Upload
helciomoraes
View
2.109
Download
2
Tags:
Embed Size (px)
DESCRIPTION
PERI World
Citation preview
Successful construction with PERI
2009 - 2
PERI provides the solution Systems Services Company Quality Management Research and Development Contribution to Cost Reduction Technical Documentation Handbook PERI scope PERI Online
Successful construction with PERI
2009 - 3
PERI provides the solution
This motto characterises the efforts undertaken for our customers since the company was founded in 1969.
We will continue to strive to find the best formwork and scaffolding solutions for every type of project.
Dieter Eismar, Christian Schwörer and Alexander Schwörer (Directors of the PERI Group)
2009 - 4
Systems
In formwork and scaffolding, our high quality systems and advanced technology are the reasons we remain world leaders.
Our comprehensive product range is the basis for the most cost-effectivesolutions in concrete construction.
PERI MAXIMO PERI GRIDFLEX PERI industrial scaffolding Flex
2009 - 5
Systems
For walls
PERI TRIO 270 panel formwork PERI TRIO as climbing formwork PERI RUNDFLEX
2009 - 6
Systems
For slabs
PERI MULTIFLEX PERI SKYDECK PERI slab tables
2009 - 7
Systems
For all types of concrete structures
2009 - 8
Services
Engineering expertise
2009 - 9
Services
Efficient logistics operations
Reliable delivery from 100 stockyards worldwide
State-of-the-art cleaning process
2009 - 10
Services
Project-specific assembly
2009 - 11
Services
Practical instruction and construction site support from PERI specialists during the entire project
2009 - 12
Services
Hands-on training
2009 - 13
Company
At PERI‘s headquartersin Weissenhorn,the equipment is
developed manufactured assembled stored
Plant 1, total area of 280.000 m² (2.8 million sq ft)
2009 - 14
Company
PERI plant 2 Assembly service Central rental stock:
maintenance and cleaning
Plant 2, total area of 78.000 m² (780,000 sq ft)
2009 - 15
Company
Revenues: PERI international 1970 – 2008 in Mio. EUR
2009 - 16
Company
Personell: PERI Group 1970-2008
2009 - 17
Company
PERI GmbH GermanyAlexander Schwörer, Christian Schwörer, Dieter Eismar
PERI Group
1969
PERI AG 1974 Switzerland
Hans Schläppi
PERI S.A.S. 1974
France
PERI S.A.U. 1975
SpainGerhard Hexel
N.V. PERI S.A. 1979 Belgium
Geert Dekleermaeker
PERI B.V. 1979 Netherlands
René van Zutven
PERI F.S. Inc. 1982 USA
Tom Ameel
PERI S.p.A. 1983 Italy
Sergio Dal´Soglio
Hani Samaha
PERI Ltd. 1989 Great Britain
Carl Heathcote
PERI Ltd. 1990 TurkeyOrhan Terzioglu
PERI Kft. 1990 Hungary
Tibor Laczai
PERI ASIA Pte. 1991 Ltd. Singapore
Bernd Kieslich
PERI Sdn. Bhd. 1991
Malaysia
Helmut Schleich
PERI Ges.m.b.H. 1992 Austria
Hubert Mayerhofer
PERI spol. s.r.o. 1992 Czech Republic
Libor Cermak
PERI Norge AS 1993
NorwayTom Wium
PERI sp. zo. o. 1993
