RETRIEVAL ENGINEERING 5, Proj ./Prog./Dept./Div. : 1 A p p r o v a l /Re1 ease RETRIEVAL ENGINEERING N/A 6. Cog. Engr.: 7. Purchase Order No.: N/A 10. Systnn/BLdg./Facility: I - I= S.A. Krieg 8. Originator Remarks: N/A 9. Equip./Conponent No.: BD-7400-172-2 (04/94) GEF097 11. Receiver Remarks: ED-7400-172-1 l07/91) N/A N/A N/A 12. Major Ism. Dug. No.: 13. PermitlPermit Application lo.: 14. Required Response Date: 15. - DATA TRANSMITTED (F) Approval Ds~,g. nator It1 Title or Dsscription 01 Data lAl IC1 ID1 NO NO NO 101 DocumentlDrawing No Rev Tranarninsd 1 WHC-SD-WM-SEMP- ISSTRS Project SEMP X 003 N/ A (G) (H) (I) Reason Ongi. Racaw- ~, Trans- Diwo- Dirpo. mitta1 .Itlo" r,tion 1 1 1

Approval /Re1 ease N/A - Digital Library/67531/metadc711353/m2/1/high_res... · Box 1970, To obtain copies of this docwnt, contact: UHC/ECS ... Hazardous Materi a1 Inventory Interface

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Approval /Re1 ease N/A - Digital Library/67531/metadc711353/m2/1/high_res... · Box 1970, To obtain copies of this docwnt, contact: UHC/ECS ... Hazardous Materi a1 Inventory Interface

R E T R I E V A L ENGINEERING 5 , Proj ./Prog./Dept./Div. :

1 A p p r o v a l / R e 1 ease

R E T R I E V A L ENGINEERING N / A 6. Cog. Engr.: 7. Purchase Order No.:

N / A 10. Systnn/BLdg./Facility: I

- I= S . A . K r i e g 8. Originator Remarks:

N / A 9. Equip./Conponent No.:

BD-7400-172-2 ( 0 4 / 9 4 ) GEF097

11. Receiver Remarks:

ED-7400-172-1 l07/91)

N / A

N / A

N / A

12. Major I s m . Dug. No.:

13. PermitlPermit Application l o . :

14. Required Response Date:

15. - DATA T R A N S M I T T E D ( F ) Approval

D s ~ , g . nator

I t 1 Title or Dsscription 01 Data l A l IC1 ID1

N O N O N O 101 DocumentlDrawing No Rev Tranarninsd

1 WHC-SD-WM-SEMP- I S S T R S P r o j e c t SEMP X 003 N/ A

( G ) ( H ) ( I ) Reason Ongi. Racaw-

~, Trans- Diwo- Dirpo. mitta1 .Itlo" r,tion

1 1 1

Page 2: Approval /Re1 ease N/A - Digital Library/67531/metadc711353/m2/1/high_res... · Box 1970, To obtain copies of this docwnt, contact: UHC/ECS ... Hazardous Materi a1 Inventory Interface

WHC-SD-WM-SEMP-003, Rev. 0

Initial Single Shell Tank Retrieval System Project System Engineering Management Plan

S. A. Krieg Westinghouse Hanford Company, Richland, WA 99352 U.S. Department o f Energy Contract DE-AC06-87RL10930

EDT/ECN: 606475 Org Code: 74420 B&R Code: EW3130010

UC: 2030 Charge Code: D2036 To ta l Pages: 22

Key Words: S ing le She l l Tanks: S l u i c i n g , ISSTRS, SEMP

Abs t rac t : Systems Engineer ing approach t h a t w i l l be used t o manage t h e r e t r i e v a l o f waste from the f i r s t s i n g l e s h e l l t ank farm us ing pas t p r a c t i c e s l u i c i n g techniques. requi rements o f t he TWRS SEMP, WHC-SD-WM-SEMP-002.

Th is System Engineering Management Plan (SEMP) descr ibes the

Th is P r o j e c t SEMP i s used t o supplement t h e

TRADEMARK DISCLAIMER. Reference herein t o any spec i f i c c o m r c i a l product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily const i tute or i np l y i t s endorsement, recomnendation, or favoring by the United States Goverment o r any agency thereof or i t s contractors or subcontractors.

P r in ted i n the United States Docment Control Services, P Fax (509) 376-4989.

o f .o.

America. Box 1970,

To obtain copies of t h i s d o c w n t , contact: UHC/ECS Mailstop H6-08, Richlard UA 59352, Phone (509) 372-2420;

7 31 447 - - Date Release Stamp

Approved for Public Release

A-6400-073 (10/95) GEF321

Page 3: Approval /Re1 ease N/A - Digital Library/67531/metadc711353/m2/1/high_res... · Box 1970, To obtain copies of this docwnt, contact: UHC/ECS ... Hazardous Materi a1 Inventory Interface

ISSTRS PROJECT SEMP

MAY 1996

S. A. Krieg

i

Page 4: Approval /Re1 ease N/A - Digital Library/67531/metadc711353/m2/1/high_res... · Box 1970, To obtain copies of this docwnt, contact: UHC/ECS ... Hazardous Materi a1 Inventory Interface

UFC-SD-VM-SEM”-003 REV . 0

M B L E Of CON I EFlTS

LIST OF TERMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iii

1.0 I n t r o d u c t i o n . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

2.0 System D e f i n i t i o n Phase . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2.1 TWRS SEMP Documents . . . . . . . . . . . . . . . . . . 2

