 17 April 17 to Apr 18
7045
763
0
1000
2000
3000
4000
5000
6000
7000
8000
MV
A
Transformation Capacity Addition during Apr 2018
Apr-17 Apr-18
7045
763
0
74520
1
MV
A
April 16 to Apr 17 April 17 to Apr 18
Apr17 Apr 18 Apr 17 Mar18 Apr17 Apr18
Northern 28389 28591 27968 28171 -15 -15
Western 32562 33371 32544 33369 -01 00
Southern 28106 29515 28091 29469 -01 -02
Eastern 11164 11634 11149 11617 -01 -01
North Eastern 1108 1187 1058 1135 -45 -43
All India 101329 104297 100810 103761 -05 -05
Apr 17 Apr 18 Apr 17 Apr 18 Apr17 Apr 18
Northern 49603 47996 48711 46959 -18 -22
Western 49850 50677 49778 50457 -01 -04
Southern 42560 45808 42535 45684 -01 -03
Eastern 19855 20429 19662 20429 -10 00
North Eastern 2258 2600 2209 2552 -22 -18
All India 159590 158520 158393 156720 -08 -11
7
8 Power Supply Position (Energy amp Peak) in Mar 2017
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()RegionPower (MW)
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandApr 17 0 3 0 0 515 0 32 0 0
Apr 18 0 0 0 0 546 0 0 247 0
Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Haveli
Apr 17 1 0 0 48 0 0 1
Apr 18 13 11 3 99 0 0 0
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Apr17 0 0 17 9 27 0 0
Apr 18 0 56 22 39 63 24 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
546
0 0
247
00 3 0 0
515
0 32
0 0
0
400
800
Chan
dig
ar
h
Delh
i
Hary
ana
HP
Jamp
K
Pu
nj
ab
Raja
sth
an
UP
Utr
ak
hand
MW
Northern States (MW) Apr 18 Apr 17
13
11
3
99
0 0 01 0 0
48
0 0 1
0
200
Ch
attis
garh
Guja
rat
MP
Mah
ara
st
ra
Da
man amp
Diu
Da
dar
Na
gar
Ha
veliM
W
Western States (MW) Apr 18 Apr 17
0
56
2239
63
2400 0
17 927
0 00
100
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Southern State (MW) Apr 18 Apr17
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Apr17 22 0 0 0 27 0 8
Apr 18 0 0 0 0 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Apr17 4 15 1 0 1 1 0
Apr 18 13 30 7 0 9 29 41
9
0 0 0 0 0 0
4
22
0 0 0
27
0
8
0
10
20
30
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW)Apr 18 Apr17
13
30
7
0
9
29
41
4 1 0 1 1 0
0
50
Aru
na
ch
al
Assa
m
Ma
nip
ur
Meghal
aya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
Sector Apr17 Apr 18
Central 7451 7646
State 6471 5892
Private 5575 6208
ALL INDIA 6490 6466
Month PLF 2017 PLF 2018
Jan 6014 6247
Feb 6153 6259
March 6312 6533
April 6466 649
May
June
July
Aug
Sep
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Apr 2018
74
51
64
71
55
75
64
90
76
46
58
92
62
08
64
66
000100020003000400050006000700080009000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Apr 2017 and Apr 2018
Apr17 Apr 18
615
3
625
9
60
80
Ap
ril
Axis
Title
Axis Title
All India PLF Month-wise
2017 2018
2010-11 2011-12 2012-13 2013-14 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
Pump sets Energised as on 3132018
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer may not be necessary)
Figures are based on the data available in DDUGJY website
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
21212860
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 30112017
Villiages Electrified (Nos) as on 3132018
9985596556
Villages electrified
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Apr 2018 and April 2017 to Apr 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1586860 2220135 5366050 9173045
Hydro 258402 227600 61900 547902
Nuclear 200000 000 000 200000
Total 2045262 2447735 5427950 9920947
Acievement 7812 15761 11592 11205
1 Capacity Addtion Targets and Achievements in the 12th Plan
Achievement of Capacity Addition during the Current Plan upto April 2017
Achievements upto Apr 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
54
790
2
20
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9920947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 4880 2260 4880 2260 -2620
State 3546 270 850 3546 850 -2696
Pvt 2940 0 300 2940 300 -2640
Total 11366 270 3410 11366 3410 -7956
Central 800 110 330 610 330 -280
State 300 0 0 478 0 -478
Pvt 205 0 0 217 0 -217
Total 1305 110 330 1305 330 -975
Nuclear Central 500 0 0 0 0 0
Central 6180 110 2590 5490 2590 -2900
State 3846 270 850 4024 850 -3174
Pvt 3145 0 300 3157 300 -2857
Total 13171 380 3740 12671 3740 -8931
13
2 Capacity Addition Targets Achievements During Apr 2018
Apr-18 April 17 - Apr 18Schemes Sector
Target 2017-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Mar 2018
Thermal1
13
66
13
05
0
12
67
1
34
10
33
0
0
37
40
0
2000
4000
6000
8000
10000
12000
14000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2017-18Target Achievement
270
3410
110
330
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Target Achievement
MW
Targets and Achievement during Mar 2018Thermal
Hydro
Nuclear
Coal Gas Diesel Total
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Sub Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Sub Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 5301726 332000 1180803 3436928 10251457
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 103840 3328216
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Sub Total 52002 173605 3600 229207 000 134200 28256 391663
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6445650 707895 7189938 000 2985800 200337 10376075
Private 7554600 1058060 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
Total 19695750 2489746 837629 22269259 678000 4529342 6902239 34378839
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032018 is given below (in MW)
448581 3404600 2165148 6902239
A April 2018 0 MW
B April 2018 214 MW
C April 2018 0 MW
D Net Capacity
Added during
April 2018 A-B-C -214 MW
Northern Region
Western Region
870080 13830
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032018
BM PowerCogen
Bio-PowerSolar Power
Waste to EnergyWind Power
Southern Region
Eastern Region
North Eastern
Region
Small
Hydro Power
Total
Capacity
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 30042018)
Region Ownership Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
(UTILITIES)
RES
(MNRE)
1 OBRA TPS U-8 (94 MW) has been retired from the State Sector of Uttar Pradesh
2 BANDEL TPS U-3amp4(2x60=120MW) has been retired from the State Sector of West Bengal
Capacity Retired during
Capacity Derated
Capacity Added during
Islands
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 381772 20701 000 402473 10283 72309 000 485065
Sub-Total 482194 211541 000 693735 10283 72309 12157 788484
State 272000 15000 000 287000 000 108451 5930 401381
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 194821 41175 1124201
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 59723 158923
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 85384 403868
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5136 5136
Central 50639 12907 000 63547 6798 113948 000 184293
Sub-Total 50639 30407 000 81047 6798 236948 18039 342832
State 262000 15000 000 277000 000 257023 12780 546803
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 859008 41401 000 900409 19681 378165 128242 1426497
State 585000 60380 000 645380 000 108796 2385 756561
Private 388200 000 000 388200 000 10400 645579 1044179
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193097 677364 2102450
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 262191 1217824
Central 379639 54949 000 434588 28948 185493 3000 652029
Sub-Total 1797972 54949 000 1852921 28948 342103 267701 2491673
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 47953 111653
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 54740 335623
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 2520 2520
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 2520 18809
124953 29105 000 154058 23703 75145 000 252907
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Grand Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Jammu amp Kashmir
Punjab
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042018)
State Ownership Sector
Modewise breakup
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Delhi
Haryana
Himachal Pradesh
(As on 30042018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1061 1061
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1061 18758
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 704902 1877469
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 729532 3079432
State 408000 000 000 408000 000 170366 8396 586762
Private 557400 10000 000 567400 000 000 363584 930984
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1244841 35700 000 1280541 27300 322366 401980 2032187
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 000 000 200144
Sub-Total 1272344 000 000 1272344 4800 12000 53535 1342679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 824775 2175275
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 857888 4307419
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Grand Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 369412 3680 760480 000 000 642713 1403193
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 392952 3680 1452476 12727 167360 672588 2305151
State 508250 000 000 508250 000 244993 4022 757265
Private 83945 95088 000 179033 000 000 360930 539963
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 95088 000 882895 14873 244993 365952 1508713
State 502000 000 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1228352 1426722
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 996082 69800 359980 1243885 2669747
State 000 000 15996 000 188150 15102 219248
Private 61500 17400 000 78900 000 000 17844 96744
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 245176 36200 188150 37946 507472
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 575247 000 000 1086081 1661328
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 1508607 144800 220320 1116541 2990268
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 016 016
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 016 36706
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 5301726 332000 1180803 3436928 10251457
Andhra Pradesh
Telangana
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 2567 75567
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 2972 176446
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34387 276887
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43582 1051759
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 17830 311730
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 19460 733842
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 000 39900
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5211 96214
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 103840 3328216
(As on 30042018)
Coal Gas Diesel Total
State 000 28845 000 28845 000 10000 3001 41846
Private 000 2450 000 2450 000 000 1655 4105
Central 27902 43556 000 71458 000 33123 000 104581
Sub-Total 27902 74851 000 102753 000 43123 4656 150532
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 9745 000 16897
Sub-Total 2470 4682 000 7152 000 9745 11000 27897
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 002 002
Central 3040 10969 000 14009 000 6519 000 20528
Sub-Total 3040 10969 000 14009 000 38719 3105 55833
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 6238 500 54173
Sub-Total 3740 60645 000 64385 000 6238 2110 72733
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 006 006
Central 3140 7157 000 10297 000 8893 000 19190
Sub-Total 3140 7157 3600 13897 000 8893 551 23341
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5337 000 12370
Sub-Total 2140 4893 000 7033 000 5337 3167 15537
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9419 000 15535
Sub-Total 2070 4046 000 6116 000 9419 3667 19202
7500 6362 000 13862 000 12726 000 26588
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Grand Total 52002 173605 3600 229207 000 134200 28256 391663
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
RES
(MNRE)
Bihar
Modewise breakup
Mizoram
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
State Ownership Sector
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Central - Unallocated
Total (North-
Eastern Region)
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Andaman amp
Nicobar
SN Contents Page
1Programme and Achievements of Transmission Lines in Apr 2018 and during April
2016 to Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
Section C - Transmission Lines
20
Programme
2017-18 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3665 0 236 0 236
State Sector 416 0 0 0 0
JVPrivate Sector 846 0 6 0 0
Total 4927 0 242 0 236
Central Sector 4851 28 36 28 36
State Sector 5157 99 4 99 4
JVPrivate Sector 1416 0 0 0 0
Total 11424 127 40 127 40
Central Sector 763 0 0 0 0
State Sector 5972 13 481 13 481
JVPrivate Sector 0 0 0 0 0
Total 6735 13 481 13 481
Grand Total 23086 140 763 140 757
Voltage Level 2
765
400
400
400
220
220
220
220
220
765
STATE SECTOR Sector3 Kalpaka - Maradam line
8 Sarangapur (Allahabad)PG - Phulpur line
Grand Total
4
Transmission Lines (220 kV and above) CommissionedReady for
commissioning During Apr-2018
Name of Transmission Lines
CENTRAL SECTOR Sector
Total of CENTRAL SECTOR
10 Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)
Sl No
2
9 Sohawal PG - Barabanki line
1 3
1 Parli - Solapur (PPTL - TBCB)
Parli (New) - Parli (PG) (Q) (PPTL -TBCB)
400 kV
220kV
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 17 to Apr 18Apr 18Voltage
Level
Sector
LILO of 2nd Ckt VTS- Malkaram to Suryapet
5 Ataur - Mandola Vihar line
Total of STATE SECTOR
PRIVATE SECTOR Sector
Total of PRIVATE SECTOR
6 LILO of 2nd Ckt Birsinghpur - Amarkantak line at Shahdol Ss
7 LILO of 2nd Ckt of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Month
Generation from
Conventional Sources
Generation
from
Renewable
Sources
Total
Generation
from
Conventional
Sources
Generation
from
Renewable
Sources
Total
Growth in
Conventional
Generation
Growth in
Renewable
Generation
Growth in
Total
Generation
(MU) (MU) (MU) (MU) (MU) (MU) () () ()
Apr-17 103160 6932 110092 99345 5082 104427 384 3640 542
May-17 107295 8666 115961 99903 6820 106723 740 2707 866
Jun-17 97525 10228 107753 97326 8118 105444 020 2599 219
Jul-17 97912 12928 110840 96442 9554 105996 152 3532 457
Aug-17 94606 10857 105463 95237 9571 104808 -066 1344 062
Sep-17 98072 7516 105588 95741 8279 104020 243 -922 151
Oct-17 102618 6564 109182 99779 6274 106053 285 462 295
Nov-17 95605 6894 102499 93568 5030 98598 218 3706 396
Dec-17 97020 8122 105142 95251 5463 100714 186 4867 440
Jan-18 95690 7399 103089 968764 5809 974573 -9012 2737 -8942
Feb-18 91611 7525 99136 89286 5755 95041 260 3076 431
Mar-18 10229 8693 18922 11601 5942 17543 -1183 4630 7861B
Wind
Solar
Biomass
Bagasse
Small Hydro
Others
Total 869291 594199 10183949 8151165
37685 47454 769158 767212
3312 3602 35845 17714
27043 38732 340495 41983
179422 101741 1184735 996034
290676 235565 5266609 4600434
331153 167105 2587107 1349941
Electricity Generation From Renewable (source wise)
April- Mar 2018 vis-agrave-vis April- Mar 2018
Electricity Generation (Conventional amp Renewable Sources)April 2017- Mar 2017 vis-agrave-vis April 2016- Mar 2016
All Figure in MU
Source-Wise All India
Generation from Renwables
For the Month of Commulative value for the period
Mar 2018 Mar 2017 Mar 2018 Mar 2017
Generation
(April 2016- Mar 2017)
Generation
(April 2017- Mar 2018) Growth
Achievement Targets Achievement
Apr-17
Thermal 2440 0 0 -10000
Hydro 116 0 0 10000
Nuclear 0 0 0 000
All India 2556 0 0 -10000
Apr -16 to Apr17 Apr -17 to Apr-18 Change
Thermal 2440 8710 257
Hydro 116 795 100
Nuclear 0 0 NA
All India 2556 95050 272
2
2 Generating Capacity Addition for Apr 2018 (MW)
Generating Capacity Addition during April 16 to Apr 17 amp April 17 to Apr 18 (MW)
Change wrt 2018TypeApr-18
25560
000
500
1000
1500
2000
2500
3000
1Apr-17 Apr-18
2556
95050
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
1Apr -16 to Apr17 Apr -17 to Apr-18
(i)
(ii)
(iii)
Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total
Northern 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Western 7060862 1080649 000 8141511 184000 744750 2044638 11114899
Southern 4578202 647366 76158 5301726 332000 1180803 3436928 10251457
Eastern 2720164 10000 000 2730164 000 494212 103840 3328216
North-East 52002 173605 3600 229207 000 134200 28256 391663
Islands 000 000 4005 4005 000 000 1256 5261
ALL INDIA 19695750 2489746 83763 22269259 678000 4529342 6902239 34378839
Note Captive Genaration is not included in the total RES as on 31122016 3
NIL
Hydro
Thermal
Nuclear
3 List of Projects Commissioned During Apr 2018
4 All India Installed Capacity (MW) Region-wise as on 3042018
NIL
NIL
Thermal
22269259
678000
45293426902239
34378839
40726
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
40000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 34378839
Sector
Coal Gas Diesel Total
State 6445650 707895 36393 7189938 000 2985800 200337 10376075
Private 7554600 1058060 47370 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
All India 19695750 2489746 83763 22269259 678000 4529342 6902239 34378839
State 10376075
Private 15551102
Central 8451663
5 All India Installed Capacity (MW) Sector-wise as on 3042018
4
Grand TotalTHERMAL
Nuclear Hydro RES
RES as on 31122016
State 10376075 30
Private 15551102 45
Central 8451663 25
All India Installed Capacity(MW) as on 30-4-2018 (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
5
0 0
6 Transmission Lines Added during Apr 2018 (Ckms)
Apr-17 Apr-18
0 0
0 0
376 236
1271 40
152 481
1799 757
Transmission Lines Added during Apr 16 to Apr 17 amp Apr 16 to Apr18 (Ckms)
Apr 16 - Apr17 Apr 16 - Apr 18
152 481
1799 763
0 0
376 242
1271 40
1799
763
0
200
400
600
800
1000
1200
1400
1600
1800
2000
ckm
s
Apr 16 to Apr 17 Apr 17 to Apr 18
1799
757
0
200
400
600
800
1000
1200
1400
1600
1800
2000
1
ck
ms
Apr17 Apr18
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
7 Transformation Capacity Addition During Apr 2018 (MVA)
0
3000
2500
1545
0 0
Apr-17 Apr-18
7045
0
242
763
40
481
0 0
All India Transformation Capacity Addition during Apr 16 to Apr17 amp Apr
17 to Apr18 (MVA)
763
0
242
40
481
7045
3000
2500
1545
0
April 16 to Apr 17 April 17 to Apr 18
7045
763
0
1000
2000
3000
4000
5000
6000
7000
8000
MV
A
Transformation Capacity Addition during Apr 2018
Apr-17 Apr-18
7045
763
0
74520
1
MV
A
April 16 to Apr 17 April 17 to Apr 18
Apr17 Apr 18 Apr 17 Mar18 Apr17 Apr18
Northern 28389 28591 27968 28171 -15 -15
Western 32562 33371 32544 33369 -01 00
Southern 28106 29515 28091 29469 -01 -02
Eastern 11164 11634 11149 11617 -01 -01
North Eastern 1108 1187 1058 1135 -45 -43
All India 101329 104297 100810 103761 -05 -05
Apr 17 Apr 18 Apr 17 Apr 18 Apr17 Apr 18
Northern 49603 47996 48711 46959 -18 -22
Western 49850 50677 49778 50457 -01 -04
Southern 42560 45808 42535 45684 -01 -03
Eastern 19855 20429 19662 20429 -10 00
North Eastern 2258 2600 2209 2552 -22 -18
All India 159590 158520 158393 156720 -08 -11
7
8 Power Supply Position (Energy amp Peak) in Mar 2017
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()RegionPower (MW)
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandApr 17 0 3 0 0 515 0 32 0 0
Apr 18 0 0 0 0 546 0 0 247 0
Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Haveli
Apr 17 1 0 0 48 0 0 1
Apr 18 13 11 3 99 0 0 0
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Apr17 0 0 17 9 27 0 0
Apr 18 0 56 22 39 63 24 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
546
0 0
247
00 3 0 0
515
0 32
0 0
0
400
800
Chan
dig
ar
h
Delh
i
Hary
ana
HP
Jamp
K
Pu
nj
ab
Raja
sth
an
UP
Utr
ak
hand
MW
Northern States (MW) Apr 18 Apr 17
13
11
3
99
0 0 01 0 0
48
0 0 1
0
200
Ch
attis
garh
Guja
rat
MP
Mah
ara
st
ra
Da
man amp
Diu
Da
dar
Na
gar
Ha
veliM
W
Western States (MW) Apr 18 Apr 17
0
56
2239
63
2400 0
17 927
0 00
100
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Southern State (MW) Apr 18 Apr17
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Apr17 22 0 0 0 27 0 8
Apr 18 0 0 0 0 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Apr17 4 15 1 0 1 1 0
Apr 18 13 30 7 0 9 29 41
9
0 0 0 0 0 0
4
22
0 0 0
27
0
8
0
10
20
30
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW)Apr 18 Apr17
13
30
7
0
9
29
41
4 1 0 1 1 0
0
50
Aru
na
ch
al
Assa
m
Ma
nip
ur
Meghal
aya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
Sector Apr17 Apr 18
Central 7451 7646
State 6471 5892
Private 5575 6208
ALL INDIA 6490 6466
Month PLF 2017 PLF 2018
Jan 6014 6247
Feb 6153 6259
March 6312 6533
April 6466 649
May
June
July
Aug
Sep
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Apr 2018
74
51
64
71
55
75
64
90
76
46
58
92
62
08
64
66
000100020003000400050006000700080009000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Apr 2017 and Apr 2018
Apr17 Apr 18
615
3
625
9
60
80
Ap
ril
Axis
Title
Axis Title
All India PLF Month-wise
2017 2018
2010-11 2011-12 2012-13 2013-14 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
Pump sets Energised as on 3132018
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer may not be necessary)
Figures are based on the data available in DDUGJY website
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
21212860
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 30112017
Villiages Electrified (Nos) as on 3132018
9985596556
Villages electrified
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Apr 2018 and April 2017 to Apr 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1586860 2220135 5366050 9173045
Hydro 258402 227600 61900 547902
Nuclear 200000 000 000 200000
Total 2045262 2447735 5427950 9920947
Acievement 7812 15761 11592 11205
1 Capacity Addtion Targets and Achievements in the 12th Plan
Achievement of Capacity Addition during the Current Plan upto April 2017
Achievements upto Apr 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
54
790
2
20
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9920947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 4880 2260 4880 2260 -2620
State 3546 270 850 3546 850 -2696
Pvt 2940 0 300 2940 300 -2640
Total 11366 270 3410 11366 3410 -7956
Central 800 110 330 610 330 -280
State 300 0 0 478 0 -478
Pvt 205 0 0 217 0 -217
Total 1305 110 330 1305 330 -975
Nuclear Central 500 0 0 0 0 0
Central 6180 110 2590 5490 2590 -2900
State 3846 270 850 4024 850 -3174
Pvt 3145 0 300 3157 300 -2857
Total 13171 380 3740 12671 3740 -8931
13
2 Capacity Addition Targets Achievements During Apr 2018
Apr-18 April 17 - Apr 18Schemes Sector
Target 2017-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Mar 2018
Thermal1
13
66
13
05
0
12
67
1
34
10
33
0
0
37
40
0
2000
4000
6000
8000
10000
12000
14000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2017-18Target Achievement
270
3410
110
330
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Target Achievement
MW
Targets and Achievement during Mar 2018Thermal
Hydro
Nuclear
Coal Gas Diesel Total
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Sub Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Sub Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 5301726 332000 1180803 3436928 10251457
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 103840 3328216
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Sub Total 52002 173605 3600 229207 000 134200 28256 391663
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6445650 707895 7189938 000 2985800 200337 10376075
Private 7554600 1058060 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
Total 19695750 2489746 837629 22269259 678000 4529342 6902239 34378839
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032018 is given below (in MW)
448581 3404600 2165148 6902239
A April 2018 0 MW
B April 2018 214 MW
C April 2018 0 MW
D Net Capacity
Added during
April 2018 A-B-C -214 MW
Northern Region
Western Region
870080 13830
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032018
BM PowerCogen
Bio-PowerSolar Power
Waste to EnergyWind Power
Southern Region
Eastern Region
North Eastern
Region
Small
Hydro Power
Total
Capacity
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 30042018)
Region Ownership Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
(UTILITIES)
RES
(MNRE)
1 OBRA TPS U-8 (94 MW) has been retired from the State Sector of Uttar Pradesh
2 BANDEL TPS U-3amp4(2x60=120MW) has been retired from the State Sector of West Bengal
Capacity Retired during
Capacity Derated
Capacity Added during
Islands
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 381772 20701 000 402473 10283 72309 000 485065
Sub-Total 482194 211541 000 693735 10283 72309 12157 788484
State 272000 15000 000 287000 000 108451 5930 401381
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 194821 41175 1124201
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 59723 158923
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 85384 403868
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5136 5136
Central 50639 12907 000 63547 6798 113948 000 184293
Sub-Total 50639 30407 000 81047 6798 236948 18039 342832
State 262000 15000 000 277000 000 257023 12780 546803
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 859008 41401 000 900409 19681 378165 128242 1426497
State 585000 60380 000 645380 000 108796 2385 756561
Private 388200 000 000 388200 000 10400 645579 1044179
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193097 677364 2102450
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 262191 1217824
Central 379639 54949 000 434588 28948 185493 3000 652029
Sub-Total 1797972 54949 000 1852921 28948 342103 267701 2491673
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 47953 111653
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 54740 335623
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 2520 2520
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 2520 18809
124953 29105 000 154058 23703 75145 000 252907
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Grand Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Jammu amp Kashmir
Punjab
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042018)
State Ownership Sector
Modewise breakup
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Delhi
Haryana
Himachal Pradesh
(As on 30042018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1061 1061
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1061 18758
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 704902 1877469
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 729532 3079432
State 408000 000 000 408000 000 170366 8396 586762
Private 557400 10000 000 567400 000 000 363584 930984
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1244841 35700 000 1280541 27300 322366 401980 2032187
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 000 000 200144
Sub-Total 1272344 000 000 1272344 4800 12000 53535 1342679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 824775 2175275
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 857888 4307419
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Grand Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 369412 3680 760480 000 000 642713 1403193
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 392952 3680 1452476 12727 167360 672588 2305151
State 508250 000 000 508250 000 244993 4022 757265
Private 83945 95088 000 179033 000 000 360930 539963
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 95088 000 882895 14873 244993 365952 1508713
State 502000 000 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1228352 1426722
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 996082 69800 359980 1243885 2669747
State 000 000 15996 000 188150 15102 219248
Private 61500 17400 000 78900 000 000 17844 96744
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 245176 36200 188150 37946 507472
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 575247 000 000 1086081 1661328
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 1508607 144800 220320 1116541 2990268
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 016 016
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 016 36706
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 5301726 332000 1180803 3436928 10251457
Andhra Pradesh
Telangana
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 2567 75567
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 2972 176446
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34387 276887
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43582 1051759
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 17830 311730
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 19460 733842
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 000 39900
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5211 96214
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 103840 3328216
(As on 30042018)
Coal Gas Diesel Total
State 000 28845 000 28845 000 10000 3001 41846
Private 000 2450 000 2450 000 000 1655 4105
Central 27902 43556 000 71458 000 33123 000 104581
Sub-Total 27902 74851 000 102753 000 43123 4656 150532
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 9745 000 16897
Sub-Total 2470 4682 000 7152 000 9745 11000 27897
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 002 002
Central 3040 10969 000 14009 000 6519 000 20528
Sub-Total 3040 10969 000 14009 000 38719 3105 55833
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 6238 500 54173
Sub-Total 3740 60645 000 64385 000 6238 2110 72733
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 006 006
Central 3140 7157 000 10297 000 8893 000 19190
Sub-Total 3140 7157 3600 13897 000 8893 551 23341
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5337 000 12370
Sub-Total 2140 4893 000 7033 000 5337 3167 15537
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9419 000 15535
Sub-Total 2070 4046 000 6116 000 9419 3667 19202
7500 6362 000 13862 000 12726 000 26588
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Grand Total 52002 173605 3600 229207 000 134200 28256 391663
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
RES
(MNRE)
Bihar
Modewise breakup
Mizoram
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
State Ownership Sector
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Central - Unallocated
Total (North-
Eastern Region)
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Andaman amp
Nicobar
SN Contents Page
1Programme and Achievements of Transmission Lines in Apr 2018 and during April
2016 to Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
Section C - Transmission Lines
20
Programme
2017-18 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3665 0 236 0 236
State Sector 416 0 0 0 0
JVPrivate Sector 846 0 6 0 0
Total 4927 0 242 0 236
Central Sector 4851 28 36 28 36
State Sector 5157 99 4 99 4
JVPrivate Sector 1416 0 0 0 0
Total 11424 127 40 127 40
Central Sector 763 0 0 0 0
State Sector 5972 13 481 13 481
JVPrivate Sector 0 0 0 0 0
Total 6735 13 481 13 481
Grand Total 23086 140 763 140 757
Voltage Level 2
765
400
400
400
220
220
220
220
220
765
STATE SECTOR Sector3 Kalpaka - Maradam line
8 Sarangapur (Allahabad)PG - Phulpur line
Grand Total
4
Transmission Lines (220 kV and above) CommissionedReady for
commissioning During Apr-2018
Name of Transmission Lines
CENTRAL SECTOR Sector
Total of CENTRAL SECTOR
10 Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)
Sl No
2
9 Sohawal PG - Barabanki line
1 3
1 Parli - Solapur (PPTL - TBCB)
Parli (New) - Parli (PG) (Q) (PPTL -TBCB)
400 kV
220kV
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 17 to Apr 18Apr 18Voltage
Level
Sector
LILO of 2nd Ckt VTS- Malkaram to Suryapet
5 Ataur - Mandola Vihar line
Total of STATE SECTOR
PRIVATE SECTOR Sector
Total of PRIVATE SECTOR
6 LILO of 2nd Ckt Birsinghpur - Amarkantak line at Shahdol Ss
7 LILO of 2nd Ckt of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Achievement Targets Achievement
Apr-17
Thermal 2440 0 0 -10000
Hydro 116 0 0 10000
Nuclear 0 0 0 000
All India 2556 0 0 -10000
Apr -16 to Apr17 Apr -17 to Apr-18 Change
Thermal 2440 8710 257
Hydro 116 795 100
Nuclear 0 0 NA
All India 2556 95050 272
2
2 Generating Capacity Addition for Apr 2018 (MW)
Generating Capacity Addition during April 16 to Apr 17 amp April 17 to Apr 18 (MW)
Change wrt 2018TypeApr-18
25560
000
500
1000
1500
2000
2500
3000
1Apr-17 Apr-18
2556
95050
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
1Apr -16 to Apr17 Apr -17 to Apr-18
(i)
(ii)
(iii)
Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total
Northern 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Western 7060862 1080649 000 8141511 184000 744750 2044638 11114899