PolandWiktor Piwkowski
PERIForm 1993 Sverige AB Sweden
Sören Alling Toubro
PERI Danmark A/S 1993 Denmark
Kristian Thielfoldt
PERI Suomi Ltd.Oy
1993 Finland
Pekka Ylänne
PERIcofragens 1994 Lda. Portugal
Juan Horstmann
PERI Ltd. 1994 South Korea
Young-Ho Jeon
PERI S.A. 1996 Argentina
Daniel Belloni
PERI Formas 1996 e Esc. Brazil
Martin Eugenio Sola
PERI Chile Ltda. 1996
ChileJorge Valdés
PERI spol. s.r.o. 1996 Slovakia
Miroslav Faktor
PERI (Romania) 1996
s.r.l. RomaniaOctavian Capatina
PERI Australia 1997 Pty. Ltd. Australia
Josef Hetesi
PERI (L. L. C.) 1997
United Arab. EmirateHans-Joachim Rau
PERI F.S. Inc. 1998 Canada
Peter Weiss
PERI Hellas Ltd. 1999 Greece
Peter Radel
PERI Ltd. 1999 Formwork Eng.Ltd. Israel
Yaron Shay
PERI EOOD 2000 Bulgaria
Georgi Yakimov
TOW PERI 2000
UkraineSergej Lopata
OOO PERI 2006 Russia
Vladimir Kuzmin
PERI AS 2002 Estonia
Raivo Vesiaid
PERI UAB 2002 Lithuana
Harijs Cika
PERI SIA 2003 Latvia
Harijs Cika
PERI S.a. de C. V 2003 Mexico
Javier Gutierrez
PERI Oplate d.o.o. 2003
SerbiaMile Bojanic
PERI Oplate i Skele 2005
d.o.o. CroatiaSergej Vujatovic
PERI Japan K.K. 2005 Japan
Noriyuki Kimura
PERI India Pvt Ltd 2007India
Raj Lakhani
PERI Qatar LLC 2007Qatar
Fady Abdo
TOO PERI 2007Kasakhstan
Mehmet Ali Gassymov
IOOO PERI 2007Belarus
Sergey Ermaschov
PERI Peruana 2008 S.A.C. Peru
Jean Pierre Saux Spigno
PERI Panama Inc. 2008Panama
Johnny Fernandez
2009 - 18
Company
1 Deutschland Weißenhorn
7 USAElkridge, MD
13 UngarnBudapest
19 FinnlandHyvinkää
25 ArgentinienEscobar
31 AustralienGlendenning
37 LibanonBeirut
43 KasachstanAlmaty
49 MexikoEstado de Mexico
55 IndienMumbai
61 Peru Lima
2 FrankreichMeaux Cedex
8 IndonesienJakarta
14 MalaysiaKuala Lumpur
20 NorwegenDrammen
26 BrasilienSao Paulo
32 Estland Saku vald
38 LitauenVilnius
44 Russische FörderationMoskau
50 AserbaidschanBaku
56 JordanienAmman
62
AngolaLuanda
3 SchweizOhringen
9 ItalienBasiano
15 SingapurSingapore
21 PolenPlochocin
27 ChileSantiago de Chile
33 GriechenlandKoropi
39 MarokkoTanger
45 SüdafrikaBellville
51 BelarusMinsk
57 KuwaitKuwait
63 Panama Panama City
4 SpanienAlgete / Madrid
10 JapanTokyo
16 ÖsterreichNußdorf ob der Traisen
22 SchwedenHalmstad
28 RumänienBalotesti – ILFOV
34 LettlandRiga
40 IsraelPetach Tikva
46 UkraineKiew
52 KroatienDonji Stupnik / Zagreb
58 Saudi ArabienJeddah
5 Belgien / LuxemburgLonderzeel
11 GroßbritannienIrlandRugby
17 Tschechische RepublikJesenice
23 KoreaSeoul
29 Slowenien Maribor
35 Ver. Arab. EmirateDubai
41 BulgarienSofia
47 ÄgyptenHeliopolis / Cairo
53 AlbanienTirane
59 KatarDoha
6 NiederlandeSchijndel
12 TürkeiIstanbul
18 DänemarkGreve
24 PortugalQueijas
30 Slowakei Senec
36 KanadaBolton, Ontario
42 IslandHafnarfjordur
48 Serbien / MontenegroNovi Beograd
54 IranTehran
60 AlgerienKouba – Alger
.
