30
The Rail Central Rail Freight Interchange and Highway Order 201[x] Application Index PINS Reference Number: TR050004 Document Reference: 1.1 Regulation Number: Reg 5(2)(q) September 2018 Version 1.0 Planning Act 2008 | Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009

Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Embed Size (px)

Citation preview

Page 1: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

The Rail Central Rail Freight Interchange and Highway Order 201[x]

Application Index

PINS Reference Number:TR050004Document Reference: 1.1 Regulation Number: Reg 5(2)(q)

September 2018Version 1.0

Planning Act 2008 | Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009

Page 2: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

TR050004

Category (use drop down list) Document type (use drop down

list)

Plain English Description Date Author

Application Form Other Application Index 26.10.18 Turley

Application Form Other Cover letter to PINS 26.10.18 Womble Bond

Dickinson

Application Form Form Application Form 26.10.18 Womble Bond

Dickinson

Application Form Other Schedule of Rail Central Development Consent Order

Submission Documents

26.10.18 Turley

Application Form Other Guide to the Rail Central Development Consent Order 26.10.18 Turley

Application Form Newspaper Notices Copies of newspaper notices & section 48 notices 26.10.18 Camargue

Application Form Other Amendments to the Resubmitted DCO Application 26.10.18 Turley 1.7 Amends to DCO Application.pdf

Plans/Drawings General Site Plans (Part 23) Location plan (Key Plan) 26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Land Plan (Key Plan) 26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Land Plan (Main Site Sheet 1 of 5) 26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Land Plan (Main Site Sheet 2 of 5) 26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Land Plan (Main Site Sheet 3 of 5) 26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Land Plan (Main Site Sheet 4 of 5) 26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Land Plan (Main Site Sheet 5 of 5) 26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Land Plan (J15a) 26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Land Plan Cycleway on Towcester (Sheet 1 of 2) 26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Land Plan Cycleway on Towcester (Sheet 2 of 2) 26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Land Plan Cycleway on Barn Lane 26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Land Plan (A43 (south)/ Saint Johns Road (west)/ A43

(north)/ Saint Johns Road (east)

26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Land Plan (A43 South/ Northampton Road/ A43 North) 26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Land Plan (A43 and Tove Roundabout, Towcester

Bypass (southwest)/ Towcester Road/ A5, (north)/ A43,

(northeast)/ A5, Watling Street (southeast)

26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Land Plan (Abthorpe Road and Abthorpe roundabout/ A43,

Towcester Bypass (north)/ Brackley Road/ A43,

Towcester Bypass (south)

26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Land Plan (A5076, Upton Way (south)/ Telford Way/ A5076,

Upton Way (north)/ Water Tull Way/ Duston Mill

Lane)

26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Land Plan (A5076, Upton Way (south)/ High Street/

A5076, Upton Way (north)/ Duston Mill)

26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Land Plan (A5076/ A5123/ Upton Way Roundabout

(Pineham Park) (Danes Camp Way)

26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Land Plan A5076 (West)/ Hunsbury Hill Avenue/ Hunsbarrow

Road/ A5076, Danes Camp Way/ Hunsbury

Hill Road

26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Land Plan Towcester Road/ A5076, Danes Camp Way/ A5123,

Towcester Road/ Mere Way/ Tesco Access

26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Ecological Mitigation Plan – Key Plan 26.10.18 BCA

Plans/Drawings General Site Plans (Part 23) Ecological Mitigation Plan – 1 of 3 26.10.18 BCA

Plans/Drawings General Site Plans (Part 23) Ecological Mitigation Plan – 2 of 3 26.10.18 BCA

Plans/Drawings General Site Plans (Part 23) Ecological Mitigation Plan – 3 of 3 26.10.18 BCA

Plans/Drawings General Site Plans (Part 23) J15A Ecological Mitigation Plan 26.10.18 BCA

Plans/Drawings General Site Plans (Part 23) Works Plan (Main Site & Highways) (Key Plan) 26.10.18 Terra Quest

RC-ALG-PLN-2.2–W21

RC-ALG-PLN-2.2–W22

RC-ALG-PLN-2.2–W23

RC-ALG-PLN-2.2–W24

RC-ALG-PLN-2.2–W25

RC-ALG-PLN-2.2-W26

Plans

Plans

Plans

Plans

RC-ALG-PLN-2.3.0

RC-ALG-PLN-2.3.1

RC-ALG-PLN-2.3.2

RC-ALG-PLN-2.3.3

RC-ALG-PLN-2.3.4

RC-ALG-PLN-2.4

Plans

Plans

Plans

Plans

RC-ALG-PLN-2.2-MS.2

RC-ALG-PLN-2.2-MS.3

RC-ALG-PLN-2.2-MS.4

RC-ALG-PLN-2.2-MS.5

1.7

RC-ALG-PLN-2.2-W10

Plans

Plans

RC-ALG-PLN-2.2-W17A.1

RC-ALG-PLN-2.2–W17A.2

RC-ALG-PLN-2.2–W17B

RC-ALG-PLN-2.2–W18

RC-ALG-PLN-2.2–W19

RC-ALG-PLN-2.2–W20

Plans

Plans

Plans

2.2.Land Plan KP.pdf

2.2-MS.1. Land Plan MS 1 of 5.pdf

Application Form

Application Form

Application Form

Application Form

Plans

Plans

Plans

Application Form

Ref or drawing number

1.1

1.2

Folder

Application Form

Application Form

1.3

1.4

1.5

1.6

RC-ALG-PLN-2.1

RC-ALG-PLN-2.2

RC-ALG-PLN-2.2-MS.1

2.2-W17B. Land Plan Cycleway Barn

Lane.pdf2.2-W18. Land Plan A43 St Johns Rd.pdf

2.2-W19. Land Plan A43 and Northampton

Road.pdf2.2-W20. Land Plan A43 and Tove

Roundabout.pdf

2.2-W21. Land Plan Abthorpe Road.pdf

Plans

Plans

Plans

2.2-MS.2. Land Plan MS 2 of 5.pdf

2.2-MS.3. Land Plan MS 3 of 5.pdf

2.2-MS.4. Land Plan MS 4 of 5.pdf

2.2-MS.5. Land Plan MS 5 of 5.pdf

2.2-W10. Land Plan J15a.pdf

2.2-W17A.1. Land Plan Cycleway Towcester

1 of 2.pdf

Plans

Plans

Plans

Planning Inspectorate Electronic Application Index

Please use a new line for each document - drop down lists in columns category and document type need to be selected

from the drop down lists only.

Planning Inspectorate Application

Reference Number:

Filename

1.1.Application Index.pdf

1.2.Covering letter.pdf

1.3.Application Form.pdf

1.4.Schedule of RC DCO Submission

Docs.pdf

1.5 Guide to the RC DCO.pdf

1.6.Newspaper Notices and Section 48

Notices.pdf

2.1. Location Plan KP.pdf

2.3.1. EMP 1 of 3.pdf

2.3.2. EMP 2 of 3.pdf

2.3.3. EMP 3 of 3.pdf

2.3.4. J15A EMP.pdf

2.4. Works Plan Key Plan.pdf

Plans

Plans

2.2-W22. Land Plan A5076 Upton Way

Telford Way.pdf

2.2-W23. Land Plan A5076 Upton Way High

Street.pdf

2.2-W24. Land Plan A5076 A5123.pdf

2.2-W25. Land Plan A5076 Hunsbury Hill

Ave.pdf

2.2-W26. Land Plan Towcester Road

A5076.pdf

2.3.0. EMP Key Plan.pdf

Plans

Plans

2.2-W17A.2. Land Plan Cycleway Towcester

2

Page 3: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Plans/Drawings General Site Plans (Part 23) Works Plan (Main Site Sheet 1 of 4) 26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Works Plan (Main Site Sheet 2 of 4) 26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Works Plan (Main Site Sheet 3 of 4) 26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Works Plan (Main Site Sheet 4 of 4) 26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Works Plan (J15a) 26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Works Plan (Cycleway on Towcester Sheet 1 of 2) 26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Works Plan (Cycleway on Towcester Sheet 2 of 2) 26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Works Plan (Cycleway on Barn Lane) 26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Works Plan (A43 (south)/ Saint Johns Road (west)/ A43

(north)/ Saint Johns Road (east)

26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Works Plan (A43 South/ Northampton Road/ A43 North) 26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Works Plan (A43 and Tove Roundabout, Towcester Bypass

(southwest)/ Towcester Road/ A5, (north)/ A43,

(northeast)/ A5, Watling Street (southeast)

26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Works Plan (Abthorpe Road and Abthorpe roundabout/ A43,

Towcester Bypass (north)/ Brackley Road/ A43,

Towcester Bypass (south)

26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Works Plan (A5076, Upton Way (south)/ Telford Way/ A5076,

Upton Way (north)/ Water Tull Way/ Duston Mill

Lane)

26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Works Plan (A5076, Upton Way (south)/ High Street/

A5076, Upton Way (north)/ Duston Mill)

26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Works Plan (A5076/ A5123/ Upton Way Roundabout

(Pineham Park) (Danes Camp Way)

26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Works Plan A5076 (West)/ Hunsbury Hill Avenue/

Hunsbarrow Road/ A5076, Danes Camp Way/ Hunsbury Hill Road

26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Works Plan Towcester Road/ A5076, Danes Camp Way/ A5123,

Towcester Road/ Mere Way/ Tesco Access

26.10.18 Terra Quest

Plans/Drawings Detailed Plans (Part 23) Access to works plan (Key Plan) 26.10.18 TPA

Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 1 of 3) 26.10.18 TPA

Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 2 of 3) 26.10.18 TPA

Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA

Plans/Drawings Detailed Plans (Part 23) Plan showing public rights of way to be stopped up (Key Plan) 26.10.18 TPA

Plans/Drawings Detailed Plans (Part 23) Plan showing public rights of way to be stopped up

(Sheet 1 of 4)

26.10.18 TPA

Plans/Drawings Detailed Plans (Part 23) Plan showing public rights of way to bestopped up

(Sheet 2 of 4)

26.10.18 TPA

Plans/Drawings Detailed Plans (Part 23) Plan showing public rights of way to be stopped up

(Sheet 3 of 4)

26.10.18 TPA

Plans/Drawings Detailed Plans (Part 23) Plan showing public rights of way to be stopped up

(Sheet 4 of 4)

26.10.18 TPA

Plans/Drawings Detailed Plans (Part 23) Streets Works Plans – Stopping up of the Highway (Key

Plan)

26.10.18 TPA

Plans/Drawings Detailed Plans (Part 23) Streets Works Plans – Stopping up of the Highway

(Sheet 1 of 2)

26.10.18 TPA

Plans/Drawings Detailed Plans (Part 23) Streets Works Plans – Stopping up of the Highway

(Sheet 2 of 2)

26.10.18 TPA

Plans/Drawings Detailed Plans (Part 23) Highway Classification Plan ( Key Plan) 26.10.18 TPA 2.8.0. HCP Key Plan.pdfRC-ALG-PLN-2.8.0 Plans

2.6.1. PROW 1 of 4.pdf

2.6.2. PROW 2 of 4.pdf

RC-ALG-PLN-2.6.3 Plans 2.6.3. PROW 3 of 4.pdf

RC-ALG-PLN-2.6.4 Plans 2.6.4. PROW 4 of 4.pdf

RC-ALG-PLN-2.7.0 Plans 2.7.0. Street Works Plans Key Plan.pdf

RC-ALG-PLN-2.7.1 Plans 2.7.1. Street Works Plans 1 of 2.pdf

RC-ALG-PLN-2.7.2 Plans 2.7.2. Street Works Plan 2 of 2.pdf

RC-ALG-PLN-2.6.2 Plans

RC-ALG-PLN-2.6.1 Plans

2.4-W25. Works Plan A5076 Hunsbury Hill

Ave.pdf

2.4-W26. Works Plan Towcester Road

A5076.pdf

RC-ALG-PLN-2.5.0 Plans 2.5.0. ATWP Key Plan.pdf

RC-ALG-PLN-2.5.1 Plans 2.5.1. ATWP Main Site 1 of 3.pdf

RC-ALG-PLN-2.5.2 Plans 2.5.2. ATWP Main Site 2 of 3.pdf

RC-ALG-PLN-2.5.3 Plans 2.5.3. ATWP Main Site 3 of 3.pdf

RC-ALG-PLN-2.6.0 Plans 2.6.0. PROW Key Plan.pdf

RC-ALG-PLN-2.4–W26 Plans

RC-ALG-PLN-2.4–W25 Plans

2.4-W18. Works Plan A43 Saint Johns

Rd.pdf

2.4-W19. Works Plan A43 Northampton

Rd.pdf

RC-ALG-PLN-2.4–W20 Plans 2.4-W20. Works Plan A43 and Tove

Roundabout.pdf

RC-ALG-PLN-2.4–W21 Plans 2.4-W21. Works Plan Abthorpe Rd and

Abthorpe Roundabout.pdf

RC-ALG-PLN-2.4–W22 Plans 2.4-W22. Works Plan A5076 Upton Way

Telford Way.pdf

RC-ALG-PLN-2.4–W23 Plans 2.4-W23. Works Plan A5076 Upton Way

High Street.pdf

RC-ALG-PLN-2.4–W24 Plans 2.4-W24. Works Plan A5076 A5123.pdf

RC-ALG-PLN-2.4–W19 Plans

RC-ALG-PLN-2.4–W18 Plans

RC-ALG-PLN-2.4-MS.1

RC-ALG-PLN-2.4-MS.2 Plans

2.4-MS.3. Works Plan Main Site 3 of 4.pdf

RC-ALG-PLN-2.4-MS.4 Plans 2.4-MS.4. Works Plan Main Site 4 of 4.pdf

RC-ALG-PLN-2.4–W10 Plans 2.4-W10. Works Plan J15a.pdf

RC-ALG-PLN-2.4-W17A.1 Plans 2.4-W17A.1. Works Plan Cycleway on

Towcester 1 of 2.pdf

RC-ALG-PLN-2.4-W17A.2 Plans 2.4-W17A.2. Works Plan Cycleway on

Towcester 2 of 2.pdf

RC-ALG-PLN-2.4–W17B Plans 2.4-W17B. Works Plan Cycleway on Barn

Lane.pdf

RC-ALG-PLN-2.4-MS.3 Plans

Plans

2.4-MS.2. Works Plan Main Site 2 of 4.pdf

2.4-MS.1. Works Plan Main Site 1 of 4.pdf

Page 4: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Plans/Drawings Detailed Plans (Part 23) Highways Classification Plan (Sheet 1 of 5) 26.10.18 TPA

Plans/Drawings Detailed Plans (Part 23) Highways Classification Plan (Sheet 2 of 5) 26.10.18 TPA

Plans/Drawings Detailed Plans (Part 23) Highways Classification Plan (Sheet 3 of 5) 26.10.18 TPA

Plans/Drawings Detailed Plans (Part 23) Highways Classification Plan (Sheet 4 of 5) 26.10.18 TPA

Plans/Drawings Detailed Plans (Part 23) Highways Classification Plan (Sheet 5 of 5) 26.10.18 TPA

Plans/Drawings Plan showing statutory and non

statutory sites (Part 16)

Plan of statutory/non-statutory sites or features of nature

conservation

26.10.18 BCA

Plans/Drawings Plans showing statutory historic or

scheduled monument sites (Part 17)

Historic Environment Plan 26.10.18 Turley

Plans/Drawings Plan showing any crown land (Part 20) Crown Land Plan (Key Plan) 26.10.18 Terra Quest

Plans/Drawings Plan showing any crown land (Part 20) Crown Land Plan (Main Site Sheet 1 of 4) 26.10.18 Terra Quest

Plans/Drawings Plan showing any crown land (Part 20) Crown Land Plan (Main Site Sheet 2 of 4) 26.10.18 Terra Quest

Plans/Drawings Plan showing any crown land (Part 20) Crown Land Plan (Main Site Sheet 3 of 4) 26.10.18 Terra Quest

Plans/Drawings Plan showing any crown land (Part 20) Crown Land Plan (Main Site Sheet 4 of 4) 26.10.18 Terra Quest

Plans/Drawings Plan showing any crown land (Part 20) Crown Land Plan (J15a) 26.10.18 Terra Quest

Plans/Drawings Plan showing any crown land (Part 20) Crown Land Plan (Cycleway on Towcester) 26.10.18 Terra Quest

Plans/Drawings Plan showing any crown land (Part 20) Crown Land Plan (A43 (south)/ Saint Johns Road

(west)/ A43 (north)/ Saint Johns Road (east)

26.10.18 Terra Quest

Plans/Drawings Plan showing any crown land (Part 20) Crown Land Plan (A43 South/ Northampton Road/ A43

North)

26.10.18 Terra Quest

Plans/Drawings Plan showing any crown land (Part 20) Crown Land Plan (A43 and Tove Roundabout, Towcester Bypass

(southwest)/ Towcester Road/ A5, (north)/ A43, (northeast)/ A5,

Watling Street (southeast)

26.10.18 Terra Quest

Plans/Drawings Plan showing any crown land (Part 20) Crown Land Plan (Abthorpe Road and Abthorpe

roundabout/ A43, Towcester Bypass (north)/ Brackley Road/ A43,

Towcester Bypass (south)

26.10.18 Terra Quest

Plans/Drawings Plan showing any crown land (Part 20) Crown Land Plan (A5076/ A5123/ Upton Way

Roundabout (Pineham Park) (Danes Camp Way)

26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Order Limits Key Plan 26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Order Limits Plan Sheet - Sheet 1 of 6 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Order Limits Plan Sheet - Sheet 2 of 6 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Order Limits Plan Sheet - Sheet 3 of 6 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Order Limits Plan Sheet - Sheet 4 of 6 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Order Limits Plan Sheet - Sheet 5 of 6 26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Order Limits Plan Sheet - Sheet 6 of 6 26.10.18 Terra Quest

Plans/Drawings General Site Plans (Part 23) Parameter Plan – Green Infrastructure Plan - Key Plan 26.10.18 BCA

Plans/Drawings General Site Plans (Part 23) Parameter Plan – Green Infrastructure Plan – 1 of 4 26.10.18 BCA

Plans/Drawings General Site Plans (Part 23) Parameter Plan – Green Infrastructure Plan – 2 of 4 26.10.18 BCA

Plans/Drawings General Site Plans (Part 23) Parameter Plan – Green Infrastructure Plan – 3 of 4 26.10.18 BCA

Plans/Drawings General Site Plans (Part 23) Parameter Plan – Green Infrastructure Plan – 4 of 4 26.10.18 BCA

Plans/Drawings General Site Plans (Part 23) Parameters Plan-A0-Sheet 1 of 2 26.10.18 Turley

Plans/Drawings General Site Plans (Part 23) Parameters Plan-A0 - Sheet 2 of 2 26.10.18 Turley

Plans/Drawings General Site Plans (Part 23) Site Context Plan – Key Plan 26.10.18 Turley

Plans/Drawings General Site Plans (Part 23) Site Context Plan Sheet 1 and 2 26.10.18 Turley

Plans/Drawings General Site Plans (Part 23) Site Context Plan – J15A 26.10.18 Turley

Plans/Drawings General Site Plans (Part 23) Illustrative Landscape Masterplan – Key Plan 26.10.18 BCA

Plans/Drawings General Site Plans (Part 23) Illustrative Landscape Masterplan – 1 of 4 26.10.18 BCA

Plans/Drawings General Site Plans (Part 23) Illustrative Landscape Masterplan – 2 of 4 26.10.18 BCA

Plans/Drawings General Site Plans (Part 23) Illustrative Landscape Masterplan – 3 of 4 26.10.18 BCA

Plans/Drawings General Site Plans (Part 23) Illustrative Landscape Masterplan – 4 of 4 26.10.18 BCA

Plans/Drawings General Site Plans (Part 23) Illustrative Colour Masterplan-A0 - Sheet 1 of 2 26.10.18 MSA

Plans/Drawings General Site Plans (Part 23) Illustrative Colour Masterplan-A0 - Sheet 2 of 2 26.10.18 MSA