3.0 Design Phase . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

4.0 Cons t ruc t i on and S ta r tup . . . . . . . . . . . . . . . . . . . . . . . . . . 6

5.0 REFERENCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

APPENDIXA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

2.2 TWRS SEMP Exceptions . . . . . . . . . . . . . . . . . 4

ii

Page 5: Approval /Re1 ease N/A - Digital Library/67531/metadc711353/m2/1/high_res... · Box 1970, To obtain copies of this docwnt, contact: UHC/ECS ... Hazardous Materi a1 Inventory Interface

WHC-SD-WM-SEMP-003 REV. 0

LIST OF TERMS

BIO BSD CRML D&D DDR DRBL DRD FRD FSAR HM I ICD I SSTRS LCAA MAR P&ID PDC PDS PSAR PSE RM L SARR SDD SDR SE SEMP S I P ssc SST TEP T PM TRBL TRR TRS TSR TWRS

Bas is f o r I n t e r i m Opera t ion B a s e l i n e System D e s c r i p t i o n C r i t i c a l R i s k Management L i s t Decontaminat ion and Decommissioning D e f i n i t i v e Design Review Design Requirements Base l ine Design Requirements Document Func t ions and Requirements Document F i n a l S a f e t y A n a l y s i s Report Hazardous M a t e r i a1 I n v e n t o r y I n t e r f a c e C o n t r o l Document I n i t i a l S i n g l e S h e l l Tank R e t r i e v a l System L i f e Cyc le Cost A n a l y s i s M i s s i o n A n a l y s i s Report Process and I n s t r u m e n t a t i o n Diagram P r o j e c t Design Concept P r o j e c t Design Speci f i c a t i on P r e l i m i n a r y S a f e t y A n a l y s i s Report P r e l i m i n a r y S a f e t y E v a l u a t i o n R i s k Management L i s t S a f e t y A n a l y s i s r e f e r e n c e Report System Design D e s c r i p t i o n System Design Review Systems Eng ineer ing Systems Eng ineer ing Management P lan System I n t e g r a t i o n P lan Systems, S t r u c t u r e s , and Components S i n g l e S h e l l Tanks T e s t and E v a l u a t i o n Plan Techn ica l Performance Measurement Techn ica l Requirements Base1 i n e Techn ica l Requirements Review Techn ica l Requirements S p e c i f i c a t i o n Techn ica l S a f e t y Requirements Tank Waste Remediat ion System

Page 6: Approval /Re1 ease N/A - Digital Library/67531/metadc711353/m2/1/high_res... · Box 1970, To obtain copies of this docwnt, contact: UHC/ECS ... Hazardous Materi a1 Inventory Interface

WHC-Sa-UM-SEMF-0123 RE' / . 0

ISSTRS P R K E C 1 SEMP

1 .O introduction

The I n i t i a l S i n g l e S h e l l Tank R e t r i e v a l System (ISSTRS) i s one o f t h e Tank Waste Remediat ion System (TWRS) p r o j e c t s f o r r e t r i e v i n g waste f rom one underground s i n g l e s h e l l t a n k (SST) fa rm o r an e q u i v a l e n t number o f t a n k s . The ISSTRS p r o j e c t w i l l p r o v i d e equipment, systems, p e r m i t s , approva ls , procedures, and t r a i n e d opera tors . The ISSTRS p r o j e c t i n c l u d e s t h e t r a n s f e r o f t h e waste f rom t h e SSTs t o a Double S h e l l Tank f o r s to rage. Past p r a c t i c e s l u i c i n g has been s e l e c t e d as t h e waste r e t r i e v a l method t h a t w i l l be used f o r ISSTRS (Er ickson 1995). The des igns f o r t h e r e t r i e v a l systems and equipment w i l l be t h e same as those developed f o r p r o j e c t W320 (Tank C-106), a f t e r p r o j e c t descoping. A d d i t i o n a l i n f o r m a t i o n on t h e ISSTRS p r o j e c t d e s c r i p t i o n , scope, g o a l s , and f u n d i n g i s conta ined i n t h e p r o j e c t m i s s i o n a n a l y s i s ( H e r t z e l 1996a) and t h e ISSTRS approach p l a n (Hagmann 1995).

The ISSTRS p r o j e c t w i l l use Systems Engineer ing, as d e f i n e d i n t h e TWRS SEMP, f o r t h e development o f p r o j e c t documentat ion and t e c h n i c a l da ta , w i t h t h e except ions addressed i n t h i s p r o j e c t SEMP. The f u l l s e t o f Systems Eng ineer ing documents r e q u i r e d by t h e TWRS SEMP are shown i n t a b l e 1 and t h e proposed ISSTRS SE a c t i v i t i e s a r e shown i n t a b l e 2. The ISSTRS p r o j e c t a c t i v i t i e s occur below t h e heavy l i n e under t h e Techn ica l Requirements B a s e l i n e (TRBL) shown on t a b l e 1. The ISSTRS p r o j e c t except ions t o t h e s tandard TWRS SEMP documentat ion and t e c h n i c a l a c t i v i t i e s t h a t a re d iscussed below are p r i m a r i l y due t o 1) ISSTRS u s i n g t h e W320 des igns and 2 ) t h e exper ience a l r e a d y ga ined i n s l u i c i n g waste o u t o f t h e SSTs i n t h e p a s t . techn iques a l l o w s t h e combina t ion o f severa l o f t h e Systems Eng ineer ing phases and a c t i v i t i e s l i s t e d i n t h e TWRS SEMP (see t a b l e 2 ) .