.
.
..
2009 - 19
Company
Example North America
2009 - 20
Quality Management
The latest material testing and production procedures ensure the highest possible quality standards.
Quality inspection of GRIDFLEX element
2009 - 21
Quality Management
Adherence to the high requirements for product quality as well as achieving thegoal of rational operational processesare supported by the QM system.
2009 - 22
Research and Development
Easier, faster, saferthe most important objectives for our developments
New ideas taken from actual construction projects are optimised by expert teams and implemented for the benefit of our customers.
2009 - 23
Contribution to Cost Reduction
Formwork costs are in principal affected by the individual parts which are to be moved as well as the time and effort required to carry this out.
This means:
Many formwork parts High labour costs
Few formwork parts Low labour costs
2009 - 24
Contribution to Cost Reduction
Example of an element connection PERI panel formwork
1 part, BFD alignment coupler
Competitor´s panel formwork5 parts for the same task
2009 - 25
Contribution to Cost Reduction
Example of length adjustment PERI panel formwork
3 parts
Competitor´s panel formwork13 parts
2009 - 26
Contribution to Cost Reduction
Optimised planning of the system equipment to be used leads to the most cost-effective formwork solutions.
Fast estimating results in time savings.
Exact material requirements planning guarantees low material and transport costs.
Fast and safe working conditions lead to a reduction in labour costs.
2009 - 27
Technical Documentation
System brochures, posters and videos in many languages
2009 - 28
Technical Documentation
Calculation tables and other aids for effective estimations
2009 - 29
Technical Documentation
Overview of the PERI system components arranged according to product groups
2009 - 30
Handbook
Reference book for allconstruction and scaffolding specialists
Wealth of ideas for engineersand site managers
Textbook for trainingin educational institutions
2009 - 31
PERI scope
Magazine for formwork and scaffolding Site reports and design solutions
from all areas of concrete construction System comparisons Presentation of new products Published several times per year in different
national and international editions
2009 - 32
PERI Online
Up-to-date and comprehensive
The international PERI homepage www.peri.de
provides direct access to
country specific PERI
websites.
2009 - 33
International Reference Projects
Al Hamra Tower, Kuwait-City
Seewinkeltherme,Frauenkirchen, Austria
Saadiyat Bridge,Abu Dhabi, UAE
The following pages show examples from all areas ofconstruction. Although they may provide ideas, they must notbe used as instructions for using formwork and scaffolding.
2009 - 34
Barrage Lurberria, St Pee sur Nivelle, France
2009 - 35
Motorway Bridge D1, Považská Bystrica, Slovakia
2009 - 36
Ritz-Carlton Hotel, Charlotte, USA
2009 - 37
Al Hamra Tower, Kuwait-City
2009 - 38
Airrail Center, Frankfurt, Germany
2009 - 39
Golden Ears Bridge, Vancouver, Canada
2009 - 40
Shopping Center Loch Logan, Bloemfontein, South Africa
2009 - 41
Motorway Bridge Oparno, Czech Republic
2009 - 42
Seewinkeltherme, Frauenkirchen, Austria
2009 - 43
Sportarena Lora, Split, Croatia
2009 - 44
Terenez Bridge, Brest, France
2009 - 45
Galeria Jurajska, Czestochowa, Poland
2009 - 46
OpernTurm, Frankfurt, Germany
2009 - 47
Saadiyat Bridge, Abu Dhabi, United Arab Emirates
2009 - 48
Bay Adelaide Center, Toronto, Canada
2009 - 49
Sotchi Tunnel, Russian Federation
2009 - 50
Office Tower “Hercules”, Cadiz, Spain
2009 - 51
Railway Bridge ERGOSE Tithorea - Lianokladi, Greece
2009 - 52
Military History Museum, Dresden, Germany
2009 - 53
Environmental Tunnel Stetten, Austria
2009 - 54
Formwork Scaffolding Engineering | www.peri.de