RC-ALG-PLN-2.16.3 Plans 2.16.3. ILM 3 of 4.pdf

RC-ALG-PLN-2.16.4 Plans 2.16.4. ILM 4 of 4.pdf

RC-ALG-PLN-2.16.05 Plans 2.16.05. ICM A0 1 of 2.pdf

RC-ALG-PLN-2.16.06 Plans 2.16.06. ICM A0 2 of 2.pdf

RC-ALG-PLN-2.15.0 Plans 2.15.0. SCP Key Plan.pdf

RC-ALG-PLN-2.15.1 Plans 2.15.1. SCP Main Site.pdf

RC-ALG-PLN-2.15.2 Plans 2.15.2. SCP J15A.pdf

RC-ALG-PLN-2.16.0 Plans 2.16.0. ILM Key Plan.pdf

RC-ALG-PLN-2.16.1 Plans 2.16.1. ILM 1 of 4.pdf

RC-ALG-PLN-2.16.2 Plans 2.16.2. ILM 2 of 4.pdf

RC-ALG-PLN-2.13.1 Plans 2.13.1. Parameter Plan GIP 1 of 4.pdf

Plans 2.13.2. Parameter Plan GIP 2 of 4.pdf

RC-ALG-PLN-2.13.3 Plans 2.13.3. Parameter Plan GIP 3 of 4.pdf

RC-ALF-PLN-2.13.4 Plans 2.13.4. Parameter Plan GIP 4 of 4.pdf

RC-ALG-PLN-2.14.0 Plans 2.14.0. Parameters Plan 1 of 2.pdf

RC-ALG-PLN-2.14.1 Plans 2.14.1. Parameters Plan 2 of 2.pdf

RC-ALG-PLN-2.13.2

RC-ALG-PLN-2.12.1 Plans 2.12.1 OLP 1 of 6.pdf

2.12.2 OLP 2 of 6.pdf

RC-ALG-PLN-2.12.3 Plans 2.12.3 OLP 3 of 6.pdf

RC-ALG-PLN-2.12.4 Plans 2.12.4 OLP 4 of 6.pdf

RC-ALG-PLN-2.12.5 Plans 2.12.5 OLP 5 of 6.pdf

RC-ALG-PLN-2.12.6 Plans 2.12.6 OLP 6 of 6.pdf

RC-ALG-PLN-2.13 Plans 2.13. Parameter Plan GIP Key Plan.pdf

RC-ALG-PLN-2.12.2 Plans

RC-ALG-PLN-2.11–W17A Plans 2.11-W17A. CLP Cycleway.pdf

2.11-W18. CLP A43 St Johns Rd.pdf

RC-ALG-PLN-2.11–W19 Plans 2.11-W19. CLP A43 Northampton Rd.pdf

RC-ALG-PLN-2.11–W20 Plans 2.11-W20. CLP A43 Tove Roundabout.pdf

RC-ALG-PLN-2.11–W21 Plans 2.11-W21. CLP Abthorpe Rd Abthorpe

Roundabout.pdf

RC-ALG-PLN-2.11–W24 Plans 2.11-W24. CLP A5076 A5123.pdf

RC-ALG-PLN-2.12.0 Plans 2.12.0. OLP Key Plan.pdf

RC-ALG-PLN-2.11–W18 Plans

Plans 2.10. Historic Environment Plan.pdf

2.11. CLP Key Plan.pdf

RC-ALG-PLN-2.11-MS.1 Plans 2.11-MS.1. CLP 1 of 4.pdf

RC-ALG-PLN-2.11-MS.2 Plans 2.11-MS.2. CLP 2 of 4.pdf

RC-ALG-PLN-2.11-MS.3 Plans 2.11-MS.3 CLP 3 of 4.pdf

RC-ALG-PLN-2.11-MS.4 Plans 2.11-MS.4 CLP 4 of 4.pdf

RC-ALG-PLN-2.11–W10 Plans 2.11-W10. CLP J15a.pdf

RC-ALG-PLN-2.11 Plans

RC-ALG-PLN-2.10

2.8.1. HCP 1 of 5.pdf

RC-ALG-PLN-2.8.2 Plans 2.8.2. HCP 2 of 5.pdf

RC-ALG-PLN-2.8.3 Plans 2.8.3. HCP 3 of 5.pdf

RC-ALG-PLN-2.8.4 Plans 2.8.4. HCP 4 of 5.pdf

RC-ALG-PLN-2.8.5 Plans 2.8.5. HCP 5 of 5.pdf

RC-ALG-PLN-2.9 Plans 2.9. Statutory non-statutory sites.pdf

RC-ALG-PLN-2.8.1 Plans

Page 5: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Plans/Drawings General Site Plans (Part 23) Private Means of Access (Key Plan) 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Private Means of Access (A43) 26.10.18 Hydrock

Plans/Drawings General Site Plans (Part 23) Private Means of Acess (J15a) 26.10.18 Hydrock

Plans/Drawings General Site Plans (Part 23) Private Means of Acess (Emergency Access) 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Speed Limits Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Speed Limits Plan (Sheet 1 of 5) 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Speed Limits Plan (Sheet 2 of 5) 26.10.18 TPA/Hydrock

Plans/Drawings General Site Plans (Part 23) Speed Limits Plan (Sheet 3 of 5) 26.10.18 TPA/Hydrock

Plans/Drawings General Site Plans (Part 23) Speed Limits Plan (Sheet 4 of 5) 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Speed Limits Plan (Sheet 5 of 5) 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Hedgerow and Tree Retention and Removal - Key Plan 26.10.18 BCA

Plans/Drawings General Site Plans (Part 23) Hedgerow and Tree Retention and Removal – 1 of 3 26.10.18 BCA

Plans/Drawings General Site Plans (Part 23) Hedgerow and Tree Retention and Removal – 2 of 3 26.10.18 BCA

Plans/Drawings General Site Plans (Part 23) Hedgerow and Tree Retention and Removal – 3 of 3 26.10.18 BCA

Plans/Drawings General Site Plans (Part 23) J15A Hedgerow and Tree Retention and Removal 26.10.18 BCA

Plans/Drawings General Site Plans (Part 23) Rail Interchange illustrative general arrangement (key

plan)

26.10.18 Trust Rail

Plans/Drawings General Site Plans (Part 23) Rail Interchange illustrative general arrangement (sheet

1 of 2)

26.10.18 Trust Rail

Plans/Drawings General Site Plans (Part 23) Rail Interchange illustrative general arrangement (sheet

2 of 2)

26.10.18 Trust Rail

Plans/Drawings General Site Plans (Part 23) Rail Interchange illustrative Phasing Plan 26.10.18 Trust Rail

Plans/Drawings General Site Plans (Part 23) Rail interchange illustrative phase 1 layout (sheet 1 of 2) 26.10.18 Trust Rail

Plans/Drawings General Site Plans (Part 23) Rail interchange illustrative phase 1 layout (sheet 2 of 2) 26.10.18 Trust Rail

Plans/Drawings General Site Plans (Part 23) Rail interchange illustrative phase 2 layout (sheet 1 of 2) 26.10.18 Trust Rail

Plans/Drawings General Site Plans (Part 23) Rail interchange illustrative phase 2 layout (sheet 2 of 2) 26.10.18 Trust Rail

Plans/Drawings Detailed Plans (Part 23) Long Sections Railway Alignment (sheet 1 of 3) 26.10.18 Trust Rail

Plans/Drawings Detailed Plans (Part 23) Long Sections Railway Alignment (sheet 2 of 3) 26.10.18 Trust Rail

Plans/Drawings Detailed Plans (Part 23) Long Sections Railway Alignment (sheet 3 of 3) 26.10.18 Trust Rail

Plans/Drawings Detailed Plans (Part 23) Cross Sections Railway Alignment (sheet 1 of 2) 26.10.18 Trust Rail

Plans/Drawings Detailed Plans (Part 23) Cross Sections Railway Alignment (sheet 2 of 2) 26.10.18 Trust Rail

Plans/Drawings Elevations (Part 23) Unit 9 Illustrative Colour Elevations-A0 26.10.18 MSA

Plans/Drawings Detailed Plans (Part 23) Landscape Sections 1 of 2 26.10.18 BCA

Plans/Drawings Detailed Plans (Part 23) Landscape Sections 2 of 2 26.10.18 BCA

Plans/Drawings Detailed Plans (Part 23) Site Access Junction – General Arrangement 26.10.18 Hydrock

Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Parameters Plan 26.10.18 Hydrock

Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Plan & Profile Northbound Merge 26.10.18 Hydrock

Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Plan & Profile Northbound

Diverge

26.10.18 Hydrock

Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Plan & Profile Southbound

Merge

26.10.18 Hydrock

Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Plan & Profile Southbound

Diverge

26.10.18 Hydrock

Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Cross Sections 26.10.18 Hydrock

Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Departure from Standard -

Mainline 1 of 2

26.10.18 Hydrock

Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Departure from Standard -

Mainline 2 of 2

26.10.18 Hydrock

Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Departure from Standard -

Northbound Diverge

26.10.18 Hydrock

Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Speed Limit Plan 26.10.18 Hydrock

Plans/Drawings Detailed Plans (Part 23) Site Access Junction – TRO Plan 26.10.18 Hydrock

Plans/Drawings Detailed Plans (Part 23) Site Access Junction - Proposed Contours 26.10.18 Hydrock

Plans/Drawings General Site Plans (Part 23) Junction 15a – General Arrangement 26.10.18 Hydrock

Plans/Drawings General Site Plans (Part 23) Junction 15a – Parameters Plan 26.10.18 Hydrock

RC-ALG-PLN-2.28.0 Plans 2.28.0. J15a General Arrangement.pdf

RC-ALG-PLN-2.28.1 Plans 2.28.1. J15a Parameters Plan.pdf

RC-ALG-PLN-2.27.7 Plans 2.27.7. SAJ Mainline 1 of 2.pdf

RC-ALG-PLN-2.27.8 Plans 2.27.8. SAJ Mainline 2 of 2.pdf

RC-ALG-PLN-2.27.9 Plans 2.27.9. SAJ Northbound Diverge.pdf

RC-ALG-PLN-2.27.10 Plans 2.27.10. SAJ Speed Limit Plan.pdf

RC-ALG-PLN-2.27.11 Plans 2.27.11. SAJ TRO Plan.pdf

RC-ALG-PLN-2.27.12 Plans 2.27.12. SAJ Proposed Contours.pdf

RC-ALG-PLN-2.27.1 Plans 2.27.1. SAJ Parameters Plan.pdf

RC-ALG-PLN-2.27.2 Plans 2.27.2. SAJ P&P Northbound Merge.pdf

RC-ALG-PLN-2.27.3 Plans 2.27.3. SAJ P&P Northbound Diverge.pdf

RC-ALG-PLN-2.27.4 Plans 2.27.4. SAJ P&P Southbound Merge.pdf

RC-ALG-PLN-2.27.5 Plans 2.27.5. SAJ P&P Southbound Diverge.pdf

RC-ALG-SEC-2.27.6 Plans 2.27.6. SAJ Cross Sections.pdf

RC-ALG-ELE-2.24.0 Plans 2.24.0. CSRA 1 of 2.pdf

RC-ALG-ELE-2.24.1 Plans 2.24.1. CSRA 2 of 2.pdf

RC-ALG-SEC-2.25 Plans 2.25. Unit 9 ICE A0.pdf

RC-ALG-PLN-2.26.0 Plans 2.26.0. Landscape Sections 1 of 2.pdf

RC-ALG-PLN-2.26.1 Plans 2.26.1. Landscape Sections 2 of 2.pdf

RC-ALG-PLN-2.27.0 Plans 2.27.0. SAJ General Arrangement.pdf

RC-ALG-PLN-2.21.2 Plans 2.21.1. IPP1L 2 of 2.pdf

RC-ALG-SEC-2.22.0 Plans 2.22.0. IP2L 1 of 2.pdf

RC-ALG-SEC-2.22.1 Plans 2.22.1. IP2L 2 of 2.pdf

RC-ALG-SEC-2.23.0 Plans 2.23.0. LSRA 1 of 3.pdf

RC-ALG-SEC-2.23.1 Plans 2.23.1. LSRA 2 of 3.pdf

RC-ALG-SEC-2.23.2 Plans 2.23.2. LSRA 3 of 3.pdf

RC-ALG-PLN-2.19.4 Plans 2.19.4. J15a HATRAR 4 of 4.pdf

RC-ALG-PLN-2.20.0 Plans 2.20.0. IGA Key Plan.pdf

RC-ALG-PLN-2.20.1 Plans 2.20.1. IGA 1 of 2.pdf

RC-ALG-PLN-2.20.2 Plans 2.20.2. IGA 2 of 2.pdf

RC-ALG-PLN-2.21.0 Plans 2.21.0. IPP.pdf

RC-ALG-PLN-2.21.1 Plans 2.21.1. IPP1L 1 of 2.pdf

RC-ALG-PLN-2.18.4 Plans 2.18.4. SLP 4 of 5.pdf

RC-ALG-PLN-2.18.5 Plans 2.18.5. SLP 5 of 5.pdf

RC-ALG-PLN-2.19.0 Plans 2.19.0. HATRAR Key Plan.pdf

RC-ALG-PLN-2.19.1 Plans 2.19.1. HATRAR 1 of 4.pdf

RC-ALG-PLN-2.19.2 Plans 2.19.2. HATRAR 2 of 4.pdf

RC-ALG-PLN-2.19.3 Plans 2.19.3. HATRAR 3 of 4.pdf

RC-ALG-PLN-2.17.2 Plans 2.17.2 PMoA J15a.pdf

RC-ALG-PLN-2.17.3 Plans 2.17.3 PMoA Emergency Access.pdf

RC-ALG-PLN-2.18.0 Plans 2.18.0. SLP.pdf

RC-ALG-PLN-2.18.1 Plans 2.18.1. SLP 1 of 5.pdf

RC-ALG-PLN-2.18.2 Plans 2.18.2. SLP 2 of 5.pdf

RC-ALG-PLN-2.18.3 Plans 2.18.3. SLP 3 of 5.pdf

RC-ALG-PLN-2.17.0 Plans 2.17.0. PMoA Key Plan.pdf

RC-ALG-PLN-2.17.1 Plans 2.17.1. PMoA A43.pdf

Page 6: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Plans/Drawings Detailed Plans (Part 23) Junction 15a – Plan & Profile A43 Westbound Link Road 26.10.18 Hydrock

Plans/Drawings Detailed Plans (Part 23) Junction 15a – Plan & Profile A43 Southbound Merge 26.10.18 Hydrock

Plans/Drawings Detailed Plans (Part 23) Junction 15a – Speed Limit Plan 26.10.18 Hydrock

Plans/Drawings Detailed Plans (Part 23) Junction 15a – TRO Plan 26.10.18 Hydrock

Plans/Drawings Detailed Plans (Part 23) Junction 15a - Proposed Contours 26.10.18 Hydrock

Plans/Drawings Detailed Plans (Part 23) Junction 15a - Cross Sections 26.10.18 Hydrock

Plans/Drawings Detailed Plans (Part 23) Northampton Road – General Arrangement 26.10.18 Hydrock

Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Site Plan 26.10.18 Hydrock

Plans/Drawings General Site Plans (Part 23) Site Access Junction – Plan View of Grade Separated

North Bridge

26.10.18 Hydrock

Plans/Drawings Elevations (Part 23) Site Access Junction – Elevation and Sections through

North Bridge

26.10.18 Hydrock

Plans/Drawings General Site Plans (Part 23) Site Access Junction – Plan View of Grade Separated

South Bridge

26.10.18 Hydrock

Plans/Drawings Elevations (Part 23) Site Access Junction – Elevation and Section South

Bridge

26.10.18 Hydrock

Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Plan view of Northern Slip Road

Retaining Walls (North of Junction)

26.10.18 Hydrock

Plans/Drawings Elevations (Part 23) Site Access Junction – Elevations and Typical Sections

of Northern Slip Road Retaining Walls

26.10.18 Hydrock

Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Plan view of Northern Slip Road

Retaining Walls (South of Junction)

26.10.18 Hydrock

Plans/Drawings Elevations (Part 23) Site Access Junction – Elevations and Sections of

Southern Slip Road Retaining Walls

26.10.18 Hydrock

Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Existing A43 Canal bridge 26.10.18 Hydrock

Plans/Drawings Elevations (Part 23) Site Access Junction – Proposed Canal Bridge Widening

Plan View and Elevation

26.10.18 Hydrock

Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Proposed Canal Bridge Widening

Abutment and Bridge Elevation

26.10.18 Hydrock

Plans/Drawings Detailed Plans (Part 23) Junction 15a – Proposed Canal Bridge Widening Plan

View and East Abutment Elevation

26.10.18 Hydrock

Plans/Drawings Detailed Plans (Part 23) Junction 15a – Proposed Typical Details through Canal

Bridge widening - Bridge Elevation

26.10.18 Hydrock

Plans/Drawings General Site Plans (Part 23) Northampton Road – Proposed Underpass General

Arrangement

26.10.18 Hydrock

Plans/Drawings General Site Plans (Part 23) Pedestrian Underpass under the Site Access Road –

General Arrangement

26.10.18 Hydrock

Plans/Drawings General Site Plans (Part 23) Junction 4 - Existing Layout Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 4 - Red Line Boundary Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 4 - General Arrangement – Key Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 4 - General Arrangement – 1 of 5 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 4 - General Arrangement – 2 of 5 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 4 - General Arrangement – 3 of 5 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 4 - General Arrangement – 4 of 5 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 4 - General Arrangement – 5 of 5 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 4 - General Arrangement - Masterplan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 6 - Existing Layout Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 6 - Red Line Boundary Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 6 - General Arrangement – Key Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 6 - General Arrangement – 1 of 4 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 6 - General Arrangement – 2 of 4 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 6 - General Arrangement – 3 of 4 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 6 - General Arrangement – 4 of 4 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 6 - General Arrangement - Masterplan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 7 - Existing Layout Plan 26.10.18 TPARC-ALG-PLN-2.36.0 Plans 2.36.0. J7 Existing Layout Plan.pdf

RC-ALG-PLN-2.35.2.0 Plans 2.35.2.0. J6 GA Key Plan.pdf

RC-ALG-PLN-2.35.2.1 Plans 2.35.2.1. J6 GA 1 of 4.pdf

RC-ALG-PLN-2.35.2.2 Plans 2.35.2.2. J6 GS 2 of 4.pdf

RC-ALG-PLN-2.35.2.3 Plans 2.35.2.3. J6 GA 3 of 4.pdf

RC-ALG-PLN-2.35.2.4 Plans 2.35.2.4. J6 GA 4 of 4.pdf

RC-ALG-PLN-2.35.3 Plans 2.35.3. J6 GA Masterplan.pdf

RC-ALG-PLN-2.34.2.3 Plans 2.34.2.3. J4 GA 3 of 5.pdf

RC-ALG-PLN-2.34.2.4 Plans 2.34.2.4. J4 GA 4 of 5.pdf

RC-ALG-PLN-2.34.2.5 Plans 2.34.2.5. J4 GA 5 of 5.pdf

RC-ALG-PLN-2.34.3 Plans 2.34.3. J4 GA Masterplan.pdf

RC-ALG-PLN-2.35.0 Plans 2.35.0. J6 Existing Layout Plan.pdf

RC-ALG-PLN-2.35.1 Plans 2.35.1. J6 Red Line Boundary Plan.pdf

RC-ALG-PLN-2.33 Plans 2.33. Pedestrian Underpass General

Arrangement.pdf

RC-ALG-PLN-2.34.0 Plans 2.34.0. J4 Existing Layout Plan.pdf

RC-ALG-PLN-2.34.1 Plans 2.34.1. J4 Red Line Boundary Plan.pdf

RC-ALG-PLN-2.34.2.0 Plans 2.34.2.0. J4 GA Key Plan.pdf

RC-ALG-PLN-2.34.2.1 Plans 2.34.2.1. J4 GA 1 of 5.pdf

RC-ALG-PLN-2.34.2.2 Plans 2.34.2.2. J4 GA 2 of 5.pdf

RC-ALG-PLN-2.30.10 Plans 2.30.10. SAJ Existing Canal Bridge.pdf

RC-ALG-PLN-2.30.11 Plans 2.30.11. SAJ Proposed Canal Bridge WPV

and Elevation.pdf

RC-ALG-PLN-2.30.12 Plans 2.30.12. SAJ Proposed Canal Bridge WA

and Bridge Elevation.pdf

RC-ALG-PLN-2.31.1 Plans 2.31.1. J15a Proposed Canal Bridge WPV

and Elevation.pdf

RC-ALG-PLN-2.31.2 Plans 2.31.2. J15a Proposed Typical Details

through Canal Bridge Widening.pdf

RC-ALG-PLN-2.32 Plans 2.32. Northampton Rd Proposed Underpass

General Arrangement.pdf

RC-ALG-PLN-2.30.3 Plans 2.30.3.SAJ PV Seperated South Bridge.pdf

RC-ALG-PLN-2.30.4 Plans 2.30.4. SAJ EAS South Bridge.pdf

RC-ALG-PLN-2.30.6 Plans 2.30.6. SAJ Northern Slip Rd Retaining

Walls.pdf

RC-ALG-PLN-2.30.7 Plans 2.30.7. SAJ EaTS Northern Slip Rd

Retaining Walls.pdf

RC-ALG-PLN-2.30.8 Plans 2.30.8. SAJ Plan View Northern Slip Rd

Retaining Walls.pdf

RC-ALG-PLN-2.30.9 Plans 2.30.9. SAJ Elevations and Sections

Southern Slip Rd Retaining Walls.pdf

RC-ALG-PLN-2.28.6 Plans 2.28.6. J15a Proposed Contours.pdf

RC-ALG-PLN-2.28.7 Plans 2.28.7. J15a Cross Sections.pdf

RC-ALG-PLN-2.29 Plans 2.29. Northampton Road General

Arrangement.pdf

RC-ALG-PLN-2.30.0 Plans 2.30.0. SAJ Site Plan.pdf

RC-ALG-PLN-2.30.1 Plans 2.30.1. SAJ PV Seperated North Bridge.pdf

RC-ALG-PLN-2.30.2 Plans 2.30.2. SAJ EAS through North Bridge.pdf

RC-ALG-PLN-2.28.2 Plans 2.28.2. J15a PP A43 Westbound.pdf

RC-ALG-PLN-2.28.3 Plans 2.28.3. J15a PP A43 Southbound.pdf

RC-ALG-PLN-2.28.4 Plans 2.28.4. J15a Speed Limit Plan.pdf

RC-ALG-PLN-2.28.5 Plans 2.28.5. J15a TRO Plan.pdf

Page 7: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Plans/Drawings General Site Plans (Part 23) Junction 7 - Red Line Boundary Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 7 - General Arrangement – Key Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 7 - General Arrangement – 1 of 4 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 7 - General Arrangement – 2 of 4 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 7 - General Arrangement – 3 of 4 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 7 - General Arrangement – 4 of 4 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 7 - General Arrangement - Masterplan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 14 - Existing Layout Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 14 - Red Line Boundary Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 14 - General Arrangement – Key Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 14 - General Arrangement – 1 of 5 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 14 - General Arrangement – 2 of 5 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 14 - General Arrangement – 3 of 5 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 14 - General Arrangement – 4 of 5 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 14 - General Arrangement – 5 of 5 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 14 - General Arrangement - Masterplan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 15 - Existing Layout Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 15 - Red Line Boundary Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 15 - General Arrangement – Key Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 15 - General Arrangement – 1 of 4 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 15 - General Arrangement – 2 of 4 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 15 - General Arrangement – 3 of 4 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 15 - General Arrangement – 4 of 4 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 15 - General Arrangement - Masterplan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 19 - Existing Layout Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 19 - Red Line Boundary Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 19 - General Arrangement – Key Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 19 - General Arrangement – 1 of 3 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 19 - General Arrangement – 2 of 3 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 19 - General Arrangement – 3 of 3 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 19 - General Arrangement – Masterplan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 20 - Existing Layout Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 20 - Red Line Boundary Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 20 - General Arrangement – Key Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 20 - General Arrangement – 1 of 2 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 20 - General Arrangement – 2 of 2 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 20 - General Arrangement – Masterplan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 29 - Existing Layout Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 29 - Red Line Boundary Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 29 - General Arrangement – Key Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 29 - General Arrangement – 1 of 2 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 29 - General Arrangement – 2 of 2 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 29 - General Arrangement - Masterplan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 31 - Existing Layout Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 31 - Red Line Boundary Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 31 - General Arrangement – Key Plan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 31 - General Arrangement – 1 of 2 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 31 - General Arrangement – 2 of 2 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Junction 31 - General Arrangement - Masterplan 26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Towcester Road/ Northampton Road Footway/