The use o f these proven des igns and

2.0 Svstem Definition Phase

The ISSTRS p r o j e c t w i l l combine t h e Design Requirements B a s e l i n e p o r t i o n o f t h e Pre-Concept phase and t h e Concept phase i n t o a s i n g l e "System D e f i n i t i o n Phase" (see t a b l e 2 ) . T h i s w i l l complete t h e "Systems Eng ineer ing" conceptual design. The t r a d e s t u d i e s , d e c i s i o n r e p o r t s , and system e f f e c t i v e n e s s a n a l y s i s t h a t appear under b o t h t h e pre-concept and concept phases ( t a b l e 1) w i l l be combined i n t o a s i n g l e s e t o f documents. The systems e n g i n e e r i n g documentat ion t h a t w i l l be p repared f o r t h e ISSTRS system d e f i n i t i o n phase i s shown below. These documents, a l l e x t r a c t e d f rom t h e TWRS SEMP, w i l l n o t n e c e s s a r i l y be s tand a lone documents, b u t may be i n c l u d e d as chapters i n a "System Design D e s c r i p t i o n " (SDD) as d e s c r i b e d i n t h e l i s t i n g below. The l i s t i n g i s d i v i d e d i n t o two s e c t i o n s , one f o r those documents t h a t w i l l be p repared as d e s c r i b e d i n t h e TWRS SEMP (Peck 1996) and one f o r those t h a t w i l l be d e l e t e d o r p repared o t h e r t h a n as descr ibed i n t h e TWRS SEMP.

1

Page 7: Approval /Re1 ease N/A - Digital Library/67531/metadc711353/m2/1/high_res... · Box 1970, To obtain copies of this docwnt, contact: UHC/ECS ... Hazardous Materi a1 Inventory Interface

WHC-SD-WM-SEMP-003 R E V . I1

2.1 TWRS SEMP Documents

The documents and a c t i v i t i e s l i s t e d below a re as d e f i n e d i n t h e TWRS SEMP. These w i l l be used by t h e ISSTRS p r o j e c t w i t h o u t excep t ion o r m o d i f i c a t i o n . excep t ions , a l l r e q u i r e d SEMP documents a re i n c l u d e d f o r c l a r i t y .

A l though a p r o j e c t SEMP i s r e q u i r e d t o l i s t o n l y t h e

System Engineer ing Level Assessment

A System Engineer ing Level Assessment document has been prepared f o r t h e ISSTRS p r o j e c t . The p r e l i m i n a r y d e t e r m i n a t i o n i s t h a t ISSTRS w i l l be a Systems Eng ineer ing Level 2 p r o j e c t ( S E - 2 ) . A SE-2 p r o j e c t r e q u i r e s t h e fuli s e t o f SE a c t i v i t i e s and documents, b u t t h e documentat ion i s s i g n i f i c a n t l y l e s s d e t a i l e d than a SE-1 p r o j e c t (Peck 1996).

Base l i ne System D e s c r i p t i o n (BSD)

The TWRS BSD w i l l be updated as r e q u i r e d t o i n c l u d e t h e p e r t i n e n t ISSTRS data.

Systems Engineer ing Management Plan (SEMP)

A p r o j e c t SEMP ( t h i s document) w i l l be prepared t o d e f i n e t h e ISSTRS p r o j e c t Systems Engineer ing ph i l osophy .

P r e l i m i n a r y Sa fe ty Eva lua t i on (PSE)

A PSE w i l l be prepared t h a t w i l l i n c l u d e t h e hazards a n a l y s i s (HA) t h e t e c h n i c a l s a f e t y requi rements (TSR), and t h e s a f e t y s t r u c t u r e s , systems, and components (SSC) e v a l u a t i o n .

R isk Management P1 an

A r i s k management p l a n w i l l be prepared f o r t h e p r o j e c t t h a t i n c l u d e s t h e r i s k management l i s t (RML) and t h e c r i t i c a l r i s k management l i s t (CRML).

Dec is ion Management P1 an/Decis ion Reports

A p p r o p r i a t e d e c i s i o n management p lans and d e c i s i o n r e p o r t s w i l l be prepared f o r ISSTRS as t h e needs a re i d e n t i f i e d . These w i l l be prepared i n accordance w i t h t h e TWRS Systems Engineer ing Manual (WHC 1996b). P resen t l y , seven c r i t i c a l d e c i s i o n s has been i d e n t i f i e d f o r t h e ISSTRS p r o j e c t . Each o f these d e c i s i o n s i s expected t o r e q u i r e a t rade /eng ineer ing s tudy t o develop t h e b a s i c i n f o r m a t i o n t o feed d e c i s i o n management. These c r i t i c a l d e c i s i o n s a re l i s t e d below:

1)

2) Is s l u i c i n g t h e proper waste r e t r i e v a l t echno logy t o

3 ) Is f o u r tanks t h e c o r r e c t number o f t anks f o r ISSTRS?

What i s t h e c o r r e c t LDMM s t r a t e g y t o p resen t t o t h e s t a t e ?

deploy f o r ISSTRS?

2

Page 8: Approval /Re1 ease N/A - Digital Library/67531/metadc711353/m2/1/high_res... · Box 1970, To obtain copies of this docwnt, contact: UHC/ECS ... Hazardous Materi a1 Inventory Interface

WHC-SD-WM-SEMP-003 REV. 0

4 ) Have we se lec ted t h e r i g h t t anks t o r e t r i e v e f o r t h e ISSTRS p r o j e c t ?

5)

6)

Have we s e l e c t e d t h e c o r r e c t r e c e i v e r t a n k f o r ISSTRS?

What a re we t r y i n g t o "demonstrate" w i t h t h e s a l t cake demo f o r ISSTRS-production r a t e , s l u i c a b i l i t y , s o l u b i l i t y ?