Southern 4578202 647366 76158 5301726 332000 1180803 3436928 10251457
Eastern 2720164 10000 000 2730164 000 494212 103840 3328216
North-East 52002 173605 3600 229207 000 134200 28256 391663
Islands 000 000 4005 4005 000 000 1256 5261
ALL INDIA 19695750 2489746 83763 22269259 678000 4529342 6902239 34378839
Note Captive Genaration is not included in the total RES as on 31122016 3
NIL
Hydro
Thermal
Nuclear
3 List of Projects Commissioned During Apr 2018
4 All India Installed Capacity (MW) Region-wise as on 3042018
NIL
NIL
Thermal
22269259
678000
45293426902239
34378839
40726
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
40000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 34378839
Sector
Coal Gas Diesel Total
State 6445650 707895 36393 7189938 000 2985800 200337 10376075
Private 7554600 1058060 47370 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
All India 19695750 2489746 83763 22269259 678000 4529342 6902239 34378839
State 10376075
Private 15551102
Central 8451663
5 All India Installed Capacity (MW) Sector-wise as on 3042018
4
Grand TotalTHERMAL
Nuclear Hydro RES
RES as on 31122016
State 10376075 30
Private 15551102 45
Central 8451663 25
All India Installed Capacity(MW) as on 30-4-2018 (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
5
0 0
6 Transmission Lines Added during Apr 2018 (Ckms)
Apr-17 Apr-18
0 0
0 0
376 236
1271 40
152 481
1799 757
Transmission Lines Added during Apr 16 to Apr 17 amp Apr 16 to Apr18 (Ckms)
Apr 16 - Apr17 Apr 16 - Apr 18
152 481
1799 763
0 0
376 242
1271 40
1799
763
0
200
400
600
800
1000
1200
1400
1600
1800
2000
ckm
s
Apr 16 to Apr 17 Apr 17 to Apr 18
1799
757
0
200
400
600
800
1000
1200
1400
1600
1800
2000
1
ck
ms
Apr17 Apr18
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
7 Transformation Capacity Addition During Apr 2018 (MVA)
0
3000
2500
1545
0 0
Apr-17 Apr-18
7045
0
242
763
40
481
0 0
All India Transformation Capacity Addition during Apr 16 to Apr17 amp Apr
17 to Apr18 (MVA)
763
0
242
40
481
7045
3000
2500
1545
0
April 16 to Apr 17 April 17 to Apr 18
7045
763
0
1000
2000
3000
4000
5000
6000
7000
8000
MV
A
Transformation Capacity Addition during Apr 2018
Apr-17 Apr-18
7045
763
0
74520
1
MV
A
April 16 to Apr 17 April 17 to Apr 18
Apr17 Apr 18 Apr 17 Mar18 Apr17 Apr18
Northern 28389 28591 27968 28171 -15 -15
Western 32562 33371 32544 33369 -01 00
Southern 28106 29515 28091 29469 -01 -02
Eastern 11164 11634 11149 11617 -01 -01
North Eastern 1108 1187 1058 1135 -45 -43
All India 101329 104297 100810 103761 -05 -05
Apr 17 Apr 18 Apr 17 Apr 18 Apr17 Apr 18
Northern 49603 47996 48711 46959 -18 -22
Western 49850 50677 49778 50457 -01 -04
Southern 42560 45808 42535 45684 -01 -03
Eastern 19855 20429 19662 20429 -10 00
North Eastern 2258 2600 2209 2552 -22 -18
All India 159590 158520 158393 156720 -08 -11
7
8 Power Supply Position (Energy amp Peak) in Mar 2017
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()RegionPower (MW)
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandApr 17 0 3 0 0 515 0 32 0 0
Apr 18 0 0 0 0 546 0 0 247 0
Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Haveli
Apr 17 1 0 0 48 0 0 1
Apr 18 13 11 3 99 0 0 0
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Apr17 0 0 17 9 27 0 0
Apr 18 0 56 22 39 63 24 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
546
0 0
247
00 3 0 0
515
0 32
0 0
0
400
800
Chan
dig
ar
h
Delh
i
Hary
ana
HP
Jamp
K
Pu
nj
ab
Raja
sth
an
UP
Utr
ak
hand
MW
Northern States (MW) Apr 18 Apr 17
13
11
3
99
0 0 01 0 0
48
0 0 1
0
200
Ch
attis
garh
Guja
rat
MP
Mah
ara
st
ra
Da
man amp
Diu
Da
dar
Na
gar
Ha
veliM
W
Western States (MW) Apr 18 Apr 17
0
56
2239
63
2400 0
17 927
0 00
100
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Southern State (MW) Apr 18 Apr17
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Apr17 22 0 0 0 27 0 8
Apr 18 0 0 0 0 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Apr17 4 15 1 0 1 1 0
Apr 18 13 30 7 0 9 29 41
9
0 0 0 0 0 0
4
22
0 0 0
27
0
8
0
10
20
30
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW)Apr 18 Apr17
13
30
7
0
9
29
41
4 1 0 1 1 0
0
50
Aru
na
ch
al
Assa
m
Ma
nip
ur
Meghal
aya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
Sector Apr17 Apr 18
Central 7451 7646
State 6471 5892
Private 5575 6208
ALL INDIA 6490 6466
Month PLF 2017 PLF 2018
Jan 6014 6247
Feb 6153 6259
March 6312 6533
April 6466 649
May
June
July
Aug
Sep
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Apr 2018
74
51
64
71
55
75
64
90
76
46
58
92
62
08
64
66
000100020003000400050006000700080009000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Apr 2017 and Apr 2018
Apr17 Apr 18
615
3
625
9
60
80
Ap
ril
Axis
Title
Axis Title
All India PLF Month-wise
2017 2018
2010-11 2011-12 2012-13 2013-14 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
Pump sets Energised as on 3132018
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer may not be necessary)
Figures are based on the data available in DDUGJY website
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
21212860
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 30112017
Villiages Electrified (Nos) as on 3132018
9985596556
Villages electrified
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Apr 2018 and April 2017 to Apr 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1586860 2220135 5366050 9173045
Hydro 258402 227600 61900 547902
Nuclear 200000 000 000 200000
Total 2045262 2447735 5427950 9920947
Acievement 7812 15761 11592 11205
1 Capacity Addtion Targets and Achievements in the 12th Plan
Achievement of Capacity Addition during the Current Plan upto April 2017
Achievements upto Apr 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
54
790
2
20
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9920947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 4880 2260 4880 2260 -2620
State 3546 270 850 3546 850 -2696
Pvt 2940 0 300 2940 300 -2640
Total 11366 270 3410 11366 3410 -7956
Central 800 110 330 610 330 -280
State 300 0 0 478 0 -478
Pvt 205 0 0 217 0 -217
Total 1305 110 330 1305 330 -975
Nuclear Central 500 0 0 0 0 0
Central 6180 110 2590 5490 2590 -2900
State 3846 270 850 4024 850 -3174
Pvt 3145 0 300 3157 300 -2857
Total 13171 380 3740 12671 3740 -8931
13
2 Capacity Addition Targets Achievements During Apr 2018
Apr-18 April 17 - Apr 18Schemes Sector
Target 2017-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Mar 2018
Thermal1
13
66
13
05
0
12
67
1
34
10
33
0
0
37
40
0
2000
4000
6000
8000
10000
12000
14000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2017-18Target Achievement
270
3410
110
330
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Target Achievement
MW
Targets and Achievement during Mar 2018Thermal
Hydro
Nuclear
Coal Gas Diesel Total
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Sub Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Sub Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 5301726 332000 1180803 3436928 10251457
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 103840 3328216
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Sub Total 52002 173605 3600 229207 000 134200 28256 391663
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6445650 707895 7189938 000 2985800 200337 10376075
Private 7554600 1058060 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
Total 19695750 2489746 837629 22269259 678000 4529342 6902239 34378839
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032018 is given below (in MW)
448581 3404600 2165148 6902239
A April 2018 0 MW
B April 2018 214 MW
C April 2018 0 MW
D Net Capacity
Added during
April 2018 A-B-C -214 MW
Northern Region
Western Region
870080 13830
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032018
BM PowerCogen
Bio-PowerSolar Power
Waste to EnergyWind Power
Southern Region
Eastern Region
North Eastern
Region
Small
Hydro Power
Total
Capacity
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 30042018)
Region Ownership Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
(UTILITIES)
RES
(MNRE)
1 OBRA TPS U-8 (94 MW) has been retired from the State Sector of Uttar Pradesh
2 BANDEL TPS U-3amp4(2x60=120MW) has been retired from the State Sector of West Bengal
Capacity Retired during
Capacity Derated
Capacity Added during
Islands
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 381772 20701 000 402473 10283 72309 000 485065
Sub-Total 482194 211541 000 693735 10283 72309 12157 788484
State 272000 15000 000 287000 000 108451 5930 401381
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 194821 41175 1124201
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 59723 158923
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 85384 403868
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5136 5136
Central 50639 12907 000 63547 6798 113948 000 184293
Sub-Total 50639 30407 000 81047 6798 236948 18039 342832
State 262000 15000 000 277000 000 257023 12780 546803
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 859008 41401 000 900409 19681 378165 128242 1426497
State 585000 60380 000 645380 000 108796 2385 756561
Private 388200 000 000 388200 000 10400 645579 1044179
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193097 677364 2102450
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 262191 1217824
Central 379639 54949 000 434588 28948 185493 3000 652029
Sub-Total 1797972 54949 000 1852921 28948 342103 267701 2491673
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 47953 111653
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 54740 335623
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 2520 2520
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 2520 18809
124953 29105 000 154058 23703 75145 000 252907
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Grand Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Jammu amp Kashmir
Punjab
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042018)
State Ownership Sector
Modewise breakup
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Delhi
Haryana
Himachal Pradesh
(As on 30042018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1061 1061
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1061 18758
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 704902 1877469
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 729532 3079432
State 408000 000 000 408000 000 170366 8396 586762
Private 557400 10000 000 567400 000 000 363584 930984
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1244841 35700 000 1280541 27300 322366 401980 2032187
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 000 000 200144
Sub-Total 1272344 000 000 1272344 4800 12000 53535 1342679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 824775 2175275
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 857888 4307419
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Grand Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 369412 3680 760480 000 000 642713 1403193
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 392952 3680 1452476 12727 167360 672588 2305151
State 508250 000 000 508250 000 244993 4022 757265
Private 83945 95088 000 179033 000 000 360930 539963
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 95088 000 882895 14873 244993 365952 1508713
State 502000 000 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1228352 1426722
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 996082 69800 359980 1243885 2669747
State 000 000 15996 000 188150 15102 219248
Private 61500 17400 000 78900 000 000 17844 96744
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 245176 36200 188150 37946 507472
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 575247 000 000 1086081 1661328
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 1508607 144800 220320 1116541 2990268
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 016 016
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 016 36706
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 5301726 332000 1180803 3436928 10251457
Andhra Pradesh
Telangana
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 2567 75567
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 2972 176446
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34387 276887
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43582 1051759
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 17830 311730
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 19460 733842
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 000 39900
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5211 96214
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 103840 3328216
(As on 30042018)
Coal Gas Diesel Total
State 000 28845 000 28845 000 10000 3001 41846
Private 000 2450 000 2450 000 000 1655 4105
Central 27902 43556 000 71458 000 33123 000 104581
Sub-Total 27902 74851 000 102753 000 43123 4656 150532
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 9745 000 16897
Sub-Total 2470 4682 000 7152 000 9745 11000 27897
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 002 002
Central 3040 10969 000 14009 000 6519 000 20528
Sub-Total 3040 10969 000 14009 000 38719 3105 55833
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 6238 500 54173
Sub-Total 3740 60645 000 64385 000 6238 2110 72733
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 006 006
Central 3140 7157 000 10297 000 8893 000 19190
Sub-Total 3140 7157 3600 13897 000 8893 551 23341
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5337 000 12370
Sub-Total 2140 4893 000 7033 000 5337 3167 15537
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9419 000 15535
Sub-Total 2070 4046 000 6116 000 9419 3667 19202
7500 6362 000 13862 000 12726 000 26588
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Grand Total 52002 173605 3600 229207 000 134200 28256 391663
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
RES
(MNRE)
Bihar
Modewise breakup
Mizoram
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
State Ownership Sector
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Central - Unallocated
Total (North-
Eastern Region)
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Andaman amp
Nicobar
SN Contents Page
1Programme and Achievements of Transmission Lines in Apr 2018 and during April
2016 to Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
Section C - Transmission Lines
20
Programme
2017-18 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3665 0 236 0 236
State Sector 416 0 0 0 0
JVPrivate Sector 846 0 6 0 0
Total 4927 0 242 0 236
Central Sector 4851 28 36 28 36
State Sector 5157 99 4 99 4
JVPrivate Sector 1416 0 0 0 0
Total 11424 127 40 127 40
Central Sector 763 0 0 0 0
State Sector 5972 13 481 13 481
JVPrivate Sector 0 0 0 0 0
Total 6735 13 481 13 481
Grand Total 23086 140 763 140 757
Voltage Level 2
765
400
400
400
220
220
220
220
220
765
STATE SECTOR Sector3 Kalpaka - Maradam line
8 Sarangapur (Allahabad)PG - Phulpur line
Grand Total
4
Transmission Lines (220 kV and above) CommissionedReady for
commissioning During Apr-2018
Name of Transmission Lines
CENTRAL SECTOR Sector
Total of CENTRAL SECTOR
10 Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)
Sl No
2
9 Sohawal PG - Barabanki line
1 3
1 Parli - Solapur (PPTL - TBCB)
Parli (New) - Parli (PG) (Q) (PPTL -TBCB)
400 kV
220kV
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 17 to Apr 18Apr 18Voltage
Level
Sector
LILO of 2nd Ckt VTS- Malkaram to Suryapet
5 Ataur - Mandola Vihar line
Total of STATE SECTOR
PRIVATE SECTOR Sector
Total of PRIVATE SECTOR
6 LILO of 2nd Ckt Birsinghpur - Amarkantak line at Shahdol Ss
7 LILO of 2nd Ckt of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
(i)
(ii)
(iii)
Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total
Northern 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Western 7060862 1080649 000 8141511 184000 744750 2044638 11114899
Southern 4578202 647366 76158 5301726 332000 1180803 3436928 10251457
Eastern 2720164 10000 000 2730164 000 494212 103840 3328216
North-East 52002 173605 3600 229207 000 134200 28256 391663
Islands 000 000 4005 4005 000 000 1256 5261
ALL INDIA 19695750 2489746 83763 22269259 678000 4529342 6902239 34378839
Note Captive Genaration is not included in the total RES as on 31122016 3
NIL
Hydro
Thermal
Nuclear
3 List of Projects Commissioned During Apr 2018
4 All India Installed Capacity (MW) Region-wise as on 3042018
NIL
NIL
Thermal
22269259
678000
45293426902239
34378839
40726
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
40000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 34378839
Sector
Coal Gas Diesel Total
State 6445650 707895 36393 7189938 000 2985800 200337 10376075
Private 7554600 1058060 47370 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
All India 19695750 2489746 83763 22269259 678000 4529342 6902239 34378839
State 10376075
Private 15551102
Central 8451663
5 All India Installed Capacity (MW) Sector-wise as on 3042018
4
Grand TotalTHERMAL
Nuclear Hydro RES
RES as on 31122016
State 10376075 30
Private 15551102 45
Central 8451663 25
All India Installed Capacity(MW) as on 30-4-2018 (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
5
0 0
6 Transmission Lines Added during Apr 2018 (Ckms)
Apr-17 Apr-18
0 0
0 0
376 236
1271 40
152 481
1799 757
Transmission Lines Added during Apr 16 to Apr 17 amp Apr 16 to Apr18 (Ckms)
Apr 16 - Apr17 Apr 16 - Apr 18
152 481
1799 763
0 0
376 242
1271 40
1799
763
0
200
400
600
800
1000
1200
1400
1600
1800
2000
ckm
s
Apr 16 to Apr 17 Apr 17 to Apr 18
1799
757
0
200
400
600
800
1000
1200
1400
1600
1800
2000
1
ck
ms
Apr17 Apr18
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
7 Transformation Capacity Addition During Apr 2018 (MVA)
0
3000
2500
1545
0 0
Apr-17 Apr-18
7045
0
242
763
40
481
0 0
All India Transformation Capacity Addition during Apr 16 to Apr17 amp Apr
17 to Apr18 (MVA)
763
0
242
40
481
7045
3000
2500
1545
0
April 16 to Apr 17 April 17 to Apr 18
7045
763
0
1000
2000
3000
4000
5000
6000
7000
8000
MV
A
Transformation Capacity Addition during Apr 2018
Apr-17 Apr-18
7045
763
0
74520
1
MV
A
April 16 to Apr 17 April 17 to Apr 18
Apr17 Apr 18 Apr 17 Mar18 Apr17 Apr18
Northern 28389 28591 27968 28171 -15 -15
Western 32562 33371 32544 33369 -01 00
Southern 28106 29515 28091 29469 -01 -02
Eastern 11164 11634 11149 11617 -01 -01
North Eastern 1108 1187 1058 1135 -45 -43
All India 101329 104297 100810 103761 -05 -05
Apr 17 Apr 18 Apr 17 Apr 18 Apr17 Apr 18
Northern 49603 47996 48711 46959 -18 -22
Western 49850 50677 49778 50457 -01 -04
Southern 42560 45808 42535 45684 -01 -03
Eastern 19855 20429 19662 20429 -10 00
North Eastern 2258 2600 2209 2552 -22 -18
All India 159590 158520 158393 156720 -08 -11
7
8 Power Supply Position (Energy amp Peak) in Mar 2017
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()RegionPower (MW)
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandApr 17 0 3 0 0 515 0 32 0 0
Apr 18 0 0 0 0 546 0 0 247 0
Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Haveli
Apr 17 1 0 0 48 0 0 1
Apr 18 13 11 3 99 0 0 0
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Apr17 0 0 17 9 27 0 0
Apr 18 0 56 22 39 63 24 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
546
0 0
247
00 3 0 0
515
0 32
0 0
0
400
800
Chan
dig
ar
h
Delh
i
Hary
ana
HP
Jamp
K
Pu
nj
ab
Raja
sth
an
UP
Utr
ak
hand
MW
Northern States (MW) Apr 18 Apr 17
13
11
3
99
0 0 01 0 0
48
0 0 1
0
200
Ch
attis
garh
Guja
rat
MP
Mah
ara
st
ra
Da
man amp
Diu
Da
dar
Na
gar
Ha
veliM
W
Western States (MW) Apr 18 Apr 17
0
56
2239
63
2400 0
17 927
0 00
100
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Southern State (MW) Apr 18 Apr17
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Apr17 22 0 0 0 27 0 8
Apr 18 0 0 0 0 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Apr17 4 15 1 0 1 1 0
Apr 18 13 30 7 0 9 29 41
9
0 0 0 0 0 0
4
22
0 0 0
27
0
8
0
10
20
30
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW)Apr 18 Apr17
13
30
7
0
9
29
41
4 1 0 1 1 0
0
50
Aru
na
ch
al
Assa
m
Ma
nip
ur
Meghal
aya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
Sector Apr17 Apr 18
Central 7451 7646
State 6471 5892
Private 5575 6208
ALL INDIA 6490 6466
Month PLF 2017 PLF 2018
Jan 6014 6247
Feb 6153 6259
March 6312 6533
April 6466 649
May
June
July
Aug
Sep
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Apr 2018
74
51
64
71
55
75
64
90
76
46
58
92
62
08
64
66
000100020003000400050006000700080009000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Apr 2017 and Apr 2018
Apr17 Apr 18
615
3
625
9
60
80
Ap
ril
Axis
Title
Axis Title
All India PLF Month-wise
2017 2018
2010-11 2011-12 2012-13 2013-14 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
Pump sets Energised as on 3132018
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer may not be necessary)
Figures are based on the data available in DDUGJY website
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
21212860
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 30112017
Villiages Electrified (Nos) as on 3132018
9985596556
Villages electrified
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Apr 2018 and April 2017 to Apr 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1586860 2220135 5366050 9173045
Hydro 258402 227600 61900 547902
Nuclear 200000 000 000 200000
Total 2045262 2447735 5427950 9920947
Acievement 7812 15761 11592 11205
1 Capacity Addtion Targets and Achievements in the 12th Plan
Achievement of Capacity Addition during the Current Plan upto April 2017
Achievements upto Apr 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
54
790
2
20
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9920947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 4880 2260 4880 2260 -2620
State 3546 270 850 3546 850 -2696
Pvt 2940 0 300 2940 300 -2640
Total 11366 270 3410 11366 3410 -7956
Central 800 110 330 610 330 -280
State 300 0 0 478 0 -478
Pvt 205 0 0 217 0 -217
Total 1305 110 330 1305 330 -975
Nuclear Central 500 0 0 0 0 0
Central 6180 110 2590 5490 2590 -2900
State 3846 270 850 4024 850 -3174
Pvt 3145 0 300 3157 300 -2857
Total 13171 380 3740 12671 3740 -8931
13
2 Capacity Addition Targets Achievements During Apr 2018
Apr-18 April 17 - Apr 18Schemes Sector
Target 2017-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Mar 2018
Thermal1
13
66
13
05
0
12
67
1
34
10
33
0
0
37
40
0
2000
4000
6000
8000
10000
12000
14000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2017-18Target Achievement
270
3410
110
330
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Target Achievement
MW
Targets and Achievement during Mar 2018Thermal
Hydro
Nuclear
Coal Gas Diesel Total
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Sub Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Sub Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 5301726 332000 1180803 3436928 10251457
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 103840 3328216
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Sub Total 52002 173605 3600 229207 000 134200 28256 391663
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6445650 707895 7189938 000 2985800 200337 10376075
Private 7554600 1058060 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
Total 19695750 2489746 837629 22269259 678000 4529342 6902239 34378839
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032018 is given below (in MW)
448581 3404600 2165148 6902239
A April 2018 0 MW
B April 2018 214 MW
C April 2018 0 MW
D Net Capacity
Added during
April 2018 A-B-C -214 MW
Northern Region
Western Region
870080 13830
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032018
BM PowerCogen
Bio-PowerSolar Power
Waste to EnergyWind Power
Southern Region
Eastern Region
North Eastern
Region
Small
Hydro Power
Total
Capacity
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 30042018)
Region Ownership Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
(UTILITIES)
RES
(MNRE)
1 OBRA TPS U-8 (94 MW) has been retired from the State Sector of Uttar Pradesh
2 BANDEL TPS U-3amp4(2x60=120MW) has been retired from the State Sector of West Bengal
Capacity Retired during
Capacity Derated
Capacity Added during
Islands
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 381772 20701 000 402473 10283 72309 000 485065
Sub-Total 482194 211541 000 693735 10283 72309 12157 788484
State 272000 15000 000 287000 000 108451 5930 401381
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 194821 41175 1124201
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 59723 158923
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 85384 403868
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5136 5136
Central 50639 12907 000 63547 6798 113948 000 184293
Sub-Total 50639 30407 000 81047 6798 236948 18039 342832
State 262000 15000 000 277000 000 257023 12780 546803
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 859008 41401 000 900409 19681 378165 128242 1426497
State 585000 60380 000 645380 000 108796 2385 756561
Private 388200 000 000 388200 000 10400 645579 1044179
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193097 677364 2102450
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 262191 1217824
Central 379639 54949 000 434588 28948 185493 3000 652029
Sub-Total 1797972 54949 000 1852921 28948 342103 267701 2491673
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 47953 111653
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 54740 335623
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 2520 2520
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 2520 18809
124953 29105 000 154058 23703 75145 000 252907
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Grand Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Jammu amp Kashmir
Punjab
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042018)
State Ownership Sector
Modewise breakup
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Delhi
Haryana
Himachal Pradesh
(As on 30042018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1061 1061
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1061 18758
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 704902 1877469
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 729532 3079432
State 408000 000 000 408000 000 170366 8396 586762
Private 557400 10000 000 567400 000 000 363584 930984
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1244841 35700 000 1280541 27300 322366 401980 2032187
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 000 000 200144
Sub-Total 1272344 000 000 1272344 4800 12000 53535 1342679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 824775 2175275
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 857888 4307419
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Grand Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 369412 3680 760480 000 000 642713 1403193
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 392952 3680 1452476 12727 167360 672588 2305151
State 508250 000 000 508250 000 244993 4022 757265
Private 83945 95088 000 179033 000 000 360930 539963
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 95088 000 882895 14873 244993 365952 1508713
State 502000 000 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1228352 1426722
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 996082 69800 359980 1243885 2669747
State 000 000 15996 000 188150 15102 219248
Private 61500 17400 000 78900 000 000 17844 96744
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 245176 36200 188150 37946 507472
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 575247 000 000 1086081 1661328
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 1508607 144800 220320 1116541 2990268
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 016 016
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 016 36706
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 5301726 332000 1180803 3436928 10251457
Andhra Pradesh
Telangana
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 2567 75567
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 2972 176446
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34387 276887
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43582 1051759
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 17830 311730
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 19460 733842
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 000 39900
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5211 96214
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 103840 3328216
(As on 30042018)
Coal Gas Diesel Total
State 000 28845 000 28845 000 10000 3001 41846
Private 000 2450 000 2450 000 000 1655 4105
Central 27902 43556 000 71458 000 33123 000 104581
Sub-Total 27902 74851 000 102753 000 43123 4656 150532
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 9745 000 16897
Sub-Total 2470 4682 000 7152 000 9745 11000 27897
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 002 002
Central 3040 10969 000 14009 000 6519 000 20528
Sub-Total 3040 10969 000 14009 000 38719 3105 55833
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 6238 500 54173
Sub-Total 3740 60645 000 64385 000 6238 2110 72733
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 006 006
Central 3140 7157 000 10297 000 8893 000 19190
Sub-Total 3140 7157 3600 13897 000 8893 551 23341
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5337 000 12370
Sub-Total 2140 4893 000 7033 000 5337 3167 15537
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9419 000 15535
Sub-Total 2070 4046 000 6116 000 9419 3667 19202
7500 6362 000 13862 000 12726 000 26588
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Grand Total 52002 173605 3600 229207 000 134200 28256 391663
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
RES
(MNRE)
Bihar
Modewise breakup
Mizoram
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
State Ownership Sector
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Central - Unallocated
Total (North-
Eastern Region)
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Andaman amp
Nicobar
SN Contents Page
1Programme and Achievements of Transmission Lines in Apr 2018 and during April
2016 to Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
Section C - Transmission Lines
20
Programme
2017-18 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3665 0 236 0 236
State Sector 416 0 0 0 0
JVPrivate Sector 846 0 6 0 0
Total 4927 0 242 0 236
Central Sector 4851 28 36 28 36
State Sector 5157 99 4 99 4
JVPrivate Sector 1416 0 0 0 0
Total 11424 127 40 127 40
Central Sector 763 0 0 0 0
State Sector 5972 13 481 13 481
JVPrivate Sector 0 0 0 0 0
Total 6735 13 481 13 481
Grand Total 23086 140 763 140 757
Voltage Level 2
765
400
400
400
220
220
220
220
220
765
STATE SECTOR Sector3 Kalpaka - Maradam line
8 Sarangapur (Allahabad)PG - Phulpur line
Grand Total
4
Transmission Lines (220 kV and above) CommissionedReady for
commissioning During Apr-2018
Name of Transmission Lines
CENTRAL SECTOR Sector
Total of CENTRAL SECTOR
10 Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)
Sl No
2
9 Sohawal PG - Barabanki line
1 3
1 Parli - Solapur (PPTL - TBCB)
Parli (New) - Parli (PG) (Q) (PPTL -TBCB)
400 kV
220kV
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 17 to Apr 18Apr 18Voltage
Level
Sector
LILO of 2nd Ckt VTS- Malkaram to Suryapet
5 Ataur - Mandola Vihar line
Total of STATE SECTOR
PRIVATE SECTOR Sector
Total of PRIVATE SECTOR
6 LILO of 2nd Ckt Birsinghpur - Amarkantak line at Shahdol Ss
7 LILO of 2nd Ckt of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Sector
Coal Gas Diesel Total
State 6445650 707895 36393 7189938 000 2985800 200337 10376075
Private 7554600 1058060 47370 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
All India 19695750 2489746 83763 22269259 678000 4529342 6902239 34378839
State 10376075
Private 15551102
Central 8451663
5 All India Installed Capacity (MW) Sector-wise as on 3042018
4
Grand TotalTHERMAL
Nuclear Hydro RES
RES as on 31122016
State 10376075 30
Private 15551102 45
Central 8451663 25
All India Installed Capacity(MW) as on 30-4-2018 (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
5
0 0
6 Transmission Lines Added during Apr 2018 (Ckms)
Apr-17 Apr-18
0 0
0 0
376 236
1271 40
152 481
1799 757
Transmission Lines Added during Apr 16 to Apr 17 amp Apr 16 to Apr18 (Ckms)
Apr 16 - Apr17 Apr 16 - Apr 18
152 481
1799 763
0 0
376 242
1271 40
1799
763
0
200
400
600
800
1000
1200
1400
1600
1800
2000
ckm
s
Apr 16 to Apr 17 Apr 17 to Apr 18
1799
757
0
200
400
600
800
1000
1200
1400
1600
1800
2000
1
ck
ms
Apr17 Apr18