Cycleway – Outline Design

26.10.18 TPA

Plans/Drawings General Site Plans (Part 23) Public Rights of Way Strategy – Key Plan 26.10.18 BCA

Plans/Drawings General Site Plans (Part 23) Public Rights of Way Strategy – 1 of 5 26.10.18 BCA

RC-ALG-PLN-2.42.2.2 Plans 2.42.2.2. J31 GA 2 of 2.pdf

RC-ALG-PLN-2.42.3 Plans 2.42.3. J31 GA Masterplan.pdf

RC-ALG-PLN-2.43.1 Plans 2.43.1. Towcester Road Northampton Road

Outline Design.pdf

RC-ALG-PLN-2.44.0 Plans 2.44.0.PROWS Key Plan.pdf

RC-ALG-PLN-2.44.1 Plans 2.44.1. PROWS 1 of 5.pdf

RC-ALG-PLN-2.41.2.2 Plans 2.41.2.2. J29 GA 2 of 2.pdf

RC-ALG-PLN-2.41.3 Plans 2.41.3. J29 GA Masterplan.pdf

RC-ALG-PLN-2.42.0 Plans 2.42.0. J31 Existing Layout Plan.pdf

RC-ALG-PLN-2.42.1 Plans 2.42.1. J31 Red Line Boundary Plan.pdf

RC-ALG-PLN-2.42.2.0 Plans 2.42.2.0. J31 GA Key Plan.pdf

RC-ALG-PLN-2.42.2.1 Plans 2.42.2.1. J31 GA 1 of 2.pdf

RC-ALG-PLN-2.40.2.2 Plans 2.40.2.2. J20 GA 2 of 2.pdf

RC-ALG-PLN-2.40.3 Plans 2.40.3. J20 GA Masterplan.pdf

RC-ALG-PLN-2.41.0 Plans 2.41.0. J29 Existing Layout Plan.pdf

RC-ALG-PLN-2.41.1 Plans 2.41.1. J29 Red Line Boundary Plan.pdf

RC-ALG-PLN-2.41.2.0 Plans 2.41.2.0. J29 GA Key Plan.pdf

RC-ALG-PLN-2.41.2.1 Plans 2.41.2.1. J29 GA 1 of 2.pdf

RC-ALG-PLN-2.39.2.3 Plans 2.39.2.3. J19 GA 3 of 3.pdf

RC-ALG-PLN-2.39.3 Plans 2.39.3. J19 GA Masterplan.pdf

RC-ALG-PLN-2.40.0 Plans 2.40.0. J20 Existing Layout Plan.pdf

RC-ALG-PLN-2.40.1 Plans 2.40.1. J20 Red Line Boundary Plan.pdf

RC-ALG-PLN-2.40.2.0 Plans 2.40.2.0. J20 GA Key Plan.pdf

RC-ALG-PLN-2.40.2.1 Plans 2.40.2.1. J20 GA 1 of 2.pdf

RC-ALG-PLN-2.38.3 Plans 2.38.3. J15 GA Masterplan.pdf

RC-ALG-PLN-2.39.0 Plans 2.39.0. J19 Existing Layout Plan.pdf

RC-ALG-PLN-2.39.1 Plans 2.39.1. J19 Red Line Boundary Plan.pdf

RC-ALG-PLN-2.39.2.0 Plans 2.39.2.0. J19 GA Key Plan.pdf

RC-ALG-PLN-2.39.2.1 Plans 2.39.2.1. J19 GA 1 of 3.pdf

RC-ALG-PLN-2.39.2.2 Plans 2.39.2.2. J19 GA 2 of 3.pdf

RC-ALG-PLN-2.38.1 Plans 2.38.1. J15 Red Line Boundary Plan.pdf

RC-ALG-PLN-2.38.2.0 Plans 2.38.2.0. J15 GA Key Plan.pdf

RC-ALG-PLN-2.38.2.1 Plans 2.38.2.1. J15 GA 1 of 4.pdf

RC-ALG-PLN-2.38.2.2 Plans 2.38.2.2. J15 GA 2 of 4.pdf

RC-ALG-PLN-2.38.2.3 Plans 2.38.2.3. J15 GA 3 of 4.pdf

RC-ALG-PLN-2.38.2.4 Plans 2.38.2.4. J15 GA 4 of 4.pdf

RC-ALG-PLN-2.37.2.2 Plans 2.37.2.2. J14 GA 2 of 5.pdf

RC-ALG-PLN-2.37.2.3 Plans 2.37.2.3. J14 GA 3 of 5.pdf

RC-ALG-PLN-2.37.2.4 Plans 2.37.2.4. J14 GA 4 of 5.pdf

RC-ALG-PLN-2.37.2.5 Plans 2.37.2.5. J14 GA 5 of 5.pdf

RC-ALG-PLN-2.37.3 Plans 2.37.3. J14 GA Masterplan.pdf

RC-ALG-PLN-2.38.0 Plans 2.38.0. J15 Existing Layout Plan.pdf

RC-ALG-PLN-2.36.2.4 Plans 2.36.2.4. J7 GA 4 of 4.pdf

RC-ALG-PLN-2.36.3 Plans 2.36.3. J7 GA Masterplan.pdf

RC-ALG-PLN-2.37.0 Plans 2.37.0. J14 Existing Layout Plan.pdf

RC-ALG-PLN-2.37.1 Plans 2.37.1. J14 Red Line Boundary Plan.pdf

RC-ALG-PLN-2.37.2.0 Plans 2.37.2.0. J14 GA Key Plan.pdf

RC-ALG-PLN-2.37.2.1 Plans 2.37.2.1. J14 GA 1 of 5.pdf

RC-ALG-PLN-2.36.1 Plans 2.36.1. J7 Red Line Boundary Plan.pdf

RC-ALG-PLN-2.36.2.0 Plans 2.36.2.0. J7 GA Key Plan.pdf

RC-ALG-PLN-2.36.2.1 Plans 2.36.2.1. J7 GA 1 of 4.pdf

RC-ALG-PLN-2.36.2.2 Plans 2.36.2.2. J7 GA 2 of 4.pdf

RC-ALG-PLN-2.36.2.3 Plans 2.36.2.3. J7 GA 3 of 4.pdf

Page 8: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Plans/Drawings General Site Plans (Part 23) Public Rights of Way Strategy – 2 of 5 26.10.18 BCA

Plans/Drawings General Site Plans (Part 23) Public Rights of Way Strategy – 3 of 5 26.10.18 BCA

Plans/Drawings General Site Plans (Part 23) J15A Public Rights of Way Strategy (4 of 5) 26.10.18 BCA

Plans/Drawings General Site Plans (Part 23) Public Rights of Way Strategy Footpath Links with

Northampton Gateway (5 of 5)

26.10.18 BCA

Draft development consent order Draft Order (Part 9) Draft Development Consent Order 26.10.18 Turley

Draft development consent order Explanatory Memorandum to Draft

Order

(Part 10)

Explanatory Memorandum 26.10.18 Turley

Compulsory Purchase information Statement of Reasons document (Part

13)

Statement of Reasons 26.10.18 Womble Bond

Dickinson

Compulsory Purchase information Funding statement document (Part 13) Funding Statement 26.10.18 Womble Bond

Dickinson

Compulsory Purchase information Book of reference Part 1 (Part 13) Book of Reference (Main Site) – (MS) 26.10.18 Terra Quest

Compulsory Purchase information Book of reference Part 1 (Part 13) Book of Reference (J15a) – (W10) 26.10.18 Terra Quest

Compulsory Purchase information Book of reference Part 1 (Part 13) Book of Reference (Cycleway on Towcester) – (W17A) 26.10.18 Terra Quest

Compulsory Purchase information Book of reference Part 1 (Part 13) Book of Reference (Cycleway on Barn Lane) – (W17B) 26.10.18 Terra Quest

Compulsory Purchase information Book of reference Part 1 (Part 13) Book of Reference A43 (south)/ Saint Johns Road (west)/ A43

(north)/ Saint Johns Road (east) – (W18)

26.10.18 Terra Quest

Compulsory Purchase information Book of reference Part 1 (Part 13) Book of Reference (A43 South/ Northampton Road/ A43 North) –

(W19)

26.10.18 Terra Quest

Compulsory Purchase information Book of reference Part 1 (Part 13) Book of Reference (A43 and Tove Roundabout, Towcester

Bypass (southwest)/ Towcester Road/ A5, (north)/ A43,

(northeast)/ A5, Watling Street (southeast)

– (W20)

26.10.18 Terra Quest

Compulsory Purchase information Book of reference Part 1 (Part 13) Book of Reference (Abthorpe Road and Abthorpe roundabout/

A43, Towcester Bypass (north)/ Brackley Road/ A43, Towcester

Bypass (south) – (W21)

26.10.18 Terra Quest

Compulsory Purchase information Book of reference Part 1 (Part 13) Book of Reference (A5076, Upton Way (south)/ Telford

Way/ A5076, Upton Way (north)/ Water Tull Way/ Duston Mill

Lane) – (W22)

26.10.18 Terra Quest

Compulsory Purchase information Book of reference Part 1 (Part 13) Book of Reference (A5076, Upton Way (south)/ High Street/

A5076, Upton Way (north)/ Duston Mill) – (W23)

26.10.18 Terra Quest

Compulsory Purchase information Book of reference Part 1 (Part 13) Book of Reference (A5076/ A5123/ Upton Way Roundabout

(Pineham Park) (Danes Camp Way) –

(W24)

26.10.18 Terra Quest

Compulsory Purchase information Book of reference Part 1 (Part 13) Book of Reference A5076 (West)/ Hunsbury Hill Avenue/

Hunsbarrow Road/ A5076, Danes Camp Way/ Hunsbury

Hill Road – (W25)

26.10.18 Terra Quest

Compulsory Purchase information Book of reference Part 1 (Part 13) Book of Reference Towcester Road/ A5076, Danes

Camp Way/ A5123, Towcester Road/ Mere Way/ Tesco Access –

(W26)

26.10.18 Terra Quest

Report Consultation report (Part 8a) Consultation Report 26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 1 – Statement of Compliance 26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 2 – Regulation 6 Notification 26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 3 – Regulation 8 Notification

(2017)

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 4 – Section 46 Notification Letter

to the Planning Inspectorate

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 5 – List of Prescribed Bodies

Consulted under Section 42 of the Act

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 6 – Letter templates to prescribed

bodies inviting comments on the Project under Section 42 of the

2008 Act

26.10.18 Camargue

5.1 Reports 5.1. CR Appendix 4.pdf

5.1 Reports 5.1. CR Appendix 5.pdf

5.1 Reports 5.1. CR Appendix 6.pdf

4.3 Compulsory Acquisition

Information

4.3. BOR W25.pdf

4.3 Compulsory

Acquisition Information

4.3. BOR W26.pdf

5.1 Reports 5.1. CR.pdf

5.1 Reports 5.1. CR Appendix 1.pdf

5.1 Reports 5.1. CR Appendix 2.pdf

5.1 Reports 5.1. CR Appendix 3.pdf

4.3 Compulsory Acquisition

Information

4.3. BOR W19.pdf

4.3 Compulsory Acquisition

Information

4.3. BOR W20.pdf

4.3 Compulsory Acquisition

Information

4.3. BOR W21.pdf

4.3 Compulsory

Acquisition Information

4.3. BOR W22.pdf

4.3 Compulsory

Acquisition Information

4.3. BOR W23.pdf

4.3 Compulsory Acquisition

Information

4.3. BOR W24.pdf

4.2 Compulsory

Acquisition Information

4.2. Funding Statement.pdf

4.3 Compulsory

Acquisition Information

4.3. BOR Main Site.pdf

4.3 Compulsory Acquisition

Information

4.3. BOR W10.pdf

4.3 Compulsory Acquisition

Information

4.3. BOR W17A.pdf

4.3 Compulsory Acquisition

Information

4.3. BOR W17B.pdf

4.3 Compulsory Acquisition

Information

4.3. BOR W18.pdf

RC-ALG-PLN-2.44.3 Plans 2.44.3. PROWS 3 of 5.pdf

RC-ALG-PLN-2.44.4 Plans 2.44.4. J15A PROWS 4 of 5.pdf

RC-ALG-PLN-2.44.5 Plans 2.44.5. PROWS Footpath Links with

N'hampton Gateway.pdf 5 of 5.pdf

3.1 Draft Development

Consent Orders

3.1. Draft Dev Consent Order.pdf

3.2 Draft Development

Consent Orders

3.2. Explanatory Memorandum.pdf

4.1 Compulsory Acquisition

Information

4.1. Statement of Reasons.pdf

RC-ALG-PLN-2.44.2 Plans 2.44.2. PROWS 2 of 5.pdf

Page 9: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Report Consultation report (Part 8a) Consultation Report – Appendix 7 – List of Local Authorities

consulted under Section 43 of the Act

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 8 – Letter templates sent to Local

Authorities inviting comments on the Project under Section 43 of

the Act

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 10 – Overview of Informal

Engagement with Key Stakeholders

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 11 – Letter templates sent to

persons with an interest in the land inviting comments on the

Project under Section 44 of the Act

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 12 – Section 47, Phase 1:

Covering emails to local authorities requesting comments on the

draft Statement of Community Consultation (SoCC) and Report to

Inform the SoCC in March 2016

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 13 – Section 47, Phase 1:

Responses received from local authorities on the draft SoCC and

Report to Inform the SoCC

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 14 – Section 47, Phase 1:

Published SoCC

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 15 – Section 47, Phase 1:

Published Report to Inform the SoCC

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 16 – Section 47, Phase 1: Notice

of Deposit of the SoCC in Northampton Chronicle & Echo on 28

April 2016 (Section 47 notice)

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 17 – Section 47, Phase 1:

Consultation zone

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 18 – Section 47, Phase 1:

Database of all addresses in consultation zone and other

stakeholders that were notified of the consultation

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 19 – Section 47, Phase 1:

Notification letter sent to addresses within the consultation zone

and stakeholders ahead of consultation (18 April 2016)

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 20 – Section 47, Phase 1:

Exhibition panels

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 21 – Section 47, Phase 1:

Supporting maps and plans published for consultation

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 22 – Section 47, Phase 1:

Feedback form

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 23 – Section 47, Phase 1: Copy

of PEIR Phase 1: Non-technical summary published as part of the

consultation

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 24 – Section 47, Phase 1: Press

releases issued in relation to the consultation

26.10.18 Camargue

5.1 Reports 5.1. CR Appendix 23.pdf

5.1 Reports 5.1. CR Appendix 24.pdf

5.1 Reports 5.1. CR Appendix 17.pdf

5.1 Reports 5.1. CR Appendix 18.pdf

5.1 Reports 5.1. CR Appendix 19.pdf

5.1 Reports 5.1. CR Appendix 20.pdf

5.1 Reports 5.1. CR Appendix 21.pdf

5.1 Reports 5.1. CR Appendix 22.pdf

5.1 Reports 5.1. CR Appendix 11.pdf

5.1 Reports 5.1. CR Appendix 12.pdf

5.1 Reports 5.1. CR Appendix 13.pdf

5.1 Reports 5.1. CR Appendix 14.pdf

5.1 Reports 5.1. CR Appendix 15.pdf

5.1 Reports 5.1. CR Appendix 16.pdf

5.1 Reports 5.1. CR Appendix 7.pdf

5.1 Reports 5.1. CR Appendix 8.pdf

5.1 Reports 5.1. CR Appendix 10.pdf

Page 10: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Report Consultation report (Part 8a) Consultation Report – Appendix 25 – Section 47, Phase 1:

Sample

of media coverage relating to the consultation

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 26 – Section 47, Phase 1

feedback

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 27 – Section 47, Phase 1:

Schedule of feedback from local community and the regard the

Applicant has had to these responses

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 28 – Section 47, Phase 1:

Responses from organisations and MPs and the regard the

Applicant has had to these responses

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 29 – Section 47, Phase 2:

Covering emails to local authorities requesting comments on the

draft SoCC and Report to Inform the SoCC

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 30 – Section 47, Phase 2:

Responses received from local authorities on the draft SoCC and

Report to Inform the SoCC

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 31 – Section 47, Phase 2:

Published Updated SoCC

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 32 – Section 47, Phase 2:

Published Updated Report to Inform the SoCC

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 33 – Section 47, Phase 2: Notice

of Deposit of the SoCC

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 34 – Section 47, Phase 2:

Notification letter sent to addresses within the consultation zone

and other stakeholders (non-statutory consultees) on 27 February

2018

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 35 – Section 47, Phase 2:

Consultation zone

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 36 – Section 47, Phase 2:

Database of consultees notified of consultation

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 37 – Parish Council boundaries

plan

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 38 – Section 47, Phase 2:

Exhibition panels

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 39 – Section 47, Phase 2:

Feedback form

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 40 – Section 47, Phase 2:

Photographs of documents at public exhibitions

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 41 – Section 47, Phase 2: Copy

of PEIR: Non-Technical Summary published as part of the

consultation

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 42 – Section 48 Notice 26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 43 – List of Regulation 11

consultees to receive a copy of the Section 48 notice at Section

42, Phase 2 Consultation

26.10.18 Camargue

5.1 Reports 5.1. CR Appendix 41.pdf

5.1 Reports 5.1. CR Appendix 42.pdf

5.1 Reports 5.1. CR Appendix 43.pdf

5.1 Reports 5.1. CR Appendix 35.pdf

5.1 Reports 5.1. CR Appendix 36.pdf

5.1 Reports 5.1. CR Appendix 37.pdf

5.1 Reports 5.1. CR Appendix 38.pdf

5.1 Reports 5.1. CR Appendix 39.pdf

5.1 Reports 5.1. CR Appendix 40.pdf

5.1 Reports 5.1. CR Appendix 29.pdf

5.1 Reports 5.1. CR Appendix 30.pdf

5.1 Reports 5.1. CR Appendix 31.pdf

5.1 Reports 5.1. CR Appendix 32.pdf

5.1 Reports 5.1. CR Appendix 33.pdf

5.1 Reports 5.1. CR Appendix 34.pdf

5.1 Reports 5.1. CR Appendix 25.pdf

5.1 Reports 5.1. CR Appendix 26.pdf

5.1 Reports 5.1. CR Appendix 27.pdf

5.1 Reports 5.1. CR Appendix 28.pdf

Page 11: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Report Consultation report (Part 8a) Consultation Report – Appendix 44 – Section 48: Copies of

notices

that appeared in newspapers

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 45 – Phase 2: Press releases

issued in relation to the consultation

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 46 – Phase 2: Sample of media

coverage related to the consultation

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 47 – Phase 2: Photos of roadside

adverts at Junction 15A service station in both directions

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 48 – Phase 2: Example

screenshots of the illustrative 3D model

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 49 – Section 42, Phase 2:

Responses received from S42 consultation and the regard the

Applicant has had to these responses (including S43 consultees)

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 50 – Section 44, Phase 2:

Responses received from S44 consultation and the regard the

Applicant has had to these responses

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 51 – Section 47, Phase 2: Full

verbatim feedback received from respondents with thematic

groupings

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 52 – Section 47, Phase 2:

Responses received from S47 consultation and the regard the

Applicant has had to these responses

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 53 – Section 47, Phase 2:

Responses received from S47 representative consultees and the

regard the Applicant has had to these responses

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 54 – Section 47, Phase 2:

Acknowledgement letter sent to all respondents after the

consultation

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 55 – Localised Consultation:

notification letter sent to relevant stakeholders and relevant

addresses in the local community on 25 June 2018

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 56 – Localised Consultation:

notification letter sent to affected landowners and others with an

interest in the land on 25 June 2018

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 57 – Localised Consultation:

letter sent as a reminder, a week prior to close of consultation on

16 July 2018

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 58 – Localised Consultation:

plans

pack

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 59 – Localised Consultation:

feedback form

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 60 – Localised Consultation:

database of recipients of notifications

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 61 – Localised Consultation:

summary of responses received

26.10.18 Camargue

5.1 Reports 5.1. CR Appendix 59.pdf

5.1 Reports 5.1. CR Appendix 60.pdf

5.1 Reports 5.1. CR Appendix 61.pdf

5.1 Reports 5.1. CR Appendix 53.pdf

5.1 Reports 5.1. CR Appendix 54.pdf

5.1 Reports 5.1. CR Appendix 55.pdf

5.1 Reports 5.1. CR Appendix 56.pdf

5.1 Reports 5.1. CR Appendix 57.pdf

5.1 Reports 5.1. CR Appendix 58.pdf

5.1 Reports 5.1. CR Appendix 47.pdf

5.1 Reports 5.1. CR Appendix 48.pdf

5.1 Reports 5.1. CR Appendix 49.pdf

5.1 Reports 5.1. CR Appendix 50.pdf

5.1 Reports 5.1. CR Appendix 51.pdf

5.1 Reports 5.1. CR Appendix 52.pdf

5.1 Reports 5.1. CR Appendix 44.pdf

5.1 Reports 5.1. CR Appendix 45.pdf

5.1 Reports 5.1. CR Appendix 46.pdf

Page 12: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Report Consultation report (Part 8a) Consultation Report – Appendix 62 – Copies of newsletters

published

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 63 – Copies of monthly updates

provided to the Local Liaison Group (LLG)

26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 64 – Example of website page 26.10.18 Camargue

Report Consultation report (Part 8a) Consultation Report – Appendix 65 – Keep in touch (KIT) card 26.10.18 Camargue

Associated Development information Environmental Protection information

(Part

19)

Environmental protection statement of engagement 26.10.18 RSK

Report Other Habitat Regulations Assessment No Significant Effects

Report

26.10.18 RSK

Associated Development information Details of other consents/licences

required

(Part 24)

Consents and licences required under other legislation 26.10.18 Womble Bond

Dickinson

Environmental Statement Environmental Impact Assessment

(Part 14a)

Environmental Statement – Introduction (Chapter 1) 26.10.18 Turley

Environmental Statement Environmental Impact Assessment

(Part 14a)

Environmental Statement – Site and Surroundings

(Chapter 2)

26.10.18 Turley

Environmental Statement Environmental Impact Assessment

(Part 14a)