Is f und ing ISSTRS as an expense p r o j e c t t h e p roper a c q u i s i t i o n s t r a t e g y ?

7 )

Trade S tud ies

I n a d d i t i o n t o t h e t r a d e s s t u d i e s i n suppor t o f d e c i s i o n management, o t h e r t r a d e and eng ineer ing s t u d i e s w i l l be prepared as necessary t o suppor t t h e system d e f i n i t i o n phase o f t h e p r o j e c t . s u b j e c t s f o r these s t u d i e s . A d d i t i o n a l t o p i c s a re expected t o be i d e n t i f i e d d u r i n g t h e development 'of t h e des ign and w i l l be added t o t h e l i s t o f s t u d i e s .

The i tems l i s t e d below a re p o t e n t i a l

Use o f e x i s t i n q s l u i c e l i n e s i n t h e A l A X farms

There are e x i s t i n g 6" l i n e s i n t h e A and AX farms t h a t were used i n t h e e a r l i e r s l u i c i n g campaigns. be used f o r ISSTRS. needs t o be determined f rom bo th t h e c o s t and compl iance s tandpo in ts .

S l u i c e l i n e r o u t i n q o o t i o n s

There are v a r i o u s op t i ons f o r r o u t i n g t h e new s l u i c e l i n e s . These o p t i o n s need t o be eva lua ted and t h e most f a v o r a b l e o p t i o n i d e n t i f i e d .

Receiver Tank Opt ions

The c o s t d i f f e r e n c e s between u s i n g AN-101 and AY-102 f o r t h e ISSTRS r e c e i v e r t a n k need t o be developed and documented a long w i t h t h e t e c h n i c a l c o n s i d e r a t i o n s .

P r a c t i c a l i t y o f u s i n s a s l u r r y Dump i n t a n k A-102

Tank A-102 con ta ins 13 .5" o f waste. Eva lua te t h e p r a c t i c a l i t y and c o s t e f f e c t i v e n e s s o f i n s t a l l i n g b o t h a s l u r r y pump and a heel pump i n t h e t a n k f o r t h i s smal l amount o f waste.

These l i n e s c o u l d The p r a c t i c a l i t y o f u s i n g these l i n e s

C-106 HVAClChi l ler System

Determine t h e f e a s i b i l i t y o f u s i n g t h e C-106 HVAC/ch i l l e r system design f o r ISSTRS. I d e n t i f y m o d i f i c a t i o n s , i f any, t h a t should be made t o t h e des ign t o meet t h e ISSTRS requi rements.

Tank Leakaqe M o n i t o r i n q and M i t i s a t i o n

3

Page 9: Approval /Re1 ease N/A - Digital Library/67531/metadc711353/m2/1/high_res... · Box 1970, To obtain copies of this docwnt, contact: UHC/ECS ... Hazardous Materi a1 Inventory Interface

lh"-IC-SD-UM-.SEMP-O03 REV. 0

Prepare a trade 8tud.y t o e'4aluate leakage detection, monitoring, and imitigation technologies to support retrieval of the waste fr~cirl the single-shell tanks.

Operational Leak.-Detection and Minimization

Prepare a trade study t o determine the appropriate operational responses to tank leakage during retrieval activities. Base the study on the leak requirements in the Functions and Requirements document (Cruse, 1995) for Single Shell Tank retrieval.

Project Development Specification (PDS)

The ISSTRS project will prepare a PDS which is a lower-level specification based on the Project functions and requirements analysis (in the TRS) and traceable to the program-level requirements in the DRD. Provided as basis to perform design. The PDS will be formatted per Mil-Std-490 (EP 1.2).

Project Design Concept(PDC)

The ISSTRS project will prepare a PDC which i s a project level BSD formatted per WHC-EP-0586.

Technical Performance Measurement (TPM)

The ISSTRS project will prepare two TPMs, one to determine the actual retrieval rate(s) of the retrieval system and one to determine the degree o f tank clean-out achievable with the retrieval system.

Hazardous Material Inventory (HMI)

The project will prepare a project specific HMI.

System Integration Plan (SIP)

The project will prepare a SIP that includes a project schedule and project cost estimate.

2.2 TWRS SEMP Exceptions

The following are deletions or revisions to the direction contained in the TWRS SEMP that will be followed. by the ISSfRS project.

Design Requirements Document (DRD)

The DRD is not yet available to update so ISSTRS will prepare a Project Mission Analysis Report (Hertzel 1996a) and an "equivalent" or project DRD (Hertzel 1996b) along with an up front determination of the program risks assumed by this process (Peck 1996).

Flow Sheets

The TRBL flow sheets are not expected to be completed by the time they are needed by the ISSTRS project. Therefore,

4

Page 10: Approval /Re1 ease N/A - Digital Library/67531/metadc711353/m2/1/high_res... · Box 1970, To obtain copies of this docwnt, contact: UHC/ECS ... Hazardous Materi a1 Inventory Interface

WHC-SD-WM-SEMP-003 REV. 0

project specific flow sheets will be developed for ISSTRS. These will be patterned after the W320 flow sheets.

Interface Control Document (ICD)

The pre-concept and concept phase draft ICDs will be combined into draft ISSTRS project ICDs. These documents will be prepared in accordance with the guidelines in the TWRS System Engineering Manual (WHC 1995b).

System Effectiveness Analysis

A single, combined System Effectiveness Analysis will be prepared for the system definition phase of the ISSTRS project.

Requirements Traceability

The requirements traceability and system assessment will be combined into a single Requirements Traceability supporting document describing how each requirement/constraint is met by the conceptual design. This is to address each item in the Function and Requirements Document (FRD), the (equivalent) DRD, and the TRS.

