www.hyundai-engine.com www.hhi.co.kr www.hyundai-engine.com • For more technical information and 2-stroke engine SCR chamber, please contact us. Power (kW) Depth (mm) Width (mm) Height (mm) Weight (kg) incl. catalyst ~ 930 1,100 1,100 3,600 2,300 ~ 1,660 1,500 1,500 3,900 3,600 ~ 2,590 1,800 1,800 4,100 4,800 ~ 2,900 1,500 1,500 4,900 4,700 Power (kW) Depth (mm) Width (mm) Height (mm) Weight (kg) incl. catalyst ~ 4,600 1,800 1,800 5,100 6,300 ~ 6,700 2,100 2,100 5,400 8,400 ~ 10,160 2,400 2,400 5,600 10,600 ~ 11,800 2,700 2,700 5,900 13,100 NoNOx Standard SCR chamber for 4 stroke engine Engine Power Plant for Stationary Application Emergency GenSets for Nuclear Power Plant PPS (Packaged Power Station) for Marine Application Drilling Rig Containership Ferry FPSO Drillship Applications Engine Power Plant Dep’t Tel.: 82-52-202-7302, 7303 E-mail: [email protected] Marine Machinery Design & Engineering Dep’t Tel.: 82-52-202-7322, 7018 E-mail: [email protected] copyright 2014 Hyundai heavy industries A20-126-03 Sep. 2014 Contents subject to change without prior notice. Engine Type Application NOx reduction rate Q’ty (sets) Status HiMSEN 16H32/40V Drill Ship IMO Tier III 18 In service HiMSEN 12H32/40V Semi-Rig IMO Tier III 8 Before delivery HiMSEN 14H32/40V Drill Ship IMO Tier III 24 Before delivery HiMSEN 9H25/33 DPP About 80% 4 In service HiMSEN 9H25/33 Diving Support Vessel IMO Tier III 6 Before delivery HiMSEN 16H32/40V Drill Ship IMO Tier III 6 Before delivery HiMSEN 18H25/33V, etc. DPP About 80% 5 In service HiMSEN 9H32/40, etc. Heavy construction vessel IMO Tier III 7 Being manufactured HiMSEN 14H32/40V Drill Ship IMO Tier III 6 Being manufactured DAIHASU LNG carrier IMO Tier III 4 Being manufactured 6G50ME-C LPG carrier IMO Tier III 3 Firm order HiMSEN 6H21/32 LPG carrier IMO Tier III 9 Firm order Total 100 Sep. 2014 Reference List Shenzhen Ho Chi Min New Delhi Busan Ulsan Kaohsiung Dubai Durban Shanghai Yoko hama Napoli Wilhelmshaven Santander Rotterdam Copenhagen La Spezia Tallinn Istanbul Keratsini Taguig Singapore Hamburg Office Lauderdale Nicaragua Havana Ecuador Santo Domingo Rio De Janeiro Santos Paulo-SP Buenos Aires Quebec Vancouver L.A Houston Barbados World Wide HYUNDAI HHI Office HHI-EMD Direct Service Center Authorized Repairer Cooperative Repairer Spare Parts Depot Parts Sales Agent 1000, Bangeojinsunhwan-doro, Dong-gu, Ulsan, South Korea Marine Engine & Machinery Sales Dep’t (Domestic) Tel : +82-52-202-7291 ~ 9 E-mail : [email protected] Marine Engine & Machinery Sales Dep’t (International) Tel : +82-52-202-7281 ~ 9 E-mail : [email protected]

Applications · • For more technical information and 2-stroke engine SCR chamber, please contact us

  • Upload
    lekhue

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

www.hyundai-engine.comwww.hhi.co.krwww.hyundai-engine.com

• For more technical information and 2-stroke engine SCR chamber, please contact us.

Power (kW)

Depth (mm)

Width (mm)

Height (mm)

Weight (kg) incl. catalyst

~ 930 1,100 1,100 3,600 2,300

~ 1,660 1,500 1,500 3,900 3,600

~ 2,590 1,800 1,800 4,100 4,800

~ 2,900 1,500 1,500 4,900 4,700

Power (kW)

Depth (mm)

Width (mm)

Height (mm)

Weight (kg) incl. catalyst

~ 4,600 1,800 1,800 5,100 6,300

~ 6,700 2,100 2,100 5,400 8,400

~ 10,160 2,400 2,400 5,600 10,600

~ 11,800 2,700 2,700 5,900 13,100

NoNOx Standard SCR chamber for 4 stroke engine

Engine Power Plant

for Stationary ApplicationEmergency GenSets for

Nuclear Power Plant

PPS (Packaged Power Station)

for Marine Application

Drilling Rig Containership

Ferry

FPSO

Drillship

Applications

Engine Power Plant Dep’tTel.: 82-52-202-7302, 7303E-mail: [email protected]

Marine Machinery Design & Engineering Dep’tTel.: 82-52-202-7322, 7018E-mail: [email protected]

copyright ⓒ 2014 H

yundai heavy industries

A20-126-03 Sep. 2014Contents subject to change without prior notice.

