1 ABA 2012 Hatfield & Dawson Consulting Engineers Appreciating Your Vertical Real Estate Stephen S. Lockwood, P.E. Hatfield & Dawson Consulting Engineers 9500 Greenwood, Ave, Seattle, WA [email protected] ABA 2012 Hatfield & Dawson Consulting Engineers Overview Market Trends • Economics Wireless Leases TV & FM Facilities AM Facilities • Questions ABA 2012 Hatfield & Dawson Consulting Engineers Market Trends New Build out of LTE (Long Term Evolution – 4G – Next Big Thing) More cell sites – Closer together – Higher data capacity – Tower mounted amplifiers fed by fiber optic & power that crosses base insulator Understand your local area – Unique site – Restrictive Land Use area – Ask other landlords – FOIA public agencies ABA 2012 Hatfield & Dawson Consulting Engineers Economics Does your site have an economic advantage for the wireless provider? – Existing land use permits – Coverage of important areas – Power Leasing tower space provides revenue for facility upkeep and bottom line ABA 2012 Hatfield & Dawson Consulting Engineers Economics New income stream Maintenance relief for broadcaster – Require site maintenance Opportunity to upgrade facilities in exchange for rent credit Use monthly income for facilities maintenance ABA 2012 Hatfield & Dawson Consulting Engineers Benefits to Wireless Providers Thousands of unused sites in urban and poor coverage areas Existing structure, minimal or no community resistance Zoning/permitting facilitated Less site work and tower provisioning than a “greenfield site” Faster time to market for new wireless facilities

Appreciating Your Vertical Real Estate - Hatfield & Dawson

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

1

ABA 2012 Hatfield & Dawson Consulting Engineers

Appreciating Your Vertical Real Estate

Stephen S. Lockwood, P.E.Hatfield & Dawson Consulting Engineers

9500 Greenwood, Ave, Seattle, [email protected]

ABA 2012 Hatfield & Dawson Consulting Engineers

Overview

• Market Trends• Economics• Wireless Leases• TV & FM Facilities• AM Facilities• Questions

ABA 2012 Hatfield & Dawson Consulting Engineers

Market Trends• New Build out of LTE (Long Term

Evolution – 4G – Next Big Thing)

• More cell sites– Closer together

– Higher data capacity

– Tower mounted amplifiers fed by fiber optic & power that crosses base insulator

• Understand your local area– Unique site

– Restrictive Land Use area

– Ask other landlords – FOIA public agencies

ABA 2012 Hatfield & Dawson Consulting Engineers

Economics

• Does your site have an economic advantage for the wireless provider?

– Existing land use permits

– Coverage of important areas

– Power

• Leasing tower space provides revenue for facility upkeep and bottom line

ABA 2012 Hatfield & Dawson Consulting Engineers

Economics

• New income stream

• Maintenance relief for broadcaster

– Require site maintenance

• Opportunity to upgrade facilities in exchange for rent credit

• Use monthly income for facilities maintenance

ABA 2012 Hatfield & Dawson Consulting Engineers

Benefits to Wireless Providers

• Thousands of unused sites in urban and poor coverage areas

• Existing structure, minimal or no community resistance

• Zoning/permitting facilitated

• Less site work and tower provisioning than a “greenfield site”

• Faster time to market for new wireless facilities

2

ABA 2012 Hatfield & Dawson Consulting Engineers

Challenges to Wireless Providers

• They do not understand broadcast facilities

– Antenna

– Ground systems

• Find broadcasters unwilling play along

• Find broadcasters hard to get along with

ABA 2012 Hatfield & Dawson Consulting Engineers

Wireless Lease

• Lease vs. License

• Make agreement reciprocal– Treat each as equals

– Termination clauses (30 days vs. 30 years)

– Restrictions and Rights

• Get an escalation clause (3-4% or CPI)

• Typical rents $1,000 to $4,000 – location and market dependent

• Site access

ABA 2012 Hatfield & Dawson Consulting Engineers

Wireless Lease

• Site construction drawings

• Complete design– Telco

– RF

– Grounding

– power

• Approval of all changes throughout the life of the lease

• Document everything – Wireless carriers use contractors for everything and have a short memory

• Get a copy of all communications with the city

ABA 2012 Hatfield & Dawson Consulting Engineers

All Wireless Installation

• Analysis of tower by Registered Professional Structural Engineer (P.E.) who know about towers