Project Configuration Management Plan

The ISSTRS project will use the existing TWRS configuration management policies as delineated in the TWRS Systems Engineering manual (WHC 1996b), Section 5. Therefore, a project configuration management plan is not required.

Life Cycle Cost Analysis (LCCA)

The LCCA is a tool to assist in the evaluation of alternatives. WHC has been directed by DOE RL (Erickson 1995) to use past practice sluicing as the waste retrieval method for ISSTRS. Since other waste retrieval alternatives have been eliminated, a LCCA is not required for the ISSTRS project and will not be produced. However, this item i s one of the critical ISSTRS decisions that require validation by the decision board or decision officer. Accepting this direction without validation and going forward with the ISSTRS project will be carried as a "risk".

Test and Evaluation Plan (TEP)

ISSTRS is a demonstration project that uses the designs and systems from project W320 therefore confirmation testing is not required and a TEP will not be prepared for ISSTRS. of the overall ISSTRS goals are to determine 1) the actual waste retrieval rate, and 2) to determine the degree of cleanout achievable with the retrieval system. These goals cannot be determined until the operational phase of the task and are not part of the ISSTRS project.

Two

System Design Description (SDD)

5

Page 11: Approval /Re1 ease N/A - Digital Library/67531/metadc711353/m2/1/high_res... · Box 1970, To obtain copies of this docwnt, contact: UHC/ECS ... Hazardous Materi a1 Inventory Interface

WHC-SD-WM-SEMP-003 REV. 0

The SDD is one of the primar,y technical documents produced in the "System Definition Phase" of the project. The SDD may contain the items listed above as "chapters" or the items may be produced as stand-alone documents (if determined to be more feasible and cost effective by the project). If they are included as SDD chapters, the chapter titles will be the same as in this SEMP so there is a one- to-one correlation. Drawings and analysis produced during the system definition phase will be included in the SDD.

Reviews

The Design Requirements Review (DRR) and the System Requirements Review (SRR) will be combined into a single review that will be conducted at the end of the System Definition Phase of the project. This review will complete the Design Configuration Baseline (DCBL) portion of the ISSTRS project.

6

Page 12: Approval /Re1 ease N/A - Digital Library/67531/metadc711353/m2/1/high_res... · Box 1970, To obtain copies of this docwnt, contact: UHC/ECS ... Hazardous Materi a1 Inventory Interface

WHC-SD-WM-SEMP-003 R E V . 0

3.0 Design Phase

The ISSTRS p r o j e c t w i l l combine P re l im ina ry des ign and d e t a i l des ign i n t o a s i n g l e des ign phase (see t a b l e 2 ) . ISSTRS w i l l n o t make any except ions t o the TWRS SEMP requirements f o r these phases except f o r t h e System Design Review (SDR). ISSTRS w i l l combine the System Design Review and t h e D e f i n i t i v e Design Review (DDR) i n t o a s i n g l e DDR a t t he complet ion o f t h e design phase.

4.0 Construction and Startur,

The ISSTRS c o n s t r u c t i o n and s t a r t u p a c t i v i t i e s w i l l be conducted i n accordance w i t h t h e requirements i n the TWRS SEMP (Peck 1996).

7

Page 13: Approval /Re1 ease N/A - Digital Library/67531/metadc711353/m2/1/high_res... · Box 1970, To obtain copies of this docwnt, contact: UHC/ECS ... Hazardous Materi a1 Inventory Interface

8

siuawnaoa iioddns

Wb0-St-W

t SHISSI

ONIH33NIDN3 SW31SAS (dW3S) SUM1 L318Vl

0 'A38 EOO-dW3S-WM-aS-3HM

Page 14: Approval /Re1 ease N/A - Digital Library/67531/metadc711353/m2/1/high_res... · Box 1970, To obtain copies of this docwnt, contact: UHC/ECS ... Hazardous Materi a1 Inventory Interface

YHC-SD-WM-SEMP-003 REV. 0

T4l3LE 1 (CONTI

TWRS (SEMFI SYSTEMS ENGINEERING

Requirements & Architecture

PDS Update

POS F i n a l

DCBL3

Update p rev ious documents

L ABBL

POR

DDR

ORR

Phase

Pre l im ina ry Design

D e t a i l e d Design

Construct ion

~

Support Documents

Flow Sheets

P&IDs

Trade Studies

Decis ion Reports

System E f f e c t . Ana lys i s

Cons t ruc t i on Drawings

S t a r t u p Documents

Operat ing Documents

PSAR

As bu i 1 t s

Update prev ious documents

D&D Plans

FSAR/BIO update

TSRs

9

Page 15: Approval /Re1 ease N/A - Digital Library/67531/metadc711353/m2/1/high_res... · Box 1970, To obtain copies of this docwnt, contact: UHC/ECS ... Hazardous Materi a1 Inventory Interface

WHC-SD-WM-SEMP-003 REV. 0

TABLE 2

ISSTRS SYSTEMS ENGINEERING

Requirements & Architecture

MAR IC0 BSD Update PDS -~ PDC Flow Sheets

DCBL

PDS update PDC u p d a t e / f i n a l P r o j e c t ICDs

DCBL3

Update p rev ious documents

ABBL -

SDR

DDR

ORR

Phase

System D e f i n i t i o n

Design

Construct ion

Support Documents

SE Level Assessment P r o j e c t SEMP Trade Studies System E f f e c t . Ana lys i s System Assessment PSE Hazard Ana lys i s H M I , SSC, TSRs Tech Performance Measure Risk Mgt Plan RML CRML Requirement T r a c e a b i l i t y S I P