Environmental Statement – Reasonable Alternatives

(Chapter 3)

26.10.18 Turley

Environmental Statement Environmental Impact Assessment

(Part 14a)

Environmental Statement – Overview of Consultation

and Scoping (Chapter 4)

26.10.18 Turley

Environmental Statement Environmental Impact Assessment

(Part 14a)

Environmental Statement – The Proposed Development

(Chapter 5)

26.10.18 Turley

Environmental Statement Environmental Impact Assessment

(Part 14a)

Environmental Statement – Legislative and Policy

Context (Chapter 6)

26.10.18 Turley

Environmental Statement Environmental Impact Assessment

(Part 14a)

Environmental Statement – EIA Assessment

Methodology (Chapter 7)

26.10.18 Turley

Environmental Statement Environmental Impact Assessment

(Part 14a)

Environmental Statement – Air Quality (Chapter 8) 26.10.18 RPS

Environmental Statement Environmental Impact Assessment

(Part 14a)

Environmental Statement – Agricultural Land (Chapter 9) 26.10.18 Reading

Agricultural

Environmental Statement Environmental Impact Assessment

(Part 14a)

Environmental Statement – Archaeology (Chapter 10) 26.10.18 CFA Archaeology

Environmental Statement Environmental Impact Assessment

(Part 14a)

Environmental Statement – Built Heritage (Chapter 11) 26.10.18 Turley

Environmental Statement Environmental Impact Assessment

(Part 14a)

Environmental Statement – Ground Conditions (Chapter

12)

26.10.18 Hydrock

Environmental Statement Environmental Impact Assessment

(Part 14a)

Environmental Statement – Hydrology, Drainage and

Flood Risk (Chapter 13)

26.10.18 Hydrock

Environmental Statement Environmental Impact Assessment

(Part 14a)

Environmental Statement – Biodiversity (Chapter 14) 26.10.18 RSK

Environmental Statement Environmental Impact Assessment

(Part 14a)

Environmental Statement – Landscape and Visual

Impact Assessment (Chapter 15)

26.10.18 RSK

Environmental Statement Environmental Impact Assessment

(Part 14a)

Environmental Statement – Noise and Vibration

(Chapter 16)

26.10.18 Spectrum

Environmental Statement Environmental Impact Assessment

(Part 14a)

Environmental Statement – Highways and

Transportation (Chapter 17)

26.10.18 TPA

Environmental Statement Environmental Impact Assessment

(Part 14a)

Environmental Statement – Socio-Economics (Chapter

18)

26.10.18 Turley

Environmental Statement Environmental Impact Assessment

(Part 14a)

Environmental Statement – Lighting (Chapter 19) 26.10.18 Hoare Lea

Environmental Statement Environmental Impact Assessment

(Part 14a)

Environmental Statement – Waste and Resource

Efficiency (Chapter 20)

26.10.18 RPS

Environmental Statement Environmental Impact Assessment

(Part 14a)

Environmental Statement – Climate Change Mitigation

and Adaptation (Chapter 21)

26.10.18 Turley

Environmental Statement Environmental Impact Assessment

(Part 14a)

Environmental Statement – Cumulative Effects

Summary (Chapter 22)

26.10.18 Turley

Environmental Statement Environmental Impact Assessment

(Part 14a)

Environmental Statement – Conclusion (Chapter 23) 26.10.18 Turley

6.1 Environmental

Statement

6.1. ES Chapter 21.pdf

6.1 Environmental

Statement

6.1. ES Chapter 22.pdf

6.1 Environmental

Statement

6.1. ES Chapter 23.pdf

6.1 Environmental

Statement

6.1. ES Chapter 15.pdf

6.1 Environmental

Statement

6.1. ES Chapter 16.pdf

6.1 Environmental

Statement

6.1. ES Chapter 17.pdf

6.1 Environmental

Statement

6.1. ES Chapter 18.pdf

6.1 Environmental

Statement

6.1. ES Chapter 19.pdf

6.1 Environmental

Statement

6.1. ES Chapter 20.pdf

6.1 Environmental

Statement

6.1. ES Chapter 9.pdf

6.1 Environmental

Statement

6.1. ES Chapter 10.pdf

6.1 Environmental

Statement

6.1. ES Chapter 11.pdf

6.1 Environmental

Statement

6.1. ES Chapter 12.pdf

6.1 Environmental

Statement

6.1. ES Chapter 13.pdf

6.1 Environmental

Statement

6.1. ES Chapter 14.pdf

6.1 Environmental

Statement

6.1. ES Chapter 3.pdf

6.1 Environmental

Statement

6.1. ES Chapter 4.pdf

6.1 Environmental

Statement

6.1. ES Chapter 5.pdf

6.1 Environmental

Statement

6.1. ES Chapter 6.pdf

6.1 Environmental

Statement

6.1. ES Chapter 7.pdf

6.1 Environmental

Statement

6.1. ES Chapter 8.pdf

5.1 Reports 5.1. CR Appendix 65.pdf

5.2 Reports 5.2. Environmental Protection Statement of

Engagement.pdf

5.3 Reports 5.3. Habitat Regs Assessment NSE

Report.pdf

5.4 Reports 5.4. Contents and Licences Required.pdf

6.1 Environmental

Statement

6.1. ES Chapter 1.pdf

6.1 Environmental

Statement

6.1. ES Chapter 2.pdf

5.1 Reports 5.1. CR Appendix 62.pdf

5.1 Reports 5.1. CR Appendix 63.pdf

5.1 Reports 5.1. CR Appendix 64.pdf

Page 13: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 2 Appendix 2.1 –

Designations

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 2 Figure 2.1 –

Location Plan

26.10.18 Terra Quest

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 2 Figure 2.2a –

Baseline Utilities

26.10.18 Hydrock

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 2 Figure 2.2b –

Baseline Utilities

26.10.18 Hydrock

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 3 Figure 3.1 – Consultation 1

Illustrative Draft Masterplan (Main SRFI

Site)

26.10.18 MSA

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 3 Figure 3.2 – March 2018

S42 Consultation Parameters Plan (Main

SRFI Site)

26.10.18 MSA

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 3 Figure 3.3 – March 2018

S42 Consultation Order Limits (All

Proposed Development)

26.10.18 MSA

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 4 Appendix 4.1 –

Scoping Opinion

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 4 Appendix 4.2 –

Population and Human Health Scoping Statement

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 4 Appendix 4.3 – Major

Accidents and Natural Disasters Risk Assessment

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 5 Appendix 5.1 - Plans

Forming Embedded Mitigation. Comprising:

• Order Limits Plans

• Parameters Plan (Main SRFI Site),

• Green Infrastructure Plan (Main SRFI Site),

• J15a Green Infrastructure Plan (J15a Works), and

• Minor Highway Works – Site Plans.

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 5 Appendix 5.2. Management

Plans Forming Embedded Mitigation. Comprising:

• Code of Construction Practice (CoCP), and

• Outline Construction Environmental Management Plan (CEMP))

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 5 Appendix 5.3 –

Schedule of Mitigation

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 5 Appendix 5.4 – Masterplans

and J15a Landscape Plan. Comprising:

• Illustrative Masterplan (Main SRFI Site),

• Illustrative Landscape Masterplan (Main SRFI Site), and

• Illustrative J15a Landscape Plan (J15a works).

26.10.18 MSA

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 5 Appendix 5.5 – Earthworks

Levels and Volumes. Comprising:

• Earthworks Plateau Levels Option 6 (Main SRFI Site), and

• Earthworks Bund Volumes Option 6 (Main SRFI Site)).

26.10.18 BCA and RPS

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 5 Appendix 5.6 – Plans

Showing Outputs of Adaptive Mitigation.

Comprising:

• Ecological Mitigation Plan (Main SRFI Site),

• Ecological Mitigation Plan (J15a works),

• Hedgerow and Tree Retention and Removal Plan (Main SRFI

Site),

• Hedgerow and Tree Retention and Removal Plan (J15a works),

• Public Rights of Way Strategy (Main SRFI Site), and

• Illustrative Colour Elevations (Main SRFI Site))

26.10.18 Turley6.1.5.6 Environmental Statement 6.1.5.6. ES Chapter 5 Appendix 5.6.pdf

6.1.4.3 Environmental Statement 6.1.4.3. ES Chapter 4 Appendix 4.3.pdf

6.1.5.1 Environmental Statement 6.1.5.1. ES Chapter 5 Appendix 5.1.pdf

6.1.5.2 Environmental Statement 6.1.5.2. ES Chapter 5 Appendix 5.2.pdf

6.1.5.3 Environmental

Statement

6.1.5.3. ES Chapter 5 Appendix 5.3.pdf

6.1.5.4 Environmental Statement 6.1.5.4. ES Chapter 5 Appendix 5.4.pdf

6.1.5.5 Environmental Statement 6.1.5.5. ES Chapter 5 Appendix 5.5.pdf

RC-ALG-PLN-6.1.2.3.1 Environmental

Statement

6.1.2.4. ES Chapter 2 Figure 2.2b.pdf

RC-ALG-PLN-6.1.3.1 Environmental Statement 6.1.3.1.ES Chapter 3 Figure 3.1.pdf

30708-FE-103 Environmental Statement 6.1.3.2. ES Chapter 3 Figure 3.2.pdf

MSA-30708-PL-DCO-117 Environmental Statement 6.1.3.3. ES Chapter 3 Figure 3.3.pdf

6.1.4.1 Environmental

Statement

6.1.4.1. ES Chapter 4 Appendix 4.1.pdf

6.1.4.2 Environmental

Statement

6.1.4.2. ES Chapter 4 Appendix 4.2.pdf

6.1.2.1 Environmental

Statement

6.1.2.1. ES Chapter 2 Appendix 2.1.pdf

RC-ALG-PLN-2.1 Environmental

Statement

6.1.2.2. ES Chapter 2 Figure 2.1.pdf

RC-ALG-PLN-6.1.2.3.0 Environmental

Statement

6.1.2.3. ES Chapter 2 Figure 2.2a.pdf

Page 14: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 5 Appendix 5.7 – Proposed

utilities Infrastructure Works. Comprising:

• Proposed Utilities,

• Utilities Connection Offers, and

• Stopping up Plans

26.10.18 Hydrock

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 5 Figure 5.1 –

Landscape Phasing Plan

26.10.18 BCA

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 7 Figure 7.1 – Zone

of Search for other Development

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 7 Figure 7.2 –

Location of Cumulative Projects (sheet 1 of 2)

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 7 Figure 7.2 –

Location of Cumulative Projects (sheet 2 of 2)

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 7 Appendix 7.3 –

List of Cumulative Projects

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Appendix 8.1 –

Model Inputs and Outputs

26.10.18 RPS

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Appendix 8.2 –

Onsite Vehicle Emissions

26.10.18 RPS

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Appendix 8.3 –

Rail Emissions

26.10.18 RPS

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Appendix 8.4 –

Model Verification

26.10.18 RPS

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Appendix 8.5 –

Diffusion Tube Monitoring

26.10.18 RPS

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Appendix 8.6 –

Quality Impacts on Designated Sites

26.10.18 RPS

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.8 –

AQMAs

26.10.18 RPS

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.9 –

Project Specific Monitoring Locations

26.10.18 RPS

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.10 –

Modelled Receptors – Northampton – Northern Area

26.10.18 RPS

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.11 – Modelled

Receptors – Northampton – Southern Area

26.10.18 RPS

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.12 –

Modelled Receptors – Northampton – Central Area

26.10.18 RPS

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.13 –

Modelled Receptors – South Northamptonshire – Northern Area

26.10.18 RPS

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.14 –

Modelled Receptors – South Northamptonshire –Central Area

26.10.18 RPS

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.15 – Modelled

Receptors – South Northamptonshire – South

Western Area

26.10.18 RPS

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.16 – Modelled

Receptors – South Northamptonshire – South

Eastern Area

26.10.18 RPS

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.17 – Modelled

Roads –Northampton – North Western Area

26.10.18 RPS

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.18 – Modelled

Roads –Northampton – North Eastern Area

26.10.18 RPS

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.19 –

Modelled Roads –Northampton –Western Area

26.10.18 RPS

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.20 – Modelled

Roads –Northampton – Central/Eastern Area

26.10.18 RPS

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.21 –

Modelled Roads –Northampton – Southern Area

26.10.18 RPS

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.22 – Modelled

Roads –South Northamptonshire – Northern

Area

26.10.18 RPS

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.23 – Modelled

Roads –South Northamptonshire – Towcester

Area

26.10.18 RPS

RC-ALG-FIG-6.1.8.19 Environmental

Statement

6.1.8.19. ES Chapter 8 Figure 8.19.pdf

RC-ALG-FIG-6.1.8.20 Environmental Statement 6.1.8.20. ES Chapter 8 Figure 8.20.pdf

RC-ALG-FIG-6.1.8.21 Environmental

Statement

6.1.8.21. ES Chapter 8 Figure 8.21.pdf

RC-ALG-FIG-6.1.8.22 Environmental Statement 6.1.8.22. ES Chapter 8 Figure 8.22.pdf

RC-ALG-FIG-6.1.8.23 Environmental Statement 6.1.8.23. ES Chapter 8 Figure 8.23.pdf

RC-ALG-FIG-6.1.8.13 Environmental Statement 6.1.8.13. ES Chapter 8 Figure 8.13.pdf

RC-ALG-FIG-6.1.8.14 Environmental Statement 6.1.8.14. ES Chapter 8 Figure 8.14.pdf

RC-ALG-FIG-6.1.8.15 Environmental Statement 6.1.8.15. ES Chapter 8 Figure 8.15.pdf

RC-ALG-FIG-6.1.8.16 Environmental Statement 6.1.8.16. ES Chapter 8 Figure 8.16.pdf

RC-ALG-FIG-6.1.8.17 Environmental Statement 6.1.8.17. ES Chapter 8 Figure 8.17.pdf

RC-ALG-FIG-6.1.8.18 Environmental Statement 6.1.8.18. ES Chapter 8 Figure 8.18.pdf

6.1.8.6 Environmental

Statement

6.1.8.6. ES Chapter 8 Appendix 8.6.pdf

RC-ALG-FIG-6.1.8.8 Environmental

Statement

6.1.8.8. ES Chapter 8 Figure 8.8.pdf

RC-ALG-FIG-6.1.8.9 Environmental

Statement

6.1.8.9. ES Chapter 8 Figure 8.9.pdf

RC-ALG-FIG-6.1.8.10 Environmental

Statement

6.1.8.10. ES Chapter 8 Figure 8.10.pdf

RC-ALG-FIG-6.1.8.11 Environmental Statement 6.1.8.11. ES Chapter 8 Figure 8.11.pdf

RC-ALG-FIG-6.1.8.12 Environmental

Statement

6.1.8.12. ES Chapter 8 Figure 8.12.pdf

6.1.7.3 Environmental

Statement

6.1.7.3. ES Chapter 7 Appendix 7.3.pdf

6.1.8.1 Environmental

Statement

6.1.8.1. ES Chapter 8 Appendix 8.1.pdf

6.1.8.2 Environmental

Statement

6.1.8.2. ES Chapter 8 Appendix 8.2.pdf

6.1.8.3 Environmental

Statement

6.1.8.3. ES Chapter 8 Appendix 8.3.pdf

6.1.8.4 Environmental

Statement

6.1.8.4. ES Chapter 8 Appendix 8.4.pdf

6.1.8.5 Environmental

Statement

6.1.8.5. ES Chapter 8 Appendix 8.5.pdf

6.1.5.7 Environmental Statement 6.1.5.7. ES Chapter 5 Appendix 5.7.pdf

RC-ALG-FIG-6.1.5.8 Environmental

Statement

6.1.5.8. ES Chapter 5 Figure 5.1.pdf

RC-ALG-FIG-6.1.7.1 Environmental

Statement

6.1.7.1. ES Chapter 7 Figure 7.1.pdf

RC-ALG-FIG-6.1.7.2.0 Environmental

Statement

6.1.7.2. ES Chapter 7 Figure 7.2. Sheet 1 of

2.pdf

RC-ALG-FIG-6.1.7.2.1 Environmental

Statement

6.1.7.2. ES Chapter 7 Figure 7.2. Sheet 2 of

2.pdf

Page 15: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.24 – Modelled

Roads –South Northamptonshire – South

Western Area

26.10.18 RPS

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.25 – Modelled

Roads –South Northamptonshire – South

Eastern Area

26.10.18 RPS

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.26 –

Receptors with a Minor Adverse Impact

26.10.18 RPS

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Appendix 8.27 –

Modelled Onsite Road Links

26.10.18 RPS

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 9 Appendix 9.1 –

Agricultural Land Classification and Soil Resources, July 2017

26.10.18 Reading

Agricultural

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 9 Appendix 9.2 – Summary of

Agricultural Land Classification and Soil

Resources, November 2017

26.10.18 Reading

Agricultural

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 9 Figure 9.1 – Soil

Profile Observations

26.10.18 Reading

Agricultural

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 9 Figure 9.2 – Soil

Resources

26.10.18 Reading

Agricultural

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 9 Figure 9.3 –

Agricultural Land Classification

26.10.18 Reading

Agricultural

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 9 Figure 9.4 – Farm

Holdings

26.10.18 Reading

Agricultural

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 10 Appendix 10.1 –

Archaeological Sites, Features and Find-spots recorded by the

HER within the Main SRFI Site

26.10.18 CFA Archaeology

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 10 Appendix 10.2 –

Archaeological Sites within the Main SRFI Site revealed

by Geophysical Survey

26.10.18 CFA Archaeology

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 10 Appendix 10.3:

Archaeological Sites within the Main SRFI Site revealed

by Trial Trenching Evaluation

26.10.18 CFA Archaeology

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 10 Appendix 10.4 –

Archaeological Sites and Features within 1km of the

Main SRFI Site

26.10.18 CFA Archaeology

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 10 Appendix 10.5: M1 J15a

Site: Archaeological Sites, Features and Find-

spots

26.10.18 CFA Archaeology

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 10 Appendix 10.6 – A43/A5

Tove Roundabout: Archaeological Sites,

Features and Find-spots here]

26.10.18 CFA Archaeology

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 10 Appendix 10.7 – The

Hedgerows Regulations – Archaeology and History

26.10.18 CFA Archaeology

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 10 Appendix 10.8 –

Geophysical Survey Report (Sumo Services 2017)

26.10.18 CFA Archaeology

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 10 Appendix 10.9 –

Archaeological Evaluation Summary Report (CFA 2017)

26.10.18 CFA Archaeology

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 10 Appendix 10.10

– Written Scheme of Investigation (CFA 2018)

26.10.18 CFA Archaeology

Environmental Statement Technical Appendices (Part 14a) Environmental Statement - Chapter 10 Figure 10.11 -

Overall Archaeology Plan

26.10.18 CFA Archaeology

Environmental Statement Technical Appendices (Part 14a) Environmental Statement - Chapter 10 Figure 10.11 -

Archaeological Sites, Features and Find-spots within the Main

SRFI Site

26.10.18 CFA Archaeology

Environmental Statement Technical Appendices (Part 14a) Environmental Statement - Chapter 10 Figure 10.11 -

Archaeological Sites within the Main SRFI Site derived from

Geophysical Survey and Aerial Photography

26.10.18 CFA Archaeology

Environmental Statement Technical Appendices (Part 14a) Environmental Statement - Chapter 10 Figure 10.11 -

Archaeological Sites within the Main SRFI Site identified by Trial

Trenching Evaluation

26.10.18 CFA Archaeology

Environmental Statement Technical Appendices (Part 14a) Environmental Statement - Chapter 10 Figure 10.11 -

Archaeological Sites and Features within 1km of the Main SRFI

Site

26.10.18 CFA Archaeology

6.1.10.10 Environmental Statement 6.1.10.10. ES Chapter 10 Appendix

10.10.pdf

RC-ALG-FIG-6.1.10.11.0 Environmental

Statement

6.1.10.11. ES Chapter 10 Appendix

10.11.0.pdf

RC-ALG-FIG-6.1.10.11.1 Environmental Statement 6.1.10.11. ES Chapter 10 Appendix

10.11.1.pdf

RC-ALG-FIG-6.1.10.11.2 Environmental Statement 6.1.10.11. ES Chapter 10 Appendix

10.11.2.pdf

RC-ALG-FIG-6.1.10.11.3 Environmental Statement 6.1.10.11. ES Chapter 10 Appendix

10.11.3.pdf

RC-ALG-FIG-6.1.10.11.4 Environmental Statement 6.1.10.11. ES Chapter 10 Appendix

10.11.4.pdf

6.1.10.4 Environmental Statement 6.1.10.4. ES Chapter 10 Appendix 10.4.pdf

6.1.10.5 Environmental Statement 6.1.10.5. ES Chapter 10 Appendix 10.5.pdf

6.1.10.6 Environmental Statement 6.1.10.6. ES Chapter 10 Appendix 10.6.pdf

6.1.10.7 Environmental Statement 6.1.10.7. ES Chapter 10 Appendix 10.7.pdf

6.1.10.8 Environmental Statement 6.1.10.8. ES Chapter 10 Appendix 10.8.pdf

6.1.10.9 Environmental Statement 6.1.10.9. ES Chapter 10 Appendix 10.9.pdf

RC-ALG-FIG-6.1.9.4 Environmental

Statement

6.1.9.4. ES Chapter 9 Figure 9.2.pdf

RC-ALG-FIG-6.1.9.5 Environmental

Statement

6.1.9.5. ES Chapter 9 Figure 9.3.pdf

RC-ALG-FIG-6.1.9.6 Environmental

Statement

6.1.9.6. ES Chapter 9 Figure 9.4.pdf

6.1.10.1 Environmental Statement 6.1.10.1. ES Chapter 10 Appendix 10.1.pdf

6.1.10.2 Environmental Statement 6.1.10.2. ES Chapter 10 Appendix 10.2.pdf

6.1.10.3 Environmental Statement 6.1.10.3. ES Chapter 10 Appendix 10.3.pdf

RC-ALG-FIG-6.1.8.25 Environmental Statement 6.1.8.25. ES Chapter 8 Figure 8.25.pdf