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
7 Transformation Capacity Addition During Apr 2018 (MVA)
0
3000
2500
1545
0 0
Apr-17 Apr-18
7045
0
242
763
40
481
0 0
All India Transformation Capacity Addition during Apr 16 to Apr17 amp Apr
17 to Apr18 (MVA)
763
0
242
40
481
7045
3000
2500
1545
0
April 16 to Apr 17 April 17 to Apr 18
7045
763
0
1000
2000
3000
4000
5000
6000
7000
8000
MV
A
Transformation Capacity Addition during Apr 2018
Apr-17 Apr-18
7045
763
0
74520
1
MV
A
April 16 to Apr 17 April 17 to Apr 18
Apr17 Apr 18 Apr 17 Mar18 Apr17 Apr18
Northern 28389 28591 27968 28171 -15 -15
Western 32562 33371 32544 33369 -01 00
Southern 28106 29515 28091 29469 -01 -02
Eastern 11164 11634 11149 11617 -01 -01
North Eastern 1108 1187 1058 1135 -45 -43
All India 101329 104297 100810 103761 -05 -05
Apr 17 Apr 18 Apr 17 Apr 18 Apr17 Apr 18
Northern 49603 47996 48711 46959 -18 -22
Western 49850 50677 49778 50457 -01 -04
Southern 42560 45808 42535 45684 -01 -03
Eastern 19855 20429 19662 20429 -10 00
North Eastern 2258 2600 2209 2552 -22 -18
All India 159590 158520 158393 156720 -08 -11
7
8 Power Supply Position (Energy amp Peak) in Mar 2017
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()RegionPower (MW)
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandApr 17 0 3 0 0 515 0 32 0 0
Apr 18 0 0 0 0 546 0 0 247 0
Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Haveli
Apr 17 1 0 0 48 0 0 1
Apr 18 13 11 3 99 0 0 0
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Apr17 0 0 17 9 27 0 0
Apr 18 0 56 22 39 63 24 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
546
0 0
247
00 3 0 0
515
0 32
0 0
0
400
800
Chan
dig
ar
h
Delh
i
Hary
ana
HP
Jamp
K
Pu
nj
ab
Raja
sth
an
UP
Utr
ak
hand
MW
Northern States (MW) Apr 18 Apr 17
13
11
3
99
0 0 01 0 0
48
0 0 1
0
200
Ch
attis
garh
Guja
rat
MP
Mah
ara
st
ra
Da
man amp
Diu
Da
dar
Na
gar
Ha
veliM
W
Western States (MW) Apr 18 Apr 17
0
56
2239
63
2400 0
17 927
0 00
100
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Southern State (MW) Apr 18 Apr17
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Apr17 22 0 0 0 27 0 8
Apr 18 0 0 0 0 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Apr17 4 15 1 0 1 1 0
Apr 18 13 30 7 0 9 29 41
9
0 0 0 0 0 0
4
22
0 0 0
27
0
8
0
10
20
30
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW)Apr 18 Apr17
13
30
7
0
9
29
41
4 1 0 1 1 0
0
50
Aru
na
ch
al
Assa
m
Ma
nip
ur
Meghal
aya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
Sector Apr17 Apr 18
Central 7451 7646
State 6471 5892
Private 5575 6208
ALL INDIA 6490 6466
Month PLF 2017 PLF 2018
Jan 6014 6247
Feb 6153 6259
March 6312 6533
April 6466 649
May
June
July
Aug
Sep
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Apr 2018
74
51
64
71
55
75
64
90
76
46
58
92
62
08
64
66
000100020003000400050006000700080009000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Apr 2017 and Apr 2018
Apr17 Apr 18
615
3
625
9
60
80
Ap
ril
Axis
Title
Axis Title
All India PLF Month-wise
2017 2018
2010-11 2011-12 2012-13 2013-14 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
Pump sets Energised as on 3132018
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer may not be necessary)
Figures are based on the data available in DDUGJY website
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
21212860
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 30112017
Villiages Electrified (Nos) as on 3132018
9985596556
Villages electrified
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Apr 2018 and April 2017 to Apr 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1586860 2220135 5366050 9173045
Hydro 258402 227600 61900 547902
Nuclear 200000 000 000 200000
Total 2045262 2447735 5427950 9920947
Acievement 7812 15761 11592 11205
1 Capacity Addtion Targets and Achievements in the 12th Plan
Achievement of Capacity Addition during the Current Plan upto April 2017
Achievements upto Apr 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
54
790
2
20
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9920947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 4880 2260 4880 2260 -2620
State 3546 270 850 3546 850 -2696
Pvt 2940 0 300 2940 300 -2640
Total 11366 270 3410 11366 3410 -7956
Central 800 110 330 610 330 -280
State 300 0 0 478 0 -478
Pvt 205 0 0 217 0 -217
Total 1305 110 330 1305 330 -975
Nuclear Central 500 0 0 0 0 0
Central 6180 110 2590 5490 2590 -2900
State 3846 270 850 4024 850 -3174
Pvt 3145 0 300 3157 300 -2857
Total 13171 380 3740 12671 3740 -8931
13
2 Capacity Addition Targets Achievements During Apr 2018
Apr-18 April 17 - Apr 18Schemes Sector
Target 2017-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Mar 2018
Thermal1
13
66
13
05
0
12
67
1
34
10
33
0
0
37
40
0
2000
4000
6000
8000
10000
12000
14000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2017-18Target Achievement
270
3410
110
330
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Target Achievement
MW
Targets and Achievement during Mar 2018Thermal
Hydro
Nuclear
Coal Gas Diesel Total
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Sub Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Sub Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 5301726 332000 1180803 3436928 10251457
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 103840 3328216
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Sub Total 52002 173605 3600 229207 000 134200 28256 391663
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6445650 707895 7189938 000 2985800 200337 10376075
Private 7554600 1058060 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
Total 19695750 2489746 837629 22269259 678000 4529342 6902239 34378839
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032018 is given below (in MW)
448581 3404600 2165148 6902239
A April 2018 0 MW
B April 2018 214 MW
C April 2018 0 MW
D Net Capacity
Added during
April 2018 A-B-C -214 MW
Northern Region
Western Region
870080 13830
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032018
BM PowerCogen
Bio-PowerSolar Power
Waste to EnergyWind Power
Southern Region
Eastern Region
North Eastern
Region
Small
Hydro Power
Total
Capacity
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 30042018)
Region Ownership Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
(UTILITIES)
RES
(MNRE)
1 OBRA TPS U-8 (94 MW) has been retired from the State Sector of Uttar Pradesh
2 BANDEL TPS U-3amp4(2x60=120MW) has been retired from the State Sector of West Bengal
Capacity Retired during
Capacity Derated
Capacity Added during
Islands
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 381772 20701 000 402473 10283 72309 000 485065
Sub-Total 482194 211541 000 693735 10283 72309 12157 788484
State 272000 15000 000 287000 000 108451 5930 401381
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 194821 41175 1124201
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 59723 158923
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 85384 403868
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5136 5136
Central 50639 12907 000 63547 6798 113948 000 184293
Sub-Total 50639 30407 000 81047 6798 236948 18039 342832
State 262000 15000 000 277000 000 257023 12780 546803
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 859008 41401 000 900409 19681 378165 128242 1426497
State 585000 60380 000 645380 000 108796 2385 756561
Private 388200 000 000 388200 000 10400 645579 1044179
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193097 677364 2102450
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 262191 1217824
Central 379639 54949 000 434588 28948 185493 3000 652029
Sub-Total 1797972 54949 000 1852921 28948 342103 267701 2491673
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 47953 111653
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 54740 335623
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 2520 2520
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 2520 18809
124953 29105 000 154058 23703 75145 000 252907
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Grand Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Jammu amp Kashmir
Punjab
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042018)
State Ownership Sector
Modewise breakup
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Delhi
Haryana
Himachal Pradesh
(As on 30042018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1061 1061
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1061 18758
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 704902 1877469
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 729532 3079432
State 408000 000 000 408000 000 170366 8396 586762
Private 557400 10000 000 567400 000 000 363584 930984
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1244841 35700 000 1280541 27300 322366 401980 2032187
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 000 000 200144
Sub-Total 1272344 000 000 1272344 4800 12000 53535 1342679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 824775 2175275
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 857888 4307419
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Grand Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 369412 3680 760480 000 000 642713 1403193
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 392952 3680 1452476 12727 167360 672588 2305151
State 508250 000 000 508250 000 244993 4022 757265
Private 83945 95088 000 179033 000 000 360930 539963
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 95088 000 882895 14873 244993 365952 1508713
State 502000 000 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1228352 1426722
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 996082 69800 359980 1243885 2669747
State 000 000 15996 000 188150 15102 219248
Private 61500 17400 000 78900 000 000 17844 96744
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 245176 36200 188150 37946 507472
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 575247 000 000 1086081 1661328
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 1508607 144800 220320 1116541 2990268
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 016 016
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 016 36706
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 5301726 332000 1180803 3436928 10251457
Andhra Pradesh
Telangana
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 2567 75567
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 2972 176446
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34387 276887
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43582 1051759
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 17830 311730
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 19460 733842
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 000 39900
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5211 96214
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 103840 3328216
(As on 30042018)
Coal Gas Diesel Total
State 000 28845 000 28845 000 10000 3001 41846
Private 000 2450 000 2450 000 000 1655 4105
Central 27902 43556 000 71458 000 33123 000 104581
Sub-Total 27902 74851 000 102753 000 43123 4656 150532
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 9745 000 16897
Sub-Total 2470 4682 000 7152 000 9745 11000 27897
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 002 002
Central 3040 10969 000 14009 000 6519 000 20528
Sub-Total 3040 10969 000 14009 000 38719 3105 55833
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 6238 500 54173
Sub-Total 3740 60645 000 64385 000 6238 2110 72733
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 006 006
Central 3140 7157 000 10297 000 8893 000 19190
Sub-Total 3140 7157 3600 13897 000 8893 551 23341
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5337 000 12370
Sub-Total 2140 4893 000 7033 000 5337 3167 15537
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9419 000 15535
Sub-Total 2070 4046 000 6116 000 9419 3667 19202
7500 6362 000 13862 000 12726 000 26588
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Grand Total 52002 173605 3600 229207 000 134200 28256 391663
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
RES
(MNRE)
Bihar
Modewise breakup
Mizoram
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
State Ownership Sector
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Central - Unallocated
Total (North-
Eastern Region)
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Andaman amp
Nicobar
SN Contents Page
1Programme and Achievements of Transmission Lines in Apr 2018 and during April
2016 to Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
Section C - Transmission Lines
20
Programme
2017-18 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3665 0 236 0 236
State Sector 416 0 0 0 0
JVPrivate Sector 846 0 6 0 0
Total 4927 0 242 0 236
Central Sector 4851 28 36 28 36
State Sector 5157 99 4 99 4
JVPrivate Sector 1416 0 0 0 0
Total 11424 127 40 127 40
Central Sector 763 0 0 0 0
State Sector 5972 13 481 13 481
JVPrivate Sector 0 0 0 0 0
Total 6735 13 481 13 481
Grand Total 23086 140 763 140 757
Voltage Level 2
765
400
400
400
220
220
220
220
220
765
STATE SECTOR Sector3 Kalpaka - Maradam line
8 Sarangapur (Allahabad)PG - Phulpur line
Grand Total
4
Transmission Lines (220 kV and above) CommissionedReady for
commissioning During Apr-2018
Name of Transmission Lines
CENTRAL SECTOR Sector
Total of CENTRAL SECTOR
10 Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)
Sl No
2
9 Sohawal PG - Barabanki line
1 3
1 Parli - Solapur (PPTL - TBCB)
Parli (New) - Parli (PG) (Q) (PPTL -TBCB)
400 kV
220kV
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 17 to Apr 18Apr 18Voltage
Level
Sector
LILO of 2nd Ckt VTS- Malkaram to Suryapet
5 Ataur - Mandola Vihar line
Total of STATE SECTOR
PRIVATE SECTOR Sector
Total of PRIVATE SECTOR
6 LILO of 2nd Ckt Birsinghpur - Amarkantak line at Shahdol Ss
7 LILO of 2nd Ckt of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
5
0 0
6 Transmission Lines Added during Apr 2018 (Ckms)
Apr-17 Apr-18
0 0
0 0
376 236
1271 40
152 481
1799 757
Transmission Lines Added during Apr 16 to Apr 17 amp Apr 16 to Apr18 (Ckms)
Apr 16 - Apr17 Apr 16 - Apr 18
152 481
1799 763
0 0
376 242
1271 40
1799
763
0
200
400
600
800
1000
1200
1400
1600
1800
2000
ckm
s
Apr 16 to Apr 17 Apr 17 to Apr 18
1799
757
0
200
400
600
800
1000
1200
1400
1600
1800
2000
1
ck
ms
Apr17 Apr18
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
7 Transformation Capacity Addition During Apr 2018 (MVA)
0
3000
2500
1545
0 0
Apr-17 Apr-18
7045
0
242
763
40
481
0 0
All India Transformation Capacity Addition during Apr 16 to Apr17 amp Apr
17 to Apr18 (MVA)
763
0
242
40
481
7045
3000
2500
1545
0
April 16 to Apr 17 April 17 to Apr 18
7045
763
0
1000
2000
3000
4000
5000
6000
7000
8000
MV
A
Transformation Capacity Addition during Apr 2018
Apr-17 Apr-18
7045
763
0
74520
1
MV
A
April 16 to Apr 17 April 17 to Apr 18
Apr17 Apr 18 Apr 17 Mar18 Apr17 Apr18
Northern 28389 28591 27968 28171 -15 -15
Western 32562 33371 32544 33369 -01 00
Southern 28106 29515 28091 29469 -01 -02
Eastern 11164 11634 11149 11617 -01 -01
North Eastern 1108 1187 1058 1135 -45 -43
All India 101329 104297 100810 103761 -05 -05
Apr 17 Apr 18 Apr 17 Apr 18 Apr17 Apr 18
Northern 49603 47996 48711 46959 -18 -22
Western 49850 50677 49778 50457 -01 -04
Southern 42560 45808 42535 45684 -01 -03
Eastern 19855 20429 19662 20429 -10 00
North Eastern 2258 2600 2209 2552 -22 -18
All India 159590 158520 158393 156720 -08 -11
7
8 Power Supply Position (Energy amp Peak) in Mar 2017
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()RegionPower (MW)
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandApr 17 0 3 0 0 515 0 32 0 0
Apr 18 0 0 0 0 546 0 0 247 0
Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Haveli
Apr 17 1 0 0 48 0 0 1
Apr 18 13 11 3 99 0 0 0
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Apr17 0 0 17 9 27 0 0
Apr 18 0 56 22 39 63 24 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
546
0 0
247
00 3 0 0
515
0 32
0 0
0
400
800
Chan
dig
ar
h
Delh
i
Hary
ana
HP
Jamp
K
Pu
nj
ab
Raja
sth
an
UP
Utr
ak
hand
MW
Northern States (MW) Apr 18 Apr 17
13
11
3
99
0 0 01 0 0
48
0 0 1
0
200
Ch
attis
garh
Guja
rat
MP
Mah
ara
st
ra
Da
man amp
Diu
Da
dar
Na
gar
Ha
veliM
W
Western States (MW) Apr 18 Apr 17
0
56
2239
63
2400 0
17 927
0 00
100
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Southern State (MW) Apr 18 Apr17
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Apr17 22 0 0 0 27 0 8
Apr 18 0 0 0 0 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Apr17 4 15 1 0 1 1 0
Apr 18 13 30 7 0 9 29 41
9
0 0 0 0 0 0
4
22
0 0 0
27
0
8
0
10
20
30
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW)Apr 18 Apr17
13
30
7
0
9
29
41
4 1 0 1 1 0
0
50
Aru
na
ch
al
Assa
m
Ma
nip
ur
Meghal
aya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
Sector Apr17 Apr 18
Central 7451 7646
State 6471 5892
Private 5575 6208
ALL INDIA 6490 6466
Month PLF 2017 PLF 2018
Jan 6014 6247
Feb 6153 6259
March 6312 6533
April 6466 649
May
June
July
Aug
Sep
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Apr 2018
74
51
64
71
55
75
64
90
76
46
58
92
62
08
64
66
000100020003000400050006000700080009000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Apr 2017 and Apr 2018
Apr17 Apr 18
615
3
625
9
60
80
Ap
ril
Axis
Title
Axis Title
All India PLF Month-wise
2017 2018
2010-11 2011-12 2012-13 2013-14 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
Pump sets Energised as on 3132018
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer may not be necessary)
Figures are based on the data available in DDUGJY website
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
21212860
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 30112017
Villiages Electrified (Nos) as on 3132018
9985596556
Villages electrified
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Apr 2018 and April 2017 to Apr 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1586860 2220135 5366050 9173045
Hydro 258402 227600 61900 547902
Nuclear 200000 000 000 200000
Total 2045262 2447735 5427950 9920947
Acievement 7812 15761 11592 11205
1 Capacity Addtion Targets and Achievements in the 12th Plan
Achievement of Capacity Addition during the Current Plan upto April 2017
Achievements upto Apr 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
54
790
2
20
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9920947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 4880 2260 4880 2260 -2620
State 3546 270 850 3546 850 -2696
Pvt 2940 0 300 2940 300 -2640
Total 11366 270 3410 11366 3410 -7956
Central 800 110 330 610 330 -280
State 300 0 0 478 0 -478
Pvt 205 0 0 217 0 -217
Total 1305 110 330 1305 330 -975
Nuclear Central 500 0 0 0 0 0
Central 6180 110 2590 5490 2590 -2900
State 3846 270 850 4024 850 -3174
Pvt 3145 0 300 3157 300 -2857
Total 13171 380 3740 12671 3740 -8931
13
2 Capacity Addition Targets Achievements During Apr 2018
Apr-18 April 17 - Apr 18Schemes Sector
Target 2017-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Mar 2018
Thermal1
13
66
13
05
0
12
67
1
34
10
33
0
0
37
40
0
2000
4000
6000
8000
10000
12000
14000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2017-18Target Achievement
270
3410
110
330
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Target Achievement
MW
Targets and Achievement during Mar 2018Thermal
Hydro
Nuclear
Coal Gas Diesel Total
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Sub Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Sub Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 5301726 332000 1180803 3436928 10251457
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 103840 3328216
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Sub Total 52002 173605 3600 229207 000 134200 28256 391663
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6445650 707895 7189938 000 2985800 200337 10376075
Private 7554600 1058060 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
Total 19695750 2489746 837629 22269259 678000 4529342 6902239 34378839
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032018 is given below (in MW)
448581 3404600 2165148 6902239
A April 2018 0 MW
B April 2018 214 MW
C April 2018 0 MW
D Net Capacity
Added during
April 2018 A-B-C -214 MW
Northern Region
Western Region
870080 13830
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032018
BM PowerCogen
Bio-PowerSolar Power
Waste to EnergyWind Power
Southern Region
Eastern Region
North Eastern
Region
Small
Hydro Power
Total
Capacity
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 30042018)
Region Ownership Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
(UTILITIES)
RES
(MNRE)
1 OBRA TPS U-8 (94 MW) has been retired from the State Sector of Uttar Pradesh
2 BANDEL TPS U-3amp4(2x60=120MW) has been retired from the State Sector of West Bengal
Capacity Retired during
Capacity Derated
Capacity Added during
Islands
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 381772 20701 000 402473 10283 72309 000 485065
Sub-Total 482194 211541 000 693735 10283 72309 12157 788484
State 272000 15000 000 287000 000 108451 5930 401381
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 194821 41175 1124201
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 59723 158923
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 85384 403868
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5136 5136
Central 50639 12907 000 63547 6798 113948 000 184293
Sub-Total 50639 30407 000 81047 6798 236948 18039 342832
State 262000 15000 000 277000 000 257023 12780 546803
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 859008 41401 000 900409 19681 378165 128242 1426497
State 585000 60380 000 645380 000 108796 2385 756561
Private 388200 000 000 388200 000 10400 645579 1044179
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193097 677364 2102450
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 262191 1217824
Central 379639 54949 000 434588 28948 185493 3000 652029
Sub-Total 1797972 54949 000 1852921 28948 342103 267701 2491673
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 47953 111653
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 54740 335623
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 2520 2520
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 2520 18809
124953 29105 000 154058 23703 75145 000 252907
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Grand Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Jammu amp Kashmir
Punjab
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042018)
State Ownership Sector
Modewise breakup
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Delhi
Haryana
Himachal Pradesh
(As on 30042018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1061 1061
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1061 18758
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 704902 1877469
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 729532 3079432
State 408000 000 000 408000 000 170366 8396 586762
Private 557400 10000 000 567400 000 000 363584 930984
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1244841 35700 000 1280541 27300 322366 401980 2032187
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 000 000 200144
Sub-Total 1272344 000 000 1272344 4800 12000 53535 1342679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 824775 2175275
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 857888 4307419
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Grand Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 369412 3680 760480 000 000 642713 1403193
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 392952 3680 1452476 12727 167360 672588 2305151
State 508250 000 000 508250 000 244993 4022 757265
Private 83945 95088 000 179033 000 000 360930 539963
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 95088 000 882895 14873 244993 365952 1508713
State 502000 000 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1228352 1426722
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 996082 69800 359980 1243885 2669747
State 000 000 15996 000 188150 15102 219248
Private 61500 17400 000 78900 000 000 17844 96744
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 245176 36200 188150 37946 507472
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 575247 000 000 1086081 1661328
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 1508607 144800 220320 1116541 2990268
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 016 016
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 016 36706
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 5301726 332000 1180803 3436928 10251457
Andhra Pradesh
Telangana
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 2567 75567
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 2972 176446
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34387 276887
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43582 1051759
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 17830 311730
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 19460 733842
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 000 39900
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5211 96214
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 103840 3328216
(As on 30042018)
Coal Gas Diesel Total
State 000 28845 000 28845 000 10000 3001 41846
Private 000 2450 000 2450 000 000 1655 4105
Central 27902 43556 000 71458 000 33123 000 104581
Sub-Total 27902 74851 000 102753 000 43123 4656 150532
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 9745 000 16897
Sub-Total 2470 4682 000 7152 000 9745 11000 27897
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 002 002
Central 3040 10969 000 14009 000 6519 000 20528
Sub-Total 3040 10969 000 14009 000 38719 3105 55833
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 6238 500 54173
Sub-Total 3740 60645 000 64385 000 6238 2110 72733
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 006 006
Central 3140 7157 000 10297 000 8893 000 19190
Sub-Total 3140 7157 3600 13897 000 8893 551 23341
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5337 000 12370
Sub-Total 2140 4893 000 7033 000 5337 3167 15537
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9419 000 15535
Sub-Total 2070 4046 000 6116 000 9419 3667 19202
7500 6362 000 13862 000 12726 000 26588
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Grand Total 52002 173605 3600 229207 000 134200 28256 391663
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
RES
(MNRE)
Bihar
Modewise breakup
Mizoram
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
State Ownership Sector
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Central - Unallocated
Total (North-
Eastern Region)
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Andaman amp
Nicobar
SN Contents Page
1Programme and Achievements of Transmission Lines in Apr 2018 and during April
2016 to Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
Section C - Transmission Lines
20
Programme
2017-18 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3665 0 236 0 236
State Sector 416 0 0 0 0
JVPrivate Sector 846 0 6 0 0
Total 4927 0 242 0 236
Central Sector 4851 28 36 28 36
State Sector 5157 99 4 99 4
JVPrivate Sector 1416 0 0 0 0
Total 11424 127 40 127 40
Central Sector 763 0 0 0 0
State Sector 5972 13 481 13 481
JVPrivate Sector 0 0 0 0 0
Total 6735 13 481 13 481
Grand Total 23086 140 763 140 757
Voltage Level 2
765
400
400
400
220
220
220
220
220
765
STATE SECTOR Sector3 Kalpaka - Maradam line
8 Sarangapur (Allahabad)PG - Phulpur line
Grand Total
4
Transmission Lines (220 kV and above) CommissionedReady for
commissioning During Apr-2018
Name of Transmission Lines
CENTRAL SECTOR Sector
Total of CENTRAL SECTOR
10 Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)
Sl No
2
9 Sohawal PG - Barabanki line
1 3
1 Parli - Solapur (PPTL - TBCB)
Parli (New) - Parli (PG) (Q) (PPTL -TBCB)
400 kV
220kV
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 17 to Apr 18Apr 18Voltage
Level
Sector
LILO of 2nd Ckt VTS- Malkaram to Suryapet
5 Ataur - Mandola Vihar line
Total of STATE SECTOR
PRIVATE SECTOR Sector
Total of PRIVATE SECTOR
6 LILO of 2nd Ckt Birsinghpur - Amarkantak line at Shahdol Ss
7 LILO of 2nd Ckt of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
7 Transformation Capacity Addition During Apr 2018 (MVA)
0
3000
2500
1545
0 0
Apr-17 Apr-18
7045
0
242
763
40
481
0 0
All India Transformation Capacity Addition during Apr 16 to Apr17 amp Apr
17 to Apr18 (MVA)
763
0
242
40
481
7045
3000
2500
1545
0
April 16 to Apr 17 April 17 to Apr 18
7045
763
0
1000
2000
3000
4000
5000
6000
7000
8000
MV
A
Transformation Capacity Addition during Apr 2018
Apr-17 Apr-18
7045
763
0
74520
1
MV
A
April 16 to Apr 17 April 17 to Apr 18
Apr17 Apr 18 Apr 17 Mar18 Apr17 Apr18
Northern 28389 28591 27968 28171 -15 -15
Western 32562 33371 32544 33369 -01 00
Southern 28106 29515 28091 29469 -01 -02
Eastern 11164 11634 11149 11617 -01 -01
North Eastern 1108 1187 1058 1135 -45 -43
All India 101329 104297 100810 103761 -05 -05
Apr 17 Apr 18 Apr 17 Apr 18 Apr17 Apr 18
Northern 49603 47996 48711 46959 -18 -22
Western 49850 50677 49778 50457 -01 -04
Southern 42560 45808 42535 45684 -01 -03
Eastern 19855 20429 19662 20429 -10 00
North Eastern 2258 2600 2209 2552 -22 -18
All India 159590 158520 158393 156720 -08 -11
7
8 Power Supply Position (Energy amp Peak) in Mar 2017
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()RegionPower (MW)
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandApr 17 0 3 0 0 515 0 32 0 0
Apr 18 0 0 0 0 546 0 0 247 0
Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Haveli
Apr 17 1 0 0 48 0 0 1
Apr 18 13 11 3 99 0 0 0
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Apr17 0 0 17 9 27 0 0
Apr 18 0 56 22 39 63 24 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
546
0 0
247
00 3 0 0
515
0 32
0 0
0
400
800
Chan
dig
ar
h
Delh
i
Hary
ana
HP
Jamp
K
Pu
nj
ab
Raja
sth
an
UP
Utr
ak
hand
MW
Northern States (MW) Apr 18 Apr 17
13
11
3
99
0 0 01 0 0
48
0 0 1
0
200
Ch
attis
garh
Guja
rat
MP
Mah
ara
st
ra
Da
man amp
Diu
Da
dar
Na
gar
Ha
veliM
W
Western States (MW) Apr 18 Apr 17
0
56
2239
63
2400 0
17 927
0 00
100
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Southern State (MW) Apr 18 Apr17
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Apr17 22 0 0 0 27 0 8
Apr 18 0 0 0 0 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Apr17 4 15 1 0 1 1 0
Apr 18 13 30 7 0 9 29 41
9
0 0 0 0 0 0
4
22
0 0 0
27
0
8
0
10
20
30
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW)Apr 18 Apr17
13
30
7
0
9
29
41
4 1 0 1 1 0
0
50
Aru
na
ch
al
Assa
m
Ma
nip
ur
Meghal
aya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
Sector Apr17 Apr 18
Central 7451 7646
State 6471 5892
Private 5575 6208
ALL INDIA 6490 6466
Month PLF 2017 PLF 2018
Jan 6014 6247
Feb 6153 6259
March 6312 6533
April 6466 649
May
June
July
Aug
Sep
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Apr 2018
74
51
64
71
55
75
64
90
76
46
58
92
62
08
64
66
000100020003000400050006000700080009000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Apr 2017 and Apr 2018
Apr17 Apr 18
615
3
625
9
60
80
Ap
ril
Axis
Title
Axis Title
All India PLF Month-wise
2017 2018
2010-11 2011-12 2012-13 2013-14 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
Pump sets Energised as on 3132018
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer may not be necessary)
Figures are based on the data available in DDUGJY website
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
21212860
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 30112017
Villiages Electrified (Nos) as on 3132018
9985596556
Villages electrified
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Apr 2018 and April 2017 to Apr 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1586860 2220135 5366050 9173045
Hydro 258402 227600 61900 547902
Nuclear 200000 000 000 200000
Total 2045262 2447735 5427950 9920947
Acievement 7812 15761 11592 11205
1 Capacity Addtion Targets and Achievements in the 12th Plan
Achievement of Capacity Addition during the Current Plan upto April 2017
Achievements upto Apr 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
54
790
2
20
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9920947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 4880 2260 4880 2260 -2620
State 3546 270 850 3546 850 -2696
Pvt 2940 0 300 2940 300 -2640
Total 11366 270 3410 11366 3410 -7956
Central 800 110 330 610 330 -280
