Applied Structural Drying (ASD) & Agent Loss Ratio Sheet

WATER

WIND

Page 3: Applied Structural Drying (ASD) & Agent Loss Ratio Sheet WATER WIND

Applied Structural Drying (ASD) & Agent Loss Ratio Sheet

BACKING

SUBSTRATE (PLYWOOD)

PAD

FAN

DEHUMIDIFIER

Page 4: Applied Structural Drying (ASD) & Agent Loss Ratio Sheet WATER WIND

Science

Freeze H2O0-32º F

Boil 212º F

ASD Primary LawHigh Heat + Agitation

WATER SURFACE TENSION WIND

HEATTHERMOCLINE

Page 5: Applied Structural Drying (ASD) & Agent Loss Ratio Sheet WATER WIND

Science

CARPET

SUBSTRATE (PLYWOOD)

PAD

Page 6: Applied Structural Drying (ASD) & Agent Loss Ratio Sheet WATER WIND

Science

H2O ÷ ASD = H2 / O

Heat – causes the violent agitation of molecules

Motion – breaks surface tension of standing water

Page 7: Applied Structural Drying (ASD) & Agent Loss Ratio Sheet WATER WIND

Science - Water Travels In 2 Directions

1. The path of least resistance

2. From wet to dry

LIVINGROOM CARPET

BATHTUB

WATERFALL

RIVER

LAKE

Page 8: Applied Structural Drying (ASD) & Agent Loss Ratio Sheet WATER WIND

The Path of Least Resistance

SIDING

JOIST

PLYWOOD

CARPET PAD

FRAMING

INS

DRY

BASE

Page 9: Applied Structural Drying (ASD) & Agent Loss Ratio Sheet WATER WIND

From Wet To Dry

Qualified Measurements Relative humidity Temperature Grains per pound Relative material

standard

HEAT 105 º

WET

DRY

+

-

STRAW EFFECT

Page 10: Applied Structural Drying (ASD) & Agent Loss Ratio Sheet WATER WIND

Goal

ASD is a method to reverse natural occurrence to restore a structure to pre-loss condition.

Page 11: Applied Structural Drying (ASD) & Agent Loss Ratio Sheet WATER WIND

Standard Water Damage Operation Remove Wet

Materials Extract Porous

Material 1 Fan per 8-12’ ?? Dehumidification per

8F ratio

10 x 15 = 1,500 sf10’

15’

DEHU

Page 12: Applied Structural Drying (ASD) & Agent Loss Ratio Sheet WATER WIND

Standard Water Damage Operation

Restoration Construction Emergency Temp

2’ Drywall $1,800

Reset Base $150

Pad $400

Re-stretch $100

Paint $1,200

Clean $100

$2,660

Profit/Over 10/10 $500

TOTAL $3,160

(5) Fans @ $25 day @ 4days $500

(1) Dehu. @ $100 day $400

Remove Pad @ 1,500 sf $750

Emergency Response – day $150

WTR Tech @ 4days $300

TOTAL $2,100

Page 13: Applied Structural Drying (ASD) & Agent Loss Ratio Sheet WATER WIND

Standard Water Damage Operation

Average Loss has 2-3 rooms E-Temp Constrution

( 2 room loss) $4,200 $6,320

Loss

$10,520

(MN/Dry + MN/PNT) Plus intrusion $1,350

$11,750

Page 14: Applied Structural Drying (ASD) & Agent Loss Ratio Sheet WATER WIND

Extract porous materials

Dehumidification by G.P.P. in air

Fans – water tension & dew point

Meet 72 hr dry time

A.S.D. Standard Water Loss

10’

15’

HEAT

105º

DEHU

Page 15: Applied Structural Drying (ASD) & Agent Loss Ratio Sheet WATER WIND

A.S.D. Standard Water Loss

Restoration Construction Emergency Temp

Dry – MN $150

Paint Walls $1,200

TOTAL $1,350

(6) Fans @ 72 hrs $450

(1) Dehu. @ 72 hrs $300

Heat @ 72 hrs $450

Extraction $350

Emergency Response $150

WTR – Tech @ 72 hrs $250

TOTAL $2,050

Page 16: Applied Structural Drying (ASD) & Agent Loss Ratio Sheet WATER WIND

A.S.D. Standard Water Loss

Construction at Intrusion Pt. $1,350

Emergency Temp $2,050

2SD Room Loss $1,650

$5,050

Water Standard $1,750

ASD Standard $5,050

$6,700 diff

57%TOTAL LOSS