RC-ALG-FIG-6.1.8.26 Environmental

Statement

6.1.8.26. ES Chapter 8 Figure 8.26.pdf

RC-ALG-APP-6.1.8.27 Environmental

Statement

6.1.8.27. ES Chapter 8 Figure 8.27.pdf

6.1.9.1 Environmental Statement 6.1.9.1. ES Chapter 9 Appendix 9.1.pdf

6.1.9.2 Environmental Statement 6.1.9.2. ES Chapter 9 Appendix 9.2.pdf

RC-ALG-FIG-6.1.9.3 Environmental

Statement

6.1.9.3. ES Chapter 9 Figure 9.1.pdf

RC-ALG-FIG-6.1.8.24 Environmental Statement 6.1.8.24. ES Chapter 8 Figure 8.24.pdf

Page 16: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Environmental Statement Technical Appendices (Part 14a) Environmental Statement - Chapter 10 Figure 10.11 - J15a Site:

Archaeological Sites, Features and Find-spots

26.10.18 CFA Archaeology

Environmental Statement Technical Appendices (Part 14a) Environmental Statement - Chapter 10 Figure 10.11 -A5 Tove

Roundabout: Archaeological Sites, Features and

Find Spots

26.10.18 CFA Archaeology

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Appendix 11.1 –

Heritage Assessment

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.2 –

5km Radius Plan

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.3 –

Heritage Asset Plan SRFI (key plan)

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.3 –

Heritage Asset Plan SRFI (sheet 1 of 8)

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.3 –

Heritage Asset Plan SRFI (sheet 2 of 8)

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.3 –

Heritage Asset Plan SRFI (sheet 3 of 8)

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.3 –

Heritage Asset Plan SRFI (sheet 4 of 8)

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.3 –

Heritage Asset Plan SRFI (sheet 5 of 8)

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.3 –

Heritage Asset Plan SRFI (sheet 6 of 8)

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.3 –

Heritage Asset Plan SRFI (sheet 7 of 8)

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.3 –

Heritage Asset Plan SRFI (sheet 8 of 8)

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –

Heritage Asset Plan Highways (key plan)

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –

Heritage Asset Plan Highways (sheet 1 of 13)

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –

Heritage Asset Plan Highways (sheet 2 of 13)

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –

Heritage Asset Plan Highways (sheet 3 of 13)

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –

Heritage Asset Plan Highways (sheet 4 of 13)

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –

Heritage Asset Plan Highways (sheet 5 of 13)

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –

Heritage Asset Plan Highways (sheet 6 of 13)

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –

Heritage Asset Plan Highways (sheet 7 of 13)

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –

Heritage Asset Plan Highways (sheet 8 of 13)

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –

Heritage Asset Plan Highways (sheet 9 of 13)

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –

Heritage Asset Plan Highways (sheet 10 of 13)

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –

Heritage Asset Plan Highways (sheet 11 of 13)

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –

Heritage Asset Plan Highways (sheet 12 of 13)

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –

Heritage Asset Plan Highways (sheet 13 of 13)

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.5 –

LIDAR Plan

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 12 Appendix 12.1 – Milton

Malsor Northamptonshire - Desk Study Report

26.10.18 Hydrock

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 12 Appendix 12.2 – Rail

Central. Milton Malsor, Northamptonshire. Ground Investigation

Report - Main SRFI Site

26.10.18 Hydrock

RC-ALG-FIG-6.1.11.4.11 Environmental

Statement

6.1.11.4.11. ES Chapter 11 Figure 11.4.pdf

RC-ALG-FIG-6.1.11.4.12 Environmental

Statement

6.1.11.4.12. ES Chapter 11 Figure 11.4.pdf

RC-ALG-FIG-6.1.11.4.13 Environmental

Statement

6.1.11.4.13. ES Chapter 11 Figure 11.4.pdf

RC-ALG-FIG-6.1.11.5 Environmental

Statement

6.1.11.5. ES Chapter 11 Figure 11.5.pdf

6.1.12.1 Environmental Statement 6.1.12.1. ES Chapter 12 Appendix 12.1.pdf

6.1.12.2 Environmental Statement 6.1.12.2. ES Chapter 12 Appendix 12.2.pdf

RC-ALG-FIG-6.1.11.4.5 Environmental

Statement

6.1.11.4.5. ES Chapter 11 Figure 11.4.pdf

RC-ALG-FIG-6.1.11.4.6 Environmental

Statement

6.1.11.4.6.ES Chapter 11 Figure 11.4.pdf

RC-ALG-FIG-6.1.11.4.7 Environmental

Statement

6.1.11.4.7. ES Chapter 11 Figure 11.4.pdf

RC-ALG-FIG-6.1.11.4.8 Environmental

Statement

6.1.11.4.8. ES Chapter 11 Figure 11.4.pdf

RC-ALG-FIG-6.1.11.4.9 Environmental

Statement

6.1.11.4.9. ES Chapter 11 Figure 11.4.pdf

RC-ALG-FIG-6.1.11.4.10 Environmental

Statement

6.1.11.4.10. ES Chapter 11 Figure 11.4.pdf

RC-ALG-FIG-6.1.11.3.8 Environmental

Statement

6.1.11.3.8. ES Chapter 11 Figure 11.3.pdf

RC-ALG-FIG-6.1.11.4.0 Environmental

Statement

6.1.11.4.0. ES Chapter 11 Figure 11.4.pdf

RC-ALG-FIG-6.1.11.4.1 Environmental

Statement

6.1.11.4.1. ES Chapter 11 Figure 11.4.pdf

RC-ALG-FIG-6.1.11.4.2 Environmental

Statement

6.1.11.4.2.ES Chapter 11 Figure 11.4.pdf

RC-ALG-FIG-6.1.11.4.3 Environmental

Statement

6.1.11.4.3. ES Chapter 11 Figure 11.4.pdf

RC-ALG-FIG-6.1.11.4.4 Environmental

Statement

6.1.11.4.4. ES Chapter 11 Figure 11.4.pdf

RC-ALG-FIG-6.1.11.3.2 Environmental

Statement

6.1.11.3.2. ES Chapter 11 Figure 11.3.pdf

RC-ALG-FIG-6.1.11.3.3 Environmental

Statement

6.1.11.3.3. ES Chapter 11 Figure 11.3.pdf

RC-ALG-FIG-6.1.11.3.4 Environmental

Statement

6.1.11.3.4. ES Chapter 11 Figure 11.3.pdf

RC-ALG-FIG-6.1.11.3.5 Environmental

Statement

6.1.11.3.5. ES Chapter 11 Figure 11.3.pdf

RC-ALG-FIG-6.1.11.3.6 Environmental

Statement

6.1.11.3.6. ES Chapter 11 Figure 11.3.pdf

RC-ALG-FIG-6.1.11.3.7 Environmental

Statement

6.1.11.3.7. ES Chapter 11 Figure 11.3.pdf

RC-ALG-FIG-6.1.10.11.5 Environmental Statement 6.1.10.11. ES Chapter 10 Appendix

10.11.5.pdf

RC-ALG-FIG-6.1.10.11.6 Environmental Statement 6.1.10.11. ES Chapter 10 Appendix

10.11.6.pdf

6.1.11.1 Environmental

Statement

6.1.11.1. ES Chapter 11 Appendix 11.1.pdf

RC-ALG-FIG-6.1.11.2 Environmental

Statement

6.1.11.2. ES Chapter 11 Figure 11.2.pdf

RC-ALG-FIG-6.1.11.3.0 Environmental

Statement

6.1.11.3.0. ES Chapter 11 Figure 11.3.pdf

RC-ALG-FIG-6.1.11.3.1 Environmental

Statement

6.1.11.3.1. ES Chapter 11 Figure 11.3.pdf

Page 17: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 12 Appendix 12.3 – Rail

Central, Milton Malsor. Ground Conditions Desk Study Report,

M1 Junction 15A Improvements

26.10.18 Hydrock

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 12 Appendix 12.4 – Rail

Central SRFI Northamptonshire. Pollution

Prevention Method Statement

26.10.18 Hydrock

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 12 Appendix 12.5 –

Rail Central SRFI Northamptonshire. Materials Management Plan

26.10.18 Hydrock

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 12 Appendix 12.6 –

Rail Central Development, Milton Malsor, Northamptonshire. Soil

Resource Survey

26.10.18 Hydrock

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 12 Appendix 12.7 – Rail

Central. Milton Malsor, Northamptonshire. Ground Investigation

Report - Main Strategic Rail Freight Interchange - Conceptual

Geotechnical Design

26.10.18 Hydrock

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 12 Appendix 12.8 – Rail

Central. Milton Malsor, Northamptonshire. Ground Investigation

Report - Main Strategic Rail Freight Interchange - Remediation

Method Statement

26.10.18 Hydrock

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 13 Appendix 13.1 - Flood

Risk Assessment, Hydraulic Modelling and

Drainage Strategy Report (Part 1 and 2)

26.10.18 Hydrock

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Appendix 14 Annex A –

(Part 1) Main Site Background Data Search

Report

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Appendix 14 Annex A –

(Part 2) J15a Background Data Search

Report

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Appendix 14

Annex B – Annex Phase 1 Habitat Survey Report

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Appendix 14

Annex C – Phase 2 Botany and NVC Report

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Appendix 14

Annex D – Hedgerow Survey Report

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement - Chapter 14 Appendix 14

Annex E – (Part 1) Bat Survey Report

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Appendix 14

Annex E – (Part 2) Bat Survey Report

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Appendix 14

Annex E – (Part 2) Bat Survey Report

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Appendix 14

Annex F – Reptiles Survey Report

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Appendix 14

Annex G – Otter and Water Vole Survey Report

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental statement – Chapter 14 Appendix 14

Annex H – Breeding Bird Survey Report

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental statement – Chapter 14 Appendix 14

Annex I – Golden Plover Survey Report

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental statement – Chapter 14 Appendix 14

Annex J – Great Crested Newt Survey Report

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental statement – Chapter 14 Appendix 14

Annex K – Invertebrate Survey Report

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental statement – Chapter 14 Appendix 14

Annex L – Aquatic Survey Report

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental statement – Chapter 14 Appendix 14

Annex M – Veteran Tree Report

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental statement – Chapter 14 Appendix 14

Annex N – Badger Survey Report

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Figure 14.1 – Study Area 26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Figure 14.2a – Statutory

Designated Sites

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Figure 14.2b – Non-

Statutory Designated Sites

26.10.18 RSK

6.1.14.15 ES Chapter 14 Figure 14.1.pdf

6.1.14.16 ES Chapter 14 Figure 14.2a.pdf

6.1.14.17 ES Chapter 14 Figure 14.2b.pdf

6.1.14.9 Environmental

Statement

6.1.14.9. ES Chapter 14 Appendix 14 I.pdf

6.1.14.10 Environmental

Statement

6.1.14.10. ES Chapter 14 Appendix 14 J.pdf

6.1.14.11 Environmental

Statement

6.1.14.11. ES Chapter 14 Appendix 14 K.pdf

6.1.14.12 Environmental

Statement

6.1.14.12. ES Chapter 14 Appendix 14 L.pdf

6.1.14.13 Environmental

Statement

6.1.14.13. ES Chapter 14 Appendix 14

M.pdf

6.1.14.14 Environmental

Statement

6.1.14.14. ES Chapter 14 Appendix 14 N.pdf

6.1.14.5 Environmental

Statement

6.1.14.5. ES Chapter 14 Appendix 14 E

(Part

1).pdf6.1.14.5 Environmental

Statement

6.1.14.5. ES Chapter 14 Appendix 14 E

(Part

2).pdf6.1.14.5 Environmental

Statement

6.1.14.5. ES Chapter 14 Appendix 14 E

(Part

3).pdf6.1.14.6 Environmental

Statement

6.1.14.6. ES Chapter 14 Appendix 14 F.pdf

6.1.14.7 Environmental

Statement

6.1.14.7. ES Chapter 14 Appendix 14 G.pdf

6.1.14.8 Environmental

Statement

6.1.14.8. ES Chapter 14 Appendix 14 H.pdf

6.1.13.1 Environmental Statement 6.1.13.1. ES Chapter 13 Appendix 13.1.pdf

6.1.14.1 Environmental Statement 6.1.14.1. ES Chapter 14 Appendix 14 A Part

1.pdf

6.1.14.1 Environmental Statement 6.1.14.1. ES Chapter 14 Appendix 14 A Part

2.pdf

6.1.14.2 Environmental

Statement

6.1.14.2. ES Chapter 14 Appendix 14 B.pdf

6.1.14.3 Environmental

Statement

6.1.14.3. ES Chapter 14 Appendix 14 C.pdf

6.1.14.4 Environmental

Statement

6.1.14.4. ES Chapter 14 Appendix 14 D.pdf

6.1.12.3 Environmental Statement 6.1.12.3. ES Chapter 12 Appendix 12.3.pdf

6.1.12.4 Environmental Statement 6.1.12.4. ES Chapter 12 Appendix 12.4.pdf

6.1.12.5 Environmental Statement 6.1.12.5. ES Chapter 12 Appendix 12.5.pdf

6.1.12.6 Environmental Statement 6.1.12.6. ES Chapter 12 Appendix 12.6.pdf

6.1.12.7 Environmental Statement 6.1.12.7. ES Chapter 12 Appendix 12.7.pdf

6.1.12.8 Environmental Statement 6.1.12.8. ES Chapter 12 Appendix 12.8.pdf

6.1.14.15

6.1.14.16

6.1.14.17

Environmental

Statement

Environmental

Statement

Environmental

Statement

Page 18: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Figure 14.3 – Phase 1

Habitat Survey (Map 1 of 5)

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Figure 14.3 – Phase 1

Habitat Survey (Map 2 of 5)

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Figure 14.3 – Phase 1

Habitat Survey (Map 3 of 5)

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Figure 14.3 – Phase 1

Habitat Survey (Map 4 of 5)

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Figure 14.3 – Phase 1

Habitat Survey (Map 5 of 5)

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Gantry

Crane ZTV

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Grade

Separated Junction ZTV

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Warehousing Buildings ZTV

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Container Storage ZTV

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Main

SRFI Site Representative Viewpoint Locations

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Junction 15a Representative Viewpoint Locations

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Main

SRFI Site Landscape Context

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Junction 15a Landscape context

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Landscape Policy and Designations Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Landscape Policy and Designations Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – National

Landscape Character

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – County

Landscape Character

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Topography

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Main

SRFI Site Residential Receptors

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Appendix 15.2 -

Landscape Character Assessments and Studies

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 1 Location Plan and Data

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 1 Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1

Parameters Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1

Parameters Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1

Parameters Photomontage Year 1 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1

Parameters Photomontage Year 7

(Foreground Mitigation Omitted) Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1

Parameters Photomontage Year 7

(Foreground Mitigation Omitted) Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1

Parameters Photomontage Year 7

(Foreground Mitigation Omitted) Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1

Parameters Photomontage Year 7 (With

Foreground Mitigation) Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1

Parameters Photomontage Year 7 (With

Foreground Mitigation) Sheet 2

26.10.18 RSK

6.1.15.3.3.2. ES Chapter 15 Figure V1 PP

Y1 S2.pdf

RC-ALG-FIG-6.1.15.3.3.3 Environmental Statement 6.1.15.3.3.3. ES Chapter 15 Figure V1 PP

Y1 S3.pdf

RC-ALG-FIG-6.1.15.3.4.1 Environmental Statement 6.1.15.3.4.1. ES Chapter 15 Figure V1 PP

Y7 (FMO) S1.pdf

RC-ALG-FIG-6.1.15.3.4.2 Environmental Statement 6.1.15.3.4.2. ES Chapter 15 Figure V1 PP

Y7 (FMO) S2.pdf

RC-ALG-FIG-6.1.15.3.4.3 Environmental Statement 6.1.15.3.4.3. ES Chapter 15 Figure V1 PP

Y7 (FMO) S3.pdf

RC-ALG-FIG-6.1.15.3.5.1 Environmental Statement 6.1.15.3.5.1. ES Chapter 15 Figure V1 PP

Y7 (WFM) S1.pdf

RC-ALG-FIG-6.1.15.3.5.2 Environmental Statement 6.1.15.3.5.2. ES Chapter 15 Figure V1 PP

Y7 (WFM) S2.pdf

6.1.15.1.11. ES Chapter 15 Figure CLC.pdf

RC-ALG-FIG-6.1.15.1.12 Environmental

Statement

6.1.15.1.12. ES Chapter 15 Figure Topo.pdf

RC-ALG-FIG-6.1.15.1.13 Environmental

Statement

6.1.15.1.13. ES Chapter 15 Figure M SRFI

SRR.pdf

6.1.15.2 Environmental Statement 6.1.15.2. ES Chapter 15 Appendix 15.2.pdf

RC-ALG-FIG-6.1.15.3.1 Environmental

Statement

6.1.15.3.1. ES Chapter 15 Figure V1

LP&D.pdf

RC-ALG-FIG-6.1.15.3.2 Environmental

Statement

6.1.15.3.2.ES Chapter 15 Figure V1 BP.pdf

RC-ALG-FIG-6.1.15.3.3.1 Environmental Statement 6.1.15.3.3.1. ES Chapter 15 Figure V1 PP

Y1 S1.pdf

6.1.15.1.5. ES Chapter 15 Figure M SRFI S

R V

L.pdfRC-ALG-FIG-6.1.15.1.6 Environmental

Statement

6.1.15.1.6. ES Chapter 15 Figure J15a R V

L.pdf

RC-ALG-FIG-6.1.15.1.7 Environmental

Statement

6.1.15.1.7. ES Chapter 15 Figure M SRFI S

L

C.pdfRC-ALG-FIG-6.1.15.1.8 Environmental

Statement

6.1.15.1.8. ES Chapter 15 Figure J15a L

C.pdf

RC-ALG-FIG-6.1.15.1.9.1 Environmental

Statement

6.1.15.1.9.1. ES Chapter 15 Figure LPandD

Sheet 1.pdf

RC-ALG-FIG-6.1.15.1.9.2 Environmental

Statement

6.1.15.1.9.2. ES Chapter 15 Figure LPandD

Sheet 2.pdf

RC-ALG-FIG-6.1.15.1.10 Environmental

Statement

6.1.15.1.10. ES Chapter 15 Figure NLC.pdf

6.1.15.1.1. ES Chapter 15 Figure GC

ZTV.pdf

6.1.14.18 ES Chapter 14 Figure 14.3 Map

1.pdf

6.1.14.19 ES Chapter 14 Figure 14.3 Map

2.pdf

6.1.14.20 ES Chapter 14 Figure 14.3 Map

3.pdf

6.1.14.21 ES Chapter 14 Figure 14.3 Map

4.pdf

6.1.14.22 ES Chapter 14 Figure 14.3 Map

5.pdf

RC-ALG-FIG-6.1.15.1.2 Environmental

Statement

6.1.15.1.2. ES Chapter 15 Figure GS

Junction

ZTV.pdfRC-ALG-FIG-6.1.15.1.3 Environmental

Statement

6.1.15.1.3. ES Chapter 15 Figure WB

ZTV.pdf

RC-ALG-FIG-6.1.15.1.4 Environmental

Statement

6.1.15.1.4. ES Chapter 15 Figure CS

ZTV.pdf

6.1.14.18

6.1.14.19

6.1.14.20

6.1.14.21

6.1.14.22

Environmental

Statement

Environmental

Statement

Environmental

Statement

Environmental

Statement

Environmental

Statement

RC-ALG-FIG-6.1.15.1.1 Environmental

Statement

RC-ALG-FIG-6.1.15.1.5 Environmental

Statement

RC-ALG-FIG-6.1.15.1.11 Environmental

Statement

RC-ALG-FIG-6.1.15.3.3.2 Environmental Statement

Page 19: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1

Parameters Photomontage Year 7 (With

Foreground Mitigation) Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1

Parameters Photomontage Year 15

(Foreground Mitigation Omitted) Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 1 Parameters Photomontage Year 15 (Foreground

Mitigation Omitted) Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 1 Parameters Photomontage Year 15 (Foreground

Mitigation Omitted) Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1

Parameters Photomontage Year 15 (With

Foreground Mitigation) Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1

Parameters Photomontage Year 15 (With

Foreground Mitigation) Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1

Parameters Photomontage Year 15 (With

Foreground Mitigation) Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1

Illustrative Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1

Illustrative Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1

Illustrative Photomontage Year 1 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1

Illustrative Photomontage Year 7

(Foreground Mitigation Omitted) Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1

Illustrative Photomontage Year 7

(Foreground Mitigation Omitted) Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1

Illustrative Photomontage Year 7

(Foreground Mitigation Omitted) Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1

Parameters Photomontage Year 7 (With

Foreground Mitigation) Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1

Parameters Photomontage Year 7 (With

Foreground Mitigation) Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1

Parameters Photomontage Year 7 (With

Foreground Mitigation) Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1

Illustrative Photomontage Year 15

(Foreground Mitigation Omitted) Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 1 Illustrative Photomontage Year 15 (Foreground

Mitigation Omitted) Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 1 Illustrative Photomontage Year 15 (Foreground

Mitigation Omitted) Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 1 Illustrative Photomontage Year 15 (With Foreground

Mitigation) Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1

Illustrative Photomontage Year 15 (With

Foreground Mitigation) Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1

Illustrative Photomontage Year 15 (With

Foreground Mitigation) Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 2 Location Plan and Data

26.10.18 RSK

RC-ALG-FIG-6.1.15.3.12.3 Environmental Statement 6.1.15.3.12.3. ES Chapter 15 Figure V1 IP

Y15 (WFM) S3.pdf

RC-ALG-FIG-6.1.15.3.13 Environmental

Statement

6.1.15.3.13. ES Chapter 15 Figure V2

LP&D.pdf

6.1.15.3.10.2. ES Chapter 15 Figure V1 PP

Y7 (WFM) S2.pdf

RC-ALG-FIG-6.1.15.3.10.3 Environmental Statement 6.1.15.3.10.3. ES Chapter 15 Figure V1 PP

Y7 (WFM) S3.pdf

RC-ALG-FIG-6.1.15.3.11.1 Environmental Statement 6.1.15.3.11.1. ES Chapter 15 Figure V1 IP

Y15 (FMO) S1.pdf

RC-ALG-FIG-6.1.15.3.11.2 Environmental Statement 6.1.15.3.11.2. ES Chapter 15 Figure V1 IP