State 300 0 0 478 0 -478
Pvt 205 0 0 217 0 -217
Total 1305 110 330 1305 330 -975
Nuclear Central 500 0 0 0 0 0
Central 6180 110 2590 5490 2590 -2900
State 3846 270 850 4024 850 -3174
Pvt 3145 0 300 3157 300 -2857
Total 13171 380 3740 12671 3740 -8931
13
2 Capacity Addition Targets Achievements During Apr 2018
Apr-18 April 17 - Apr 18Schemes Sector
Target 2017-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Mar 2018
Thermal1
13
66
13
05
0
12
67
1
34
10
33
0
0
37
40
0
2000
4000
6000
8000
10000
12000
14000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2017-18Target Achievement
270
3410
110
330
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Target Achievement
MW
Targets and Achievement during Mar 2018Thermal
Hydro
Nuclear
Coal Gas Diesel Total
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Sub Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Sub Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 5301726 332000 1180803 3436928 10251457
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 103840 3328216
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Sub Total 52002 173605 3600 229207 000 134200 28256 391663
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6445650 707895 7189938 000 2985800 200337 10376075
Private 7554600 1058060 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
Total 19695750 2489746 837629 22269259 678000 4529342 6902239 34378839
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032018 is given below (in MW)
448581 3404600 2165148 6902239
A April 2018 0 MW
B April 2018 214 MW
C April 2018 0 MW
D Net Capacity
Added during
April 2018 A-B-C -214 MW
Northern Region
Western Region
870080 13830
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032018
BM PowerCogen
Bio-PowerSolar Power
Waste to EnergyWind Power
Southern Region
Eastern Region
North Eastern
Region
Small
Hydro Power
Total
Capacity
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 30042018)
Region Ownership Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
(UTILITIES)
RES
(MNRE)
1 OBRA TPS U-8 (94 MW) has been retired from the State Sector of Uttar Pradesh
2 BANDEL TPS U-3amp4(2x60=120MW) has been retired from the State Sector of West Bengal
Capacity Retired during
Capacity Derated
Capacity Added during
Islands
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 381772 20701 000 402473 10283 72309 000 485065
Sub-Total 482194 211541 000 693735 10283 72309 12157 788484
State 272000 15000 000 287000 000 108451 5930 401381
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 194821 41175 1124201
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 59723 158923
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 85384 403868
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5136 5136
Central 50639 12907 000 63547 6798 113948 000 184293
Sub-Total 50639 30407 000 81047 6798 236948 18039 342832
State 262000 15000 000 277000 000 257023 12780 546803
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 859008 41401 000 900409 19681 378165 128242 1426497
State 585000 60380 000 645380 000 108796 2385 756561
Private 388200 000 000 388200 000 10400 645579 1044179
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193097 677364 2102450
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 262191 1217824
Central 379639 54949 000 434588 28948 185493 3000 652029
Sub-Total 1797972 54949 000 1852921 28948 342103 267701 2491673
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 47953 111653
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 54740 335623
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 2520 2520
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 2520 18809
124953 29105 000 154058 23703 75145 000 252907
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Grand Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Jammu amp Kashmir
Punjab
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042018)
State Ownership Sector
Modewise breakup
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Delhi
Haryana
Himachal Pradesh
(As on 30042018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1061 1061
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1061 18758
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 704902 1877469
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 729532 3079432
State 408000 000 000 408000 000 170366 8396 586762
Private 557400 10000 000 567400 000 000 363584 930984
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1244841 35700 000 1280541 27300 322366 401980 2032187
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 000 000 200144
Sub-Total 1272344 000 000 1272344 4800 12000 53535 1342679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 824775 2175275
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 857888 4307419
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Grand Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 369412 3680 760480 000 000 642713 1403193
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 392952 3680 1452476 12727 167360 672588 2305151
State 508250 000 000 508250 000 244993 4022 757265
Private 83945 95088 000 179033 000 000 360930 539963
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 95088 000 882895 14873 244993 365952 1508713
State 502000 000 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1228352 1426722
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 996082 69800 359980 1243885 2669747
State 000 000 15996 000 188150 15102 219248
Private 61500 17400 000 78900 000 000 17844 96744
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 245176 36200 188150 37946 507472
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 575247 000 000 1086081 1661328
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 1508607 144800 220320 1116541 2990268
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 016 016
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 016 36706
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 5301726 332000 1180803 3436928 10251457
Andhra Pradesh
Telangana
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 2567 75567
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 2972 176446
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34387 276887
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43582 1051759
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 17830 311730
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 19460 733842
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 000 39900
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5211 96214
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 103840 3328216
(As on 30042018)
Coal Gas Diesel Total
State 000 28845 000 28845 000 10000 3001 41846
Private 000 2450 000 2450 000 000 1655 4105
Central 27902 43556 000 71458 000 33123 000 104581
Sub-Total 27902 74851 000 102753 000 43123 4656 150532
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 9745 000 16897
Sub-Total 2470 4682 000 7152 000 9745 11000 27897
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 002 002
Central 3040 10969 000 14009 000 6519 000 20528
Sub-Total 3040 10969 000 14009 000 38719 3105 55833
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 6238 500 54173
Sub-Total 3740 60645 000 64385 000 6238 2110 72733
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 006 006
Central 3140 7157 000 10297 000 8893 000 19190
Sub-Total 3140 7157 3600 13897 000 8893 551 23341
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5337 000 12370
Sub-Total 2140 4893 000 7033 000 5337 3167 15537
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9419 000 15535
Sub-Total 2070 4046 000 6116 000 9419 3667 19202
7500 6362 000 13862 000 12726 000 26588
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Grand Total 52002 173605 3600 229207 000 134200 28256 391663
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
RES
(MNRE)
Bihar
Modewise breakup
Mizoram
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
State Ownership Sector
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Central - Unallocated
Total (North-
Eastern Region)
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Andaman amp
Nicobar
SN Contents Page
1Programme and Achievements of Transmission Lines in Apr 2018 and during April
2016 to Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
Section C - Transmission Lines
20
Programme
2017-18 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3665 0 236 0 236
State Sector 416 0 0 0 0
JVPrivate Sector 846 0 6 0 0
Total 4927 0 242 0 236
Central Sector 4851 28 36 28 36
State Sector 5157 99 4 99 4
JVPrivate Sector 1416 0 0 0 0
Total 11424 127 40 127 40
Central Sector 763 0 0 0 0
State Sector 5972 13 481 13 481
JVPrivate Sector 0 0 0 0 0
Total 6735 13 481 13 481
Grand Total 23086 140 763 140 757
Voltage Level 2
765
400
400
400
220
220
220
220
220
765
STATE SECTOR Sector3 Kalpaka - Maradam line
8 Sarangapur (Allahabad)PG - Phulpur line
Grand Total
4
Transmission Lines (220 kV and above) CommissionedReady for
commissioning During Apr-2018
Name of Transmission Lines
CENTRAL SECTOR Sector
Total of CENTRAL SECTOR
10 Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)
Sl No
2
9 Sohawal PG - Barabanki line
1 3
1 Parli - Solapur (PPTL - TBCB)
Parli (New) - Parli (PG) (Q) (PPTL -TBCB)
400 kV
220kV
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 17 to Apr 18Apr 18Voltage
Level
Sector
LILO of 2nd Ckt VTS- Malkaram to Suryapet
5 Ataur - Mandola Vihar line
Total of STATE SECTOR
PRIVATE SECTOR Sector
Total of PRIVATE SECTOR
6 LILO of 2nd Ckt Birsinghpur - Amarkantak line at Shahdol Ss
7 LILO of 2nd Ckt of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Apr17 Apr 18 Apr 17 Mar18 Apr17 Apr18
Northern 28389 28591 27968 28171 -15 -15
Western 32562 33371 32544 33369 -01 00
Southern 28106 29515 28091 29469 -01 -02
Eastern 11164 11634 11149 11617 -01 -01
North Eastern 1108 1187 1058 1135 -45 -43
All India 101329 104297 100810 103761 -05 -05
Apr 17 Apr 18 Apr 17 Apr 18 Apr17 Apr 18
Northern 49603 47996 48711 46959 -18 -22
Western 49850 50677 49778 50457 -01 -04
Southern 42560 45808 42535 45684 -01 -03
Eastern 19855 20429 19662 20429 -10 00
North Eastern 2258 2600 2209 2552 -22 -18
All India 159590 158520 158393 156720 -08 -11
7
8 Power Supply Position (Energy amp Peak) in Mar 2017
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()RegionPower (MW)
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandApr 17 0 3 0 0 515 0 32 0 0
Apr 18 0 0 0 0 546 0 0 247 0
Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Haveli
Apr 17 1 0 0 48 0 0 1
Apr 18 13 11 3 99 0 0 0
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Apr17 0 0 17 9 27 0 0
Apr 18 0 56 22 39 63 24 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
546
0 0
247
00 3 0 0
515
0 32
0 0
0
400
800
Chan
dig
ar
h
Delh
i
Hary
ana
HP
Jamp
K
Pu
nj
ab
Raja
sth
an
UP
Utr
ak
hand
MW
Northern States (MW) Apr 18 Apr 17
13
11
3
99
0 0 01 0 0
48
0 0 1
0
200
Ch
attis
garh
Guja
rat
MP
Mah
ara
st
ra
Da
man amp
Diu
Da
dar
Na
gar
Ha
veliM
W
Western States (MW) Apr 18 Apr 17
0
56
2239
63
2400 0
17 927
0 00
100
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Southern State (MW) Apr 18 Apr17
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Apr17 22 0 0 0 27 0 8
Apr 18 0 0 0 0 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Apr17 4 15 1 0 1 1 0
Apr 18 13 30 7 0 9 29 41
9
0 0 0 0 0 0
4
22
0 0 0
27
0
8
0
10
20
30
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW)Apr 18 Apr17
13
30
7
0
9
29
41
4 1 0 1 1 0
0
50
Aru
na
ch
al
Assa
m
Ma
nip
ur
Meghal
aya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
Sector Apr17 Apr 18
Central 7451 7646
State 6471 5892
Private 5575 6208
ALL INDIA 6490 6466
Month PLF 2017 PLF 2018
Jan 6014 6247
Feb 6153 6259
March 6312 6533
April 6466 649
May
June
July
Aug
Sep
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Apr 2018
74
51
64
71
55
75
64
90
76
46
58
92
62
08
64
66
000100020003000400050006000700080009000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Apr 2017 and Apr 2018
Apr17 Apr 18
615
3
625
9
60
80
Ap
ril
Axis
Title
Axis Title
All India PLF Month-wise
2017 2018
2010-11 2011-12 2012-13 2013-14 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
Pump sets Energised as on 3132018
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer may not be necessary)
Figures are based on the data available in DDUGJY website
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
21212860
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 30112017
Villiages Electrified (Nos) as on 3132018
9985596556
Villages electrified
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Apr 2018 and April 2017 to Apr 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1586860 2220135 5366050 9173045
Hydro 258402 227600 61900 547902
Nuclear 200000 000 000 200000
Total 2045262 2447735 5427950 9920947
Acievement 7812 15761 11592 11205
1 Capacity Addtion Targets and Achievements in the 12th Plan
Achievement of Capacity Addition during the Current Plan upto April 2017
Achievements upto Apr 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
54
790
2
20
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9920947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 4880 2260 4880 2260 -2620
State 3546 270 850 3546 850 -2696
Pvt 2940 0 300 2940 300 -2640
Total 11366 270 3410 11366 3410 -7956
Central 800 110 330 610 330 -280
State 300 0 0 478 0 -478
Pvt 205 0 0 217 0 -217
Total 1305 110 330 1305 330 -975
Nuclear Central 500 0 0 0 0 0
Central 6180 110 2590 5490 2590 -2900
State 3846 270 850 4024 850 -3174
Pvt 3145 0 300 3157 300 -2857
Total 13171 380 3740 12671 3740 -8931
13
2 Capacity Addition Targets Achievements During Apr 2018
Apr-18 April 17 - Apr 18Schemes Sector
Target 2017-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Mar 2018
Thermal1
13
66
13
05
0
12
67
1
34
10
33
0
0
37
40
0
2000
4000
6000
8000
10000
12000
14000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2017-18Target Achievement
270
3410
110
330
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Target Achievement
MW
Targets and Achievement during Mar 2018Thermal
Hydro
Nuclear
Coal Gas Diesel Total
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Sub Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Sub Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 5301726 332000 1180803 3436928 10251457
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 103840 3328216
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Sub Total 52002 173605 3600 229207 000 134200 28256 391663
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6445650 707895 7189938 000 2985800 200337 10376075
Private 7554600 1058060 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
Total 19695750 2489746 837629 22269259 678000 4529342 6902239 34378839
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032018 is given below (in MW)
448581 3404600 2165148 6902239
A April 2018 0 MW
B April 2018 214 MW
C April 2018 0 MW
D Net Capacity
Added during
April 2018 A-B-C -214 MW
Northern Region
Western Region
870080 13830
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032018
BM PowerCogen
Bio-PowerSolar Power
Waste to EnergyWind Power
Southern Region
Eastern Region
North Eastern
Region
Small
Hydro Power
Total
Capacity
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 30042018)
Region Ownership Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
(UTILITIES)
RES
(MNRE)
1 OBRA TPS U-8 (94 MW) has been retired from the State Sector of Uttar Pradesh
2 BANDEL TPS U-3amp4(2x60=120MW) has been retired from the State Sector of West Bengal
Capacity Retired during
Capacity Derated
Capacity Added during
Islands
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 381772 20701 000 402473 10283 72309 000 485065
Sub-Total 482194 211541 000 693735 10283 72309 12157 788484
State 272000 15000 000 287000 000 108451 5930 401381
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 194821 41175 1124201
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 59723 158923
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 85384 403868
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5136 5136
Central 50639 12907 000 63547 6798 113948 000 184293
Sub-Total 50639 30407 000 81047 6798 236948 18039 342832
State 262000 15000 000 277000 000 257023 12780 546803
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 859008 41401 000 900409 19681 378165 128242 1426497
State 585000 60380 000 645380 000 108796 2385 756561
Private 388200 000 000 388200 000 10400 645579 1044179
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193097 677364 2102450
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 262191 1217824
Central 379639 54949 000 434588 28948 185493 3000 652029
Sub-Total 1797972 54949 000 1852921 28948 342103 267701 2491673
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 47953 111653
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 54740 335623
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 2520 2520
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 2520 18809
124953 29105 000 154058 23703 75145 000 252907
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Grand Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Jammu amp Kashmir
Punjab
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042018)
State Ownership Sector
Modewise breakup
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Delhi
Haryana
Himachal Pradesh
(As on 30042018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1061 1061
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1061 18758
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 704902 1877469
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 729532 3079432
State 408000 000 000 408000 000 170366 8396 586762
Private 557400 10000 000 567400 000 000 363584 930984
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1244841 35700 000 1280541 27300 322366 401980 2032187
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 000 000 200144
Sub-Total 1272344 000 000 1272344 4800 12000 53535 1342679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 824775 2175275
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 857888 4307419
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Grand Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 369412 3680 760480 000 000 642713 1403193
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 392952 3680 1452476 12727 167360 672588 2305151
State 508250 000 000 508250 000 244993 4022 757265
Private 83945 95088 000 179033 000 000 360930 539963
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 95088 000 882895 14873 244993 365952 1508713
State 502000 000 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1228352 1426722
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 996082 69800 359980 1243885 2669747
State 000 000 15996 000 188150 15102 219248
Private 61500 17400 000 78900 000 000 17844 96744
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 245176 36200 188150 37946 507472
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 575247 000 000 1086081 1661328
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 1508607 144800 220320 1116541 2990268
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 016 016
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 016 36706
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 5301726 332000 1180803 3436928 10251457
Andhra Pradesh
Telangana
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 2567 75567
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 2972 176446
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34387 276887
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43582 1051759
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 17830 311730
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 19460 733842
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 000 39900
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5211 96214
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 103840 3328216
(As on 30042018)
Coal Gas Diesel Total
State 000 28845 000 28845 000 10000 3001 41846
Private 000 2450 000 2450 000 000 1655 4105
Central 27902 43556 000 71458 000 33123 000 104581
Sub-Total 27902 74851 000 102753 000 43123 4656 150532
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 9745 000 16897
Sub-Total 2470 4682 000 7152 000 9745 11000 27897
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 002 002
Central 3040 10969 000 14009 000 6519 000 20528
Sub-Total 3040 10969 000 14009 000 38719 3105 55833
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 6238 500 54173
Sub-Total 3740 60645 000 64385 000 6238 2110 72733
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 006 006
Central 3140 7157 000 10297 000 8893 000 19190
Sub-Total 3140 7157 3600 13897 000 8893 551 23341
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5337 000 12370
Sub-Total 2140 4893 000 7033 000 5337 3167 15537
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9419 000 15535
Sub-Total 2070 4046 000 6116 000 9419 3667 19202
7500 6362 000 13862 000 12726 000 26588
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Grand Total 52002 173605 3600 229207 000 134200 28256 391663
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
RES
(MNRE)
Bihar
Modewise breakup
Mizoram
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
State Ownership Sector
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Central - Unallocated
Total (North-
Eastern Region)
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Andaman amp
Nicobar
SN Contents Page
1Programme and Achievements of Transmission Lines in Apr 2018 and during April
2016 to Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
Section C - Transmission Lines
20
Programme
2017-18 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3665 0 236 0 236
State Sector 416 0 0 0 0
JVPrivate Sector 846 0 6 0 0
Total 4927 0 242 0 236
Central Sector 4851 28 36 28 36
State Sector 5157 99 4 99 4
JVPrivate Sector 1416 0 0 0 0
Total 11424 127 40 127 40
Central Sector 763 0 0 0 0
State Sector 5972 13 481 13 481
JVPrivate Sector 0 0 0 0 0
Total 6735 13 481 13 481
Grand Total 23086 140 763 140 757
Voltage Level 2
765
400
400
400
220
220
220
220
220
765
STATE SECTOR Sector3 Kalpaka - Maradam line
8 Sarangapur (Allahabad)PG - Phulpur line
Grand Total
4
Transmission Lines (220 kV and above) CommissionedReady for
commissioning During Apr-2018
Name of Transmission Lines
CENTRAL SECTOR Sector
Total of CENTRAL SECTOR
10 Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)
Sl No
2
9 Sohawal PG - Barabanki line
1 3
1 Parli - Solapur (PPTL - TBCB)
Parli (New) - Parli (PG) (Q) (PPTL -TBCB)
400 kV
220kV
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 17 to Apr 18Apr 18Voltage
Level
Sector
LILO of 2nd Ckt VTS- Malkaram to Suryapet
5 Ataur - Mandola Vihar line
Total of STATE SECTOR
PRIVATE SECTOR Sector
Total of PRIVATE SECTOR
6 LILO of 2nd Ckt Birsinghpur - Amarkantak line at Shahdol Ss
7 LILO of 2nd Ckt of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandApr 17 0 3 0 0 515 0 32 0 0
Apr 18 0 0 0 0 546 0 0 247 0
Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Haveli
Apr 17 1 0 0 48 0 0 1
Apr 18 13 11 3 99 0 0 0
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Apr17 0 0 17 9 27 0 0
Apr 18 0 56 22 39 63 24 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
546
0 0
247
00 3 0 0
515
0 32
0 0
0
400
800
Chan
dig
ar
h
Delh
i
Hary
ana
HP
Jamp
K
Pu
nj
ab
Raja
sth
an
UP
Utr
ak
hand
MW
Northern States (MW) Apr 18 Apr 17
13
11
3
99
0 0 01 0 0
48
0 0 1
0
200
Ch
attis
garh
Guja
rat
MP
Mah
ara
st
ra
Da
man amp
Diu
Da
dar
Na
gar
Ha
veliM
W
Western States (MW) Apr 18 Apr 17
0
56
2239
63
2400 0
17 927
0 00
100
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Southern State (MW) Apr 18 Apr17
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Apr17 22 0 0 0 27 0 8
Apr 18 0 0 0 0 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Apr17 4 15 1 0 1 1 0
Apr 18 13 30 7 0 9 29 41
9
0 0 0 0 0 0
4
22
0 0 0
27
0
8
0
10
20
30
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW)Apr 18 Apr17
13
30
7
0
9
29
41
4 1 0 1 1 0
0
50
Aru
na
ch
al
Assa
m
Ma
nip
ur
Meghal
aya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
Sector Apr17 Apr 18
Central 7451 7646
State 6471 5892
Private 5575 6208
ALL INDIA 6490 6466
Month PLF 2017 PLF 2018
Jan 6014 6247
Feb 6153 6259
March 6312 6533
April 6466 649
May
June
July
Aug
Sep
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Apr 2018
74
51
64
71
55
75
64
90
76
46
58
92
62
08
64
66
000100020003000400050006000700080009000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Apr 2017 and Apr 2018
Apr17 Apr 18
615
3
625
9
60
80
Ap
ril
Axis
Title
Axis Title
All India PLF Month-wise
2017 2018
2010-11 2011-12 2012-13 2013-14 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
Pump sets Energised as on 3132018
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer may not be necessary)
Figures are based on the data available in DDUGJY website
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
21212860
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 30112017
Villiages Electrified (Nos) as on 3132018
9985596556
Villages electrified
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Apr 2018 and April 2017 to Apr 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1586860 2220135 5366050 9173045
Hydro 258402 227600 61900 547902
Nuclear 200000 000 000 200000
Total 2045262 2447735 5427950 9920947
Acievement 7812 15761 11592 11205
1 Capacity Addtion Targets and Achievements in the 12th Plan
Achievement of Capacity Addition during the Current Plan upto April 2017
Achievements upto Apr 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
54
790
2
20
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9920947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 4880 2260 4880 2260 -2620
State 3546 270 850 3546 850 -2696
Pvt 2940 0 300 2940 300 -2640
Total 11366 270 3410 11366 3410 -7956
Central 800 110 330 610 330 -280
State 300 0 0 478 0 -478
Pvt 205 0 0 217 0 -217
Total 1305 110 330 1305 330 -975
Nuclear Central 500 0 0 0 0 0
Central 6180 110 2590 5490 2590 -2900
State 3846 270 850 4024 850 -3174
Pvt 3145 0 300 3157 300 -2857
Total 13171 380 3740 12671 3740 -8931
13
2 Capacity Addition Targets Achievements During Apr 2018
Apr-18 April 17 - Apr 18Schemes Sector
Target 2017-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Mar 2018
Thermal1
13
66
13
05
0
12
67
1
34
10
33
0
0
37
40
0
2000
4000
6000
8000
10000
12000
14000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2017-18Target Achievement
270
3410
110
330
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Target Achievement
MW
Targets and Achievement during Mar 2018Thermal
Hydro
Nuclear
Coal Gas Diesel Total
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Sub Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Sub Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 5301726 332000 1180803 3436928 10251457
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 103840 3328216
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Sub Total 52002 173605 3600 229207 000 134200 28256 391663
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6445650 707895 7189938 000 2985800 200337 10376075
Private 7554600 1058060 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
Total 19695750 2489746 837629 22269259 678000 4529342 6902239 34378839
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032018 is given below (in MW)
448581 3404600 2165148 6902239
A April 2018 0 MW
B April 2018 214 MW
C April 2018 0 MW
D Net Capacity
Added during
April 2018 A-B-C -214 MW
Northern Region
Western Region
870080 13830
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032018
BM PowerCogen
Bio-PowerSolar Power
Waste to EnergyWind Power
Southern Region
Eastern Region
North Eastern
Region
Small
Hydro Power
Total
Capacity
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 30042018)
Region Ownership Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
(UTILITIES)
RES
(MNRE)
1 OBRA TPS U-8 (94 MW) has been retired from the State Sector of Uttar Pradesh
2 BANDEL TPS U-3amp4(2x60=120MW) has been retired from the State Sector of West Bengal
Capacity Retired during
Capacity Derated
Capacity Added during
Islands
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 381772 20701 000 402473 10283 72309 000 485065
Sub-Total 482194 211541 000 693735 10283 72309 12157 788484
State 272000 15000 000 287000 000 108451 5930 401381
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 194821 41175 1124201
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 59723 158923
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 85384 403868
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5136 5136
Central 50639 12907 000 63547 6798 113948 000 184293
Sub-Total 50639 30407 000 81047 6798 236948 18039 342832
State 262000 15000 000 277000 000 257023 12780 546803
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 859008 41401 000 900409 19681 378165 128242 1426497
State 585000 60380 000 645380 000 108796 2385 756561
Private 388200 000 000 388200 000 10400 645579 1044179
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193097 677364 2102450
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 262191 1217824
Central 379639 54949 000 434588 28948 185493 3000 652029
Sub-Total 1797972 54949 000 1852921 28948 342103 267701 2491673
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 47953 111653
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 54740 335623
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 2520 2520
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 2520 18809
124953 29105 000 154058 23703 75145 000 252907
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Grand Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Jammu amp Kashmir
Punjab
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042018)
State Ownership Sector
Modewise breakup
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Delhi
Haryana
Himachal Pradesh
(As on 30042018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1061 1061
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1061 18758
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 704902 1877469
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 729532 3079432
State 408000 000 000 408000 000 170366 8396 586762
Private 557400 10000 000 567400 000 000 363584 930984
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1244841 35700 000 1280541 27300 322366 401980 2032187
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 000 000 200144
Sub-Total 1272344 000 000 1272344 4800 12000 53535 1342679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 824775 2175275
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 857888 4307419
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Grand Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 369412 3680 760480 000 000 642713 1403193
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 392952 3680 1452476 12727 167360 672588 2305151
State 508250 000 000 508250 000 244993 4022 757265
Private 83945 95088 000 179033 000 000 360930 539963
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 95088 000 882895 14873 244993 365952 1508713
State 502000 000 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1228352 1426722
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 996082 69800 359980 1243885 2669747
State 000 000 15996 000 188150 15102 219248
Private 61500 17400 000 78900 000 000 17844 96744
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 245176 36200 188150 37946 507472
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 575247 000 000 1086081 1661328
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 1508607 144800 220320 1116541 2990268
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 016 016
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 016 36706
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 5301726 332000 1180803 3436928 10251457
Andhra Pradesh
Telangana
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 2567 75567
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 2972 176446
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34387 276887
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43582 1051759
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 17830 311730
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 19460 733842
