12
April 14, 2009 Los Angeles Valley College Prop J Master Plan Town Hall Presentation

April 14, 2009 Los Angeles Valley College Prop J Master Plan Town Hall Presentation

Embed Size (px)

Citation preview

Page 1: April 14, 2009 Los Angeles Valley College Prop J Master Plan Town Hall Presentation

April 14, 2009

Los Angeles Valley College Prop J Master Plan

Town Hall Presentation

Page 2: April 14, 2009 Los Angeles Valley College Prop J Master Plan Town Hall Presentation

Master Planning Process

Page 3: April 14, 2009 Los Angeles Valley College Prop J Master Plan Town Hall Presentation

Master Planning Process

Proposition A/AA 2001/2003 $286 million

Measure J 2008 $350 million

2006 Facilities Master Plan, BTA

Page 4: April 14, 2009 Los Angeles Valley College Prop J Master Plan Town Hall Presentation

Master Planning Process

Prop A/AA Projects

New Construction Projects Start Date Completion Date

Maintenance & Operations/ Sheriff’s Station2005 Completed (2006)

Concession Stand & Visitor Restrooms – Phase 12006 Completed (2007)

Allied Health & Sciences Center2006 Completed (2009)

Swimming & Diving Pools2007 Completed (2009)

Disabled Students Gymnasium2008 Completed (2008)

Motion Picture / TV Studio2008 Completed (2009)

Child & Family Complex2008 2009 (in construction)

Hertzberg Library & Academic Resource Center2009 2010

Student Services Building2009 2010 (in construction)

Page 5: April 14, 2009 Los Angeles Valley College Prop J Master Plan Town Hall Presentation

Master Planning Process

Prop A/AA Projects

Renovation Projects Start Date Completion Date

Foreign Language Building2005 Completed (2005)

Campus Painting Projects2005 Completed (2006)

Monarch Stadium/ Track & Field2005 Completed (2007)

Monarch Patio2006 Completed (2006)

Art Patio2006 Completed (2006)

Marquee2006 Completed (2006)

Behavioral Sciences Building2006 Completed (2007)

Campus Center Building Classrooms2006 Completed (2007)

Campus-wide Restrooms2006 Completed (2007)

Gymnasium Complex (North & South Gyms)2006 Completed (2008)

Central Plant Upgrades2006 Completed (2009)

Business Journalism Building2007 Completed (2007)

Art Building & Art Gallery2007 Completed (2008)

Music Building & Recital Hall2007 Completed (2008)

Page 6: April 14, 2009 Los Angeles Valley College Prop J Master Plan Town Hall Presentation

Master Planning Process

Prop A/AA Projects

Renovation Projects Start Date Completion Date

Humanities Building2008 Completed (2009)

Fulton Avenue Entryway & Monarch Square2008 Completed (2008)

Math Sciences Building2008 Completed (2008)

Engineering Building2008 Completed (2008)

Theater Arts Building2008 Completed (2009)

Life Science Building & Planetarium2009 2009 (in construction)

Campus Center Building2010 2010

Administration Building2010 2010

Page 7: April 14, 2009 Los Angeles Valley College Prop J Master Plan Town Hall Presentation

Master Planning Process

Prop J Projects Media Arts Building LAVC Community Work Force

Development Center Athletic Training Facility Planetarium Building Expansion Performance Art Center Multi-purpose Community

Services Center General Campus Improvements Parking Structure Student Support Services Business Technology Building New Environment Center Campus Modernization –

Outdoor Facilities and Infrastructure

Valley Satellite

LAVC, Aerial View

Page 8: April 14, 2009 Los Angeles Valley College Prop J Master Plan Town Hall Presentation

Master Planning Process > Master Plan Components

FMP WORKSHOP 1

FMP WORKSHOP 2

FMP WORKSHOPS 3 & 4

FMP WORKSHOP 5

FMP WORKSHOP 6

FMP WORKSHOP 6

Page 9: April 14, 2009 Los Angeles Valley College Prop J Master Plan Town Hall Presentation

Master Planning Process

Goals & Vision Guiding Principles Planning Outcomes Measurements for Success

Master Program Campus-wide Space

Utilization Existing Building Plans with

Departmental Space Assignments

Lecture/Lab Utilization Proposed Location Plan of

Each Department on Campus

Page 10: April 14, 2009 Los Angeles Valley College Prop J Master Plan Town Hall Presentation

Master Planning Process

Facilities Master Plan Conceptual Plan Circulation

Vehicular/Parking Service Pedestrian

Buildings New, Renovate, Expand, Demolish

Options Development Buildings & Massing Open Space/ Athletic/ Recreational

Landscape Sustainability

Prop A/AA Master Plan, BTA

Page 11: April 14, 2009 Los Angeles Valley College Prop J Master Plan Town Hall Presentation

Master Planning Process

Guidelines & Standards Architectural Landscape Signage Lighting

Information Technology Audio Visual Hardware & Access Control Direct Digital Control Systems MEP Systems Fire Alarm Landscape Irrigation

Allied Health and Sciences Center

Monarch Square

Page 12: April 14, 2009 Los Angeles Valley College Prop J Master Plan Town Hall Presentation

Master Planning Process

Infrastructure Master Plan Electrical Technology Chilled & Hot Water System Water Sanitary Sewer Storm Drain Gas

Implementation, Phasing & Cost

Horizons – Short term and long term

Coordinated Scopes of Work Phasing Temporary Facilities Cost

Student Services Center, Groundbreaking