Y15 (FMO) S2.pdf

RC-ALG-FIG-6.1.15.3.11.3 Environmental Statement 6.1.15.3.11.3. ES Chapter 15 Figure V1 IP

Y15 (FMO) S3.pdf

RC-ALG-FIG-6.1.15.3.12.1 Environmental Statement 6.1.15.3.12.1. ES Chapter 15 Figure V1 IP

Y15 (WFM) S1.pdf

RC-ALG-FIG-6.1.15.3.12.2 Environmental Statement 6.1.15.3.12.2. ES Chapter 15 Figure V1 IP

Y15 (WFM) S2.pdf

6.1.15.3.8.1. ES Chapter 15 Figure V1 IP Y1

S1.pdf

RC-ALG-FIG-6.1.15.3.8.2 Environmental Statement 6.1.15.3.8.2. ES Chapter 15 Figure V1 IP Y1

S2.pdf

RC-ALG-FIG-6.1.15.3.8.3 Environmental Statement 6.1.15.3.8.3. ES Chapter 15 Figure V1 IP Y1

S3.pdf

RC-ALG-FIG-6.1.15.3.9.1 Environmental Statement 6.1.15.3.9.1. ES Chapter 15 Figure V1 IP Y7

(FMO) S1.pdf

RC-ALG-FIG-6.1.15.3.9.2 Environmental Statement 6.1.15.3.9.2. ES Chapter 15 Figure V1 IP Y7

(FMO) S2.pdf

RC-ALG-FIG-6.1.15.3.9.3 Environmental Statement 6.1.15.3.9.3. ES Chapter 15 Figure V1 IP Y7

(FMO) S3.pdf

RC-ALG-FIG-6.1.15.3.10.1 Environmental Statement 6.1.15.3.10.1. ES Chapter 15 Figure V1 PP

Y7 (WFM) S1.pdf

6.1.15.3.5.3. ES Chapter 15 Figure V1 PP

Y7 (WFM) S3.pdf

RC-ALG-FIG-6.1.15.3.6.1 Environmental Statement 6.1.15.3.6.1. ES Chapter 15 Figure V1 PP

Y15 (FMO) S1.pdf

RC-ALG-FIG-6.1.15.3.6.2 Environmental Statement 6.1.15.3.6.2. ES Chapter 15 Figure V1 PP

Y15 (FMO) S2.pdf

RC-ALG-FIG-6.1.15.3.6.3 Environmental Statement 6.1.15.3.6.3. ES Chapter 15 Figure V1 PP

Y15 (FMO) S3.pdf

RC-ALG-FIG-6.1.15.3.7.1 Environmental Statement 6.1.15.3.7.1. ES Chapter 15 Figure V1 PP

Y15 (WFM) S1.pdf

RC-ALG-FIG-6.1.15.3.7.2 Environmental Statement 6.1.15.3.7.2. ES Chapter 15 Figure V1 PP

Y15 (WFM) S2.pdf

RC-ALG-FIG-6.1.15.3.7.3 Environmental Statement 6.1.15.3.7.3. ES Chapter 15 Figure V1 PP

Y15 (WFM) S3.pdf

RC-ALG-FIG-6.1.15.3.5.3 Environmental Statement

RC-ALG-FIG-6.1.15.3.8.1 Environmental Statement

RC-ALG-FIG-6.1.15.3.10.2 Environmental Statement

Page 20: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 2 Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 2

Parameters Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 2

Parameters Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 2

Parameters Photomontage Year 1 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 2

Illustrative Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 2

Illustrative Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 2

Illustrative Photomontage Year 1 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 3 Location Plan and Data

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 3 Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 3

Parameters Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 3

Parameters Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 3

Parameters Photomontage Year 7 Sheet

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 3

Parameters Photomontage Year 7 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 3

Parameters Photomontage Year 15 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 3

Parameters Photomontage Year 15 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 3

Illustrative Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 3

Illustrative Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 3

Illustrative Photomontage Year 7 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 3

Illustrative Photomontage Year 7 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 3

Illustrative Photomontage Year 15 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 3

Illustrative Photomontage Year 15 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 4 Location Plan and Data

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 4 Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4

Parameters Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4

Parameters Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4

Parameters Photomontage Year 1 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4

Parameters Photomontage Year 7 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4

Parameters Photomontage Year 7 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4

Parameters Photomontage Year 7 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4

Parameters Photomontage Year 15 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4

Parameters Photomontage Year 15 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4

Parameters Photomontage Year 15 Sheet 3

26.10.18 RSK

RC-ALG-FIG-6.1.15.3.28.3 Environmental Statement 6.1.15.3.28.3. ES Chapter 15 VP4 PP Y7

S3.pdf

RC-ALG-FIG-6.1.15.3.29.1 Environmental Statement 6.1.15.3.29.1. ES Chapter 15 VP4 PP Y15

S1.pdf

RC-ALG-FIG-6.1.15.3.29.2 Environmental Statement 6.1.15.3.29.2. ES Chapter 15 VP4 PP Y15

S2.pdf

RC-ALG-FIG-6.1.15.3.29.3 Environmental Statement 6.1.15.3.29.3. ES Chapter 15 VP4 PP Y15

S3.pdf

RC-ALG-FIG-6.1.15.3.26 Environmental

Statement

6.1.15.3.26. ES Chapter 15 VP4 BP.pdf

RC-ALG-FIG-6.1.15.3.27.1 Environmental Statement 6.1.15.3.27.1. ES Chapter 15 VP4 PP Y1

S1.pdf

RC-ALG-FIG-6.1.15.3.27.2 Environmental Statement 6.1.15.3.27.2. ES Chapter 15 VP4 PP Y1

S2.pdf

RC-ALG-FIG-6.1.15.3.27.3 Environmental Statement 6.1.15.3.27.3. ES Chapter 15 VP4 PP Y1

S3.pdf

RC-ALG-FIG-6.1.15.3.28.1 Environmental Statement 6.1.15.3.28.1. ES Chapter 15 VP4 PP Y7

S1.pdf

RC-ALG-FIG-6.1.15.3.28.2 Environmental Statement 6.1.15.3.28.2. ES Chapter 15 VP4 PP Y7

S2.pdf

RC-ALG-FIG-6.1.15.3.22.2 Environmental Statement 6.1.15.3.22.2. ES Chapter 15 VP3 IP Y1

S2.pdf

RC-ALG-FIG-6.1.15.3.23.1 Environmental Statement 6.1.15.3.23.1. ES Chapter 15 VP3 IP Y7

S1.pdf

RC-ALG-FIG-6.1.15.3.23.2 Environmental Statement 6.1.15.3.23.2. ES Chapter 15 VP3 IP Y2

S2.pdf

RC-ALG-FIG-6.1.15.3.24.1 Environmental Statement 6.1.15.3.24.1. ES Chapter 15 VP3 IP Y15

S1.pdf

RC-ALG-FIG-6.1.15.3.24.2 Environmental Statement 6.1.15.3.24.2. ES Chapter 15 VP3 IP Y15

S2.pdf

RC-ALG-FIG-6.1.15.3.25 Environmental

Statement

6.1.15.3.25. ES Chapter 15 VP4 LP.pdf

RC-ALG-FIG-6.1.15.3.19.2 Environmental Statement 6.1.15.3.19.2. ES Chapter 15 Figure VP3

PP Y1 S2.pdf

RC-ALG-FIG-6.1.15.3.20.1 Environmental Statement 6.1.15.3.20.1. ES Chapter 15 Figure VP3

PP Y7 S1.pdf

RC-ALG-FIG-6.1.15.3.20.2 Environmental Statement 6.1.15.3.20.2. ES Chapter 15 Figure VP3

PP Y7 S2.pdf

RC-ALG-FIG-6.1.15.3.21.1 Environmental Statement 6.1.15.3.21.1. ES Chapter 15 Figure VP3

PP Y15 S1.pdf

RC-ALG-FIG-6.1.15.3.21.2 Environmental Statement 6.1.15.3.21.2. ES Chapter 15 Figure VP3

PP Y15 S2.pdf

RC-ALG-FIG-6.1.15.3.22.1 Environmental Statement 6.1.15.3.22.1. ES Chapter 15 VP3 IP Y1

S1.pdf

RC-ALG-FIG-6.1.15.3.16.1 Environmental Statement 6.1.15.3.16.1. ES Chapter 15 Figure VP2 IP

Y1

S1.pdfRC-ALG-FIG-6.1.15.3.16.2 Environmental Statement 6.1.15.3.16.2. ES Chapter 15 Figure VP2 IP

Y1

S2.pdfRC-ALG-FIG-6.1.15.3.16.3 Environmental Statement 6.1.15.3.16.3. ES Chapter 15 Figure VP2 IP

Y1

S3.pdfRC-ALG-FIG-6.1.15.3.17 Environmental

Statement

6.1.15.3.17. ES Chapter 15 Figure VP3

LP.pdf

RC-ALG-FIG-6.1.15.3.18 Environmental

Statement

6.1.15.3.18. ES Chapter 15 Figure VP3

BP.pdf

RC-ALG-FIG-6.1.15.3.19.1 Environmental Statement 6.1.15.3.19.1. ES Chapter 15 Figure PP Y1

S1.pdf

RC-ALG-FIG-6.1.15.3.14 Environmental

Statement

6.1.15.3.14. ES Chapter 15 Figure V2

BP.pdf

RC-ALG-FIG-6.1.15.3.15.1 Environmental Statement 6.1.15.3.15.1. ES Chapter 15 Figure V2 PP

Y1 S1.pdf

RC-ALG-FIG-6.1.15.3.15.2 Environmental Statement 6.1.15.3.15.2. ES Chapter 15 Figure V2 PP

Y1 S2.pdf

RC-ALG-FIG-6.1.15.3.15.3 Environmental Statement 6.1.15.3.15.3. ES Chapter 15 Figure V2 PP

Y1 S3.pdf

Page 21: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4

Illustrative Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4

Illustrative Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4

Illustrative Photomontage Year 1 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4

Illustrative Photomontage Year 7 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4

Illustrative Photomontage Year 7 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4

Illustrative Photomontage Year 7 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4

Illustrative Photomontage Year 15 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4

Illustrative Photomontage Year 15 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4

Illustrative Photomontage Year 15 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 5 Location Plan and Data

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 5 Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5

Parameters Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5

Parameters Photomontage Viewpoint 5

Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5

Parameters Photomontage Viewpoint 5

Year 1 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5

Parameters Photomontage Viewpoint 5

Year 7 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5

Parameters Photomontage Viewpoint 5

Year 7 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5

Parameters Photomontage Viewpoint 5

Year 7 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5

Parameters Photomontage Year 15 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5

Parameters Photomontage Year 15 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5

Parameters Photomontage Year 15 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5

Illustrative Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5

Illustrative Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5

Illustrative Photomontage Year 1 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5

Illustrative Photomontage Year 7 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5

Illustrative Photomontage Year 7 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5

Illustrative Photomontage Year 7 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5

Illustrative Photomontage Year 15 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5

Illustrative Photomontage Year 15 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5

Illustrative Photomontage Year 15 Sheet 3

26.10.18 RSK

RC-ALG-FIG-6.1.15.3.40.1 Environmental Statement 6.1.15.3.40.1. ES Chapter 15 VP5 IP Y15

S1.pdf

RC-ALG-FIG-6.1.15.3.40.2 Environmental Statement 6.1.15.3.40.2. ES Chapter 15 VP5 IP Y15

S2.pdf

RC-ALG-FIG-6.1.15.3.40.3 Environmental Statement 6.1.15.3.40.3. ES Chapter 15 VP5 IP Y15

S3.pdf

RC-ALG-FIG-6.1.15.3.38.1 Environmental Statement 6.1.15.3.38.1. ES Chapter 15 VP5 IP Y1

S1.pdf

RC-ALG-FIG-6.1.15.3.38.2 Environmental Statement 6.1.15.3.38.2. ES Chapter 15 VP5 IP Y1

S2.pdf

RC-ALG-FIG-6.1.15.3.38.3 Environmental Statement 6.1.15.3.38.3. ES Chapter 15 VP5 IP Y1

S3.pdf

RC-ALG-FIG-6.1.15.3.39.1 Environmental Statement 6.1.15.3.39.1. ES Chapter 15 VP5 IP Y7

S1.pdf

RC-ALG-FIG-6.1.15.3.39.2 Environmental Statement 6.1.15.3.39.2. ES Chapter 15 VP5 IP Y7

S2.pdf

RC-ALG-FIG-6.1.15.3.39.3 Environmental Statement 6.1.15.3.39.3. ES Chapter 15 VP5 IP Y7

S3.pdf

RC-ALG-FIG-6.1.15.3.36.1 Environmental Statement 6.1.15.3.36.1. ES Chapter 15 VP5 PP Y7

S1.pdf

RC-ALG-FIG-6.1.15.3.36.2 Environmental Statement 6.1.15.3.36.2. ES Chapter 15 VP5 PP Y7

S2.pdf

RC-ALG-FIG-6.1.15.3.36.3 Environmental Statement 6.1.15.3.36.3. ES Chapter 15 VP5 PP Y7

S3.pdf

RC-ALG-FIG-6.1.15.3.37.1 Environmental Statement 6.1.15.3.37.1. ES Chapter 15 VP5 PP Y15

S1.pdf

RC-ALG-FIG-6.1.15.3.37.2 Environmental Statement 6.1.15.3.37.2. ES Chapter 15 VP5 PP Y15

S2.pdf

RC-ALG-FIG-6.1.15.3.37.3 Environmental Statement 6.1.15.3.37.3. ES Chapter 15 VP5 PP Y15

S3.pdf

RC-ALG-FIG-6.1.15.3.32.3 Environmental Statement 6.1.15.3.32.3. ES Chapter 15 VP4 IP Y15

S3.pdf

RC-ALG-FIG-6.1.15.3.33 Environmental

Statement

6.1.15.3.33. ES Chapter 15 VP5 LP.pdf

RC-ALG-FIG-6.1.15.3.34 Environmental

Statement

6.1.15.3.34. ES Chapter 15 VP5 BP.pdf

RC-ALG-FIG-6.1.15.3.35.1 Environmental Statement 6.1.15.3.35.1. ES Chapter 15 VP5 PP Y1

S1.pdf

RC-ALG-FIG-6.1.15.3.35.2 Environmental Statement 6.1.15.3.35.2. ES Chapter 15 VP5 PP Y1

S2.pdf

RC-ALG-FIG-6.1.15.3.35.3 Environmental Statement 6.1.15.3.35.3. ES Chapter 15 VP5 PP Y1

S3.pdf

RC-ALG-FIG-6.1.15.3.30.3 Environmental Statement 6.1.15.3.30.3. ES Chapter 15 VP4 IP Y1

S3.pdf

RC-ALG-FIG-6.1.15.3.31.1 Environmental Statement 6.1.15.3.31.1. ES Chapter 15 VP4 IP Y7

S1.pdf

RC-ALG-FIG-6.1.15.3.31.2 Environmental Statement 6.1.15.3.31.2. ES Chapter 15 VP4 IP Y7

S2.pdf

RC-ALG-FIG-6.1.15.3.31.3 Environmental Statement 6.1.15.3.31.3. ES Chapter 15 VP4 IP Y7

S3.pdf

RC-ALG-FIG-6.1.15.3.32.1 Environmental Statement 6.1.15.3.32.1. ES Chapter 15 VP4 IP Y15

S1.pdf

RC-ALG-FIG-6.1.15.3.32.2 Environmental Statement 6.1.15.3.32.2. ES Chapter 15 VP4 IP Y15

S2.pdf

RC-ALG-FIG-6.1.15.3.30.1 Environmental Statement 6.1.15.3.30.1. ES Chapter 15 VP4 IP Y1

S1.pdf

RC-ALG-FIG-6.1.15.3.30.2 Environmental Statement 6.1.15.3.30.2. ES Chapter 15 VP4 IP Y1

S2.pdf

Page 22: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 6 Location Plan and Data

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 6 Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 6

Parameters Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 6

Parameters Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 6

Parameters Photomontage Year 1 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 6

llustrative Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 6

Illustrative Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 6

Illustrative Photomontage Year 1 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 7 Location Plan and Data

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 7 Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7

Parameters Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7

Parameters Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7

Parameters Photomontage Year 1 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7

Parameters Photomontage Year 7 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7

Parameters Photomontage Year 7 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7

Parameters Photomontage Year 7 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7

Parameters Photomontage Year 15 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7

Parameters Photomontage Year 15 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7

Parameters Photomontage Year 15 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7

Illustrative Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7

Illustrative Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7

Illustrative Photomontage Year 1 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7

Illustrative Photomontage Year 7 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7

Illustrative Photomontage Year 7 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7

Illustrative Photomontage Year 7 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7

Illustrative Photomontage Year 15 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7

llustrative Photomontage Year 15 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7

Illustrative Photomontage Year 15 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 8 Location Plan and Data

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 8 Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 8 Parameters Photomontage Year 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 8 Illustrative Photomontage Year 1

26.10.18 RSK

RC-ALG-FIG-6.1.15.3.52.3 Environmental Statement 6.1.15.3.52.3. ES Chapter 15 VP7 IP Y15

S3.pdf

RC-ALG-FIG-6.1.15.3.53 Environmental

Statement

6.1.15.3.53. ES Chapter 15 VP8 LP.pdf

RC-ALG-FIG-6.1.15.3.54 Environmental

Statement

6.1.15.3.54. ES Chapter 15 VP8 BP.pdf

RC-ALG-FIG-6.1.15.3.55 Environmental

Statement

6.1.15.3.55. ES Chapter 15 VP8 PP Y1.pdf

RC-ALG-FIG-6.1.15.3.56 Environmental

Statement

6.1.15.3.56. ES Chapter 15 VP8 IP Y1.pdf

RC-ALG-FIG-6.1.15.3.50.3 Environmental Statement 6.1.15.3.50.3. ES Chapter 15 VP7 IP Y1

S3.pdf

RC-ALG-FIG-6.1.15.3.51.1 Environmental Statement 6.1.15.3.51.1. ES Chapter 15 VP7 IP Y7

S1.pdf

RC-ALG-FIG-6.1.15.3.51.2 Environmental Statement 6.1.15.3.51.2. ES Chapter 15 VP7 IP Y7

S2.pdf

RC-ALG-FIG-6.1.15.3.51.3 Environmental Statement 6.1.15.3.51.3. ES Chapter 15 VP7 IP Y7

S3.pdf

RC-ALG-FIG-6.1.15.3.52.1 Environmental Statement 6.1.15.3.52.1. ES Chapter 15 VP7 IP Y15

S1.pdf

RC-ALG-FIG-6.1.15.3.52.2 Environmental Statement 6.1.15.3.52.2. ES Chapter 15 VP7 IP Y15

S2.pdf

RC-ALG-FIG-6.1.15.3.48.3 Environmental Statement 6.1.15.3.48.3. ES Chapter 15 VP7 PP Y7

S3.pdf

RC-ALG-FIG-6.1.15.3.49.1 Environmental Statement 6.1.15.3.49.1. ES Chapter 15 VP7 PP Y15

S1.pdf

RC-ALG-FIG-6.1.15.3.49.2 Environmental Statement 6.1.15.3.49.2. ES Chapter 15 VP7 PP Y15

S2.pdf

RC-ALG-FIG-6.1.15.3.49.3 Environmental Statement 6.1.15.3.49.3. ES Chapter 15 VP7 PP Y15

S3.pdf

RC-ALG-FIG-6.1.15.3.50.1 Environmental Statement 6.1.15.3.50.1. ES Chapter 15 VP7 IP Y1

S1.pdf

RC-ALG-FIG-6.1.15.3.50.2 Environmental Statement 6.1.15.3.50.2. ES Chapter 15 VP7 IP Y1

S2.pdf

RC-ALG-FIG-6.1.15.3.46 Environmental

Statement

6.1.15.3.46. ES Chapter 15 VP7 BP.pdf

RC-ALG-FIG-6.1.15.3.47.1 Environmental Statement 6.1.15.3.47.1. ES Chapter 15 VP7 PP Y1

S1.pdf

RC-ALG-FIG-6.1.15.3.47.2 Environmental Statement 6.1.15.3.47.2. ES Chapter 15 VP7 PP Y1

S2.pdf

RC-ALG-FIG-6.1.15.3.47.3 Environmental Statement 6.1.15.3.47.3. ES Chapter 15 VP7 PP Y1

S3.pdf

RC-ALG-FIG-6.1.15.3.48.1 Environmental Statement 6.1.15.3.48.1. ES Chapter 15 VP7 PP Y7

S1.pdf

RC-ALG-FIG-6.1.15.3.48.2 Environmental Statement 6.1.15.3.48.2. ES Chapter 15 VP7 PP Y7

S2.pdf

RC-ALG-FIG-6.1.15.3.43.2 Environmental Statement 6.1.15.3.43.2. ES Chapter 15 VP6 PP Y1

S2.pdf

RC-ALG-FIG-6.1.15.3.43.3 Environmental Statement 6.1.15.3.43.3. ES Chapter 15 VP6 PP Y1

S3.pdf

RC-ALG-FIG-6.1.15.3.44.1 Environmental Statement 6.1.15.3.44.1. ES Chapter 15 VP6 IP Y1

S1.pdf

RC-ALG-FIG-6.1.15.3.44.2 Environmental Statement 6.1.15.3.44.2. ES Chapter 15 VP6 IP Y1

S2.pdf

RC-ALG-FIG-6.1.15.3.44.3 Environmental Statement 6.1.15.3.44.3. ES Chapter 15 VP6 IP Y1

S3.pdf

RC-ALG-FIG-6.1.15.3.45 Environmental

Statement

6.1.15.3.45. ES Chapter 15 VP7 LP.pdf

RC-ALG-FIG-6.1.15.3.41 Environmental

Statement

6.1.15.3.41. ES Chapter 15 VP6 LP.pdf

RC-ALG-FIG-6.1.15.3.42 Environmental

Statement

6.1.15.3.42. ES Chapter 15 VP6 BP.pdf

RC-ALG-FIG-6.1.15.3.43.1 Environmental Statement 6.1.15.3.43.1. ES Chapter 15 VP6 PP Y1

S1.pdf

Page 23: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 10 Location Plan and Data

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 10 Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 10 Parameters Wireline Year 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 11 Location Plan and Data

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 11 Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 11 Parameters Wireline Year 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 12 Location Plan and Data