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 000 39900
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5211 96214
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 103840 3328216
(As on 30042018)
Coal Gas Diesel Total
State 000 28845 000 28845 000 10000 3001 41846
Private 000 2450 000 2450 000 000 1655 4105
Central 27902 43556 000 71458 000 33123 000 104581
Sub-Total 27902 74851 000 102753 000 43123 4656 150532
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 9745 000 16897
Sub-Total 2470 4682 000 7152 000 9745 11000 27897
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 002 002
Central 3040 10969 000 14009 000 6519 000 20528
Sub-Total 3040 10969 000 14009 000 38719 3105 55833
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 6238 500 54173
Sub-Total 3740 60645 000 64385 000 6238 2110 72733
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 006 006
Central 3140 7157 000 10297 000 8893 000 19190
Sub-Total 3140 7157 3600 13897 000 8893 551 23341
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5337 000 12370
Sub-Total 2140 4893 000 7033 000 5337 3167 15537
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9419 000 15535
Sub-Total 2070 4046 000 6116 000 9419 3667 19202
7500 6362 000 13862 000 12726 000 26588
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Grand Total 52002 173605 3600 229207 000 134200 28256 391663
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
RES
(MNRE)
Bihar
Modewise breakup
Mizoram
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
State Ownership Sector
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Central - Unallocated
Total (North-
Eastern Region)
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Andaman amp
Nicobar
SN Contents Page
1Programme and Achievements of Transmission Lines in Apr 2018 and during April
2016 to Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
Section C - Transmission Lines
20
Programme
2017-18 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3665 0 236 0 236
State Sector 416 0 0 0 0
JVPrivate Sector 846 0 6 0 0
Total 4927 0 242 0 236
Central Sector 4851 28 36 28 36
State Sector 5157 99 4 99 4
JVPrivate Sector 1416 0 0 0 0
Total 11424 127 40 127 40
Central Sector 763 0 0 0 0
State Sector 5972 13 481 13 481
JVPrivate Sector 0 0 0 0 0
Total 6735 13 481 13 481
Grand Total 23086 140 763 140 757
Voltage Level 2
765
400
400
400
220
220
220
220
220
765
STATE SECTOR Sector3 Kalpaka - Maradam line
8 Sarangapur (Allahabad)PG - Phulpur line
Grand Total
4
Transmission Lines (220 kV and above) CommissionedReady for
commissioning During Apr-2018
Name of Transmission Lines
CENTRAL SECTOR Sector
Total of CENTRAL SECTOR
10 Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)
Sl No
2
9 Sohawal PG - Barabanki line
1 3
1 Parli - Solapur (PPTL - TBCB)
Parli (New) - Parli (PG) (Q) (PPTL -TBCB)
400 kV
220kV
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 17 to Apr 18Apr 18Voltage
Level
Sector
LILO of 2nd Ckt VTS- Malkaram to Suryapet
5 Ataur - Mandola Vihar line
Total of STATE SECTOR
PRIVATE SECTOR Sector
Total of PRIVATE SECTOR
6 LILO of 2nd Ckt Birsinghpur - Amarkantak line at Shahdol Ss
7 LILO of 2nd Ckt of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Apr17 22 0 0 0 27 0 8
Apr 18 0 0 0 0 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Apr17 4 15 1 0 1 1 0
Apr 18 13 30 7 0 9 29 41
9
0 0 0 0 0 0
4
22
0 0 0
27
0
8
0
10
20
30
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW)Apr 18 Apr17
13
30
7
0
9
29
41
4 1 0 1 1 0
0
50
Aru
na
ch
al
Assa
m
Ma
nip
ur
Meghal
aya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
Sector Apr17 Apr 18
Central 7451 7646
State 6471 5892
Private 5575 6208
ALL INDIA 6490 6466
Month PLF 2017 PLF 2018
Jan 6014 6247
Feb 6153 6259
March 6312 6533
April 6466 649
May
June
July
Aug
Sep
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Apr 2018
74
51
64
71
55
75
64
90
76
46
58
92
62
08
64
66
000100020003000400050006000700080009000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Apr 2017 and Apr 2018
Apr17 Apr 18
615
3
625
9
60
80
Ap
ril
Axis
Title
Axis Title
All India PLF Month-wise
2017 2018
2010-11 2011-12 2012-13 2013-14 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
Pump sets Energised as on 3132018
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer may not be necessary)
Figures are based on the data available in DDUGJY website
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
21212860
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 30112017
Villiages Electrified (Nos) as on 3132018
9985596556
Villages electrified
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Apr 2018 and April 2017 to Apr 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1586860 2220135 5366050 9173045
Hydro 258402 227600 61900 547902
Nuclear 200000 000 000 200000
Total 2045262 2447735 5427950 9920947
Acievement 7812 15761 11592 11205
1 Capacity Addtion Targets and Achievements in the 12th Plan
Achievement of Capacity Addition during the Current Plan upto April 2017
Achievements upto Apr 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
54
790
2
20
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9920947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 4880 2260 4880 2260 -2620
State 3546 270 850 3546 850 -2696
Pvt 2940 0 300 2940 300 -2640
Total 11366 270 3410 11366 3410 -7956
Central 800 110 330 610 330 -280
State 300 0 0 478 0 -478
Pvt 205 0 0 217 0 -217
Total 1305 110 330 1305 330 -975
Nuclear Central 500 0 0 0 0 0
Central 6180 110 2590 5490 2590 -2900
State 3846 270 850 4024 850 -3174
Pvt 3145 0 300 3157 300 -2857
Total 13171 380 3740 12671 3740 -8931
13
2 Capacity Addition Targets Achievements During Apr 2018
Apr-18 April 17 - Apr 18Schemes Sector
Target 2017-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Mar 2018
Thermal1
13
66
13
05
0
12
67
1
34
10
33
0
0
37
40
0
2000
4000
6000
8000
10000
12000
14000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2017-18Target Achievement
270
3410
110
330
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Target Achievement
MW
Targets and Achievement during Mar 2018Thermal
Hydro
Nuclear
Coal Gas Diesel Total
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Sub Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Sub Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 5301726 332000 1180803 3436928 10251457
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 103840 3328216
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Sub Total 52002 173605 3600 229207 000 134200 28256 391663
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6445650 707895 7189938 000 2985800 200337 10376075
Private 7554600 1058060 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
Total 19695750 2489746 837629 22269259 678000 4529342 6902239 34378839
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032018 is given below (in MW)
448581 3404600 2165148 6902239
A April 2018 0 MW
B April 2018 214 MW
C April 2018 0 MW
D Net Capacity
Added during
April 2018 A-B-C -214 MW
Northern Region
Western Region
870080 13830
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032018
BM PowerCogen
Bio-PowerSolar Power
Waste to EnergyWind Power
Southern Region
Eastern Region
North Eastern
Region
Small
Hydro Power
Total
Capacity
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 30042018)
Region Ownership Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
(UTILITIES)
RES
(MNRE)
1 OBRA TPS U-8 (94 MW) has been retired from the State Sector of Uttar Pradesh
2 BANDEL TPS U-3amp4(2x60=120MW) has been retired from the State Sector of West Bengal
Capacity Retired during
Capacity Derated
Capacity Added during
Islands
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 381772 20701 000 402473 10283 72309 000 485065
Sub-Total 482194 211541 000 693735 10283 72309 12157 788484
State 272000 15000 000 287000 000 108451 5930 401381
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 194821 41175 1124201
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 59723 158923
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 85384 403868
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5136 5136
Central 50639 12907 000 63547 6798 113948 000 184293
Sub-Total 50639 30407 000 81047 6798 236948 18039 342832
State 262000 15000 000 277000 000 257023 12780 546803
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 859008 41401 000 900409 19681 378165 128242 1426497
State 585000 60380 000 645380 000 108796 2385 756561
Private 388200 000 000 388200 000 10400 645579 1044179
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193097 677364 2102450
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 262191 1217824
Central 379639 54949 000 434588 28948 185493 3000 652029
Sub-Total 1797972 54949 000 1852921 28948 342103 267701 2491673
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 47953 111653
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 54740 335623
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 2520 2520
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 2520 18809
124953 29105 000 154058 23703 75145 000 252907
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Grand Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Jammu amp Kashmir
Punjab
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042018)
State Ownership Sector
Modewise breakup
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Delhi
Haryana
Himachal Pradesh
(As on 30042018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1061 1061
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1061 18758
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 704902 1877469
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 729532 3079432
State 408000 000 000 408000 000 170366 8396 586762
Private 557400 10000 000 567400 000 000 363584 930984
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1244841 35700 000 1280541 27300 322366 401980 2032187
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 000 000 200144
Sub-Total 1272344 000 000 1272344 4800 12000 53535 1342679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 824775 2175275
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 857888 4307419
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Grand Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 369412 3680 760480 000 000 642713 1403193
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 392952 3680 1452476 12727 167360 672588 2305151
State 508250 000 000 508250 000 244993 4022 757265
Private 83945 95088 000 179033 000 000 360930 539963
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 95088 000 882895 14873 244993 365952 1508713
State 502000 000 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1228352 1426722
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 996082 69800 359980 1243885 2669747
State 000 000 15996 000 188150 15102 219248
Private 61500 17400 000 78900 000 000 17844 96744
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 245176 36200 188150 37946 507472
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 575247 000 000 1086081 1661328
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 1508607 144800 220320 1116541 2990268
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 016 016
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 016 36706
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 5301726 332000 1180803 3436928 10251457
Andhra Pradesh
Telangana
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 2567 75567
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 2972 176446
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34387 276887
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43582 1051759
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 17830 311730
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 19460 733842
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 000 39900
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5211 96214
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 103840 3328216
(As on 30042018)
Coal Gas Diesel Total
State 000 28845 000 28845 000 10000 3001 41846
Private 000 2450 000 2450 000 000 1655 4105
Central 27902 43556 000 71458 000 33123 000 104581
Sub-Total 27902 74851 000 102753 000 43123 4656 150532
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 9745 000 16897
Sub-Total 2470 4682 000 7152 000 9745 11000 27897
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 002 002
Central 3040 10969 000 14009 000 6519 000 20528
Sub-Total 3040 10969 000 14009 000 38719 3105 55833
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 6238 500 54173
Sub-Total 3740 60645 000 64385 000 6238 2110 72733
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 006 006
Central 3140 7157 000 10297 000 8893 000 19190
Sub-Total 3140 7157 3600 13897 000 8893 551 23341
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5337 000 12370
Sub-Total 2140 4893 000 7033 000 5337 3167 15537
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9419 000 15535
Sub-Total 2070 4046 000 6116 000 9419 3667 19202
7500 6362 000 13862 000 12726 000 26588
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Grand Total 52002 173605 3600 229207 000 134200 28256 391663
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
RES
(MNRE)
Bihar
Modewise breakup
Mizoram
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
State Ownership Sector
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Central - Unallocated
Total (North-
Eastern Region)
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Andaman amp
Nicobar
SN Contents Page
1Programme and Achievements of Transmission Lines in Apr 2018 and during April
2016 to Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
Section C - Transmission Lines
20
Programme
2017-18 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3665 0 236 0 236
State Sector 416 0 0 0 0
JVPrivate Sector 846 0 6 0 0
Total 4927 0 242 0 236
Central Sector 4851 28 36 28 36
State Sector 5157 99 4 99 4
JVPrivate Sector 1416 0 0 0 0
Total 11424 127 40 127 40
Central Sector 763 0 0 0 0
State Sector 5972 13 481 13 481
JVPrivate Sector 0 0 0 0 0
Total 6735 13 481 13 481
Grand Total 23086 140 763 140 757
Voltage Level 2
765
400
400
400
220
220
220
220
220
765
STATE SECTOR Sector3 Kalpaka - Maradam line
8 Sarangapur (Allahabad)PG - Phulpur line
Grand Total
4
Transmission Lines (220 kV and above) CommissionedReady for
commissioning During Apr-2018
Name of Transmission Lines
CENTRAL SECTOR Sector
Total of CENTRAL SECTOR
10 Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)
Sl No
2
9 Sohawal PG - Barabanki line
1 3
1 Parli - Solapur (PPTL - TBCB)
Parli (New) - Parli (PG) (Q) (PPTL -TBCB)
400 kV
220kV
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 17 to Apr 18Apr 18Voltage
Level
Sector
LILO of 2nd Ckt VTS- Malkaram to Suryapet
5 Ataur - Mandola Vihar line
Total of STATE SECTOR
PRIVATE SECTOR Sector
Total of PRIVATE SECTOR
6 LILO of 2nd Ckt Birsinghpur - Amarkantak line at Shahdol Ss
7 LILO of 2nd Ckt of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Sector Apr17 Apr 18
Central 7451 7646
State 6471 5892
Private 5575 6208
ALL INDIA 6490 6466
Month PLF 2017 PLF 2018
Jan 6014 6247
Feb 6153 6259
March 6312 6533
April 6466 649
May
June
July
Aug
Sep
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Apr 2018
74
51
64
71
55
75
64
90
76
46
58
92
62
08
64
66
000100020003000400050006000700080009000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Apr 2017 and Apr 2018
Apr17 Apr 18
615
3
625
9
60
80
Ap
ril
Axis
Title
Axis Title
All India PLF Month-wise
2017 2018
2010-11 2011-12 2012-13 2013-14 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
Pump sets Energised as on 3132018
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer may not be necessary)
Figures are based on the data available in DDUGJY website
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
21212860
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 30112017
Villiages Electrified (Nos) as on 3132018
9985596556
Villages electrified
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Apr 2018 and April 2017 to Apr 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1586860 2220135 5366050 9173045
Hydro 258402 227600 61900 547902
Nuclear 200000 000 000 200000
Total 2045262 2447735 5427950 9920947
Acievement 7812 15761 11592 11205
1 Capacity Addtion Targets and Achievements in the 12th Plan
Achievement of Capacity Addition during the Current Plan upto April 2017
Achievements upto Apr 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
54
790
2
20
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9920947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 4880 2260 4880 2260 -2620
State 3546 270 850 3546 850 -2696
Pvt 2940 0 300 2940 300 -2640
Total 11366 270 3410 11366 3410 -7956
Central 800 110 330 610 330 -280
State 300 0 0 478 0 -478
Pvt 205 0 0 217 0 -217
Total 1305 110 330 1305 330 -975
Nuclear Central 500 0 0 0 0 0
Central 6180 110 2590 5490 2590 -2900
State 3846 270 850 4024 850 -3174
Pvt 3145 0 300 3157 300 -2857
Total 13171 380 3740 12671 3740 -8931
13
2 Capacity Addition Targets Achievements During Apr 2018
Apr-18 April 17 - Apr 18Schemes Sector
Target 2017-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Mar 2018
Thermal1
13
66
13
05
0
12
67
1
34
10
33
0
0
37
40
0
2000
4000
6000
8000
10000
12000
14000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2017-18Target Achievement
270
3410
110
330
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Target Achievement
MW
Targets and Achievement during Mar 2018Thermal
Hydro
Nuclear
Coal Gas Diesel Total
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Sub Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Sub Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 5301726 332000 1180803 3436928 10251457
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 103840 3328216
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Sub Total 52002 173605 3600 229207 000 134200 28256 391663
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6445650 707895 7189938 000 2985800 200337 10376075
Private 7554600 1058060 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
Total 19695750 2489746 837629 22269259 678000 4529342 6902239 34378839
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032018 is given below (in MW)
448581 3404600 2165148 6902239
A April 2018 0 MW
B April 2018 214 MW
C April 2018 0 MW
D Net Capacity
Added during
April 2018 A-B-C -214 MW
Northern Region
Western Region
870080 13830
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032018
BM PowerCogen
Bio-PowerSolar Power
Waste to EnergyWind Power
Southern Region
Eastern Region
North Eastern
Region
Small
Hydro Power
Total
Capacity
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 30042018)
Region Ownership Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
(UTILITIES)
RES
(MNRE)
1 OBRA TPS U-8 (94 MW) has been retired from the State Sector of Uttar Pradesh
2 BANDEL TPS U-3amp4(2x60=120MW) has been retired from the State Sector of West Bengal
Capacity Retired during
Capacity Derated
Capacity Added during
Islands
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 381772 20701 000 402473 10283 72309 000 485065
Sub-Total 482194 211541 000 693735 10283 72309 12157 788484
State 272000 15000 000 287000 000 108451 5930 401381
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 194821 41175 1124201
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 59723 158923
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 85384 403868
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5136 5136
Central 50639 12907 000 63547 6798 113948 000 184293
Sub-Total 50639 30407 000 81047 6798 236948 18039 342832
State 262000 15000 000 277000 000 257023 12780 546803
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 859008 41401 000 900409 19681 378165 128242 1426497
State 585000 60380 000 645380 000 108796 2385 756561
Private 388200 000 000 388200 000 10400 645579 1044179
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193097 677364 2102450
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 262191 1217824
Central 379639 54949 000 434588 28948 185493 3000 652029
Sub-Total 1797972 54949 000 1852921 28948 342103 267701 2491673
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 47953 111653
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 54740 335623
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 2520 2520
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 2520 18809
124953 29105 000 154058 23703 75145 000 252907
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Grand Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Jammu amp Kashmir
Punjab
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042018)
State Ownership Sector
Modewise breakup
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Delhi
Haryana
Himachal Pradesh
(As on 30042018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1061 1061
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1061 18758
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 704902 1877469
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 729532 3079432
State 408000 000 000 408000 000 170366 8396 586762
Private 557400 10000 000 567400 000 000 363584 930984
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1244841 35700 000 1280541 27300 322366 401980 2032187
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 000 000 200144
Sub-Total 1272344 000 000 1272344 4800 12000 53535 1342679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 824775 2175275
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 857888 4307419
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Grand Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 369412 3680 760480 000 000 642713 1403193
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 392952 3680 1452476 12727 167360 672588 2305151
State 508250 000 000 508250 000 244993 4022 757265
Private 83945 95088 000 179033 000 000 360930 539963
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 95088 000 882895 14873 244993 365952 1508713
State 502000 000 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1228352 1426722
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 996082 69800 359980 1243885 2669747
State 000 000 15996 000 188150 15102 219248
Private 61500 17400 000 78900 000 000 17844 96744
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 245176 36200 188150 37946 507472
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 575247 000 000 1086081 1661328
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 1508607 144800 220320 1116541 2990268
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 016 016
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 016 36706
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 5301726 332000 1180803 3436928 10251457
Andhra Pradesh
Telangana
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 2567 75567
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 2972 176446
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34387 276887
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43582 1051759
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 17830 311730
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 19460 733842
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 000 39900
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5211 96214
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 103840 3328216
(As on 30042018)
Coal Gas Diesel Total
State 000 28845 000 28845 000 10000 3001 41846
Private 000 2450 000 2450 000 000 1655 4105
Central 27902 43556 000 71458 000 33123 000 104581
Sub-Total 27902 74851 000 102753 000 43123 4656 150532
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 9745 000 16897
Sub-Total 2470 4682 000 7152 000 9745 11000 27897
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 002 002
Central 3040 10969 000 14009 000 6519 000 20528
Sub-Total 3040 10969 000 14009 000 38719 3105 55833
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 6238 500 54173
Sub-Total 3740 60645 000 64385 000 6238 2110 72733
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 006 006
Central 3140 7157 000 10297 000 8893 000 19190
Sub-Total 3140 7157 3600 13897 000 8893 551 23341
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5337 000 12370
Sub-Total 2140 4893 000 7033 000 5337 3167 15537
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9419 000 15535
Sub-Total 2070 4046 000 6116 000 9419 3667 19202
7500 6362 000 13862 000 12726 000 26588
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Grand Total 52002 173605 3600 229207 000 134200 28256 391663
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
RES
(MNRE)
Bihar
Modewise breakup
Mizoram
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
State Ownership Sector
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Central - Unallocated
Total (North-
Eastern Region)
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Andaman amp
Nicobar
SN Contents Page
1Programme and Achievements of Transmission Lines in Apr 2018 and during April
2016 to Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
Section C - Transmission Lines
20
Programme
2017-18 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3665 0 236 0 236
State Sector 416 0 0 0 0
JVPrivate Sector 846 0 6 0 0
Total 4927 0 242 0 236
Central Sector 4851 28 36 28 36
State Sector 5157 99 4 99 4
JVPrivate Sector 1416 0 0 0 0
Total 11424 127 40 127 40
Central Sector 763 0 0 0 0
State Sector 5972 13 481 13 481
JVPrivate Sector 0 0 0 0 0
Total 6735 13 481 13 481
Grand Total 23086 140 763 140 757
Voltage Level 2
765
400
400
400
220
220
220
220
220
765
STATE SECTOR Sector3 Kalpaka - Maradam line
8 Sarangapur (Allahabad)PG - Phulpur line
Grand Total
4
Transmission Lines (220 kV and above) CommissionedReady for
commissioning During Apr-2018
Name of Transmission Lines
CENTRAL SECTOR Sector
Total of CENTRAL SECTOR
10 Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)
Sl No
2
9 Sohawal PG - Barabanki line
1 3
1 Parli - Solapur (PPTL - TBCB)
Parli (New) - Parli (PG) (Q) (PPTL -TBCB)
400 kV
220kV
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 17 to Apr 18Apr 18Voltage
Level
Sector
LILO of 2nd Ckt VTS- Malkaram to Suryapet
5 Ataur - Mandola Vihar line
Total of STATE SECTOR
PRIVATE SECTOR Sector
Total of PRIVATE SECTOR
6 LILO of 2nd Ckt Birsinghpur - Amarkantak line at Shahdol Ss
7 LILO of 2nd Ckt of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
2010-11 2011-12 2012-13 2013-14 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
Pump sets Energised as on 3132018
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer may not be necessary)
Figures are based on the data available in DDUGJY website
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
21212860
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 30112017
Villiages Electrified (Nos) as on 3132018
9985596556
Villages electrified
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Apr 2018 and April 2017 to Apr 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1586860 2220135 5366050 9173045
Hydro 258402 227600 61900 547902
Nuclear 200000 000 000 200000
Total 2045262 2447735 5427950 9920947
Acievement 7812 15761 11592 11205
1 Capacity Addtion Targets and Achievements in the 12th Plan
Achievement of Capacity Addition during the Current Plan upto April 2017
Achievements upto Apr 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
54
790
2
20
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9920947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 4880 2260 4880 2260 -2620
State 3546 270 850 3546 850 -2696
Pvt 2940 0 300 2940 300 -2640
Total 11366 270 3410 11366 3410 -7956
Central 800 110 330 610 330 -280
State 300 0 0 478 0 -478
Pvt 205 0 0 217 0 -217
Total 1305 110 330 1305 330 -975
Nuclear Central 500 0 0 0 0 0
Central 6180 110 2590 5490 2590 -2900
State 3846 270 850 4024 850 -3174
Pvt 3145 0 300 3157 300 -2857
Total 13171 380 3740 12671 3740 -8931
13
2 Capacity Addition Targets Achievements During Apr 2018
Apr-18 April 17 - Apr 18Schemes Sector
Target 2017-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Mar 2018
Thermal1
13
66
13
05
0
12
67
1
34
10
33
0
0
37
40
0
2000
4000
6000
8000
10000
12000
14000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2017-18Target Achievement
270
3410
110
330
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Target Achievement
MW
Targets and Achievement during Mar 2018Thermal
Hydro
Nuclear
Coal Gas Diesel Total
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Sub Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Sub Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 5301726 332000 1180803 3436928 10251457
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 103840 3328216
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Sub Total 52002 173605 3600 229207 000 134200 28256 391663
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6445650 707895 7189938 000 2985800 200337 10376075
Private 7554600 1058060 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
Total 19695750 2489746 837629 22269259 678000 4529342 6902239 34378839
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032018 is given below (in MW)
448581 3404600 2165148 6902239
A April 2018 0 MW
B April 2018 214 MW
C April 2018 0 MW
D Net Capacity
Added during
April 2018 A-B-C -214 MW
Northern Region
Western Region
870080 13830
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032018
BM PowerCogen
Bio-PowerSolar Power
Waste to EnergyWind Power
Southern Region
Eastern Region
North Eastern
Region
Small
Hydro Power
Total
Capacity
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 30042018)
Region Ownership Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
(UTILITIES)
RES
(MNRE)
1 OBRA TPS U-8 (94 MW) has been retired from the State Sector of Uttar Pradesh
2 BANDEL TPS U-3amp4(2x60=120MW) has been retired from the State Sector of West Bengal
Capacity Retired during
Capacity Derated
Capacity Added during
Islands
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 381772 20701 000 402473 10283 72309 000 485065
Sub-Total 482194 211541 000 693735 10283 72309 12157 788484
State 272000 15000 000 287000 000 108451 5930 401381
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 194821 41175 1124201
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 59723 158923
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 85384 403868
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5136 5136
Central 50639 12907 000 63547 6798 113948 000 184293
Sub-Total 50639 30407 000 81047 6798 236948 18039 342832
State 262000 15000 000 277000 000 257023 12780 546803
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 859008 41401 000 900409 19681 378165 128242 1426497
State 585000 60380 000 645380 000 108796 2385 756561
Private 388200 000 000 388200 000 10400 645579 1044179
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193097 677364 2102450
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 262191 1217824
Central 379639 54949 000 434588 28948 185493 3000 652029
Sub-Total 1797972 54949 000 1852921 28948 342103 267701 2491673
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 47953 111653
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 54740 335623
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 2520 2520
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 2520 18809
124953 29105 000 154058 23703 75145 000 252907
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Grand Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Jammu amp Kashmir
Punjab
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042018)
State Ownership Sector
Modewise breakup
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Delhi
Haryana
Himachal Pradesh
(As on 30042018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1061 1061
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1061 18758
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 704902 1877469
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 729532 3079432
State 408000 000 000 408000 000 170366 8396 586762
Private 557400 10000 000 567400 000 000 363584 930984
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1244841 35700 000 1280541 27300 322366 401980 2032187
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 000 000 200144