Flow Sheets P&IDs Trade Studies Decis ion Reports System E f f e c t . Ana lys i s Cons t ruc t i on Drawings S ta r tup Documents Operat ing Documents SA

As b u i l t s Update p rev ious documents D&D Plans B I O update (FSAR) TSRs

10

Page 16: Approval /Re1 ease N/A - Digital Library/67531/metadc711353/m2/1/high_res... · Box 1970, To obtain copies of this docwnt, contact: UHC/ECS ... Hazardous Materi a1 Inventory Interface

WHC-SD-WM-SEMP-003 REV. 0

5.0 REFERENCES

Certa, P. J., 1995, Pre l im ina ry R e t r i e v a l Sequence and Blending S t r a t e g y , WHC-SD-WM-RPT-167, Westi nghouse Hanford Company, R i c h l and, Washington.

Cruse, J.M., 1995, Funct ions and Requirements f o r Hanford S ing le -She l l Tank Leakage De tec t i on and Mon i to r i ng , WHC-SD-WM-FRD-021, Rev 0, A p r i l 1995, Westinghouse Hanford Company, Rich land Washington.

Ecology, EPA, and DOE, 1994, Hanford Federal f a c i l i t y Agreement and Consent Orde r , as amended, Washington S ta te Department o f Ecology, U.S. Environmental P r o t e c t i o n Agency, and U.S. Department o f Energy, Olympia, Washington.

R e t r i e v a l , Treatment, and Immob i l i za t i on , and system Engineer ing Program Areas, 95-RTI-003, Department o f Energy, Rich land Operat ions O f f i c e , Richland, Washington.

Single-Shel l Tank Waste R e t r i e v a l Process S tud ies , WHC-SD-WM-ES-252, Rev.0, September 1993, Westinghouse Hanford Company, Richland, Washington.

Hagmann, O.B., 1995, Approach Plan f o r t h e I n i t i a l S ing le -She l l Tank R e t r i e v a l System D e f i n i t i o n E f f o r t , WHC-SD-WM-AP-039, Westinghouse Hanford Company, Richland, Washington.

H e r t z e l , J.S., 1996a, I n i t i a l S ing le-Shel l Tank R e t r i e v a l System Miss ion Ana lys i s Repor t , WHC-SD-WM-MAR-009, Rev 1, March 1996, Westinghouse Hanford Company, R ich l and, Washington.

Sing le -she l l Tank R e t r i e v a l System, WHC-SD-WM-DRO-010, Rev. 0 , J u l y 1996, Westinghouse Hanford Company, Rich land Washington.

WHC-EP-0856, Rev. 1, DRAFT, September 1995 d r a f t ( t o be r e v i s e d and issued) .

Rev. 1, August 1995, Westinghouse Hanford Company, Rich land Washington.

Plan , WHC-SD-WM-SEMP-002, Rev 0 , February 1996, Westinghouse Hanford Company, R i c h l and, Washington .

WHC, 1995a, Tank Waste Remediation System Miss ion Ana lys i s , WHC-SD-WM-MAR-008, Rev. 0 , September 1995, Westinghouse Hanford Company, Rich land Washington.

Er ickson, L., 1995, Supplemental d i r e c t i o n Regarding t h e Implementation o f FY 1995

Gibbons, P.W., Sabin, J.C., Prather , M.C., K r i eg , S.A., 1993, Review o f P r i o r

H e r t z e l , J.S., 1996b, Pre l im ina ry Design Requirements Document f o r t h e I n i t i a l

Johnson, M.E. , 1995, Tank Waste Remediation System, Basel ine System D e s c r i p t i o n ,

Orme, R.M. , 1995, Tank Waste Remediation System Process.Flowsheet, WHC-SD-WM-TI-613,

Peck, L.G. , 1996, Tank Waste Remediation System Systems Engineer ing Management

11

Page 17: Approval /Re1 ease N/A - Digital Library/67531/metadc711353/m2/1/high_res... · Box 1970, To obtain copies of this docwnt, contact: UHC/ECS ... Hazardous Materi a1 Inventory Interface

WHC-SD-WM-SEMP-003 REV. 0

WHC, 1995b, WHC Tank Waste Remediation System Systems Engineer ing Manual, M iss ion Analys is , WHC-IP-(Interim), August 1995, Westinghouse Hanford Company, Rich1 and Washington.

WHC, 1996a, Tank Waste Remediation System Funct ions and Requirements Document, WHC- SD-WM-FRD-020, D r a f t Rev. A, January 1996, Westinghouse Hanford Company, Rich land Washington.

Rev. 0, May 1996, Westinghouse Hanford Company, Rich land Washington. WHC, 1996b, Tank Waste Remediation System Systems Engineer ing Manual, WHC-IP-1231,

12

Page 18: Approval /Re1 ease N/A - Digital Library/67531/metadc711353/m2/1/high_res... · Box 1970, To obtain copies of this docwnt, contact: UHC/ECS ... Hazardous Materi a1 Inventory Interface

WHC-SD-WM-SEMP-003 REV. 0

APPENDIX A

ISSTRS UNREVIEWED SAFETY QUESTION

DRAFT

13

Page 19: Approval /Re1 ease N/A - Digital Library/67531/metadc711353/m2/1/high_res... · Box 1970, To obtain copies of this docwnt, contact: UHC/ECS ... Hazardous Materi a1 Inventory Interface

UNREVIEWED SAFETY QUESTION SCREENING FORM (Per WHC-IP-0842)

ECN No.

Work Pkg No.

WHC-SD-WM- SEMP-003, Rev. 0

PCA No.