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 12 Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 12

Parameters Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 12

Parameters Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 12

Illustrative Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 12

Illustrative Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 13 Location Plan and Data

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 13 Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 13

Parameters Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 13

Parameters Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 13 Parameters Wireline Year 15 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 13 Parameters Wireline Year 15 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 13

Illustrative Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 13

Illustrative Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 14 Location Plan and Data

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 14 Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 14 Parameters Photomontage Year 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 14 Illustrative Photomontage Year 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 15 Location Plan and Data

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 15 Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 15 Parameters Photomontage Year 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 15 Parameters Photomontage Year 7

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 15 Parameters Wireframe Year 15

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 15 Illustrative Photomontage Year 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 15 Illustrative Photomontage Year 7

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 15 Illustrative Photomontage Year 15

26.10.18 RSKRC-ALG-FIG-6.1.15.3.83 Environmental

Statement

6.1.15.3.83. ES Chapter 15 VP15 IP

Y15.pdf

RC-ALG-FIG-6.1.15.3.77 Environmental

Statement

6.1.15.3.77. ES Chapter 15 VP15 BP.pdf

RC-ALG-FIG-6.1.15.3.78 Environmental

Statement

6.1.15.3.78. ES Chapter 15 VP15 PP Y1.pdf

RC-ALG-FIG-6.1.15.3.79 Environmental

Statement

6.1.15.3.79. ES Chapter 15 VP15 PP Y7.pdf

RC-ALG-FIG-6.1.15.3.80 Environmental

Statement

6.1.15.3.80. ES Chapter 15 VP15 Pp

Y15.pdf

RC-ALG-FIG-6.1.15.3.81 Environmental

Statement

6.1.15.3.81. ES Chapter 15 VP15 IP Y1.pdf

RC-ALG-FIG-6.1.15.3.82 Environmental

Statement

6.1.15.3.82. ES Chapter 15 VP15 IP Y7.pdf

RC-ALG-FIG-6.1.15.3.71.2 Environmental Statement 6.1.15.3.71.2. ES Chapter 15 VP13 IP Y1

S2.pdf

RC-ALG-FIG-6.1.15.3.72 Environmental

Statement

6.1.15.3.72. ES Chapter 15 VP14 LP.pdf

RC-ALG-FIG-6.1.15.3.73 Environmental

Statement

6.1.15.3.73. ES Chapter 15 VP14 BP.pdf

RC-ALG-FIG-6.1.15.3.74 Environmental

Statement

6.1.15.3.74. ES Chapter 15 VP14 PP Y1.pdf

RC-ALG-FIG-6.1.15.3.75 Environmental

Statement

6.1.15.3.75. ES Chapter 15 VP14 IP Y1.pdf

RC-ALG-FIG-6.1.15.3.76 Environmental

Statement

6.1.15.3.76. ES Chapter 15 VP15 LP.pdf

RC-ALG-FIG-6.1.15.3.68 Environmental

Statement

6.1.15.3.68. ES Chapter 15 VP13 BP.pdf

RC-ALG-FIG-6.1.15.3.69.1 Environmental Statement 6.1.15.3.69.1. ES Chapter 15 VP13 PP Y1

S1.pdf

RC-ALG-FIG-6.1.15.3.69.2 Environmental Statement 6.1.15.3.69.2. ES Chapter 15 VP13 PP Y1

S2.pdf

RC-ALG-FIG-6.1.15.3.70.1 Environmental

Statement

6.1.15.3.70.1. ES Chapter 15 VP13 PW Y15

S1.pdf

RC-ALG-FIG-6.1.15.3.70.2 Environmental

Statement

6.1.15.3.70.2. ES Chapter 15 VP13 PW Y15

S2.pdf

RC-ALG-FIG-6.1.15.3.71.1 Environmental Statement 6.1.15.3.71.1. ES Chapter 15 VP13 IP Y1

S1.pdf

RC-ALG-FIG-6.1.15.3.64 Environmental

Statement

6.1.15.3.64. ES Chapter 15 VP12 BP.pdf

RC-ALG-FIG-6.1.15.3.65.1 Environmental Statement 6.1.15.3.65.1. ES Chapter 15 VP12 PP Y1

S1.pdf

RC-ALG-FIG-6.1.15.3.65.2 Environmental Statement 6.1.15.3.65.2. ES Chapter 15 VP12 PP Y1

S2.pdf

RC-ALG-FIG-6.1.15.3.66.1 Environmental Statement 6.1.15.3.66.1. ES Chapter 15 VP12 IP Y1

S1.pdf

RC-ALG-FIG-6.1.15.3.66.2 Environmental Statement 6.1.15.3.66.2. ES Chapter 15 VP12 IP Y1

S2.pdf

RC-ALG-FIG-6.1.15.3.67 Environmental

Statement

6.1.15.3.67. ES Chapter 15 VP13 LP.pdf

RC-ALG-FIG-6.1.15.3.58 Environmental

Statement

6.1.15.3.58. ES Chapter 15 VP10 BP.pdf

RC-ALG-FIG-6.1.15.3.59 Environmental

Statement

6.1.15.3.59. ES Chapter 15 VP10 PW

Y1.pdf

RC-ALG-FIG-6.1.15.3.60 Environmental

Statement

6.1.15.3.60. ES Chapter 15 VP11 LP.pdf

RC-ALG-FIG-6.1.15.3.61 Environmental

Statement

6.1.15.3.61. ES Chapter 15 VP11 BP.pdf

RC-ALG-FIG-6.1.15.3.62 Environmental

Statement

6.1.15.3.62. ES Chapter 15 VP11 PW

Y1.pdf

RC-ALG-FIG-6.1.15.3.63 Environmental

Statement

6.1.15.3.63. ES Chapter 15 VP12 LP.pdf

RC-ALG-FIG-6.1.15.3.57 Environmental

Statement

6.1.15.3.57. ES Chapter 15 VP10 LP.pdf

Page 24: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 16 Location Plan and Data

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 16 Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 16

Parameters Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 16

Parameters Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 16

Parameters Photomontage Year 7 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 16

Parameters Photomontage Year 7 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 16

Parameters Photomontage Year 15 Sheet

1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 16

Parameters Photomontage Year 15 Sheet

2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 16

Illustrative Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 16

Illustrative Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 16

Illustrative Photomontage Year 7 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 16

Illustrative Photomontage Year 7 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 16

Illustrative Photomontage Year 15 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 16

Illustrative Photomontage Year 15 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 17 Location Plan and Data

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 17 Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17

Parameters Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17

Parameters Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17

Parameters Photomontage Year 1 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17

Parameters Photomontage Year 7 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17

Parameters Photomontage Year 7 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17

Parameters Photomontage Year 7 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 17 Parameters Photomontage Year 15 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17

Parameters Photomontage Year 15 Sheet

2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17

Parameters Photomontage Year 15 Sheet

3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17

Illustrative Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17

Illustrative Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17

Illustrative Photomontage Year 1 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17

Illustrative Photomontage Year 7 Sheet 1

26.10.18 RSK

RC-ALG-FIG-6.1.15.3.96.2 Environmental Statement 6.1.15.3.96.2. ES Chapter 15 VP17 PP Y15

S2.pdf

RC-ALG-FIG-6.1.15.3.96.3 Environmental Statement 6.1.15.3.96.3. ES Chapter 15 VP17 PP Y15

S3.pdf

RC-ALG-FIG-6.1.15.3.97.1 Environmental Statement 6.1.15.3.97.1. ES Chapter 15 VP17 IP Y1

S1.pdf

RC-ALG-FIG-6.1.15.3.97.2 Environmental Statement 6.1.15.3.97.2. ES Chapter 15 VP17 IP Y1

S2.pdf

RC-ALG-FIG-6.1.15.3.97.3 Environmental Statement 6.1.15.3.97.3. ES Chapter 15 VP17 IP Y1

S3.pdf

RC-ALG-FIG-6.1.15.3.98.1 Environmental Statement 6.1.15.3.98.1. ES Chapter 15 VP17 IP Y7

S1.pdf

RC-ALG-FIG-6.1.15.3.94.2 Environmental Statement 6.1.15.3.94.2. ES Chapter 15 VP17 PP Y1

S2.pdf

RC-ALG-FIG-6.1.15.3.94.3 Environmental Statement 6.1.15.3.94.3. ES Chapter 15 VP17 PP Y1

S3.pdf

RC-ALG-FIG-6.1.15.3.95.1 Environmental Statement 6.1.15.3.95.1. ES Chapter 15 VP17 PP Y7

S1.pdf

RC-ALG-FIG-6.1.15.3.95.2 Environmental Statement 6.1.15.3.95.2. ES Chapter 15 VP17 PP Y7

S2.pdf

RC-ALG-FIG-6.1.15.3.95.3 Environmental Statement 6.1.15.3.95.3. ES Chapter 15 VP17 PP Y7

S3.pdf

RC-ALG-FIG-6.1.15.3.96.1 Environmental Statement 6.1.15.3.96.1. ES Chapter 15 VP17 PP Y15

S1.pdf

RC-ALG-FIG-6.1.15.3.90.2 Environmental Statement 6.1.15.3.90.2. ES Chapter 15 VP16 IP Y7

S2.pdf

RC-ALG-FIG-6.1.15.3.91.1 Environmental Statement 6.1.15.3.91.1. ES Chapter 15 VP16 IP Y15

S1.pdf

RC-ALG-FIG-6.1.15.3.91.2 Environmental Statement 6.1.15.3.91.2. ES Chapter 15 VP16 IP Y15

S2.pdf

RC-ALG-FIG-6.1.15.3.92 Environmental

Statement

6.1.15.3.92. ES Chapter 15 VP17 LP.pdf

RC-ALG-FIG-6.1.15.3.93 Environmental

Statement

6.1.15.3.93. ES Chapter 15 VP17 BP.pdf

RC-ALG-FIG-6.1.15.3.94.1 Environmental Statement 6.1.15.3.94.1. ES Chapter 15 VP17 PP Y1

S1.pdf

RC-ALG-FIG-6.1.15.3.87.2 Environmental Statement 6.1.15.3.87.2. ES Chapter 15 VP16 PP Y7

S2.pdf

RC-ALG-FIG-6.1.15.3.88.1 Environmental Statement 6.1.15.3.88.1. ES Chapter 15 VP16 PP Y15

S1.pdf

RC-ALG-FIG-6.1.15.3.88.2 Environmental Statement 6.1.15.3.88.2. ES Chapter 15 VP16 PP Y15

S2.pdf

RC-ALG-FIG-6.1.15.3.89.1 Environmental Statement 6.1.15.3.89.1. ES Chapter 15 VP16 IP Y1

S1.pdf

RC-ALG-FIG-6.1.15.3.89.2 Environmental Statement 6.1.15.3.89.2. ES Chapter 15 VP16 IP Y1

S2.pdf

RC-ALG-FIG-6.1.15.3.90.1 Environmental Statement 6.1.15.3.90.1. ES Chapter 15 VP16 IP Y7

S1.pdf

RC-ALG-FIG-6.1.15.3.84 Environmental

Statement

6.1.15.3.84. ES Chapter 15 VP16 LP.pdf

RC-ALG-FIG-6.1.15.3.85 Environmental

Statement

6.1.15.3.85. ES Chapter 15 VP16 BP.pdf

RC-ALG-FIG-6.1.15.3.86.1 Environmental Statement 6.1.15.3.86.1. ES Chapter 15 VP16 PP Y1

S1.pdf

RC-ALG-FIG-6.1.15.3.86.2 Environmental Statement 6.1.15.3.86.2. ES Chapter 15 VP16 PP Y1

S2.pdf

RC-ALG-FIG-6.1.15.3.87.1 Environmental Statement 6.1.15.3.87.1. ES Chapter 15 VP16 PP Y7

S1.pdf

Page 25: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17

Illustrative Photomontage Year 7 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17

Illustrative Photomontage Year 7 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17

Illustrative Photomontage Year 15 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17

Illustrative Photomontage Year 15 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17

Illustrative Photomontage Year 15 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 18 Location Plan and Data

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 18 Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 18 Parameters Photomontage Year 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 18 Parameters Photomontage Year 7

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 18 Parameters Photomontage Year 15

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 18 Illustrative Photomontage Year 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 18 Illustrative Photomontage Year 7

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 18 Illustrative Photomontage Year 15

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 19 Location Plan and Data

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 19 Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 19 Parameters Photomontage Year 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 19 Illustrative Photomontage Year 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 20 Location Plan and Data

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 20 Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 20 Parameters Wireline Year 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 21 Location Plan and Data

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 21 Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 21 Parameters Photomontage Year 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 21 Parameters Photomontage Year 7

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 21 Parameters Photomontage Year 15

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 21 Illustrative Photomontage Year 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 21 Illustrative Photomontage Year 7

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 21 Illustrative Photomontage Year 15

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 22 Location Plan and Data

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 22 Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 22 Parameters Wireline Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 22 Parameters Wireline Year 1 sheet 2

26.10.18 RSK

RC-ALG-FIG-6.1.15.3.125.1 Environmental

Statement

6.1.15.3.125.1. ES Chapter 15 VP22 PW Y1

S1.pdf

RC-ALG-FIG-6.1.15.3.125.2 Environmental

Statement

6.1.15.3.125.2. ES Chapter 15 VP22 PW Y1

S2.pdf

RC-ALG-FIG-6.1.15.3.119 Environmental

Statement

6.1.15.3.119. ES Chapter 15 VP21 PP

Y15.pdf

RC-ALG-FIG-6.1.15.3.120 Environmental

Statement

6.1.15.3.120. ES Chapter 15 VP21 IP

Y1.pdf

RC-ALG-FIG-6.1.15.3.121 Environmental

Statement

6.1.15.3.121. ES Chapter 15 VP21 IP

Y7.pdf

RC-ALG-FIG-6.1.15.3.122 Environmental

Statement

6.1.15.3.122. ES Chapter 15 VP21 IP

Y15.pdf

RC-ALG-FIG-6.1.15.3.123 Environmental

Statement

6.1.15.3.123. ES Chapter 15 VP22 LP.pdf

RC-ALG-FIG-6.1.15.3.124 Environmental

Statement

6.1.15.3.124. ES Chapter 15 VP22 BP.pdf

RC-ALG-FIG-6.1.15.3.113 Environmental

Statement

6.1.15.3.113. ES Chapter 15 VP20 BP.pdf

RC-ALG-FIG-6.1.15.3.114 Environmental

Statement

6.1.15.3.114. ES Chapter 15 VP20 PW

Y1.pdf

RC-ALG-FIG-6.1.15.3.115 Environmental

Statement

6.1.15.3.115. ES Chapter 15 VP21 LP.pdf

RC-ALG-FIG-6.1.15.3.116 Environmental

Statement

6.1.15.3.116. ES Chapter 15 VP21 BP.pdf

RC-ALG-FIG-6.1.15.3.117 Environmental

Statement

6.1.15.3.117. ES Chapter 15 VP21 PP

Y1.pdf

RC-ALG-FIG-6.1.15.3.118 Environmental

Statement

6.1.15.3.118. ES Chapter 15 VP21 PP

Y7.pdf

RC-ALG-FIG-6.1.15.3.107 Environmental

Statement

6.1.15.3.107. ES Chapter 15 VP18 IP

Y15.pdf

RC-ALG-FIG-6.1.15.3.108 Environmental

Statement

6.1.15.3.108. ES Chapter 15 VP19 LP.pdf

RC-ALG-FIG-6.1.15.3.109 Environmental

Statement

6.1.15.3.109. ES Chapter 15 VP19 BP.pdf

RC-ALG-FIG-6.1.15.3.110 Environmental

Statement

6.1.15.3.110. ES Chapter 15 VP19 PP.pdf

RC-ALG-FIG-6.1.15.3.111 Environmental

Statement

6.1.15.3.111. ES Chapter 15 VP19 IP

Y1.pdf

RC-ALG-FIG-6.1.15.3.112 Environmental

Statement

6.1.15.3.112. ES Chapter 15 VP20 LP.pdf

RC-ALG-FIG-6.1.15.3.101 Environmental

Statement

6.1.15.3.101. ES Chapter 15 VP18 BP.pdf

RC-ALG-FIG-6.1.15.3.102 Environmental

Statement

6.1.15.3.102. ES Chapter 15 VP18 PP

Y1.pdf

RC-ALG-FIG-6.1.15.3.103 Environmental

Statement

6.1.15.3.103. ES Chapter 15 VP18 PP

Y7.pdf

RC-ALG-FIG-6.1.15.3.104 Environmental

Statement

6.1.15.3.104. ES Chapter 15 VP18 PP

Y15.pdf

RC-ALG-FIG-6.1.15.3.105 Environmental

Statement

6.1.15.3.105. ES Chapter 15 VP18 IP

Y1.pdf

RC-ALG-FIG-6.1.15.3.106 Environmental

Statement

6.1.15.3.106. ES Chapter 15 VP18 IP

Y7.pdf

RC-ALG-FIG-6.1.15.3.98.2 Environmental Statement 6.1.15.3.98.2. ES Chapter 15 VP17 IP Y7

S2.pdf

RC-ALG-FIG-6.1.15.3.98.3 Environmental Statement 6.1.15.3.98.3. ES Chapter 15 VP17 IP Y7

S3.pdf

RC-ALG-FIG-6.1.15.3.99.1 Environmental Statement 6.1.15.3.99.1. ES Chapter 15 VP17 IP Y15

S1.pdf

RC-ALG-FIG-6.1.15.3.99.2 Environmental Statement 6.1.15.3.99.2. ES Chapter 15 VP17 IP Y15

S2.pdf

RC-ALG-FIG-6.1.15.3.99.3 Environmental Statement 6.1.15.3.99.3. ES Chapter 15 VP17 IP Y15

S3.pdf

RC-ALG-FIG-6.1.15.3.100 Environmental

Statement

6.1.15.3.100. ES Chapter 15 VP18 LP.pdf

Page 26: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 23 Location Plan and Data

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 23 Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 23 Parameters Wireline Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 23 Parameters Wireline Year 1 sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 24 Location Plan and Data

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 24 Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Parameters Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Parameters Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Parameters Photomontage Year 1 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Parameters Photomontage Year 7 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Parameters Photomontage Year 7 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Parameters Photomontage Year 7 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Parameters Photomontage Year 15 Sheet

1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Parameters Photomontage Year 15 Sheet

2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Parameters Photomontage Year 15 Sheet

3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Illustrative Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Illustrative Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Illustrative Photomontage Year 1 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Illustrative Photomontage Year 7 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Illustrative Photomontage Year 7 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Illustrative Photomontage Year 7 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Illustrative Photomontage Year 15 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Illustrative Photomontage Year 15 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Illustrative Photomontage Year 15 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint A Location Plan and Data

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint A Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint B Location Plan and Data

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint B Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint C Location Plan and Data

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint C Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint D Location Plan and Data

26.10.18 RSK

RC-ALG-FIG-6.1.15.4.5 Environmental

Statement

6.1.15.4.5. ES Chapter 15 VP C LP.pdf

RC-ALG-FIG-6.1.15.4.6 Environmental

Statement

6.1.15.4.6. ES Chapter 15 VP C Baseline

Panorama.pdf

RC-ALG-FIG-6.1.15.4.7 Environmental

Statement

6.1.15.4.7. ES Chapter 15 VP D LPAD.pdf

RC-ALG-FIG-6.1.15.3.136.2 Environmental Statement 6.1.15.3.136.2. ES Chapter 15 VP24 IP Y15

S2.pdf

RC-ALG-FIG-6.1.15.3.136.3 Environmental Statement 6.1.15.3.136.3. ES Chapter 15 VP24 IP Y15

S3.pdf

RC-ALG-FIG-6.1.15.4.1 Environmental

Statement

6.1.15.4.1. ES Chapter 15 VP A LP.pdf

RC-ALG-FIG-6.1.15.4.2 Environmental

Statement

6.1.15.4.2. ES Chapter 15 VP A BP.pdf

RC-ALG-FIG-6.1.15.4.3 Environmental

Statement

6.1.15.4.3. ES Chapter 15 VP B LP.pdf

RC-ALG-FIG-6.1.15.4.4 Environmental

Statement

6.1.15.4.4. ES Chapter 15 VP B BP.pdf

RC-ALG-FIG-6.1.15.3.134.2 Environmental Statement 6.1.15.3.134.2. ES Chapter 15 VP24 IP Y1

S2.pdf

RC-ALG-FIG-6.1.15.3.134.3 Environmental Statement 6.1.15.3.134.3. ES Chapter 15 VP24 IP Y1

S3.pdf

RC-ALG-FIG-6.1.15.3.135.1 Environmental Statement 6.1.15.3.135.1. ES Chapter 15 VP24 IP Y7

S1.pdf

RC-ALG-FIG-6.1.15.3.135.2 Environmental Statement 6.1.15.3.135.2. ES Chapter 15 VP24 IP Y7

S2.pdf

RC-ALG-FIG-6.1.15.3.135.3 Environmental Statement 6.1.15.3.135.3. ES Chapter 15 VP24 IP Y7

S3.pdf

RC-ALG-FIG-6.1.15.3.136.1 Environmental Statement 6.1.15.3.136.1. ES Chapter 15 VP24 IP Y15

S1.pdf

RC-ALG-FIG-6.1.15.3.132.2 Environmental Statement 6.1.15.3.132.2. ES Chapter 15 VP24 PP Y7

S2.pdf

RC-ALG-FIG-6.1.15.3.132.3 Environmental Statement 6.1.15.3.132.3. ES Chapter 15 VP24 PP Y7

S3.pdf

RC-ALG-FIG-6.1.15.3.133.1 Environmental Statement 6.1.15.3.133.1. ES Chapter 15 VP24 PP

Y15 S1.pdf

RC-ALG-FIG-6.1.15.3.133.2 Environmental Statement 6.1.15.3.133.2. ES Chapter 15 VP24 PP

Y15 S2.pdf

RC-ALG-FIG-6.1.15.3.133.3 Environmental Statement 6.1.15.3.133.3. ES Chapter 15 VP24 PP 15

S3.pdf

RC-ALG-FIG-6.1.15.3.134.1 Environmental Statement 6.1.15.3.134.1. ES Chapter 15 VP24 IP Y1