Sub-Total 1272344 000 000 1272344 4800 12000 53535 1342679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 824775 2175275
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 857888 4307419
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Grand Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 369412 3680 760480 000 000 642713 1403193
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 392952 3680 1452476 12727 167360 672588 2305151
State 508250 000 000 508250 000 244993 4022 757265
Private 83945 95088 000 179033 000 000 360930 539963
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 95088 000 882895 14873 244993 365952 1508713
State 502000 000 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1228352 1426722
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 996082 69800 359980 1243885 2669747
State 000 000 15996 000 188150 15102 219248
Private 61500 17400 000 78900 000 000 17844 96744
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 245176 36200 188150 37946 507472
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 575247 000 000 1086081 1661328
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 1508607 144800 220320 1116541 2990268
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 016 016
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 016 36706
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 5301726 332000 1180803 3436928 10251457
Andhra Pradesh
Telangana
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 2567 75567
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 2972 176446
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34387 276887
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43582 1051759
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 17830 311730
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 19460 733842
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 000 39900
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5211 96214
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 103840 3328216
(As on 30042018)
Coal Gas Diesel Total
State 000 28845 000 28845 000 10000 3001 41846
Private 000 2450 000 2450 000 000 1655 4105
Central 27902 43556 000 71458 000 33123 000 104581
Sub-Total 27902 74851 000 102753 000 43123 4656 150532
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 9745 000 16897
Sub-Total 2470 4682 000 7152 000 9745 11000 27897
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 002 002
Central 3040 10969 000 14009 000 6519 000 20528
Sub-Total 3040 10969 000 14009 000 38719 3105 55833
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 6238 500 54173
Sub-Total 3740 60645 000 64385 000 6238 2110 72733
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 006 006
Central 3140 7157 000 10297 000 8893 000 19190
Sub-Total 3140 7157 3600 13897 000 8893 551 23341
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5337 000 12370
Sub-Total 2140 4893 000 7033 000 5337 3167 15537
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9419 000 15535
Sub-Total 2070 4046 000 6116 000 9419 3667 19202
7500 6362 000 13862 000 12726 000 26588
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Grand Total 52002 173605 3600 229207 000 134200 28256 391663
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
RES
(MNRE)
Bihar
Modewise breakup
Mizoram
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
State Ownership Sector
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Central - Unallocated
Total (North-
Eastern Region)
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Andaman amp
Nicobar
SN Contents Page
1Programme and Achievements of Transmission Lines in Apr 2018 and during April
2016 to Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
Section C - Transmission Lines
20
Programme
2017-18 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3665 0 236 0 236
State Sector 416 0 0 0 0
JVPrivate Sector 846 0 6 0 0
Total 4927 0 242 0 236
Central Sector 4851 28 36 28 36
State Sector 5157 99 4 99 4
JVPrivate Sector 1416 0 0 0 0
Total 11424 127 40 127 40
Central Sector 763 0 0 0 0
State Sector 5972 13 481 13 481
JVPrivate Sector 0 0 0 0 0
Total 6735 13 481 13 481
Grand Total 23086 140 763 140 757
Voltage Level 2
765
400
400
400
220
220
220
220
220
765
STATE SECTOR Sector3 Kalpaka - Maradam line
8 Sarangapur (Allahabad)PG - Phulpur line
Grand Total
4
Transmission Lines (220 kV and above) CommissionedReady for
commissioning During Apr-2018
Name of Transmission Lines
CENTRAL SECTOR Sector
Total of CENTRAL SECTOR
10 Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)
Sl No
2
9 Sohawal PG - Barabanki line
1 3
1 Parli - Solapur (PPTL - TBCB)
Parli (New) - Parli (PG) (Q) (PPTL -TBCB)
400 kV
220kV
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 17 to Apr 18Apr 18Voltage
Level
Sector
LILO of 2nd Ckt VTS- Malkaram to Suryapet
5 Ataur - Mandola Vihar line
Total of STATE SECTOR
PRIVATE SECTOR Sector
Total of PRIVATE SECTOR
6 LILO of 2nd Ckt Birsinghpur - Amarkantak line at Shahdol Ss
7 LILO of 2nd Ckt of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Apr 2018 and April 2017 to Apr 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1586860 2220135 5366050 9173045
Hydro 258402 227600 61900 547902
Nuclear 200000 000 000 200000
Total 2045262 2447735 5427950 9920947
Acievement 7812 15761 11592 11205
1 Capacity Addtion Targets and Achievements in the 12th Plan
Achievement of Capacity Addition during the Current Plan upto April 2017
Achievements upto Apr 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
54
790
2
20
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9920947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 4880 2260 4880 2260 -2620
State 3546 270 850 3546 850 -2696
Pvt 2940 0 300 2940 300 -2640
Total 11366 270 3410 11366 3410 -7956
Central 800 110 330 610 330 -280
State 300 0 0 478 0 -478
Pvt 205 0 0 217 0 -217
Total 1305 110 330 1305 330 -975
Nuclear Central 500 0 0 0 0 0
Central 6180 110 2590 5490 2590 -2900
State 3846 270 850 4024 850 -3174
Pvt 3145 0 300 3157 300 -2857
Total 13171 380 3740 12671 3740 -8931
13
2 Capacity Addition Targets Achievements During Apr 2018
Apr-18 April 17 - Apr 18Schemes Sector
Target 2017-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Mar 2018
Thermal1
13
66
13
05
0
12
67
1
34
10
33
0
0
37
40
0
2000
4000
6000
8000
10000
12000
14000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2017-18Target Achievement
270
3410
110
330
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Target Achievement
MW
Targets and Achievement during Mar 2018Thermal
Hydro
Nuclear
Coal Gas Diesel Total
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Sub Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Sub Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 5301726 332000 1180803 3436928 10251457
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 103840 3328216
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Sub Total 52002 173605 3600 229207 000 134200 28256 391663
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6445650 707895 7189938 000 2985800 200337 10376075
Private 7554600 1058060 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
Total 19695750 2489746 837629 22269259 678000 4529342 6902239 34378839
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032018 is given below (in MW)
448581 3404600 2165148 6902239
A April 2018 0 MW
B April 2018 214 MW
C April 2018 0 MW
D Net Capacity
Added during
April 2018 A-B-C -214 MW
Northern Region
Western Region
870080 13830
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032018
BM PowerCogen
Bio-PowerSolar Power
Waste to EnergyWind Power
Southern Region
Eastern Region
North Eastern
Region
Small
Hydro Power
Total
Capacity
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 30042018)
Region Ownership Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
(UTILITIES)
RES
(MNRE)
1 OBRA TPS U-8 (94 MW) has been retired from the State Sector of Uttar Pradesh
2 BANDEL TPS U-3amp4(2x60=120MW) has been retired from the State Sector of West Bengal
Capacity Retired during
Capacity Derated
Capacity Added during
Islands
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 381772 20701 000 402473 10283 72309 000 485065
Sub-Total 482194 211541 000 693735 10283 72309 12157 788484
State 272000 15000 000 287000 000 108451 5930 401381
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 194821 41175 1124201
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 59723 158923
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 85384 403868
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5136 5136
Central 50639 12907 000 63547 6798 113948 000 184293
Sub-Total 50639 30407 000 81047 6798 236948 18039 342832
State 262000 15000 000 277000 000 257023 12780 546803
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 859008 41401 000 900409 19681 378165 128242 1426497
State 585000 60380 000 645380 000 108796 2385 756561
Private 388200 000 000 388200 000 10400 645579 1044179
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193097 677364 2102450
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 262191 1217824
Central 379639 54949 000 434588 28948 185493 3000 652029
Sub-Total 1797972 54949 000 1852921 28948 342103 267701 2491673
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 47953 111653
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 54740 335623
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 2520 2520
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 2520 18809
124953 29105 000 154058 23703 75145 000 252907
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Grand Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Jammu amp Kashmir
Punjab
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042018)
State Ownership Sector
Modewise breakup
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Delhi
Haryana
Himachal Pradesh
(As on 30042018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1061 1061
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1061 18758
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 704902 1877469
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 729532 3079432
State 408000 000 000 408000 000 170366 8396 586762
Private 557400 10000 000 567400 000 000 363584 930984
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1244841 35700 000 1280541 27300 322366 401980 2032187
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 000 000 200144
Sub-Total 1272344 000 000 1272344 4800 12000 53535 1342679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 824775 2175275
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 857888 4307419
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Grand Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 369412 3680 760480 000 000 642713 1403193
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 392952 3680 1452476 12727 167360 672588 2305151
State 508250 000 000 508250 000 244993 4022 757265
Private 83945 95088 000 179033 000 000 360930 539963
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 95088 000 882895 14873 244993 365952 1508713
State 502000 000 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1228352 1426722
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 996082 69800 359980 1243885 2669747
State 000 000 15996 000 188150 15102 219248
Private 61500 17400 000 78900 000 000 17844 96744
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 245176 36200 188150 37946 507472
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 575247 000 000 1086081 1661328
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 1508607 144800 220320 1116541 2990268
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 016 016
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 016 36706
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 5301726 332000 1180803 3436928 10251457
Andhra Pradesh
Telangana
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 2567 75567
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 2972 176446
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34387 276887
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43582 1051759
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 17830 311730
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 19460 733842
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 000 39900
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5211 96214
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 103840 3328216
(As on 30042018)
Coal Gas Diesel Total
State 000 28845 000 28845 000 10000 3001 41846
Private 000 2450 000 2450 000 000 1655 4105
Central 27902 43556 000 71458 000 33123 000 104581
Sub-Total 27902 74851 000 102753 000 43123 4656 150532
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 9745 000 16897
Sub-Total 2470 4682 000 7152 000 9745 11000 27897
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 002 002
Central 3040 10969 000 14009 000 6519 000 20528
Sub-Total 3040 10969 000 14009 000 38719 3105 55833
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 6238 500 54173
Sub-Total 3740 60645 000 64385 000 6238 2110 72733
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 006 006
Central 3140 7157 000 10297 000 8893 000 19190
Sub-Total 3140 7157 3600 13897 000 8893 551 23341
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5337 000 12370
Sub-Total 2140 4893 000 7033 000 5337 3167 15537
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9419 000 15535
Sub-Total 2070 4046 000 6116 000 9419 3667 19202
7500 6362 000 13862 000 12726 000 26588
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Grand Total 52002 173605 3600 229207 000 134200 28256 391663
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
RES
(MNRE)
Bihar
Modewise breakup
Mizoram
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
State Ownership Sector
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Central - Unallocated
Total (North-
Eastern Region)
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Andaman amp
Nicobar
SN Contents Page
1Programme and Achievements of Transmission Lines in Apr 2018 and during April
2016 to Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
Section C - Transmission Lines
20
Programme
2017-18 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3665 0 236 0 236
State Sector 416 0 0 0 0
JVPrivate Sector 846 0 6 0 0
Total 4927 0 242 0 236
Central Sector 4851 28 36 28 36
State Sector 5157 99 4 99 4
JVPrivate Sector 1416 0 0 0 0
Total 11424 127 40 127 40
Central Sector 763 0 0 0 0
State Sector 5972 13 481 13 481
JVPrivate Sector 0 0 0 0 0
Total 6735 13 481 13 481
Grand Total 23086 140 763 140 757
Voltage Level 2
765
400
400
400
220
220
220
220
220
765
STATE SECTOR Sector3 Kalpaka - Maradam line
8 Sarangapur (Allahabad)PG - Phulpur line
Grand Total
4
Transmission Lines (220 kV and above) CommissionedReady for
commissioning During Apr-2018
Name of Transmission Lines
CENTRAL SECTOR Sector
Total of CENTRAL SECTOR
10 Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)
Sl No
2
9 Sohawal PG - Barabanki line
1 3
1 Parli - Solapur (PPTL - TBCB)
Parli (New) - Parli (PG) (Q) (PPTL -TBCB)
400 kV
220kV
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 17 to Apr 18Apr 18Voltage
Level
Sector
LILO of 2nd Ckt VTS- Malkaram to Suryapet
5 Ataur - Mandola Vihar line
Total of STATE SECTOR
PRIVATE SECTOR Sector
Total of PRIVATE SECTOR
6 LILO of 2nd Ckt Birsinghpur - Amarkantak line at Shahdol Ss
7 LILO of 2nd Ckt of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1586860 2220135 5366050 9173045
Hydro 258402 227600 61900 547902
Nuclear 200000 000 000 200000
Total 2045262 2447735 5427950 9920947
Acievement 7812 15761 11592 11205
1 Capacity Addtion Targets and Achievements in the 12th Plan
Achievement of Capacity Addition during the Current Plan upto April 2017
Achievements upto Apr 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
54
790
2
20
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9920947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 4880 2260 4880 2260 -2620
State 3546 270 850 3546 850 -2696
Pvt 2940 0 300 2940 300 -2640
Total 11366 270 3410 11366 3410 -7956
Central 800 110 330 610 330 -280
State 300 0 0 478 0 -478
Pvt 205 0 0 217 0 -217
Total 1305 110 330 1305 330 -975
Nuclear Central 500 0 0 0 0 0
Central 6180 110 2590 5490 2590 -2900
State 3846 270 850 4024 850 -3174
Pvt 3145 0 300 3157 300 -2857
Total 13171 380 3740 12671 3740 -8931
13
2 Capacity Addition Targets Achievements During Apr 2018
Apr-18 April 17 - Apr 18Schemes Sector
Target 2017-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Mar 2018
Thermal1
13
66
13
05
0
12
67
1
34
10
33
0
0
37
40
0
2000
4000
6000
8000
10000
12000
14000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2017-18Target Achievement
270
3410
110
330
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Target Achievement
MW
Targets and Achievement during Mar 2018Thermal
Hydro
Nuclear
Coal Gas Diesel Total
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Sub Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Sub Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 5301726 332000 1180803 3436928 10251457
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 103840 3328216
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Sub Total 52002 173605 3600 229207 000 134200 28256 391663
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6445650 707895 7189938 000 2985800 200337 10376075
Private 7554600 1058060 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
Total 19695750 2489746 837629 22269259 678000 4529342 6902239 34378839
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032018 is given below (in MW)
448581 3404600 2165148 6902239
A April 2018 0 MW
B April 2018 214 MW
C April 2018 0 MW
D Net Capacity
Added during
April 2018 A-B-C -214 MW
Northern Region
Western Region
870080 13830
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032018
BM PowerCogen
Bio-PowerSolar Power
Waste to EnergyWind Power
Southern Region
Eastern Region
North Eastern
Region
Small
Hydro Power
Total
Capacity
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 30042018)
Region Ownership Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
(UTILITIES)
RES
(MNRE)
1 OBRA TPS U-8 (94 MW) has been retired from the State Sector of Uttar Pradesh
2 BANDEL TPS U-3amp4(2x60=120MW) has been retired from the State Sector of West Bengal
Capacity Retired during
Capacity Derated
Capacity Added during
Islands
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 381772 20701 000 402473 10283 72309 000 485065
Sub-Total 482194 211541 000 693735 10283 72309 12157 788484
State 272000 15000 000 287000 000 108451 5930 401381
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 194821 41175 1124201
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 59723 158923
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 85384 403868
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5136 5136
Central 50639 12907 000 63547 6798 113948 000 184293
Sub-Total 50639 30407 000 81047 6798 236948 18039 342832
State 262000 15000 000 277000 000 257023 12780 546803
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 859008 41401 000 900409 19681 378165 128242 1426497
State 585000 60380 000 645380 000 108796 2385 756561
Private 388200 000 000 388200 000 10400 645579 1044179
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193097 677364 2102450
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 262191 1217824
Central 379639 54949 000 434588 28948 185493 3000 652029
Sub-Total 1797972 54949 000 1852921 28948 342103 267701 2491673
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 47953 111653
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 54740 335623
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 2520 2520
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 2520 18809
124953 29105 000 154058 23703 75145 000 252907
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Grand Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Jammu amp Kashmir
Punjab
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042018)
State Ownership Sector
Modewise breakup
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Delhi
Haryana
Himachal Pradesh
(As on 30042018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1061 1061
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1061 18758
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 704902 1877469
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 729532 3079432
State 408000 000 000 408000 000 170366 8396 586762
Private 557400 10000 000 567400 000 000 363584 930984
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1244841 35700 000 1280541 27300 322366 401980 2032187
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 000 000 200144
Sub-Total 1272344 000 000 1272344 4800 12000 53535 1342679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 824775 2175275
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 857888 4307419
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Grand Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 369412 3680 760480 000 000 642713 1403193
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 392952 3680 1452476 12727 167360 672588 2305151
State 508250 000 000 508250 000 244993 4022 757265
Private 83945 95088 000 179033 000 000 360930 539963
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 95088 000 882895 14873 244993 365952 1508713
State 502000 000 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1228352 1426722
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 996082 69800 359980 1243885 2669747
State 000 000 15996 000 188150 15102 219248
Private 61500 17400 000 78900 000 000 17844 96744
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 245176 36200 188150 37946 507472
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 575247 000 000 1086081 1661328
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 1508607 144800 220320 1116541 2990268
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 016 016
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 016 36706
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 5301726 332000 1180803 3436928 10251457
Andhra Pradesh
Telangana
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 2567 75567
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 2972 176446
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34387 276887
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43582 1051759
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 17830 311730
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 19460 733842
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 000 39900
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5211 96214
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 103840 3328216
(As on 30042018)
Coal Gas Diesel Total
State 000 28845 000 28845 000 10000 3001 41846
Private 000 2450 000 2450 000 000 1655 4105
Central 27902 43556 000 71458 000 33123 000 104581
Sub-Total 27902 74851 000 102753 000 43123 4656 150532
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 9745 000 16897
Sub-Total 2470 4682 000 7152 000 9745 11000 27897
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 002 002
Central 3040 10969 000 14009 000 6519 000 20528
Sub-Total 3040 10969 000 14009 000 38719 3105 55833
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 6238 500 54173
Sub-Total 3740 60645 000 64385 000 6238 2110 72733
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 006 006
Central 3140 7157 000 10297 000 8893 000 19190
Sub-Total 3140 7157 3600 13897 000 8893 551 23341
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5337 000 12370
Sub-Total 2140 4893 000 7033 000 5337 3167 15537
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9419 000 15535
Sub-Total 2070 4046 000 6116 000 9419 3667 19202
7500 6362 000 13862 000 12726 000 26588
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Grand Total 52002 173605 3600 229207 000 134200 28256 391663
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
RES
(MNRE)
Bihar
Modewise breakup
Mizoram
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
State Ownership Sector
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Central - Unallocated
Total (North-
Eastern Region)
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Andaman amp
Nicobar
SN Contents Page
1Programme and Achievements of Transmission Lines in Apr 2018 and during April
2016 to Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
Section C - Transmission Lines
20
Programme
2017-18 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3665 0 236 0 236
State Sector 416 0 0 0 0
JVPrivate Sector 846 0 6 0 0
Total 4927 0 242 0 236
Central Sector 4851 28 36 28 36
State Sector 5157 99 4 99 4
JVPrivate Sector 1416 0 0 0 0
Total 11424 127 40 127 40
Central Sector 763 0 0 0 0
State Sector 5972 13 481 13 481
JVPrivate Sector 0 0 0 0 0
Total 6735 13 481 13 481
Grand Total 23086 140 763 140 757
Voltage Level 2
765
400
400
400
220
220
220
220
220
765
STATE SECTOR Sector3 Kalpaka - Maradam line
8 Sarangapur (Allahabad)PG - Phulpur line
Grand Total
4
Transmission Lines (220 kV and above) CommissionedReady for
commissioning During Apr-2018
Name of Transmission Lines
CENTRAL SECTOR Sector
Total of CENTRAL SECTOR
10 Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)
Sl No
2
9 Sohawal PG - Barabanki line
1 3
1 Parli - Solapur (PPTL - TBCB)
Parli (New) - Parli (PG) (Q) (PPTL -TBCB)
400 kV
220kV
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 17 to Apr 18Apr 18Voltage
Level
Sector
LILO of 2nd Ckt VTS- Malkaram to Suryapet
5 Ataur - Mandola Vihar line
Total of STATE SECTOR
PRIVATE SECTOR Sector
Total of PRIVATE SECTOR
6 LILO of 2nd Ckt Birsinghpur - Amarkantak line at Shahdol Ss
7 LILO of 2nd Ckt of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 4880 2260 4880 2260 -2620
State 3546 270 850 3546 850 -2696
Pvt 2940 0 300 2940 300 -2640
Total 11366 270 3410 11366 3410 -7956
Central 800 110 330 610 330 -280
State 300 0 0 478 0 -478
Pvt 205 0 0 217 0 -217
Total 1305 110 330 1305 330 -975
Nuclear Central 500 0 0 0 0 0
Central 6180 110 2590 5490 2590 -2900
State 3846 270 850 4024 850 -3174
Pvt 3145 0 300 3157 300 -2857
Total 13171 380 3740 12671 3740 -8931
13
2 Capacity Addition Targets Achievements During Apr 2018
Apr-18 April 17 - Apr 18Schemes Sector
Target 2017-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Mar 2018
Thermal1
13
66
13
05
0
12
67
1
34
10
33
0
0
37
40
0
2000
4000
6000
8000
10000
12000
14000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2017-18Target Achievement
270
3410
110
330
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Target Achievement
MW
Targets and Achievement during Mar 2018Thermal
Hydro
Nuclear
Coal Gas Diesel Total
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Sub Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Sub Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 5301726 332000 1180803 3436928 10251457
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 103840 3328216
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Sub Total 52002 173605 3600 229207 000 134200 28256 391663
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6445650 707895 7189938 000 2985800 200337 10376075
Private 7554600 1058060 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
Total 19695750 2489746 837629 22269259 678000 4529342 6902239 34378839
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032018 is given below (in MW)
448581 3404600 2165148 6902239
A April 2018 0 MW
B April 2018 214 MW
C April 2018 0 MW
D Net Capacity
Added during
April 2018 A-B-C -214 MW
Northern Region
Western Region
870080 13830
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032018
BM PowerCogen
Bio-PowerSolar Power
Waste to EnergyWind Power
Southern Region
Eastern Region
North Eastern
Region
Small
Hydro Power
Total
Capacity
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 30042018)
Region Ownership Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
(UTILITIES)
RES
(MNRE)
1 OBRA TPS U-8 (94 MW) has been retired from the State Sector of Uttar Pradesh
2 BANDEL TPS U-3amp4(2x60=120MW) has been retired from the State Sector of West Bengal
Capacity Retired during
Capacity Derated
Capacity Added during
Islands
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 381772 20701 000 402473 10283 72309 000 485065
Sub-Total 482194 211541 000 693735 10283 72309 12157 788484
State 272000 15000 000 287000 000 108451 5930 401381
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 194821 41175 1124201
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 59723 158923
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 85384 403868
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5136 5136
Central 50639 12907 000 63547 6798 113948 000 184293
Sub-Total 50639 30407 000 81047 6798 236948 18039 342832
State 262000 15000 000 277000 000 257023 12780 546803
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 859008 41401 000 900409 19681 378165 128242 1426497
State 585000 60380 000 645380 000 108796 2385 756561
Private 388200 000 000 388200 000 10400 645579 1044179
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193097 677364 2102450
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 262191 1217824
Central 379639 54949 000 434588 28948 185493 3000 652029
Sub-Total 1797972 54949 000 1852921 28948 342103 267701 2491673
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 47953 111653
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 54740 335623
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 2520 2520
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 2520 18809
124953 29105 000 154058 23703 75145 000 252907
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Grand Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Jammu amp Kashmir
Punjab
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042018)
State Ownership Sector
Modewise breakup
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Delhi
Haryana
Himachal Pradesh
(As on 30042018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1061 1061
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1061 18758
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 704902 1877469
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 729532 3079432
State 408000 000 000 408000 000 170366 8396 586762
Private 557400 10000 000 567400 000 000 363584 930984
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1244841 35700 000 1280541 27300 322366 401980 2032187
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 000 000 200144
Sub-Total 1272344 000 000 1272344 4800 12000 53535 1342679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 824775 2175275
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 857888 4307419
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Grand Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 369412 3680 760480 000 000 642713 1403193
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 392952 3680 1452476 12727 167360 672588 2305151
State 508250 000 000 508250 000 244993 4022 757265
Private 83945 95088 000 179033 000 000 360930 539963
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 95088 000 882895 14873 244993 365952 1508713
State 502000 000 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1228352 1426722
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 996082 69800 359980 1243885 2669747
State 000 000 15996 000 188150 15102 219248
Private 61500 17400 000 78900 000 000 17844 96744
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 245176 36200 188150 37946 507472
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 575247 000 000 1086081 1661328
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 1508607 144800 220320 1116541 2990268
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 016 016
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 016 36706
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 5301726 332000 1180803 3436928 10251457
Andhra Pradesh
Telangana
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 2567 75567
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 2972 176446
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34387 276887
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43582 1051759
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 17830 311730
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 19460 733842
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 000 39900