• Competent A&E for design work with your consulting engineer

• Building space, building systems, electrical, heat load and access

• Local permits

ABA 2012 Hatfield & Dawson Consulting Engineers

TV/FM Sites

• Site restrictions

• RF Safety – Exposure

• Assure they understand broadcast facilities

ABA 2012 Hatfield & Dawson Consulting Engineers

AM Towers

• Isolation across the tower base

• Isocoupler

• Iso-coil

• Slotted coils

• Power

• Fiber Optic

3

ABA 2012 Hatfield & Dawson Consulting Engineers

AM Directional Antennas

• Need a moment method analysis to determine which tower in the DA to use

• Determine if the existing DA parts can be adjusted for the expected changes

• Pattern bandwidth analysis

• Have wireless provider pay for a new moment method proof on DAs

ABA 2012 Hatfield & Dawson Consulting Engineers

AM Tower Requirements

• AM feed system analysis

– Base impedance

– System bandwidth

– On high power system consider high voltages

– Full system design

ABA 2012 Hatfield & Dawson Consulting Engineers

AM Tower Requirements

• RF Safety

– Shock and burn

– Exposure

• Signs from www.radhaz.com

ABA 2012 Hatfield & Dawson Consulting Engineers

Ground Systems

• Assure that the wireless provider and their team understand your ground system (detail them on the drawings)

• Assure that their ground system has been bonded to yours in an appropriate manner –think about faults & lightning

• Document everything – Someone will try and change something in the future

• Typical wireless ground 6 to 12 – 8 foot ground rods & 2 AGW wire – AM ground system 20,000 feet of 10 AGW wire

ABA 2012 Hatfield & Dawson Consulting Engineers

Typical Wireless Ground System

ABA 2012 Hatfield & Dawson Consulting Engineers

4

ABA 2012 Hatfield & Dawson Consulting Engineers

FCC Requirements

• Measure base impedance on ND

• Possible partial proof on DA

• File new FCC 302 form

• This needs to be done every time something changes above the base insulator

ABA 2012 Hatfield & Dawson Consulting Engineers

From WLW 700 kHz

STUDIO TO TRANSMITTER LINK 950MHZ ISOCOUPLER

MODEL FMC-7.5 & FMC-30FM ISOCOUPLERS

MODEL FMC-1.9G-PCS ISOCOUPLERS FOR 3G CELLPHONE INSTALL ON “HOT”

AM TOWER

CUSTOM MULTI-COAX, MULTI-CONDUCTOR ISOLATION INDUCTORS FOR CELLPHONE SERVICE ON “HOT”

AM TOWER

5

© 2011 LBA Group, Inc., A ll Rights Reserv ed.

LBA Group, Inc.3400 Tupper Drive, Greenville, North Caro lina 27834 / 800-522-4464 / 252-757-0279 / Fax 252-752-9155 / Email: [email protected] / www.Lbagroup.com

CoLoPole system on an AM station tower in the Boston Area

®

© 2011 LBA Group, Inc., A ll Rights Reserv ed.

LBA Group, Inc.3400 Tupper Drive, Greenville, North Caro lina 27834 / 800-522-4464 / 252-757-0279 / Fax 252-752-9155 / Email: [email protected] / www.Lbagroup.com

“Hot side” view of modular CoLoCoil units in place at AM radio station in Vermont

®

© 2011 LBA Group, Inc., A ll Rights Reserv ed.

LBA Group, Inc.3400 Tupper Drive, Greenville, North Caro lina 27834 / 800-522-4464 / 252-757-0279 / Fax 252-752-9155 / Email: [email protected] / www.Lbagroup.com

Integrated CoLoCoil units can accommodate different carriers or

services

®

© 2011 LBA Group, Inc., A ll Rights Reserv ed.

LBA Group, Inc.3400 Tupper Drive, Greenville, North Caro lina 27834 / 800-522-4464 / 252-757-0279 / Fax 252-752-9155 / Email: [email protected] / www.Lbagroup.com

AM – Cellular Colocation

Colocation system isolation for security and RF safety

6

© 2012 LBA Group, Inc., A ll Rights Reserv ed.

LBA Group, Inc.3400 Tupper Drive, Greenville, North Caro lina 27834 / 800-522-4464 / 252-757-0279 / Fax 252-752-9155 / Email: [email protected] / www.Lbagroup.com

Clearwire WiMAX Colocation (Seattle)

© 2012 LBA Group, Inc., A ll Rights Reserv ed.

LBA Group, Inc.3400 Tupper Drive, Greenville, North Caro lina 27834 / 800-522-4464 / 252-757-0279 / Fax 252-752-9155 / Email: [email protected] / www.Lbagroup.com

Examples: AM – 4G Wireless Colocation

VZWHawaii

ABA 2012 Hatfield & Dawson Consulting Engineers ABA 2012 Hatfield & Dawson Consulting Engineers

ABA 2012 Hatfield & Dawson Consulting Engineers ABA 2012 Hatfield & Dawson Consulting Engineers Radio 9 Sao Paulo 100 kW

7

ABA 2012 Hatfield & Dawson Consulting Engineers IBB Thailand 1 MW ABA 2012 Hatfield & Dawson Consulting Engineers WJR 50 kW

ABA 2012 Hatfield & Dawson Consulting Engineers ABA 2012 Hatfield & Dawson Consulting Engineers

ABA 2012 Hatfield & Dawson Consulting Engineers ABA 2012 Hatfield & Dawson Consulting Engineers

Questions

Stephen Lockwood, P.E.

[email protected]

206-783-9151