Other (Specify) WHC-SD-WM-AP-039

TITLE: I n i t i a l S ing le She l l Tank Waste R e t r i e v a l System h i s USQ screening addresses t h e proposed change t o r e t r i e v e waste as descr ibed i n WHC-SO WM-AP-039, "Approach Plan For The I n i t i a l S ing le-Shel l Tank R e t r i e v a l System D e f i n i t i o n

E f f o r t " . Th i s t a s k i s necessary t o p rov ide the sa fe ty documentation f o r t h e " I n i t i a l ; i n g l e She l l Tank R e t r i e v a l System (ISSTRS) task " , de r i ved from TPA m i les tone M-45-04-TO1

f o r tanks A-102, Ax-103, C-103 & C-105. The waste r e t r i e v e d from these tanks w i l l be to red i n double s h e l l tanks. The p lan descr ibed i n WHC-SD-WM-AP-039 e s s e n t i a l l y p a t t e r n i t s e l f a f t e r p r o j e c t W-320, 241-C-106 s l u i c i n g . Th is p r o j e c t has been determined t o be

unauthor ized as w e l l . A.Does the PROPOSED CHANGE represent a change to the facility as described in the

AUTHORIZATION BASIS documentation?

[I N/A [ ] No [ X I Yes/Maybe

Basis, Removal o f waste from these tanks as descr ibed i n the proposed change document (WHC-SD-WM-AP039) i s n o t c u r r e n t l y analyzed and w i l l r e q u i r e f u r t h e r s a f e t y ana lys i s .

B.Does the PROPOSED CHANGE represent a change to procedures as described in the AUTHORIZATION BASIS?

[ ] N/A [ ] No [ X I Yes/Maybe

Basis: Present TWRS procedures are f o r waste s torage. S l u i c i n g / r e t r i e v a l i s n o t

procedures o r change t o t h e e x i s t i n g procedures. c u r r e n t l y descr ibed i n the A u t h o r i z a t i o n Basis . Th i s a c t i v i t y may r e q u i r e new

C.Does the test or experiment represent a test or experiment not described in the AUTHORIZATION BASIS documentation?

[I N/A [ X I No [I YeslMaybe

Basis: Th i s i s a no t a t e s t o r experiment.

D.Does the change, test or experiment impact:

Implemented OSRsor IOSRs! [ ] N/A [I No [ X I Yes/Maybe

Approved IOSR Compliance Implementation Plans? [ ] N/A [ X I No [I Yes/Maybe

Basis: S l u i c i n g / r e t r i e v a l i s n o t c u r r e n t l y analyzed o r au tho r i zed and r e q u i r e d c o n t r o l s are n o t descr ibed i n t h e IOSRs, OSDs o r C I P .

Based on the above, a Safety Evaluation [ X ] DOES [ 3 DOES NOT need to be performed for this change

A-6001-202 (12/95) GEF288 14

Page 20: Approval /Re1 ease N/A - Digital Library/67531/metadc711353/m2/1/high_res... · Box 1970, To obtain copies of this docwnt, contact: UHC/ECS ... Hazardous Materi a1 Inventory Interface

UNREVIEWED SAFETY QUESTION SCREENING FORM WHC-SD-WM- SEMP-003, Rev. 0 (Continued)

iJSOE NO. 1 J a s b i r K. Bajwa USOE No. 2 L. F. Dougherty Print Name Print l a m

Signature Date signature Date

A-6001-202 (12/95) GEF288 15

Page 21: Approval /Re1 ease N/A - Digital Library/67531/metadc711353/m2/1/high_res... · Box 1970, To obtain copies of this docwnt, contact: UHC/ECS ... Hazardous Materi a1 Inventory Interface

-- UNREVIEWED SAFETY QUESTION EVALUATION FORM

(Per WHC-IP-0842)

USQ Tracking Number: TF-96-0020

WHC-SD-WM- SEMP-003, Rev. 0

Rev. No. Does this change require a revision to the authorization basis? [XI Yes [ I No

AREA: [ X I East [ ] West

Facility: [ ] 242-A [I DST [ X I SST [ ] LERF

EQUIPMENT DESCRIPTION: The scope o f t h i s unreviewed s a f e t y ques t i on e v a l u a t i o n i s a proposed change i n c l u d i n g the r e t r i e v a l o f waste by h y d r a u l i c s l u i c i n g from SSTs: A-102, AX-103 (hydrogen flammable gas tank ) , C-103 (organic tank) , and C-105, t o double s h e l l tanks. The proposed change i s d e f i n e d i n WHC-OSD-WM-AP-039 Rev 0, "Approach Plan For The I n i t i a l S ing le-Shel l Tank R e t r i e v a l System D e f i n i t i o n E f f o r t " . Th i s p lan s t a t e s t h a t t h e proposed change w i l l p a t t e r n i t s e l f a f t e r p r o j e c t W-320 which has been determined t o a l so be unauthor ized.

[ I Aging Waste [ ] Other

REFERENCE DOCUMENT(S1:

ECN No. NA

Work Pkg No. NA

PCA No. NA

Other (Specify) WHC-SD-WM-AP-039 Rev. 0

TITLE: I n i t i a l S ing le-Shel l Tank Waste R e t r i e v a l System

1 .Does the PROPOSED CHANGE, test, experiment or DISCOVERY increase the probability of occurrence of an accident previously evaluated in the AUTHORIZATION BASIS documentation?