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5211 96214
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 103840 3328216
(As on 30042018)
Coal Gas Diesel Total
State 000 28845 000 28845 000 10000 3001 41846
Private 000 2450 000 2450 000 000 1655 4105
Central 27902 43556 000 71458 000 33123 000 104581
Sub-Total 27902 74851 000 102753 000 43123 4656 150532
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 9745 000 16897
Sub-Total 2470 4682 000 7152 000 9745 11000 27897
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 002 002
Central 3040 10969 000 14009 000 6519 000 20528
Sub-Total 3040 10969 000 14009 000 38719 3105 55833
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 6238 500 54173
Sub-Total 3740 60645 000 64385 000 6238 2110 72733
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 006 006
Central 3140 7157 000 10297 000 8893 000 19190
Sub-Total 3140 7157 3600 13897 000 8893 551 23341
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5337 000 12370
Sub-Total 2140 4893 000 7033 000 5337 3167 15537
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9419 000 15535
Sub-Total 2070 4046 000 6116 000 9419 3667 19202
7500 6362 000 13862 000 12726 000 26588
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Grand Total 52002 173605 3600 229207 000 134200 28256 391663
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
RES
(MNRE)
Bihar
Modewise breakup
Mizoram
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
State Ownership Sector
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Central - Unallocated
Total (North-
Eastern Region)
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Andaman amp
Nicobar
SN Contents Page
1Programme and Achievements of Transmission Lines in Apr 2018 and during April
2016 to Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
Section C - Transmission Lines
20
Programme
2017-18 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3665 0 236 0 236
State Sector 416 0 0 0 0
JVPrivate Sector 846 0 6 0 0
Total 4927 0 242 0 236
Central Sector 4851 28 36 28 36
State Sector 5157 99 4 99 4
JVPrivate Sector 1416 0 0 0 0
Total 11424 127 40 127 40
Central Sector 763 0 0 0 0
State Sector 5972 13 481 13 481
JVPrivate Sector 0 0 0 0 0
Total 6735 13 481 13 481
Grand Total 23086 140 763 140 757
Voltage Level 2
765
400
400
400
220
220
220
220
220
765
STATE SECTOR Sector3 Kalpaka - Maradam line
8 Sarangapur (Allahabad)PG - Phulpur line
Grand Total
4
Transmission Lines (220 kV and above) CommissionedReady for
commissioning During Apr-2018
Name of Transmission Lines
CENTRAL SECTOR Sector
Total of CENTRAL SECTOR
10 Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)
Sl No
2
9 Sohawal PG - Barabanki line
1 3
1 Parli - Solapur (PPTL - TBCB)
Parli (New) - Parli (PG) (Q) (PPTL -TBCB)
400 kV
220kV
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 17 to Apr 18Apr 18Voltage
Level
Sector
LILO of 2nd Ckt VTS- Malkaram to Suryapet
5 Ataur - Mandola Vihar line
Total of STATE SECTOR
PRIVATE SECTOR Sector
Total of PRIVATE SECTOR
6 LILO of 2nd Ckt Birsinghpur - Amarkantak line at Shahdol Ss
7 LILO of 2nd Ckt of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Coal Gas Diesel Total
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Sub Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Sub Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 5301726 332000 1180803 3436928 10251457
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 103840 3328216
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Sub Total 52002 173605 3600 229207 000 134200 28256 391663
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6445650 707895 7189938 000 2985800 200337 10376075
Private 7554600 1058060 8660030 000 339400 6551672 15551102
Central 5695500 723791 000 6419291 678000 1204142 150230 8451663
Total 19695750 2489746 837629 22269259 678000 4529342 6902239 34378839
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032018 is given below (in MW)
448581 3404600 2165148 6902239
A April 2018 0 MW
B April 2018 214 MW
C April 2018 0 MW
D Net Capacity
Added during
April 2018 A-B-C -214 MW
Northern Region
Western Region
870080 13830
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032018
BM PowerCogen
Bio-PowerSolar Power
Waste to EnergyWind Power
Southern Region
Eastern Region
North Eastern
Region
Small
Hydro Power
Total
Capacity
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 30042018)
Region Ownership Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
(UTILITIES)
RES
(MNRE)
1 OBRA TPS U-8 (94 MW) has been retired from the State Sector of Uttar Pradesh
2 BANDEL TPS U-3amp4(2x60=120MW) has been retired from the State Sector of West Bengal
Capacity Retired during
Capacity Derated
Capacity Added during
Islands
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 381772 20701 000 402473 10283 72309 000 485065
Sub-Total 482194 211541 000 693735 10283 72309 12157 788484
State 272000 15000 000 287000 000 108451 5930 401381
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 194821 41175 1124201
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 59723 158923
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 85384 403868
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5136 5136
Central 50639 12907 000 63547 6798 113948 000 184293
Sub-Total 50639 30407 000 81047 6798 236948 18039 342832
State 262000 15000 000 277000 000 257023 12780 546803
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 859008 41401 000 900409 19681 378165 128242 1426497
State 585000 60380 000 645380 000 108796 2385 756561
Private 388200 000 000 388200 000 10400 645579 1044179
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193097 677364 2102450
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 262191 1217824
Central 379639 54949 000 434588 28948 185493 3000 652029
Sub-Total 1797972 54949 000 1852921 28948 342103 267701 2491673
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 47953 111653
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 54740 335623
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 2520 2520
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 2520 18809
124953 29105 000 154058 23703 75145 000 252907
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Grand Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Jammu amp Kashmir
Punjab
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042018)
State Ownership Sector
Modewise breakup
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Delhi
Haryana
Himachal Pradesh
(As on 30042018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1061 1061
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1061 18758
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 704902 1877469
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 729532 3079432
State 408000 000 000 408000 000 170366 8396 586762
Private 557400 10000 000 567400 000 000 363584 930984
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1244841 35700 000 1280541 27300 322366 401980 2032187
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 000 000 200144
Sub-Total 1272344 000 000 1272344 4800 12000 53535 1342679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 824775 2175275
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 857888 4307419
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Grand Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 369412 3680 760480 000 000 642713 1403193
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 392952 3680 1452476 12727 167360 672588 2305151
State 508250 000 000 508250 000 244993 4022 757265
Private 83945 95088 000 179033 000 000 360930 539963
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 95088 000 882895 14873 244993 365952 1508713
State 502000 000 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1228352 1426722
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 996082 69800 359980 1243885 2669747
State 000 000 15996 000 188150 15102 219248
Private 61500 17400 000 78900 000 000 17844 96744
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 245176 36200 188150 37946 507472
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 575247 000 000 1086081 1661328
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 1508607 144800 220320 1116541 2990268
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 016 016
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 016 36706
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 5301726 332000 1180803 3436928 10251457
Andhra Pradesh
Telangana
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 2567 75567
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 2972 176446
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34387 276887
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43582 1051759
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 17830 311730
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 19460 733842
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 000 39900
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5211 96214
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 103840 3328216
(As on 30042018)
Coal Gas Diesel Total
State 000 28845 000 28845 000 10000 3001 41846
Private 000 2450 000 2450 000 000 1655 4105
Central 27902 43556 000 71458 000 33123 000 104581
Sub-Total 27902 74851 000 102753 000 43123 4656 150532
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 9745 000 16897
Sub-Total 2470 4682 000 7152 000 9745 11000 27897
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 002 002
Central 3040 10969 000 14009 000 6519 000 20528
Sub-Total 3040 10969 000 14009 000 38719 3105 55833
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 6238 500 54173
Sub-Total 3740 60645 000 64385 000 6238 2110 72733
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 006 006
Central 3140 7157 000 10297 000 8893 000 19190
Sub-Total 3140 7157 3600 13897 000 8893 551 23341
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5337 000 12370
Sub-Total 2140 4893 000 7033 000 5337 3167 15537
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9419 000 15535
Sub-Total 2070 4046 000 6116 000 9419 3667 19202
7500 6362 000 13862 000 12726 000 26588
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Grand Total 52002 173605 3600 229207 000 134200 28256 391663
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
RES
(MNRE)
Bihar
Modewise breakup
Mizoram
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
State Ownership Sector
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Central - Unallocated
Total (North-
Eastern Region)
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Andaman amp
Nicobar
SN Contents Page
1Programme and Achievements of Transmission Lines in Apr 2018 and during April
2016 to Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
Section C - Transmission Lines
20
Programme
2017-18 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3665 0 236 0 236
State Sector 416 0 0 0 0
JVPrivate Sector 846 0 6 0 0
Total 4927 0 242 0 236
Central Sector 4851 28 36 28 36
State Sector 5157 99 4 99 4
JVPrivate Sector 1416 0 0 0 0
Total 11424 127 40 127 40
Central Sector 763 0 0 0 0
State Sector 5972 13 481 13 481
JVPrivate Sector 0 0 0 0 0
Total 6735 13 481 13 481
Grand Total 23086 140 763 140 757
Voltage Level 2
765
400
400
400
220
220
220
220
220
765
STATE SECTOR Sector3 Kalpaka - Maradam line
8 Sarangapur (Allahabad)PG - Phulpur line
Grand Total
4
Transmission Lines (220 kV and above) CommissionedReady for
commissioning During Apr-2018
Name of Transmission Lines
CENTRAL SECTOR Sector
Total of CENTRAL SECTOR
10 Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)
Sl No
2
9 Sohawal PG - Barabanki line
1 3
1 Parli - Solapur (PPTL - TBCB)
Parli (New) - Parli (PG) (Q) (PPTL -TBCB)
400 kV
220kV
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 17 to Apr 18Apr 18Voltage
Level
Sector
LILO of 2nd Ckt VTS- Malkaram to Suryapet
5 Ataur - Mandola Vihar line
Total of STATE SECTOR
PRIVATE SECTOR Sector
Total of PRIVATE SECTOR
6 LILO of 2nd Ckt Birsinghpur - Amarkantak line at Shahdol Ss
7 LILO of 2nd Ckt of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 381772 20701 000 402473 10283 72309 000 485065
Sub-Total 482194 211541 000 693735 10283 72309 12157 788484
State 272000 15000 000 287000 000 108451 5930 401381
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 194821 41175 1124201
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 59723 158923
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 85384 403868
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5136 5136
Central 50639 12907 000 63547 6798 113948 000 184293
Sub-Total 50639 30407 000 81047 6798 236948 18039 342832
State 262000 15000 000 277000 000 257023 12780 546803
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 859008 41401 000 900409 19681 378165 128242 1426497
State 585000 60380 000 645380 000 108796 2385 756561
Private 388200 000 000 388200 000 10400 645579 1044179
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193097 677364 2102450
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 262191 1217824
Central 379639 54949 000 434588 28948 185493 3000 652029
Sub-Total 1797972 54949 000 1852921 28948 342103 267701 2491673
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 47953 111653
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 54740 335623
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 2520 2520
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 2520 18809
124953 29105 000 154058 23703 75145 000 252907
State 1679400 287920 000 1967320 000 864355 68956 2900631
Private 2276083 55800 000 2331883 000 251400 1185466 3768749
Central 1329037 234406 000 1563443 162000 859622 32900 2617965
Grand Total 5284520 578126 000 5862646 162000 1975377 1287322 9287345
Jammu amp Kashmir
Punjab
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042018)
State Ownership Sector
Modewise breakup
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Delhi
Haryana
Himachal Pradesh
(As on 30042018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1061 1061
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1061 18758
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 704902 1877469
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 729532 3079432
State 408000 000 000 408000 000 170366 8396 586762
Private 557400 10000 000 567400 000 000 363584 930984
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1244841 35700 000 1280541 27300 322366 401980 2032187
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 000 000 200144
Sub-Total 1272344 000 000 1272344 4800 12000 53535 1342679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 824775 2175275
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 857888 4307419
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Grand Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 369412 3680 760480 000 000 642713 1403193
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 392952 3680 1452476 12727 167360 672588 2305151
State 508250 000 000 508250 000 244993 4022 757265
Private 83945 95088 000 179033 000 000 360930 539963
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 95088 000 882895 14873 244993 365952 1508713
State 502000 000 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1228352 1426722
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 996082 69800 359980 1243885 2669747
State 000 000 15996 000 188150 15102 219248
Private 61500 17400 000 78900 000 000 17844 96744
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 245176 36200 188150 37946 507472
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 575247 000 000 1086081 1661328
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 1508607 144800 220320 1116541 2990268
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 016 016
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 016 36706
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 5301726 332000 1180803 3436928 10251457
Andhra Pradesh
Telangana
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 2567 75567
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 2972 176446
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34387 276887
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43582 1051759
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 17830 311730
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 19460 733842
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 000 39900
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5211 96214
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 103840 3328216
(As on 30042018)
Coal Gas Diesel Total
State 000 28845 000 28845 000 10000 3001 41846
Private 000 2450 000 2450 000 000 1655 4105
Central 27902 43556 000 71458 000 33123 000 104581
Sub-Total 27902 74851 000 102753 000 43123 4656 150532
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 9745 000 16897
Sub-Total 2470 4682 000 7152 000 9745 11000 27897
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 002 002
Central 3040 10969 000 14009 000 6519 000 20528
Sub-Total 3040 10969 000 14009 000 38719 3105 55833
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 6238 500 54173
Sub-Total 3740 60645 000 64385 000 6238 2110 72733
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 006 006
Central 3140 7157 000 10297 000 8893 000 19190
Sub-Total 3140 7157 3600 13897 000 8893 551 23341
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5337 000 12370
Sub-Total 2140 4893 000 7033 000 5337 3167 15537
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9419 000 15535
Sub-Total 2070 4046 000 6116 000 9419 3667 19202
7500 6362 000 13862 000 12726 000 26588
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Grand Total 52002 173605 3600 229207 000 134200 28256 391663
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
RES
(MNRE)
Bihar
Modewise breakup
Mizoram
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
State Ownership Sector
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Central - Unallocated
Total (North-
Eastern Region)
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Andaman amp
Nicobar
SN Contents Page
1Programme and Achievements of Transmission Lines in Apr 2018 and during April
2016 to Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
Section C - Transmission Lines
20
Programme
2017-18 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3665 0 236 0 236
State Sector 416 0 0 0 0
JVPrivate Sector 846 0 6 0 0
Total 4927 0 242 0 236
Central Sector 4851 28 36 28 36
State Sector 5157 99 4 99 4
JVPrivate Sector 1416 0 0 0 0
Total 11424 127 40 127 40
Central Sector 763 0 0 0 0
State Sector 5972 13 481 13 481
JVPrivate Sector 0 0 0 0 0
Total 6735 13 481 13 481
Grand Total 23086 140 763 140 757
Voltage Level 2
765
400
400
400
220
220
220
220
220
765
STATE SECTOR Sector3 Kalpaka - Maradam line
8 Sarangapur (Allahabad)PG - Phulpur line
Grand Total
4
Transmission Lines (220 kV and above) CommissionedReady for
commissioning During Apr-2018
Name of Transmission Lines
CENTRAL SECTOR Sector
Total of CENTRAL SECTOR
10 Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)
Sl No
2
9 Sohawal PG - Barabanki line
1 3
1 Parli - Solapur (PPTL - TBCB)
Parli (New) - Parli (PG) (Q) (PPTL -TBCB)
400 kV
220kV
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 17 to Apr 18Apr 18Voltage
Level
Sector
LILO of 2nd Ckt VTS- Malkaram to Suryapet
5 Ataur - Mandola Vihar line
Total of STATE SECTOR
PRIVATE SECTOR Sector
Total of PRIVATE SECTOR
6 LILO of 2nd Ckt Birsinghpur - Amarkantak line at Shahdol Ss
7 LILO of 2nd Ckt of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
(As on 30042018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1061 1061
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1061 18758
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 704902 1877469
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 729532 3079432
State 408000 000 000 408000 000 170366 8396 586762
Private 557400 10000 000 567400 000 000 363584 930984
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1244841 35700 000 1280541 27300 322366 401980 2032187
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 000 000 200144
Sub-Total 1272344 000 000 1272344 4800 12000 53535 1342679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 824775 2175275
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 857888 4307419
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3428567 467600 000 3896167 000 48100 1947389 5891656
Central 1504295 328067 000 1832362 184000 152000 66130 2234492
Grand Total 7060862 1080649 000 8141511 184000 744750 2044638 11114899
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 369412 3680 760480 000 000 642713 1403193
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 392952 3680 1452476 12727 167360 672588 2305151
State 508250 000 000 508250 000 244993 4022 757265
Private 83945 95088 000 179033 000 000 360930 539963
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 95088 000 882895 14873 244993 365952 1508713
State 502000 000 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1228352 1426722
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 996082 69800 359980 1243885 2669747
State 000 000 15996 000 188150 15102 219248
Private 61500 17400 000 78900 000 000 17844 96744
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 245176 36200 188150 37946 507472
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 575247 000 000 1086081 1661328
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 1508607 144800 220320 1116541 2990268
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 016 016
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 016 36706
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 5301726 332000 1180803 3436928 10251457
Andhra Pradesh
Telangana
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 2567 75567
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 2972 176446
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34387 276887
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43582 1051759
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 17830 311730
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 19460 733842
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 000 39900
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5211 96214
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 103840 3328216
(As on 30042018)
Coal Gas Diesel Total
State 000 28845 000 28845 000 10000 3001 41846
Private 000 2450 000 2450 000 000 1655 4105
Central 27902 43556 000 71458 000 33123 000 104581
Sub-Total 27902 74851 000 102753 000 43123 4656 150532
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 9745 000 16897
Sub-Total 2470 4682 000 7152 000 9745 11000 27897
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 002 002
Central 3040 10969 000 14009 000 6519 000 20528
Sub-Total 3040 10969 000 14009 000 38719 3105 55833
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 6238 500 54173
Sub-Total 3740 60645 000 64385 000 6238 2110 72733
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 006 006
Central 3140 7157 000 10297 000 8893 000 19190
Sub-Total 3140 7157 3600 13897 000 8893 551 23341
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5337 000 12370
Sub-Total 2140 4893 000 7033 000 5337 3167 15537
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9419 000 15535
Sub-Total 2070 4046 000 6116 000 9419 3667 19202
7500 6362 000 13862 000 12726 000 26588
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Grand Total 52002 173605 3600 229207 000 134200 28256 391663
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
RES
(MNRE)
Bihar
Modewise breakup
Mizoram
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
State Ownership Sector
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Central - Unallocated
Total (North-
Eastern Region)
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Andaman amp
Nicobar
SN Contents Page
1Programme and Achievements of Transmission Lines in Apr 2018 and during April
2016 to Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
Section C - Transmission Lines
20
Programme
2017-18 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3665 0 236 0 236
State Sector 416 0 0 0 0
JVPrivate Sector 846 0 6 0 0
Total 4927 0 242 0 236
Central Sector 4851 28 36 28 36
State Sector 5157 99 4 99 4
JVPrivate Sector 1416 0 0 0 0
Total 11424 127 40 127 40
Central Sector 763 0 0 0 0
State Sector 5972 13 481 13 481
JVPrivate Sector 0 0 0 0 0
Total 6735 13 481 13 481
Grand Total 23086 140 763 140 757
Voltage Level 2
765
400
400
400
220
220
220
220
220
765
STATE SECTOR Sector3 Kalpaka - Maradam line
8 Sarangapur (Allahabad)PG - Phulpur line
Grand Total
4
Transmission Lines (220 kV and above) CommissionedReady for
commissioning During Apr-2018
Name of Transmission Lines
CENTRAL SECTOR Sector
Total of CENTRAL SECTOR
10 Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)
Sl No
2
9 Sohawal PG - Barabanki line
1 3
1 Parli - Solapur (PPTL - TBCB)
Parli (New) - Parli (PG) (Q) (PPTL -TBCB)
400 kV
220kV
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 17 to Apr 18Apr 18Voltage
Level
Sector
LILO of 2nd Ckt VTS- Malkaram to Suryapet
5 Ataur - Mandola Vihar line
Total of STATE SECTOR
PRIVATE SECTOR Sector
Total of PRIVATE SECTOR
6 LILO of 2nd Ckt Birsinghpur - Amarkantak line at Shahdol Ss
7 LILO of 2nd Ckt of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
(As on 30042018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 369412 3680 760480 000 000 642713 1403193
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 392952 3680 1452476 12727 167360 672588 2305151
State 508250 000 000 508250 000 244993 4022 757265
Private 83945 95088 000 179033 000 000 360930 539963
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 95088 000 882895 14873 244993 365952 1508713
State 502000 000 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1228352 1426722
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 996082 69800 359980 1243885 2669747
State 000 000 15996 000 188150 15102 219248
Private 61500 17400 000 78900 000 000 17844 96744
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 245176 36200 188150 37946 507472
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 575247 000 000 1086081 1661328
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 1508607 144800 220320 1116541 2990268
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 016 016
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 016 36706
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 2051236 000 1180803 51802 3283841
Private 1212450 532210 1792030 000 000 3335936 5127966
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 5301726 332000 1180803 3436928 10251457
Andhra Pradesh
Telangana
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 2567 75567
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 2972 176446
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34387 276887
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43582 1051759
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 17830 311730
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 19460 733842
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 000 39900
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5211 96214
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 103840 3328216
(As on 30042018)
Coal Gas Diesel Total
State 000 28845 000 28845 000 10000 3001 41846
Private 000 2450 000 2450 000 000 1655 4105
Central 27902 43556 000 71458 000 33123 000 104581
Sub-Total 27902 74851 000 102753 000 43123 4656 150532
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 9745 000 16897
Sub-Total 2470 4682 000 7152 000 9745 11000 27897
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 002 002
Central 3040 10969 000 14009 000 6519 000 20528
Sub-Total 3040 10969 000 14009 000 38719 3105 55833
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 6238 500 54173
Sub-Total 3740 60645 000 64385 000 6238 2110 72733
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 006 006
Central 3140 7157 000 10297 000 8893 000 19190
Sub-Total 3140 7157 3600 13897 000 8893 551 23341
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5337 000 12370
Sub-Total 2140 4893 000 7033 000 5337 3167 15537
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9419 000 15535
Sub-Total 2070 4046 000 6116 000 9419 3667 19202
7500 6362 000 13862 000 12726 000 26588
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Grand Total 52002 173605 3600 229207 000 134200 28256 391663
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
RES
(MNRE)
Bihar
Modewise breakup
Mizoram
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
State Ownership Sector
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Central - Unallocated
Total (North-
Eastern Region)
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Andaman amp
Nicobar
SN Contents Page
1Programme and Achievements of Transmission Lines in Apr 2018 and during April
2016 to Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
Section C - Transmission Lines
20
Programme
2017-18 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3665 0 236 0 236
State Sector 416 0 0 0 0
JVPrivate Sector 846 0 6 0 0
Total 4927 0 242 0 236
Central Sector 4851 28 36 28 36
State Sector 5157 99 4 99 4
JVPrivate Sector 1416 0 0 0 0
Total 11424 127 40 127 40
Central Sector 763 0 0 0 0
State Sector 5972 13 481 13 481
JVPrivate Sector 0 0 0 0 0
Total 6735 13 481 13 481
Grand Total 23086 140 763 140 757
Voltage Level 2
765
400
400
400
220
220
220
220
220
765
STATE SECTOR Sector3 Kalpaka - Maradam line
8 Sarangapur (Allahabad)PG - Phulpur line
Grand Total
4
Transmission Lines (220 kV and above) CommissionedReady for
commissioning During Apr-2018
Name of Transmission Lines
CENTRAL SECTOR Sector
Total of CENTRAL SECTOR
10 Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)
Sl No
2
9 Sohawal PG - Barabanki line
1 3
1 Parli - Solapur (PPTL - TBCB)
Parli (New) - Parli (PG) (Q) (PPTL -TBCB)
400 kV
220kV
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 17 to Apr 18Apr 18Voltage
Level
Sector
LILO of 2nd Ckt VTS- Malkaram to Suryapet
5 Ataur - Mandola Vihar line
Total of STATE SECTOR
PRIVATE SECTOR Sector
Total of PRIVATE SECTOR
6 LILO of 2nd Ckt Birsinghpur - Amarkantak line at Shahdol Ss
7 LILO of 2nd Ckt of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
(As on 30042018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 2567 75567
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 2972 176446
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34387 276887
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43582 1051759
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 17830 311730
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 19460 733842
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 000 39900
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5211 96214
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 80329 757729
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 103840 3328216
(As on 30042018)
Coal Gas Diesel Total
State 000 28845 000 28845 000 10000 3001 41846
Private 000 2450 000 2450 000 000 1655 4105
Central 27902 43556 000 71458 000 33123 000 104581
Sub-Total 27902 74851 000 102753 000 43123 4656 150532
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 9745 000 16897
Sub-Total 2470 4682 000 7152 000 9745 11000 27897
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 002 002
Central 3040 10969 000 14009 000 6519 000 20528
Sub-Total 3040 10969 000 14009 000 38719 3105 55833
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 6238 500 54173
Sub-Total 3740 60645 000 64385 000 6238 2110 72733
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 006 006
Central 3140 7157 000 10297 000 8893 000 19190
Sub-Total 3140 7157 3600 13897 000 8893 551 23341
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5337 000 12370
Sub-Total 2140 4893 000 7033 000 5337 3167 15537
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9419 000 15535
Sub-Total 2070 4046 000 6116 000 9419 3667 19202
7500 6362 000 13862 000 12726 000 26588
State 000 45795 3600 49395 000 42200 25425 117020
Private 000 2450 000 2450 000 000 2331 4781
Central 52002 125360 000 177362 000 92000 500 269862
Grand Total 52002 173605 3600 229207 000 134200 28256 391663
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
RES
(MNRE)
Bihar
Modewise breakup
Mizoram