Engine Type Application NOx reduction rate Q’ty (sets) Status

HiMSEN 16H32/40V Drill Ship IMO Tier III 18 In service

HiMSEN 12H32/40V Semi-Rig IMO Tier III 8 Before delivery

HiMSEN 14H32/40V Drill Ship IMO Tier III 24 Before delivery

HiMSEN 9H25/33 DPP About 80% 4 In service

HiMSEN 9H25/33 Diving Support Vessel IMO Tier III 6 Before delivery

HiMSEN 16H32/40V Drill Ship IMO Tier III 6 Before delivery

HiMSEN 18H25/33V, etc. DPP About 80% 5 In service

HiMSEN 9H32/40, etc. Heavy construction vessel IMO Tier III 7 Being manufactured

HiMSEN 14H32/40V Drill Ship IMO Tier III 6 Being manufactured

DAIHASU LNG carrier IMO Tier III 4 Being manufactured

6G50ME-C LPG carrier IMO Tier III 3 Firm order

HiMSEN 6H21/32 LPG carrier IMO Tier III 9 Firm order

Total 100

Sep. 2014Reference List

Shenzhen

Ho Chi Min

New Delhi

Busan

Ulsan

KaohsiungDubai

Durban

Shanghai

YokohamaNapoli

Wilhelmshaven

Santander

Rotterdam

Copenhagen

La Spezia

Tallinn

Istanbul

Keratsini

Taguig

Singapore

Hamburg Office

Lauderdale

Nicaragua

Havana

Ecuador

Santo Domingo

Rio De Janeiro

SantosPaulo-SP

Buenos Aires

Quebec

Vancouver

L.A Houston

Barbados

World Wide HYUNDAI

HHI OfficeHHI-EMD Direct Service CenterAuthorized Repairer

Cooperative RepairerSpare Parts DepotParts Sales Agent

1000, Bangeojinsunhwan-doro, Dong-gu, Ulsan, South Korea

Marine Engine & Machinery Sales Dep’t (Domestic)Tel : +82-52-202-7291 ~ 9E-mail : [email protected]

Marine Engine & Machinery Sales Dep’t (International)Tel : +82-52-202-7281 ~ 9E-mail : [email protected]

SCR is a technology which can reduce NOx in exhaust gas by a chemical reaction process. Urea solution is commonly adopted as the reductant as it decomposes into ammonia and carbon dioxide in hot gas stream.

(NH2)2CO + H2O > 2NH3 + CO2

[Urea] [Water] [Ammonia] [Carbon dioxide]

The ammonia decomposed from urea is chemically reacted with NOx at the surface of the catalyst. It is then converted to molecular nitrogen and water.

4NO + 4NH3 + O2 > 4N2 + 6H2O6NO2 + 8NH3 > 7N2 + 12H2O

SCR (Selective Catalytic Reduction) Principle

Main Features of NoNOx SCR System Main Components of NoNOx SCR System

Certification of NoNOx SCR System

SCR system and relevant certification procedure for marine application is defined by IMO.According to resolution MEPC.198(62), SCR system is considered as an engine component. Therefore, instead of separate certification of SCR system, IMO NOx verification in combination with engine is required according to Scheme A and Scheme B. NoNOx SCR system can be verified and receive IMO NOx Tier III certification at HHI-EMD test-bed according to Scheme A.

Special care is being taken to protect the environment from air pollution. IMO MARPOL NOx regulation is the dominant guideline for marine industries.IMO NOx Tier III regulations takes effect from 1 January 2016. This requires 80% less NOx emissions compared with NOx Tier I. This amount of NOx reduction is generally not achieved by the engine itself. Hence, a separate device is required to meet Tier III regulations in this respect.

NoNOx is the brand name of HHI’s SCR system. NoNOx SCR system can provide the most suitable solution for all marine applications, and can also be used in other industries as well.

Most reliable design for marine application- HHI patented catalyst proven long durability- ACONIS* based full automatic control system - Qualified design for marine requirements

Best adoptability for onboard installation- Compact components for easy installation- Design flexibility aimed at optimum installation- Good connectivity with other system units

Most convenience for verification & operation- Verified SCR performance before onboard installation- Low operating cost by closed loop dosing system - Worldwide service & spare parts network

ACONIS: Automation Communication and Navigation Information Solution

Resolution MEPC.198(62)

6NO2 + 8NH3

[Nitrogen dioxide] [Ammonia]Catalyst layers 7N2 + 12H2O

[Nitrogen] [Water]

NOx Emissions in Marine Applications

NOx

emiss

ion

[g/k

Wh]

Engine Speed [rpm]

Mixing unit

to be installed before SCR chamber.

It can be devided to Mixing pipe and

Injection pipe

Soot blowing unit

to be vertically mounted on wall

by welding or fastening

SCR Chamber

to be installed in between exhaust pipes.

Vertical mounting is standard but

Horizontal can be adopted on demand

Urea dosing unit

to be generally hung on wall structure.

Pipe length from injector nozzle to be

limited shorter than 10m

Urea supply unit

to be installed on the bottom level of Urea storage tank.

Urea supply is assembled on common skid, which is vertically

mounted on structure by welding or fastening

4-Stroke

engine

application

Mixing unit

2-Stroke engine application

SCR

Chamber

Pump starter panel

to be generally hung on wall

structure near Urea supply unit

※ Piping & wiring works between

each components to be carried out

by shipyard.

CompressedAir

Urea Solution

Control Unit

to be installed on engine

control room