[ ] No [ ] Yes [ X I Maybe"

C-103, and C-105 were rev i sed : Basis: The f o l l o w i n g a u t h o r i z a t i o n and sa fe ty bas i s documents f o r SSTs A-102, AX-103,

WHC-SD-WM-ISB-001, Vol I , Rev. 0-1 Hanford S i t e Tank Farm F a c i l i t y I n t e r i m Sa fe ty Basis Sect ion 6.

WHC-SD-WM-OSR-005, Rev. A S ing le She l l Tank I n t e r i m Operat ion Safety Requirements.

WHC-SD-WM-SAR-006, Rev. 2

WHC-SD-WM-SAR-034, Rev. 0-A

Review o f these documents i n d i c a t e s t h a t s l u i c i n g and r e t r i e v a l are n o t i nc luded i n t h e

occurrence o f an acc ident p r e v i o u s l y evaluated i n the A u t h o r i z a t i o n Basis . Hazard and acc ident analyses are requ i red t o be performed.

2.Does the PROPOSED CHANGE, test, experiment or DISCOVERY increase the consequences of an accident previously evaluated in the AUTHORIZATION BASIS documentation?

[ ] No [ ] Yes [ X I Maybe*

e x i s t i n g a u t h o r i z a t i o n bas i s . The proposed change may increase the p r o b a b i l i t y of

-- A-0001-203 (12/95) GEF289 16

Page 22: Approval /Re1 ease N/A - Digital Library/67531/metadc711353/m2/1/high_res... · Box 1970, To obtain copies of this docwnt, contact: UHC/ECS ... Hazardous Materi a1 Inventory Interface

-~ UNREVIEWED SAFETY QUESTION EVALUATION FORM I WHC-SD-WM-

(Continuedl SEMP-003, Rev. 0

Basis: Because s l u i c i n g and r e t r i e v a l are n o t i nc luded i n t h e e x i s t i n g a u t h o r i z a t i o n bas i s t h e proposed change may increase t h e consequences o f an acc iden t p r e v i o u s l y

evaluated i n the Au tho r i za t i on Basis.

3.Does the PROPOSED CHANGE, test, experiment or DISCOVERY increase the probability of occurrence of a malfunction of EQUIPMENT previously evaluated in the AUTHORIZATION BASIS

documentation?

[ I No [ I Yes [ X I Maybe"

Basis: The proposed change i s n o t inc luded i n t h e a u t h o r i z a t i o n b a s i s and has n o t been analyzed, t h e r e f o r e it may increase t h e p r o b a b i l i t y o f occurrence o f a m a l f u n c t i o n o f

equipment p r e v i o u s l y evaluated i n the A u t h o r i z a t i o n Basis .

4.Does the PROPOSED CHANGE, test, experiment or DISCOVERY increase the consequences of a malfunction of ITS EQUIPMENT previously evaluated in the AUTHORIZATION BASIS documentation?

[ I No [ I Yes [ X I Maybe"

Basis: Because s l u i c i n g and r e t r i e v a l are n o t inc luded i n the e x i s t i n g a u t h o r i z a t i o n bas i s o r have been analyzed the proposed change may increase the consequences o f a

m a l f u n c t i o n o f ITS equipment p rev ious l y evaluated i n t h e A u t h o r i z a t i o n Basis .

5.Does the PROPOSED CHANGE, test, experiment or DISCOVERY create the possibility of an accident of a different type than any previously evaluated in the AUTHORIZATION BASIS documentation?

[ I No [ I Yes [ X I Maybe'

Basis: Removal o f waste from these tanks may the change waste chemist ry f o r organic tanks o r a l t e r t h e p roduc t i on o f flammable gas, which cou ld i n i t i a t e acc ident

sequences. Fu r the r hazard and acc ident ana lys i s i s requ i red f o r t h i s proposed change.

6.Does the PROPOSED CHANGE, test, experiment or DISCOVERY create the possibility o f a malfunction of EQUIPMENT of a different type than any previously evaluated in the AUTHORIZATION

BASIS documentation?

[ ] No [ ] Yes [ X I Maybe*

Basis: Because s l u i c i n g and r e t r i e v a l are no t inc luded i n the e x i s t i n g a u t h o r i z a t i o n bas i s o r has been analyzed the proposed change may c rea te t h e p o s s i b i l i t y o f a

ma l func t i on o f EQUIPMENT o f a d i f f e r e n t t ype than any p r e v i o u s l y evaluated i n t h e AUTHORIZATION BASIS documentation.

7.Does the PROPOSED CHANGE, test, experiment or DISCOVERY reduce the margin of safety as defined in the basis for any Technical Specification/Operational Safety Requirement?

[ ] No [ ] Yes [ X I Maybe"

Basis: Because s l u i c i n g and r e t r i e v a l are n o t inc luded i n the a u t h o r i z a t i o n bas i s a hazard and acc iden t ana lys i s s p e c i f i c t o the proposed a c t i o n i s r e q u i r e d i n o rde r t o

determine i f the re i s a reduc t i on i n margin o f sa fe ty .

8.Does the PROPOSED CHANGE, test, experiment or DISCOVERY require a new or revised OSR, IOSR or a compensatory measure required by a Compliance Implementation Plan?

A-6001-203 (12/95) GEf289 17

Page 23: Approval /Re1 ease N/A - Digital Library/67531/metadc711353/m2/1/high_res... · Box 1970, To obtain copies of this docwnt, contact: UHC/ECS ... Hazardous Materi a1 Inventory Interface

UNREVIEWED SAFETY QUESTION EVALUATION FORM (Continued)

PRC Chairman Concurrence: Signature Date

WHC-SD-WM- SEMP-003, Rev. 0

*Requires PRC Subcommittee meeting for resolution.

Comments:

A-6001.203 (12/95) GEF289 18