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
State Ownership Sector
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Central - Unallocated
Total (North-
Eastern Region)
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
(As on 30042018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Andaman amp
Nicobar
SN Contents Page
1Programme and Achievements of Transmission Lines in Apr 2018 and during April
2016 to Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
Section C - Transmission Lines
20
Programme
2017-18 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3665 0 236 0 236
State Sector 416 0 0 0 0
JVPrivate Sector 846 0 6 0 0
Total 4927 0 242 0 236
Central Sector 4851 28 36 28 36
State Sector 5157 99 4 99 4
JVPrivate Sector 1416 0 0 0 0
Total 11424 127 40 127 40
Central Sector 763 0 0 0 0
State Sector 5972 13 481 13 481
JVPrivate Sector 0 0 0 0 0
Total 6735 13 481 13 481
Grand Total 23086 140 763 140 757
Voltage Level 2
765
400
400
400
220
220
220
220
220
765
STATE SECTOR Sector3 Kalpaka - Maradam line
8 Sarangapur (Allahabad)PG - Phulpur line
Grand Total
4
Transmission Lines (220 kV and above) CommissionedReady for
commissioning During Apr-2018
Name of Transmission Lines
CENTRAL SECTOR Sector
Total of CENTRAL SECTOR
10 Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)
Sl No
2
9 Sohawal PG - Barabanki line
1 3
1 Parli - Solapur (PPTL - TBCB)
Parli (New) - Parli (PG) (Q) (PPTL -TBCB)
400 kV
220kV
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 17 to Apr 18Apr 18Voltage
Level
Sector
LILO of 2nd Ckt VTS- Malkaram to Suryapet
5 Ataur - Mandola Vihar line
Total of STATE SECTOR
PRIVATE SECTOR Sector
Total of PRIVATE SECTOR
6 LILO of 2nd Ckt Birsinghpur - Amarkantak line at Shahdol Ss
7 LILO of 2nd Ckt of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
(As on 30042018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Andaman amp
Nicobar
SN Contents Page
1Programme and Achievements of Transmission Lines in Apr 2018 and during April
2016 to Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
Section C - Transmission Lines
20
Programme
2017-18 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3665 0 236 0 236
State Sector 416 0 0 0 0
JVPrivate Sector 846 0 6 0 0
Total 4927 0 242 0 236
Central Sector 4851 28 36 28 36
State Sector 5157 99 4 99 4
JVPrivate Sector 1416 0 0 0 0
Total 11424 127 40 127 40
Central Sector 763 0 0 0 0
State Sector 5972 13 481 13 481
JVPrivate Sector 0 0 0 0 0
Total 6735 13 481 13 481
Grand Total 23086 140 763 140 757
Voltage Level 2
765
400
400
400
220
220
220
220
220
765
STATE SECTOR Sector3 Kalpaka - Maradam line
8 Sarangapur (Allahabad)PG - Phulpur line
Grand Total
4
Transmission Lines (220 kV and above) CommissionedReady for
commissioning During Apr-2018
Name of Transmission Lines
CENTRAL SECTOR Sector
Total of CENTRAL SECTOR
10 Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)
Sl No
2
9 Sohawal PG - Barabanki line
1 3
1 Parli - Solapur (PPTL - TBCB)
Parli (New) - Parli (PG) (Q) (PPTL -TBCB)
400 kV
220kV
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 17 to Apr 18Apr 18Voltage
Level
Sector
LILO of 2nd Ckt VTS- Malkaram to Suryapet
5 Ataur - Mandola Vihar line
Total of STATE SECTOR
PRIVATE SECTOR Sector
Total of PRIVATE SECTOR
6 LILO of 2nd Ckt Birsinghpur - Amarkantak line at Shahdol Ss
7 LILO of 2nd Ckt of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
SN Contents Page
1Programme and Achievements of Transmission Lines in Apr 2018 and during April
2016 to Apr 2018
2 List of Transmission Lines CommissionedReady for commissioning during Apr 2018
Section C - Transmission Lines
20
Programme
2017-18 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3665 0 236 0 236
State Sector 416 0 0 0 0
JVPrivate Sector 846 0 6 0 0
Total 4927 0 242 0 236
Central Sector 4851 28 36 28 36
State Sector 5157 99 4 99 4
JVPrivate Sector 1416 0 0 0 0
Total 11424 127 40 127 40
Central Sector 763 0 0 0 0
State Sector 5972 13 481 13 481
JVPrivate Sector 0 0 0 0 0
Total 6735 13 481 13 481
Grand Total 23086 140 763 140 757
Voltage Level 2
765
400
400
400
220
220
220
220
220
765
STATE SECTOR Sector3 Kalpaka - Maradam line
8 Sarangapur (Allahabad)PG - Phulpur line
Grand Total
4
Transmission Lines (220 kV and above) CommissionedReady for
commissioning During Apr-2018
Name of Transmission Lines
CENTRAL SECTOR Sector
Total of CENTRAL SECTOR
10 Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)
Sl No
2
9 Sohawal PG - Barabanki line
1 3
1 Parli - Solapur (PPTL - TBCB)
Parli (New) - Parli (PG) (Q) (PPTL -TBCB)
400 kV
220kV
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 17 to Apr 18Apr 18Voltage
Level
Sector
LILO of 2nd Ckt VTS- Malkaram to Suryapet
5 Ataur - Mandola Vihar line
Total of STATE SECTOR
PRIVATE SECTOR Sector
Total of PRIVATE SECTOR
6 LILO of 2nd Ckt Birsinghpur - Amarkantak line at Shahdol Ss
7 LILO of 2nd Ckt of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Programme
2017-18 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0
State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3665 0 236 0 236
State Sector 416 0 0 0 0
JVPrivate Sector 846 0 6 0 0
Total 4927 0 242 0 236
Central Sector 4851 28 36 28 36
State Sector 5157 99 4 99 4
JVPrivate Sector 1416 0 0 0 0
Total 11424 127 40 127 40
Central Sector 763 0 0 0 0
State Sector 5972 13 481 13 481
JVPrivate Sector 0 0 0 0 0
Total 6735 13 481 13 481
Grand Total 23086 140 763 140 757
Voltage Level 2
765
400
400
400
220
220
220
220
220
765
STATE SECTOR Sector3 Kalpaka - Maradam line
8 Sarangapur (Allahabad)PG - Phulpur line
Grand Total
4
Transmission Lines (220 kV and above) CommissionedReady for
commissioning During Apr-2018
Name of Transmission Lines
CENTRAL SECTOR Sector
Total of CENTRAL SECTOR
10 Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)
Sl No
2
9 Sohawal PG - Barabanki line
1 3
1 Parli - Solapur (PPTL - TBCB)
Parli (New) - Parli (PG) (Q) (PPTL -TBCB)
400 kV
220kV
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 17 to Apr 18Apr 18Voltage
Level
Sector
LILO of 2nd Ckt VTS- Malkaram to Suryapet
5 Ataur - Mandola Vihar line
Total of STATE SECTOR
PRIVATE SECTOR Sector
Total of PRIVATE SECTOR
6 LILO of 2nd Ckt Birsinghpur - Amarkantak line at Shahdol Ss
7 LILO of 2nd Ckt of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
SN Contents Page
1Programme and Achievements of Sub-Stations in Apr 2018 and during Apr 2016 to
Apr 2018
2 List of Sub Stations commissionedready for commisssioning during Apr 2018
Section D - Sub Stations
21
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Programme Achievement Achievement
Central Sector 0 0 0
State Sector 0 0 0
JVPrivate Sector 0 0 0
Total 0 0 0
Central Sector 0 4000 4000
State Sector 0 0
JVPrivate Sector 0 0 0
Total 0 4000 4000
Central Sector 0 185 0
State Sector 0 0 1285
JVPrivate Sector 0 0 0
Total 0 185 1285
Central Sector 0 0 0
State Sector 1790 1285 1285
JVPrivate Sector 0 0 0
Total 1790 1285 1285
Grand Total 1790 5470 6570
Sl
No
1
1
2
3
4
5
6
7
8
9
10
11
Grand Total
Total of STATE SECTOR 1285
5470
Sarsawa New (Saharanpur) ICT-I 220132 UPPTCL 160
Verpal Repl (100-50) 22066 PSTCL 50
Barabanki (New) 220132 UPPTCL 320
185
Sohawal (Aug) (160-100) ICT-I 220132 UPPTCL 60
Moradabad (Aug) (500-315) ICT- 400220 UPPTCL
Kanpur Road (Lucknow New) 22033 UPPTCL 120
75
Banda (New) ICT-II 400220 UPPTCL 315
Parli (New) Ss (PPTL -TBCB) 765400 PGCIL 3000
Narendra (ICT-II Repl) (500-315) PGCIL 185
Total of CENTRAL SECTOR 4185
Apr 16 - Apr 18Apr-18
Name of
Sub Stations
Voltage
Ratio
2
0
plusmn 800 kV HVDC
Programme
Sub-Stations (220 kV and above) CommissionedReady for commissioning
During -APR 2018
4 5
Voltage Level
Sector
0
0
1790
Capacity
(MWMVA)
As on 30-Apr-2018
1790
0
0
0
0
400 kV
220 kV
1 Programme amp Achievement of sub- stations in April 2018 and during April 2016 to April 2018
0
3580
1790
0
(Fig in MVA)
765 kV
0
0
3
CENTRAL SECTOR
Orai (ICT-II) 765400 PGCIL 1000
STATE SECTOR
Obra-BTPS (Aug) (315-240) 400220 UPPTCL
400220
Executing
Agency
0
1790
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2017-18 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Programme Achievement Ach Programme Achievement Ach
Central Sector 33974900 2796600 3149260 11261 2796600 3149260 11261
State Sector 33949400 2870700 3046585 10613 2870700 3046585 10613
PvtIPP Sector 34423900 3189500 2892450 9069 3189500 2892450 9069
PvtUTL Sector 1854600 158900 174025 10952 158900 174025 10952
Total 104202800 9015700 9262320 10274 9015700 9262320 10274
Central Sector 5502800 364200 290550 7978 364200 290550 7978
State Sector 7300500 438800 400373 9124 438800 400373 9124
PvtIPP Sector 1191700 52300 47710 9122 52300 47710 9122
PvtUTL Sector 145000 10400 13600 13077 10400 13600 13077
Total 1526082001 865700 752233 39301 865700 752233 8689
Central Sector 4097200 250800 321638 12824 250800 321638 12824
Total 4097200 250800 321638 12824 250800 321638 12824
Bhutan Import 500000 14100 7768 5509 485601 561734 11568
Central Sector 43574900 3411600 3761448 11025 3411600 3761448 11025
State Sector 41249900 3309500 3446958 10415 3309500 3446958 10415
Pvt Sector 37615200 3411100 3127785 9169 3411100 3127785 9169
Total 122940000 10146300 10343959 10195 10617801 10897925 10264
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-17 Sep-16 Upto Sep-17 Upto Sep-16
12928 9442 3831854 2942478
22
Renewable Energy Generation
Achievement
Apr18
1 Electricity Generation (MU) Targets and Achievememts for 2017-18
All India Energy Generation During April 2016 to April 2018 (MU)
Target (2017-18April 17 to Apr 18
Sector
Hydro
Thermal
Nuclear
90157
8657
2508
106178
92623
75223216
108979
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
SN Contents Page
1 Power Supply Position (Provisional) for Apr 2018 and April 2017 to Apr 2018 23
2 Peak Demand and Peak Met (Provisional) for Apr 2018 and Apr 2016 to Apr 2018 24
3 Power Supply Position (Revised) for Mar 2018 25
4 Peak Demand and Peak Met (Revised) for Mar 2018 26
5 Notified Power cuts Restrictions on Industries during Apr 2018 27
6 Power Supply to Agricultural Sector during Apr 2018 28
Section F - Power supply position
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
आकड़ मिमियन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 119 119 0 00
दिलली Delhi 2636 2634 1 01
हरियजणज Haryana 3773 3773 0 00
दहमजचल परिश Himachal Pradesh753 749 4 06
रमम कशमीि Jammu amp Kashmir1582 1267 315 199
परजब Punjab 3567 3567 0 00
िजरसथजन Rajasthan 5741 5716 25 04
उततर परिश Uttar Pradesh 9315 9243 72 08
उततराखड Uttarakhand 1106 1103 2 02
उततरी कषतर Northern Region28591 28171 420 15
छततीसगढ़ Chhattisgarh 2410 2409 1 00
गरिजत Gujarat 10343 10343 0 00
मधय परिश Madhya Pradesh 5293 5293 0 00
महजिजषटर Maharashtra 14199 14199 0 00
िमन औि दिउ Daman amp Diu 216 216 0 00
िजिि व नगि हवली 526 526 0 00
गोवज Goa 382 382 0 00
पशचिमी कषतर Western Region33371 33369 1 00
आनधर परिश Andhra Pradesh 5372 5366 6 01
तलगजनज Telangana 5269 5263 6 01
कनजाटक Karnataka 6521 6513 8 01
किल Kerala 2270 2258 12 05
तममल नजड Tamil Nadu 9838 9826 12 01
पडचिी Puducherry 245 243 1 05
लकष-दवीप Lakshadweep 4 4 0 0
दकषकषणी कषतर Southern Region29515 29469 46 02
बबहजि Bihar 2396 2393 3 01
िजमोिि घजटी ननगम DVC 1792 1788 3 02
झजिखणड Jharkhand 636 635 1 02
ओडडशज Odisha 2262 2259 3 01
पशशचम बगजल West 4506 4500 6 01
मिशककम Sikkim 43 43 0 01
अडमजन-ननकोबजि 29 27 2 7
परवी कषतर Eastern 11634 11617 17 01
अरणजचल परिश 64 63 1 19
अिम Assam 700 664 36 51
मणणपि Manipur 65 63 1 18
मघजलय Meghalaya 133 133 0 00
ममज़ोिम Mizoram 49 48 1 19
नजगजलड Nagaland 65 57 8 128
बिपिज Tripura 111 107 4 37
उततर-परवी कषतर North- 1187 1135 51 43
समपणण भारत All India 104297 103761 536 05
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
Energy not Supplied
ऊरजा पनत ा म कमी
विदयत आपरति सथिरत (पिवििलोकन)Power Supply Position (Provisional)
राजयStateअपरल 2018 April2018
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 229 229 0 00
दिलली Delhi 5200 5200 0 00
हरियजणज Haryana 7706 7706 0 00
दहमजचल परिश Himachal Pradesh 1424 1424 0 00
रमम कशमीि Jammu amp Kashmir 2729 2183 546 200
परजब Punjab 7061 7061 0 00
िजरसथजन Rajasthan 10053 10053 0 00
उततर परिश Uttar Pradesh 16945 16697 247 15
उततराखड Uttarakhand 1953 1953 0 00
उततरी कषतर Northern Region 47996 46959 1037 22
छततीसगढ़ Chhattisgarh 3658 3645 13 04
गरिजत Gujarat 15053 15042 11 01
मधय परिश Madhya Pradesh 8591 8589 3 00
महजिजषटर Maharashtra 23306 23207 99 04
िमन औि दिउ Daman amp Diu 347 347 0 00
िजिि व नगि हवली DNH 778 778 0 00
गोवज Goa 562 562 0 00
पशचिमी कषतर Western Region 50677 50457 220 04
आनधर परिश Andhra Pradesh 8943 8943 0 00
तलगजनज Telangana 9188 9132 56 06
कनजाटक Karnataka 10710 10688 22 02
किल Kerala 3976 3937 39 10
तममल नजड Tamil Nadu 15049 14986 63 04
पडचिी Puducherry 408 384 24 58
लकष-दवीप Lakshadweep 8 8 0 0
दकषकषणी कषतर Southern Region 45808 45684 124 03
बबहजि Bihar 4669 4669 0 00
िजमोिि घजटी ननगम DVC 2909 2909 0 00
झजिखणड Jharkhand 1150 1150 0 00
ओडडशज Odisha 4320 4320 0 00
पशशचम बगजल West Bengal 7905 7905 0 00
मिशककम Sikkim 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7
परवी कषतर Eastern Region 20429 20429 0 00
अरणजचल परिश Arunachal Pradesh 138 125 13 94
अिम Assam 1533 1503 30 19
मणणपि Manipur 193 186 7 36
मघजलय Meghalaya 307 307 0 01
ममज़ोिम Mizoram 98 89 9 95
नजगजलड Nagaland 156 127 29 183
बिपिज Tripura 269 265 4 14
उततर-परवी कषतर North-Eastern Region 2600 2552 48 18
समपणण भारत All India 162673 161286 1387 09
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied
अधिकतम मवाग और अधिकतम उपलसधि (पिवििलोकन ) Peak Demand and Peak Met (Provisional)
आकड़ िगा वाट नट Figures in MW net
राजयStateअपरल 2018 April2018
मजग की पनता म कमी Demand not Met
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 90 90 0 00 1514 1505 9 06
दिलली Delhi 1755 1754 1 01 29773 29754 19 01
हरियजणज Haryana 3378 3378 0 00 46788 46788 0 00
दहमजचल परिश Himachal Pradesh 743 739 4 06 8626 8578 48 06
रमम कशमीि Jammu amp Kashmir 1531 1231 300 196 17136 13708 3428 200
परजब Punjab 3099 3099 0 00 51060 51060 0 00
िजरसथजन Rajasthan 5889 5808 81 14 65244 64668 575 09
उततर परिश Uttar Pradesh 8172 8091 81 10 110788 109176 1612 15
उततराखड Uttarakhand 1025 1023 1 01 12380 12351 30 02
उततरी कषतर Northern Region 25681 25213 468 18 343309 337588 5721 17
छततीसगढ़ Chhattisgarh 1816 1816 1 00 23597 23513 84 04
गरिजत Gujarat 8473 8473 0 00 100086 100074 12 00
मधय परिश Madhya Pradesh 5497 5497 0 00 64190 64189 0 00
महजिजषटर Maharashtra 11561 11561 0 00 135925 135695 230 02
िमन औि दिउ Daman amp Diu 199 199 0 00 2312 2312 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 492 492 0 00 5634 5634 0 00
गोवज Goa 318 318 0 00 3741 3741 0 00
पशचिमी कषतर Western Region 28356 28356 1 00 335484 335159 326 01
आनधर परिश Andhra Pradesh 4823 4819 4 01 52755 52707 48 01
तलगजनज Telangana 5334 5330 4 01 53634 53597 38 01
कनजाटक Karnataka 6007 6002 5 01 60808 60702 107 02
किल Kerala 1986 1979 6 03 22623 22565 58 03
तममल नजड Tamil Nadu 8332 8324 8 01 96172 96096 75 01
पडचिी Puducherry 202 202 0 01 2429 2424 5 02
लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0
दकषकषणी कषतर Southern Region 26685 26656 29 01 288422 288091 330 01
बबहजि Bihar 1945 1933 13 07 24718 24306 412 17
िजमोिि घजटी ननगम DVC 1689 1685 4 02 19732 19563 170 09
झजिखणड Jharkhand 693 666 26 38 7204 7069 135 19
ओडडशज Odisha 2149 2121 28 13 26264 26200 64 02
पशशचम बगजल West Bengal 3525 3512 12 03 46138 45963 175 04
मिशककम Sikkim 45 45 0 01 442 442 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 300 272 27 91
परवी कषतर Eastern Region 10045 9962 83 08 124498 123542 956 08
अरणजचल परिश Arunachal Pradesh 69 69 0 00 736 727 9 13
अिम Assam 624 623 1 02 8514 8225 288 34
मणणपि Manipur 85 73 11 135 806 761 45 56
मघजलय Meghalaya 140 139 1 05 1455 1452 3 02
ममज़ोिम Mizoram 46 46 0 00 457 449 8 17
नजगजलड Nagaland 58 57 1 10 728 716 11 16
बिपिज Tripura 114 106 8 73 2498 2451 47 19
उततर-परवी कषतर North-Eastern Region 1136 1114 22 19 15193 14781 412 27
समपणण भारत All India 91903 91300 603 07 1106906 1099161 7745 07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied Energy not Supplied
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
राजयState
फररवरी 2018 February2018 अपरल2017 -फररवरी18 April2017 to February2018
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 235 235 0 00 363 363 0 00
दिलली Delhi 3946 3946 0 00 6553 6526 27 04
हरियजणज Haryana 7120 7120 0 00 9671 9539 132 14
दहमजचल परिश Himachal Pradesh 1555 1555 0 00 1594 1594 0 00
रमम कशमीि Jammu amp Kashmir 2748 2199 549 200 2899 2319 580 200
परजब Punjab 6277 6277 0 00 11705 11705 0 00
िजरसथजन Rajasthan 11502 11449 53 05 11722 11564 158 13
उततर परिश Uttar Pradesh 15388 15015 373 24 20274 18061 2213 109
उततराखड Uttarakhand 2134 2134 0 00 2149 2149 0 00
उततरी कषतर Northern Region 47171 46578 593 13 60749 58448 2301 38
छततीसगढ़ Chhattisgarh 3390 3387 4 01 4169 3887 282 68
गरिजत Gujarat 14252 14246 5 00 16590 16590 0 00
मधय परिश Madhya Pradesh 11444 11444 0 00 12338 12301 37 03
महजिजषटर Maharashtra 21172 21164 8 00 22542 22494 48 02
िमन औि दिउ Daman amp Diu 353 353 0 00 362 362 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 766 766 0 00 790 790 0 00
गोवज Goa 486 486 0 00 559 558 1 02
पशचिमी कषतर Western Region 48797 48691 106 02 50477 50085 392 08
आनधर परिश Andhra Pradesh 8927 8909 18 02 8927 8909 18 02
तलगजनज Telangana 10124 10109 15 02 10124 10109 15 02
कनजाटक Karnataka 10235 10212 23 02 10381 10347 34 03
किल Kerala 3844 3706 138 36 3889 3862 27 07
तममल नजड Tamil Nadu 14440 14388 52 04 15001 14975 26 02
पडचिी Puducherry 359 358 0 01 390 387 3 07
लकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0
दकषकषणी कषतर Southern Region 45426 45326 100 02 45426 45326 100 02
बबहजि Bihar 4356 4346 10 02 4521 4515 6 01
िजमोिि घजटी ननगम DVC 2758 2758 0 00 2886 2886 0 00
झजिखणड Jharkhand 1175 1175 0 00 1332 1260 72 54
ओडडशज Odisha 4109 4109 0 00 4370 4370 0 00
पशशचम बगजल West Bengal 6882 6879 3 00 8137 8114 23 03
मिशककम Sikkim 96 96 0 00 96 96 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 18810 18797 13 01 20274 20208 66 03
अरणजचल परिश Arunachal Pradesh 133 128 5 40 145 145 0 03
अिम Assam 1501 1481 20 13 1822 1745 77 42
मणणपि Manipur 197 191 6 32 202 195 7 32
मघजलय Meghalaya 312 311 1 04 369 368 1 02
ममज़ोिम Mizoram 103 94 9 84 105 96 9 84
नजगजलड Nagaland 150 122 28 187 155 146 9 59
बिपिज Tripura 274 273 1 05 342 342 0 00
उततर-परवी कषतर North-Eastern Region 2387 2333 53 22 2629 2520 109 41
समपणण भारत All India 158505 157037 1468 09 164066 160752 3314 20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW netअपरल2017 -फररवरी18 April2017 to February2018
मजग की पनता म कमी Demand not Met
राजयStateफररवरी 2018 February2018
मजग की पनता म कमी Demand not Met
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
मािण 2018 March2018 अपरल2017 -मािण18 April2017 to March2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthan
उततर परिश Uttar Pradesh
उततराखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
मािण 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during March2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
राजय कषतर State Region औसत विदयत आपरति घनटो म Average Hours of Supply
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received
दिलली Delhi Data not received
हरियजणज Haryana 0709 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture
sector
रमम कशमीि Jammu amp Kashmir Data not received
परजब Punjab 349 hrsday
िजरसथजन Rajasthan 0630 hrsday
उततर परिश Uttar Pradesh 1814 hrsday
उततराखड Uttarakhand 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday
गरिजत Gujarat 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0947 hrs day Three-Phase (Mixed) Supply - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday
तलगजनज Telangana 24 hrsday
कनजाटक Karnataka 6 hrsday
किल Kerala No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday
झजिखणड Jharkhand 20 hrsday
ओडडशज Odisha 24 hrsday
पशशचम बगजल West Bengal 23 hrsday
अपरल 2018 कवि कषतर को विदयत आपरति कव वििरण
Power Supply to Agricultural Sector during April2018
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Hydro 2018
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Mar 2018 19695750 2489746 837629 22269259 6780 4529342 6902239 34378839
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
1969575 2489746 837629 678000 452934 69022385 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34052658MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
3042018
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 35301 32250
400 ckm 6029 19824 36142 49378 75722 106819 171640 144819
220 ckm 46005 59631 79600 96993 114629 135980 169236 170980
Total ckm 52034 79455 115742 147531 192535 248049 376177 348049
HVDC ckm 0 0 1634 4738 5872 9432 15556 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 391733 364921
765 MVA 0 0 0 0 0 25000 194500 174000
400 MVA 9330 21580 40865 60380 92942 151027 282807 196027
220 MVA 37291 53742 84177 116363 156497 223774 332621 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 809928 669801
HVDC MW 0 0 0 5200 8200 9750 22500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 832428 692301
Inter-regional
transmission
Capacity
MW 14050 27750 86450 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Mar-18
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage
electrification since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th
Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
8629
3726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309
010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information
received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally
not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of
electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village
electrification of CEA is independent of the earlier published reports
Nil
7 Status of Hydro Schemes Cleared by the CEA in Apr 2018
Name of Scheme
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600
CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400
Mar-18 NHPC LTD HYDRO-HYDRO 4500 26900 95400
SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200
NTPC LTD THERMAL-GASN 41930 90900 39900
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300
TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900
KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884
NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820
RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000
RATE OF SALE OF POWER FOR THE YEAR 2015-2016
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700
KILLAR HPSEB HYDRO-HYDRO 030 043 31700
BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400
CHAMVA HPSEB HYDRO-HYDRO 045 068 22600
GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600
GUMMA HPSEB HYDRO-HYDRO 300 176 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700
PPS-I PPCL THERMAL-GAS 33000 150030 55100
PPS-III PPCL THERMAL-GAS 137120 183630 40800
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409
KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322
CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484
CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768
MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845
HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534
SANJAK JampKPDD HYDRO-HYDRO 126 072 1943
GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249
GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249
GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249
SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249
UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249
ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249
MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249
RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400
SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830
KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500
UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300
EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500
SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500
OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900
OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900
PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800
PRIVATE SECTOR
INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620
MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516
BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500
KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600
KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200
MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500
MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820
BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700
SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900
UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100
UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500
KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100
UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000
UGBPS II GSECL THERMAL-GAS 37457 123759 63300
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100
PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400
SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000
BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600
BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000
KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700
KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400
KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500
NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800
PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800
PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100
URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400
KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400
VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200
BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400
TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500
PRIVATE SECTOR
JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800
JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600
GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800
MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280
LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900
LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400
DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300
DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781
NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600
SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900
SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161
KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730
MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000
AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000
ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000
KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000
AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000
KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000
KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000
CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000
BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000
STATE SECTOR
APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376
APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700
Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700
UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700
LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700
DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700
CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700
MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 9504 45700
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142
LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721
PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503
BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530
RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998
ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952
BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849
GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831
GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101
KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271
NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473
KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227
MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124
SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933
VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100
IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100
KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100
KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100
MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100
MADUPETTY KSEB HYDRO-HYDRO 200 203 54100
MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100
URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100
PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100
PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100
PEPPARA KSEB HYDRO-HYDRO 300 18364 54100
POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100
PEECHI KSEB HYDRO-HYDRO 125 143 54100
RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100
SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100
VILANGAD KSEB HYDRO-HYDRO 750 1275 54100
PLBE KSEB HYDRO-HYDRO 1600 10643 54100
CHIMMINI KSEB HYDRO-HYDRO 250 459 54100
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688
BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688
PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688
PRIVATE SECTOR
LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260
BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400
GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900
SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300
SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400
LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000
LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000
VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000
UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300
SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167
TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400
VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803
GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521
MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219
PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470
TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000
TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200
BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200
TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100
CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900
PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900
RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900
NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900
HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900
RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900
BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900
RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900
LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900
STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400
HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900
SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900
HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900
DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900
NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900
KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900
CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900
KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900
TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900
CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900
CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900
GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900
SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900
GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359
IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935
BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740
GCHARAMA SPV AampN ISLAND SOALR 500 626 77600
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900
ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060
KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120
JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600
AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800
Note