S1.pdf

RC-ALG-FIG-6.1.15.3.129 Environmental

Statement

6.1.15.3.129. ES Chapter 15 VP24 LP.pdf

RC-ALG-FIG-6.1.15.3.130 Environmental

Statement

6.1.15.3.130. ES Chapter 15 VP24 BP.pdf

RC-ALG-FIG-6.1.15.3.131.1 Environmental Statement 6.1.15.3.131.1. ES Chapter 15 VP24 PP Y1

S1.pdf

RC-ALG-FIG-6.1.15.3.131.2 Environmental Statement 6.1.15.3.131.2. ES Chapter 15 VP24 PP Y1

S2.pdf

RC-ALG-FIG-6.1.15.3.131.3 Environmental Statement 6.1.15.3.131.3. ES Chapter 15 VP24 PP Y1

S3.pdf

RC-ALG-FIG-6.1.15.3.132.1 Environmental Statement 6.1.15.3.132.1. ES Chapter 15 VP24 PP Y7

S1.pdf

RC-ALG-FIG-6.1.15.3.126 Environmental

Statement

6.1.15.3.126. ES Chapter 15 VP23 LP.pdf

RC-ALG-FIG-6.1.15.3.127 Environmental

Statement

6.1.15.3.127. ES Chapter 15 VP23 BP.pdf

RC-ALG-FIG-6.1.15.3.128.1 Environmental

Statement

6.1.15.3.128.1. ES Chapter 15 VP23 PW Y1

S1.pdf

RC-ALG-FIG-6.1.15.3.128.2 Environmental

Statement

6.1.15.3.128.2. ES Chapter 15 VP23 PW Y1

S2.pdf

Page 27: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint D Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint E Location Plan and Data

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint E Baseline Panorama

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5 Night-

time Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5 Night-

time Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5 Night-

time Photomontage Year 1 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5 Night-

time Photomontage Year 7 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5 Night-

time Photomontage Year 7 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5 Night-

time Photomontage Year 7 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5 Night-

time Photomontage Year 15 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5 Night-

time Photomontage Year 15 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5 Night-

time Photomontage Year 15 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7 Night-

time Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7 Night-

time Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7 Night-

time Photomontage Year 1 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7 Night-

time Photomontage Year 7 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7 Night-

time Photomontage Year 7 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7 Night-

time Photomontage Year 7 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7 Night-

time Photomontage Year 15 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7 Night-

time Photomontage Year 15 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7 Night-

time Photomontage Year 15 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 15 Night-time Photomontage Year 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 15 Night-time Photomontage Year 7

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 15 Night-time Photomontage Year 15

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17

Night-time Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17

Night-time Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17

Night-time Photomontage Year 1 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17

Night-time Photomontage Year 7 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17

Night-time Photomontage Year 7 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17

Night-time Photomontage Year 7 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17

Night-time Photomontage Year 15 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17

Night-time Photomontage Year 15 Sheet 2

26.10.18 RSK

RC-ALG-FIG-6.1.15.5.11.1 Environmental Statement 6.1.15.5.11.1. ES Chapter 15 VP17 Y7

S1.pdf

RC-ALG-FIG-6.1.15.5.11.2 Environmental Statement 6.1.15.5.11.2. ES Chapter 15 VP17 Y7

S2.pdf

RC-ALG-FIG-6.1.15.5.11.3 Environmental Statement 6.1.15.5.11.3. ES Chapter 15 VP17 Y7

S3.pdf

RC-ALG-FIG-6.1.15.5.12.1 Environmental Statement 6.1.15.5.12.1. ES Chapter 15 VP 17 Y15

S1.pdf

RC-ALG-FIG-6.1.15.5.12.2 Environmental Statement 6.1.15.5.12.2. ES Chapter 15 VP 17 Y15

S2.pdf

RC-ALG-FIG-6.1.15.5.7 Environmental

Statement

6.1.15.5.7. ES Chapter 15 VP 15 Y1.pdf

RC-ALG-FIG-6.1.15.5.8 Environmental

Statement

6.1.15.5.8. ES Chapter 15 VP 15 Y7.pdf

RC-ALG-FIG-6.1.15.5.9 Environmental

Statement

6.1.15.5.9. ES Chapter 15 VP15 Y15.pdf

RC-ALG-FIG-6.1.15.5.10.1 Environmental Statement 6.1.15.5.10.1. ES Chapter 15 VP 17 Y1

S1.pdf

RC-ALG-FIG-6.1.15.5.10.2 Environmental Statement 6.1.15.5.10.2. ES Chapter 15 VP17 Y1

S2.pdf

RC-ALG-FIG-6.1.15.5.10.3 Environmental Statement 6.1.15.5.10.3. ES Chapter 15 VP17 Y1

S3.pdf

RC-ALG-FIG-6.1.15.5.5.1 Environmental Statement 6.1.15.5.5.1. ES Chapter 15 VP7 Y7 S1.pdf

RC-ALG-FIG-6.1.15.5.5.2 Environmental Statement 6.1.15.5.5.2. ES Chapter 15 VP7 Y7 S2.pdf

RC-ALG-FIG-6.1.15.5.5.3 Environmental Statement 6.1.15.5.5.3. ES Chapter 15 VP7 Y7 S3.pdf

RC-ALG-FIG-6.1.15.5.6.1 Environmental Statement 6.1.15.5.6.1. ES Chapter 15 VP7 Y15

S1.pdf

RC-ALG-FIG-6.1.15.5.6.2 Environmental Statement 6.1.15.5.6.2. ES Chapter 15 VP7 Y15

S2.pdf

RC-ALG-FIG-6.1.15.5.6.3 Environmental Statement 6.1.15.5.6.3. ES Chapter 15 VP 7 Y15

S3.pdf

RC-ALG-FIG-6.1.15.5.3.1 Environmental Statement 6.1.15.5.3.1. ES Chapter 15 VP5 Y15

S1.pdf

RC-ALG-FIG-6.1.15.5.3.2 Environmental Statement 6.1.15.5.3.2. ES Chapter 15 VP5 Y15

S2.pdf

RC-ALG-FIG-6.1.15.5.3.3 Environmental Statement 6.1.15.5.3.3. ES Chapter 15 VP5 Y15

S3.pdf

RC-ALG-FIG-6.1.15.5.4.1 Environmental Statement 6.1.15.5.4.1. ES Chapter 15 VP7 Y1 S1.pdf

RC-ALG-FIG-6.1.15.5.4.2 Environmental Statement 6.1.15.5.4.2. ES Chapter 15 VP7 Y1 S2.pdf

RC-ALG-FIG-6.1.15.5.4.3 Environmental Statement 6.1.15.5.4.3. ES Chapter 15 VP7 Y1 S3.pdf

RC-ALG-FIG-6.1.15.5.1.1 Environmental Statement 6.1.15.5.1.1 ES Chapter 15 VP5 Y1 S1.pdf

RC-ALG-FIG-6.1.15.5.1.2 Environmental Statement 6.1.15.5.1.2. ES Chapter 15 VP 5 Y1 S2.pdf

RC-ALG-FIG-6.1.15.5.1.3 Environmental Statement 6.1.15.5.1.3. ES Chapter 15 VP5 Y1 S3.pdf

RC-ALG-FIG-6.1.15.5.2.1 Environmental Statement 6.1.15.5.2.1. ES Chapter 15 VP 5 Y7 S1.pdf

RC-ALG-FIG-6.1.15.5.2.2 Environmental Statement 6.1.15.5.2.2. ES Chapter 15 VP5 Y7 S2.pdf

RC-ALG-FIG-6.1.15.5.2.3 Environmental Statement 6.1.15.5.2.3. ES Chapter 15 VP5 Y7 S2.pdf

RC-ALG-FIG-6.1.15.4.8 Environmental

Statement

6.1.15.4.8. ES Chapter 15 VP D Baseline

Panorama.pdf

RC-ALG-FIG-6.1.15.4.9 Environmental

Statement

6.1.15.4.9. ES Chapter 15 VP E LPAD.pdf

RC-ALG-FIG-6.1.15.4.10 Environmental

Statement

6.1.15.4.10. ES Chapter 15 VP E Baseline

Panorama.pdf

Page 28: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17

Night-time Photomontage Year 15 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 18 Night-time Photomontage Year 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 18 Night-time Photomontage Year 7

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 18 Night-time Photomontage Year 15

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 21 Night-time Photomontage Year 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 21 Night-time Photomontage Year 7

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –

Viewpoint 21 Night-time Photomontage Year 15

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Night-time Photomontage Year 1 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Night-time Photomontage Year 1 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Night-time Photomontage Year 1 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Night-time Photomontage Year 7 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Night-time Photomontage Year 7 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Night-time Photomontage Year 7 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Night-time Photomontage Year 15 Sheet 1

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Night-time Photomontage Year 15 Sheet 2

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24

Night-time Photomontage Year 15 Sheet 3

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Appendix 15.6 –

Representative Viewpoint Assessment

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Appendix 15.7 –

Visual Effects to Residential Receptors

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Appendix 15.8 – Visual

Effects to Users of Recreational Routes & Public

Rights of Way

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Appendix 15.9 –

Visual Effects to Road Users

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Appendix 15.10

– Photographic Surveys & Verifiable Photomontage Methodology

26.10.18 RSK

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.1 –

Glossary of Acoustic Terms

26.10.18 Spectrum

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.2 – Baseline

noise and vibration monitoring locations,

equipment list and calibration details

26.10.18 Spectrum

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.3 – Baseline

noise and vibration monitoring analysis and

results

26.10.18 Spectrum

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.4 –

Construction traffic distribution plan

26.10.18 Spectrum

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.5 –

Road traffic flow data and Basic Noise Level (BNL) calculations

26.10.18 Spectrum

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.6 – Road

traffic Basic Noise Level (BNL) changes

26.10.18 Spectrum

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.7 – Road

traffic operating noise contour plots and tables

results at NSRs

26.10.18 Spectrum

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.8 –

Site construction noise assumptions

26.10.18 Spectrum

6.1.16.5 Environmental Statement 6.1.16.5. ES Chapter 16 Appendix 16.5.pdf

6.1.16.6 Environmental Statement 6.1.16.6. ES Chapter 16 Appendix 16.6.pdf

6.1.16.7 Environmental Statement 6.1.16.7. ES Chapter 16 Appendix 16.7.pdf

6.1.16.8 Environmental

Statement

6.1.16.8. ES Chapter 16 Appendix 16.8.pdf

6.1.15.9 Environmental

Statement

6.1.15.9. ES Chapter 15 Appendix 15.9.pdf

6.1.15.10 Environmental Statement 6.1.15.10. ES Chapter 15 Appendix

15.10.pdf

6.1.16.1 Environmental

Statement

6.1.16.1. ES Chapter 16 Appendix 16.1.pdf

6.1.16.2 Environmental Statement 6.1.16.2. ES Chapter 16 Appendix 16.2.pdf

6.1.16.3 Environmental Statement 6.1.16.3. ES Chapter 16 Appendix 16.3.pdf

6.1.16.4 Environmental

Statement

6.1.16.4. ES Chapter 16 Appendix 16.4.pdf

RC-ALG-FIG-6.1.15.5.21.1 Environmental Statement 6.1.15.5.21.1. ES Chapter 15 VP24 Y15

S1.pdf

RC-ALG-FIG-6.1.15.5.21.2 Environmental Statement 6.1.15.5.21.2. ES Chapter 15 VP24 Y15

S2.pdf

RC-ALG-FIG-6.1.15.5.21.3 Environmental Statement 6.1.15.5.21.3. ES Chapter 15 VP24 Y15

S3.pdf

6.1.15.6 Environmental

Statement

6.1.15.6. ES Chapter 15 Appendix 15.6.pdf

6.1.15.7 Environmental

Statement

6.1.15.7. ES Chapter 15 Appendix 15.7.pdf

6.1.15.8 Environmental Statement 6.1.15.8. ES Chapter 15 Appendix 15.8.pdf

RC-ALG-FIG-6.1.15.5.19.1 Environmental Statement 6.1.15.5.19.1. ES Chapter 15 VP24 Y1

S1.pdf

RC-ALG-FIG-6.1.15.5.19.2 Environmental Statement 6.1.15.5.19.2. ES Chapter 15 VP24 Y1

S2.pdf

RC-ALG-FIG-6.1.15.5.19.3 Environmental Statement 6.1.15.5.19.3. ES Chapter 15 VP24 Y1

S3.pdf

RC-ALG-FIG-6.1.15.5.20.1 Environmental Statement 6.1.15.5.20.1. ES Chapter 15 VP24 Y7

S1.pdf

RC-ALG-FIG-6.1.15.5.20.2 Environmental Statement 6.1.15.5.20.2. ES Chapter 15 VP24 Y7

S2.pdf

RC-ALG-FIG-6.1.15.5.20.3 Environmental Statement 6.1.15.5.20.3. ES Chapter 15 VP24 Y7

S3.pdf

RC-ALG-FIG-6.1.15.5.13 Environmental

Statement

6.1.15.5.13. ES Chapter 15 VP 18 Y1.pdf

RC-ALG-FIG-6.1.15.5.14 Environmental

Statement

6.1.15.5.14. ES Chapter 15 VP 18 Y7.pdf

RC-ALG-FIG-6.1.15.5.15 Environmental

Statement

6.1.15.5.15. ES Chapter 15 VP 18 Y15.pdf

RC-ALG-FIG-6.1.15.5.16 Environmental

Statement

6.1.15.5.16. ES Chapter 15 VP21 Y1.pdf

RC-ALG-FIG-6.1.15.5.17 Environmental

Statement

6.1.15.5.17. ES Chapter 15 VP21 Y7.pdf

RC-ALG-FIG-6.1.15.5.18 Environmental

Statement

6.1.15.5.18. ES Chapter VP21 Y15.pdf

RC-ALG-FIG-6.1.15.5.12.3 Environmental Statement 6.1.15.5.12.3. ES Chapter 15 VP17 Y15

S3.pdf

Page 29: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.9 –

Site construction noise calculation procedure and tabled results

26.10.18 Spectrum

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.10

– Cumulative effects assessment projects

26.10.18 Spectrum

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.11

– Site operational noise assumptions and calculation procedures

26.10.18 Spectrum

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.12

– Site operational noise prediction results including source

contributions at NSRs

26.10.18 Spectrum

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.13

– Site noise mitigation

26.10.18 Spectrum

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.14

– Consultation

26.10.18 Spectrum

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.15

– Noise and vibration impact to terrestrial ecology

26.10.18 Spectrum

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.16

– Noise and vibration assessment to heritage assets

26.10.18 Spectrum

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.17

– Legislation, Policy and Guidance

26.10.18 Spectrum

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Figure 16.18 –

Study area for operational noise and vibration on main SRFI site

26.10.18 Spectrum

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Figure 16.19 –

Study area for operational noise on J15a

26.10.18 Spectrum

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Figure 16.20 –

Study area for construction noise on J15a

26.10.18 Spectrum

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 17 Appendix 17.1 –

Transport Assessment (including Appendices and Figures A-AB)

26.10.18 TPA

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 17 Figure 17.2 –

Agreed Study Area Plan

26.10.18 TPA

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 17 Figure 17.3 –

Junction Mitigation Location Plan

26.10.18 TPA

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 19 Appendix 19.1 – Pre-

Development Baseline Survey – Main Site

26.10.18 Hoare Lea

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 19 Appendix 19.2 – Pre-

Development Baseline Survey – Junction 15a

26.10.18 Hoare Lea

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 19 Appendix 19.3 –

Operational Lighting Parameters – Main Site

26.10.18 Hoare Lea

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 19 Figure 19.4 – Operational

Lighting Parameters Plan – Junction 15a

26.10.18 Hoare Lea

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 19 Appendix 19.5 –

Illumination Impact Profile – Main Site

26.10.18 Hoare Lea

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 19 Appendix 19.6 –

Illumination Impact Profile – Junction 15a

26.10.18 Hoare Lea

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 21 Appendix 21.1 –

Rail Central GHG Assessment

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 21 Appendix 21.2 –

Rail Central Freight Emissions

26.10.18 Turley

Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 21 Appendix 21.3 – Rail

Central Climate Change Risk Assessment

26.10.18 Turley

Environmental Statement Environmental Impact Assessment

(Part 14a)

Non-Technical Summary 26.10.18 Turley

Report Other Planning Statement 26.10.18 Turley

Report Other Design and Access Statement 26.10.18 Turley

Report Other Alternative Sites Assessment 26.10.18 Turley

Report Other Market Assessment Report 26.10.18 JLL

Report Other Rail Operations Report 26.10.18 Intermodality

Report Other Public Rights of Way Strategy 26.10.18 BCA

Report Other Heads of Terms for Development Consent Obligations 26.10.18 Womble Bond

Dickinson

6.1.19.6 Environmental

Statement

6.1.19.6. ES Chapter 19 Appendix 19.6.pdf

6.1.21.1 Environmental

Statement

6.1.21.1. ES Chapter 21 Appendix 21.1.pdf

6.1.21.2 Environmental

Statement

6.1.21.2. ES Chapter 21 Appendix 21.2.pdf

7.3. Alternative Sites Assessment.pdf

7.4. Market Assessment Report.pdf

7.5. Rail Operations Report.pdf

7.6. Public Rights of Way Strategy.pdf

7.7. Heads of Terms of Development

Consent Obligations.pdf

7.1

7.2

Other Documents

Other Documents

Other Documents

Other Documents

Other Documents

Other Documents

Other Documents

7.5

7.6

7.7

6.1.21.3 Environmental Statement 6.1.21.3. ES Chapter 21 Appendix 21.3.pdf

6.2 Environmental

Statement

6.2. Non-Technical Summary.pdf

7.3

7.4

7.1. Planning Statement.pdf

7.2. Design and Access Statement.pdf

RC-ALG-FIG-6.1.17.3 Environmental

Statement

6.1.17.3. ES Chapter 17 Figure 17.3.pdf

6.1.19.1 Environmental Statement 6.1.19.1. ES Chapter 19 Appendix 19.1.pdf

6.1.19.2 Environmental Statement 6.1.19.2. ES Chapter 19 Appendix 19.2.pdf

6.1.19.3 Environmental

Statement

6.1.19.3. ES Chapter 19 Appendix 19.3.pdf

RC-ALG-FIG-6.1.19.4 Environmental Statement 6.1.19.4. ES Chapter 19 Figure 19.4.pdf

6.1.19.5 Environmental

Statement

6.1.19.5. ES Chapter 19 Appendix 19.5.pdf

6.1.16.17 Environmental

Statement

6.1.16.17. ES Chapter 16 Appendix

16.17.pdf

RC-ALG-FIG-6.1.16.18 Environmental Statement 6.1.16.18. ES Chapter 16 Figure 16.18.pdf

RC-ALG-FIG-6.1.16.19 Environmental

Statement

6.1.16.19. ES Chapter 16 Figure 16.19.pdf

RC-ALG-FIG-6.1.16.20 Environmental

Statement

6.1.16.20. ES Chapter 16 Figure 16.20.pdf

6.1.17.1 Environmental Statement 6.1.17.1. ES Chapter 17 Transport

Assessment.pdf

RC-ALG-FIG-6.1.17.2 Environmental

Statement

6.1.17.2. ES Chapter 17 Figure 17.2.pdf

6.1.16.11 Environmental Statement 6.1.16.11. ES Chaper 16 Appendix

16.11.pdf

6.1.16.12 Environmental Statement 6.1.16.12. ES Chapter 16 Appendix

16.12.pdf

6.1.16.13 Environmental

Statement

6.1.16.13. ES Chapter 16 Appendix

16.13.pdf

6.1.16.14 Environmental

Statement

6.1.16.14. ES Chapter 16 Appendix

16.14.pdf

6.1.16.15 Environmental Statement 6.1.16.15. ES Chapter 16 Appendix

16.15.pdf

6.1.16.16 Environmental Statement 6.1.16.16. ES Chapter 16 Appendix

16.16.pdf

6.1.16.9 Environmental Statement 6.1.16.9. ES Chapter 16 Appendix 16.9.pdf

6.1.16.10 Environmental

Statement

6.1.16.10. ES Chapter 16 Appendix

16.10.pdf

Page 30: Application Index - infrastructure.planninginspectorate.gov.uk · Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA Plans/Drawings

Report Other Framework Travel Plan 26.10.18 TPA

Report Other Construction Traffic Management Plan 26.10.18 TPA

Report Other Operational Traffic Management Plan 26.10.18 TPA

Report Other Outline Ecological Creation and Habitat Management

Plan

26.10.18 RSK

Report Other 15 year Management and Maintenance Plan 26.10.18 BCA

Report Other Landscape and Ecological Infrastructure Strategy 26.10.18 BCA and RSK

Report Other Biodiversity Offsetting Report 26.10.18 RSK

Report Other Outline Written Scheme of Investigation Archaeology

and Cultural Heritage

26.10.18 CFA Archaeology

Plans/Drawings Other In Principle Monitoring Plan 26.10.18 Turley

Plans/Drawings Other Plan of Plans 26.10.18 Turley

Report Other Sustainability Appraisal 26.10.18 Turley

Report Other Draft Section 55 Check List 26.10.18 Womble Bond

Dickinson

Report Other Economic Benefits Statement 26.10.18 Turley

Report Other Northampton Gateway Interrelationship Report 26.10.18 Womble Bond

Dickinson

Other Documents

Other Documents

Other Documents

Other Documents

7.8 7.8. Framework Travel Plan.pdf

7.9a

7.9b

7.10

7.11

Other Documents

Other Documents

Other Documents

Other Documents

Other Documents

Other Documents

Other Documents

Other Documents

7.12

7.13

7.9a. Construction Traffic Management

Plan.pdf

7.9b. Operational Traffic Management

Plan.pdf7.10. Outline Ecological Creation and

Habitat Management Plan.pdf

7.11.15 year Management and Maintenance

Plan.pdf

7.20

7.14

7.15

7.16

7.17

7.18

7.19 7.19. Economic Benefits Statement.pdf

7.20. NG Interrelationship Report.pdf

7.12. Landscape and Ecological

Infrastructure Strategy.pdf

7.13. Biodiversity Offsetting Report.pdf

7.14. Outline WSIA and CH.pdf

7.15. In Principle Monitoring Plan.pdf

7.16. Plan of Plans.pdf

7.17. Sustainability Appraisal.pdf

7.18. Draft S55 Check List.pdf

Other Documents

Other Documents